Loading...
HomeMy WebLinkAbout10-13A RESOLUTION of the City Council of the City of Port Angeles, Washington, adopting the Capital Facilities Plan and Transportation Improvement Program for 2013 -2019. WHEREAS, the City of Port Angeles is required to annually update its Capital Facilities Plan and Transportation Improvement Program; and WHEREAS, the City Council of the City of Port Angeles, Washington being the legislative body of said City, on the 4th of June 2013, and the 18` of June 2013 did hold public hearings on the update of its Capital Facilities Plan and Transportation Improvement Program; and WHEREAS, the proposed Capital Facilities Plan and Transportation Improvement Program for 2013 -2019 are consistent with the City's Comprehensive Plan; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles, Washington that the Capital Facilities Plan and the Transportation Improvement Program, attached hereto as Exhibit A, for the City of Port Angeles, Washington, be and the same are hereby adopted; and BE IT FURTHER RESOLVED that the 2013 -2019 Transportation Improvement Program, together with this Resolution, shall be filed with the Secretary of Transportation of the State of Washington. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 18th day of June 2013. ATTEST: Jae�sa Hurd, City Clerk RESOLUTION NO. 10 -13 H \a ORDINANCES &RESOLUTIONS\RESOLUTIONS 2013 \06 TIP &CIP -Adopt 05 30 12 wpd (June 4, 2013) IOLU r0e0 Cherie Kidd, May APPROVED AS TO FO William E. Bloor, City Attorney Project ID Project Title (FIRE PROJECTS I FRO2 -2009 FRO7 -1999 GENERAL PROJECTS GG03 -2003 GG01 -2013 0003 -2009 GG01 -2010 0003 -2007 CFP Ranking (052613) GAC ski Wireless Mobile Data for Fire Apparatus West Side Fire Station Infrastructure Development (NICE Program) Feiro /NOAA /City Shared Facility Entryway Monument Valley Creek Restoration Phase 111 City Hall Parking Lot Repair PARKS AND RECREATION PROJECTS PK06 -2005 Replacement Roof of Vern Burton PK04 -2009 Edo Hook West Boat Dock Repair -FEMA Mitigation PK02 -2012 City Pier Electrical Upgrades PK01 -2010 Civic Fold Upgrades PK04 -2012 Lincoln Park Development PK11 -2006 City Per Float Replacement PK03 -2012 'City Per Fire Suppression System Central/East Systems PK02 -2005 IRestroom Replacement PK04 -2006 Shane Elks Ball Field Lighting Project PK03 -2007 Tennis Courts Lighting at Enckson Playfield PK08 -2002 'Neighborhood Park Renovations POLICE DEPARTMENT PROJECTS P002 -2012 'Emergency Generator Police Department /City Hall PD01 -2012 'Waterfront Surveillance Cameras P003 -2012 (PenCom PD01 -2013 IWMDS Enhancement PD03 -2007 (Regional Firearms Training Facility TOTAL OF ALL GENERAL FUND PROJECTS 'STREET PROJECTS I TR02 -2013 (West End Park (WTIP Phase 2) (TR05 -2009 (Edit Hook Harbor Erosion Riprap Repair -FEMA Mitigation TR06 -2009 ITumwater Street Retaining Wall Repair -FEMA Mitigation TR42 -1999 ILauridsen Blvd Bridge Replacement TR16 -1999 1 18th Street Reconstruction Priority Grants Bonds Total Project Net City Costs 2013 City Contributions Loans Costs Costs 1 60,000 2 1 2 12,560,000 3 4 2,000,000 5 1 2 390,000 3 4 1,000,000 5 14,000,000 6 637,500 7 9 10 25,000 11 2 3 4 5 2 3 4 310,062 123,000 360,000 265,000 31,730,562 969,000 228,000 134,000 4,776,825 1,434,000 2013 2019 Caprtal Facilities Projects Priority Order 2,125,000 4,000,000 6,125,000 60,000 2,125,000 753,300 12,600,000 88,000 2,000,000 100,000 300,000 520,000 140,000 5,000,000 14,000,000 850,000 330,000 375,000 300,000 75,000 500,000 120,000 413,416 123,000 540,000 300,000 41,612,716 3,394,000 254,000 153,000 5 971,031 1,580,000 Exhibit "A" D( 2,125,000 753,300 I 100,000 I 100,000 40,000 I 0 I 40,000 88,000 0I 0 0 0 0 100,000 300,000 130,000 140,000 4,000,000 0 212,500 330,000 375,000 300,000 50,000 500,000 120,000 103,354 0 180,000 35,000 9,882,154 2,425,000 26,000 19,000 1,194,206 146,000 60,000 I 0 I 120,000 413,416 123,000 O 90,000 O 300,000 816,416 880,000 168,000 2,638,000 254,000 0 153,000 5,000,000 255,779 150,000 1,430,000 CFP TIP Summary Page 1 2014 City 2015 City 2016 City 2017 City 2018 City 2019 City Costs Costs Costs Costs Costs Costs 300,000 50,000 O 0 0 O 0 0 100,000 100,000 100,000 O 0 0 57,000 31,000 0 300,000 300,000 0 O 100,000 0 0 O 0 470,000 0 0 140,000 0 0 O 