HomeMy WebLinkAbout09241
ORDINANCE NO. fit( _
AN ORDINANCE of the City of Port Angeles, Washington, grantirg
to the Chicago, Milwaukee, St. Paul & Pacific Railroad Company, a
Wisconsin corporation, its successors and assigns, a franchise grant-
ing said corporation, its successors and assign, the right, privilege
and franchise to construct and maintain a railroad track. along and
upon certain streets and highways of the City of Port Angeles and to
operate railroad trains and other railroad equipment over, across and
upon said railroad track, specifying the limitations and conditions
of such grant.
THE CITY COMMISSION OF THE CITY OF PORT ANGELES DOES HRDAIN AS
FOLLOWS:
Section, 1. That the City of Port Angeles, Washington, does
hereby grant to the Chicago, Milwauke, St. Paul & Pacific Railroad,
a Wisconsin corporation, its successors and assigns, the right, pri-
vilege-and franchise to construct and maintain a line of railroad
track along, over and upon the following described streets and alleys
of the City of Port Angeles, to wit:
The North One -half of Third Street within the following
limitations, to wit:
Commencing at a point opposite the line between Lots Four
and Five in Block One hundred, and three, of the Townsite
of Port Angeles, which point is the intersection of Center
Line of Seaview Drive and Third Street, thence Easterly to
the Westerly margin of Tumwater Street, a distance of ap-
proximately 770 feet.
and to operate trains and equipment over and along such track when
constructed. Such right, privilege and franchise shall continue
and exist for a term of jtf years from and after the effec-
tive date of this ordinance.
Section 2. The construction, repair, operation and use of the
said railroad shall be conducted in all respects in accordance with
and under and pursuant to the provisions of the franchises under
which the said railroad is at present operating within the City of
Port Angeles and particularly the provisions and restrictions of
Ordinance No. 457 of the City of Port Angeles.
•
A11 requirements of the said Ordinance Ho. 457 and of other
effective ordinances regulating and controlling the operation of
the said railroad and use of the streets and alleys of the City by
said railroad, and all limitations and reservations of right, super-
vision and control of and by the city, and all covenants, agreements
and undertakings of -the said railroad or its predecessors in inter-
est which are contained in Ordinance 457 and other effective ordi-
nances shall govern the use, operation and control of the said
railroad in this franchise, except as otherwise specifically set
forth herein.
Section 3. The said grantee shall file its written acceptance
of this ordinance and the rights and privileges granted thereunder
in the office of the City Clerk of the City of Port Angeles within
thirty days after the effective date of said ordinance which accept-
ance shall contain an express undertaking by the grantee, its succes-
sors- and:asigns -, -to comply with,__abide by.and be bound by the terms
and requirements thereof.
Section 4. The work of the construction of the said railroad
track shall commence within "A days after the effective date
of the franchise and shall be carried on to completion within_) 1
days from the effective date hereof and if not so completed within
said time, all the rights and privileges under this franchise shall
be forfeited and the franchise shall be declared null and void at
the option of the City Commission of the City of Port Angeles.
Passed first4 reading by the City Commission of the City of Port
• Angeles the re.1 day of January, 1931.. Passed second ading by the-
City Commission of the City of Port Angeles this day of Jan-
uary, 1931. Passed third reading and finally passed by the City Com-
mission of the City of Port Angeles, the i/ - day of January, 1931.
�1.
Finally passed and approved by the Mayor,.-his aVI ` day of
January, 1931.
ayor.
Attest:? Approved as t�
C. E. Shiel6CGe�%
City Clerk. GO 42-47.23 /fl /, City Attorney.
•
0