HomeMy WebLinkAbout2210ORDINANCE NO. c2,...7/
AN ORDINANCE of the City of Port Angeles
altering the rates for the sale of
electricity; and amending Sections 3, 4,
6, and 9 of Ordinance 2054, Sections 3,
4, 6 and 9 of Ordinance 2137, Sections 1
and 2 of Ordinance 2173, Section 1 of
Ordinance 219,,8��cc...�and Sections 13.12.030,
13.12.040, 15.12.060 and 13.12.090 of the
Port Angeles Municipal Code.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO ORDAIN
as follows:
Section 1. Section 3 of Ordinance 2054, Section 3 of
Ordinance 2137, and Section 13.12.030 of the Port Angeles Munici-
pal Code are each amended to read as follows:
13.12.030 Schedule R2 - Residential Service.
1. Applicable to single phase electric service in
residences (single family detached dwellings, duplexes,
multifamily dwellings, apartments).
2. Rate:
a. Basic Charge
b. All kWh
$5.00
$0.0211 per kWh
Section 2. Section 4 of Ordinance 2137, Section 1 of Ordi-
nance 2173, Section 1 of Ordinance 2198, Section 4 of Ordinance
2054, and Section 13.12.040 of the Port Angeles Municipal Code
are each amended to read as follows:
13.12.040 Schedule G2' -. General Service.
1. Applicable to govermental agencies, schools,
churches, municipal and commercial accounts, multiple
dwellings with a single meter, and all industrial
accounts not included under Schedule IP and IT.
2. Rate:
a. Basic Charge $10.00
b. Energy Charge:
(i) 0 - 20,000 kWh $ 0.0198 per kWh
(ii) All kWh over 20,000 $ 0.0124 per kWh
c. Demand Charge:
(i) 0 - 50 kW of billing demand:
(ii) All kW over 50 kW of billing
demand:
no charge
$3.45 per kW
Section 3. Section 6 of Ordinance 2054, Section 6 of Ordi-
nance 2137, and Section 13.12.060 of the Port Angeles Municipal
Code are each amended to read as follows:
13.12.060 Schedule IP2 - Industrial Primary.
1. This schedule is applicable to industrial, manufac-
turing and processing plants where connected load is
greater than 500 kilowatts. Energy delivered-Under this
schedule shall be unregulated three phase, 60 cycle,
A. C. at primary voltage.
2. Rate:
a. Billing demand for the month shall be the highest
of the maximum fifteen minute demand for the month
or five hundred (500) kW.
b. Demand Charge:
December -May $4.10 per kW of billing demand
June - November $2.72 per kW of billing demand
c. Energy Charge:
September -March $0.0097 per kWh
April- August $0.0090 per kWh
Section 4. Section 2 of Ordinance 2173 is amended to read
as follows:
Schedule IT2 - Industrial Transmission.
1. This schedule is applicable to industrial, manufactur-
ingandprocessing plants, for energy delivered at trans-
mission voltage, 69 kV, directly from the Bonneville Power
Administration 69 kV Port Angeles Substation facilities.
2. Rate:
a. Billing demand for the month shall be the maximum
one hour demand for the month, for the hours of
Monday through Saturday, 7:00 AM through 10:00 PM.
b. Demand Charge:
December -May $2.91 per kW of billing demand
June - November $1.52 per kW of billing demand
c. Energy Charge:
September -March $0.0100 per kWh
April- August $0.0095 per kWh
Section 5. Section 9 of Ordinance 2054, Section 9 of
Ordinance 2137, and Section 13.12.090 of the Port Angeles Munici-
pal Code are each amended to read as follows:
13.12.090 Service Charges.
The following service charges shall apply:
(1) Installation and removal of temporary
(2) Turn ons during regular working hours
(8:00 AM to 4:30 PM):
(3) Turn ons after regular working hours:
(4) Service calls on customer's equipment
(5) Service calls on customer's equipment
after regular working hours:
(6) Installation of new services:
(7) Revision of existing services:
service: $22.00
6.00
22.00
and meters: 11.25
and meters
40.00
24.00
24.00
Section 6. This ordinance shall take effect on 7724,1uot 1) /9'.Z
PASSED by the City Council of the City of Port Angeles
t a regular meeting of the Council held on the ad day
f , 1982.
•
ATTEST:
Marian C. Parrish, City Clerk
APPROVED AS TO FORM:
Craig Miller, CiT y Attorney
•
M ;' Y 0 R