HomeMy WebLinkAbout2232•
ORDINANCE NO. 02222
AN ORDINANCE of the City of Port Angeles
altering the rates for the sale of
electricity; providing for fees for
electrical inspections; amending Sections
3, 4, 6, and 9 of Ordinance 2054; Sections
3, 4, 6, and 9 of Ordinance 2137; Sections
1, 2, and 3 of Ordinance 2173; Section 1 of
Ordinance 2198; Sections 1, 2, 3, 4, 5, and
6 of Ordinance 2210; and Sections 13.12.030,
13.12.040, 13.12.060, 13.12.072, and 13.12.090
of the Port Angeles Municipal Code; repealing
Section 7 of Ordinance 2054, Section 7 of
Ordinance 2137, and Section 13.12.070 of the
Port Angeles Municipal Code; and adding a new
section to Chapter 13.12 of the Port Angeles
Municipal Code.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DOES
ORDAIN
as follows:
Section 1. Section 3 of Ordinance 2054, Section 3 of
Ordinance 2137, Section 1 of Ordinance 2210, and Section
12.13.020 of the Port Angeles Municipal Code are each amended to
read as follows:
13.12.030 Schedule R3 - Residential Service.
A. This schedule is applicable to single phase electric service
in residences (single family detached dwellings, duplexes,
multifamily dwellings, apartments).
B. Rate:
1. Basic Charge
2. All Kilowatt hours (kWh)
$5.00
$0.0322 per kWh
Section 2. Section 4 of Ordinance 2054, Section 4 of
Ordinance 2137, Section 1 of Ordinance 2173, Section 1 of
Ordinance 2198, Section 2 of Ordinance 2210, and Section
13.12.040 of the Port Angeles Municipal Code are each amended to
read as follows:
13.12.040 Schedule G3 - General Service.
A. This schedule is applicable to governmental agencies,
schools, churches, municipal and commercial accounts,
multiple dwellings with a single meter, and all industrial
accounts not included under Schedule IP and IT.
B. Rate:
1. Basic Charge:
a. Single Phase
b. Three Phase
$10.00
$20.00
2. Energy Charge:
a. 0 - 20,000 kWh $ 0.0315 per kWh
b. All kWh over 20,000 $ 0.0193 per kWh
3. Demand Charge:
a. 0 - 50 kW of billing demand: no charge
b. All kW over 50 kW of billing
demand:
i. December - May: $4.91 per kW
ii. June - November $3.57 per kW
Section 3. Section 6 of Ordinance 2054, Section 6 of
Ordinance 2137, Section 3 of Ordinance 2210, and Section
13.12.060 of the Port Angeles Municipal Code are each amended to
read as follows:
13.12.060 Schedule IP3 - Industrial Primary.
A. This schedule is applicable to industrial, manufacturing and
processing plants where connected load is greater than five
hundred kilowatts. Energy delivered under this schedule
shall be unregulated three phase, sixty cycle, Alternating
Current at primary voltage.
B. Rate:
1. Billing demand for the month shall be the maximum one
hour demand for the month or five hundred kilowatts,
whichever is higher.
2. Demand Charge:
a. For the hours of 7:00 A.M. through 2 :00 P.M.,
Monday through Saturday:
i. December - May: $5.50 per kW of billing
demand
ii. June - November: $3.47 per kW of billing
demand
b. For all other hours: $1.67 per kW of billing
demand, for all billing
demand in excess of that
occurring during the
hours of 7:00 A.M.
through 2 :00 P.M.,
Monday through Saturday.
3. Energy Charge:
a. September - March
b. April - August
$0.0169 per kWh
$0.0165 per kWh
Section 4. Section 2 of Ordinance 2173, Section 4 of
Ordinance 2210, and Section 13.12.071 of the Port Angeles
Municipal Code are each amended to read as follows:
13.12.071 Schedule IT3 - Industrial Transmission.
A. This schedule is applicable to industrial, manufacturing and
processing plants, for power delivered at transmission
voltage, 69 KV.
B. Rate:
1. Billing demand for the month shall be the maximum one
hour demand for the month, for the hours of Monday
through Saturday, 7:00 AM through 10:00 PM.
-2-
2. Demand Charge:
a. December - May $4.65 per kW of billing
demand
b. June - November $2.28 per kW of billing
demand
3. Energy Charge:
a. September - March
b. April - August
$0.0156 per kWh
$0.0152 per kWh
Section 5. Section 3 of Ordinance 2173 and Section
13.12.072 of the Port Angeles Municipal Code are each amended to
read as follows:
13.12.072 Schedule L1 Lighting
A. This schedule is applicable to all miscellaneous lighting.
Yard or area lights are available upon request. Upon
approval by the Light Department, lights will be installed
and energy furnished on private or public property, for the
use and convenience of customers. A one year contract for
service will be required before the light will be installed.
B. Costs of additional poles and /or line extensions necessary
to provide for lighting shall be charged to the customer at
the time of installation or removal.
C. 1. If the Light Department retains ownership of the area
lighting, the maintenance of such lights shall be the
responsibility of the Light Department.
2. The rates for lighting which remains in Light
Department ownership shall be as follows:
a. 175 Watts or less: $ 8.50
b. More than 175 Watts, but 250 Watts
or less: 9.00
c. More than 250 Watts, but 400 Watts
or less: 10.25
d. More than 400 Watts, but 1,000 Watts
or less: 14.75
D. 1. If the customer retains ownership of the area lighting,
the maintenance of such lights shall be the responsi-
bility of the customer.
2. The rates for lighting which remains in customer
ownership shall be as follows:
a. 175 Watts or less: $ 3.25
b. More than 175 Watts, but 250 Watts
or less: 3.75
c. More than 250 Watts, but 400 Watts
or less: 5.00
d. More than 400 Watts, but 1,000 Watts
or less: 9.50
Section 6. Section 9 of Ordinance 2054, Section 9 of
Ordinance 2137, Section 5 of Ordinance 2210, and Section
13.12.090 of the Port Angeles Municipal Code are each amended to
read as follows:
•
•
13.12.090 Service Charges.
The following service charges shall apply:
(1) Installation and removal of temporary service:
(2) Connections or reconnections during regular
working hours (8:00 AM to 4:30 PM):
(3) Connections or reconnections after
regular working hours:
(4) Service calls on customer's equipment and
meters:
(5) Service calls on customer's equipment and
meters after regular working hours:
(6) Installation of new services:
(7) Revision of existing services:
(8) Field collection charge (when service crew
makes arrangement for payment in the
process of disconnection for non - payment)
$47.00
10.00
50.00
20.00
50.00
33.00
33.00
5.00
Section 7. There is added to Chapter 13.12 a new
section to read as follows:
Electrical Inspection Fees. The fees for electrical
inspections performed by the City of Port Angeles, pursuant
to State Statute or City Ordinance, shall be established by
the City Council by resolution, which may be amended from
time to time.
Section 8 - Repealer. Section 7 of Ordinance 2054,
Section 7 of Ordinance 2137, and Section 13.12.070 of the Port
Angeles Municipal Code are each hereby repealed.
Section 9 - Effective Date. This Ordinance shall take
effect on October 1, 1982.
PASSED by the City Council of the City of Port Angeles
at a regular meeting of the Council held on the c2/66 day of
, 1982.
ATTEST:
Marian C. Parrish, City Clerk
APPROVED AS TO FORM:
Lit-r1A.
MA OR