1,000,000 4,000,000 O 14,000,000 0 0 212,500 637,500 O 40,000 290,000 O 125,000 O 0 O 0 0 O 0 0 0 0 O 0 O 0 90,000 90,000 90,000 O 0 1,157,000 15,873,500 5,242,500 214,000 0 0 O 0 O 0 0 O 0 O 0 340,000 1,785,000 100,000 0 12,560,000 0 O 0 300,000 1,100,000 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 125,000 125,000 150,000 150,000 75,000 0 O 100,000 O 0 O 0 O 0 90,000 90,000 O 0 13,740,000 3,350,000 O 0 0 O 0 0 0 6/14/2013 Project i0 Project Title TR04 -2005 Alley Paving 6 I TR01 -2013 Waterfront Redevelopment (Railroad Ave East to Hollywood Bel 7 I TR01 -2003 Overlay Program 8 TR02 -2009 Race Street Complete Street Development 9 TR26 -1999 ADA Curb Ramps 10 TR74 -1999 Sidewalk Program 11 TR20 -1999 Street Bicycle Facilities /Racks /Striping 12 TR11 -2009 Marine Drive Bulkhead Repairs 13 TR01 -2001 Laurel 5t Stairs Replacement 14 TR09 -2009 Way Finding Signage 15 TR05 -2006 Valley Creek Loop Trail 16 TR02 -2008 Alternative Cross -Town Route Study 17 TR10 -2009 First /Front Race Street Nodes 18 TR03 -2006 Oak Street Stairs Replacement 19 TR18 -1999 Lincoln /Laurel Rechannelization /Signal /Roundabout 20 TR17 -1999 Truck Route at US101 Intersection 21 TR02 -2012 Caroline Street Slide Repair 22 TR01 -2011 Marine Drive Channel Bridge Repair /Replacement 23 TR12 -1999 Park Avenue Reconstruction [Peabody to Race] 24 TR03 -2007 Laurel Street Sidewalk Phase I 25 TR13 -2000 'N' Street Sidewalk [14th St to 18th St 26 TR02 -2007 Laurel 5t Sidewalk Phase II 27 TR05 -1999 Hill Street Intersection Reconstruction 28 TR07 -1999 Milwaukee Drive Phase 1 29 TR01 -2004 2nd Valley Pavement Restoration 30 TR12 -2000 10th Street ['M' Street to 'I' Street] 31 TR04 -1999 Laurel Street /Ahlvers Road Reconstruction 32 TR11 -2000 10th Street S/W ['N' Street to 'M' Street] 33 TR71 -1999 10th /13th and "I "M" Street Improvements 34 TR02 -2001 Ennis St Slide Repair 35 TR69 -1999 Rhoads Road Area Street Improvements 36 TR70 -1999 Mt Angeles Road /Porter Street Improvements 37 TR13 -1999 City -Wide Traffic Signal Interconnect /Pre emption 38 TR30 -1999 10th Street Reconstruction 39 CFP Ranking (052813) G4Gvisr Grants Bonds Total Project 2013 City 2014 City 2015 City 2016 City 2017 City 2018 City 2019 City Pnonty Contributions Loans Costs Net City Costs Costs Costs Costs Costs Costs Costs Costs 840,000 2,413,000 330,000 50,000 1,383,000 1,090,000 200,000 300,000 250,000 182,000 510,000 932,000 440,000 2013 2019 Capital Facilities Projects Pnonty Order 300,000 3,330,000 1,355,000 3,030,000 750,000 750,000 8,645,000 7,805,000 2,713,000 2,713,000 2,413,000 0 140,000 140,000 360,000 360,000 120,000 120,000 4,530,000 4,200,000 302,500 302,500 482,500 482,500 100,000 50,000 220,000 220,000 423,000 423,000 550,000 550,000 1,750,000 367,000 6,000,000 6,000,000 375,000 375,000 510,000 510,000 1,455,000 365,000 260,000 60,000 355,000 55,000 325,000 75,000 485,000 303,000 2,905,000 2,905,000 550,000 550,000 735,000 225,000 1,745,000 813,000 660,000 220,000 3,330,000 3,330,000 500,000 500,000 1,355,000 1,355,000 3,030,000 3,030,000 725,000 725,000 1,000,000 1,000,000 Exhibit "A" 125,000 0 0 0 0 840,000 357,000 327,000 20,000 60,000 20,000 330,000 0 0 CFP TIP Summary Page 2 125,000 125,000 125,000 125,000 125,000 2,663,000 2,861,000 1,951,000 330,000 0 382,000 429,000 470,000 512,000 563,000 302,000 1,359,000 425,000 0 0 20,000 20,000 20,000 20,000 20,000 60,000 60,000 60,000 60,000 60,000 20,000 20,000 20,000 20,000 20,000 O 0 0 0 4,200,000 27,500 275,000 0 0 0 120,625 120,625 120,625 120,625 0 25,000 25,000 25,000 25,000 0 220,000 0 0 0 0 55,000 0 0 0 368,000 55,000 495,0001 0 0 0 O 01 0 0 1,750,000 O 0I 0 0 6,000,000 O 01 0 0 375,000 O 0 0 0 510,000 O 0 0 0 1,455,000 0 0 0 0 260,000 O 0 0 0 355,000 O 0 0 0 325,000 O 0 0 0 485,000 O 0 0 0 2,905,000 O 0 0 0 550,000 O 0 0 735,000 O 0 0 1,745,000 O 0 0 660,000 O 0 0 3,330,000 O 0 0 500,000 O 0 0 1,355,000 O 0 0 3,030,000 O 0 0 725,000 O 0 0 1,000,000 6/14/2013 Project ID Project Title TR80 -1999 TR14 -1999 TR03 -2008 'Lauridsen Blvd /Washington Street Reconstruct 'White's Creek Crossing 1 0 Street Improvements (14th to 16th Streets) 'ELECTRIC PROJECTS I CL07 -2010 IBPA Conservation Program I CL09 -2009 Tier 2 Conservation Program I CL06 -2012 Upgrade Downtown Lighting Poles CL02 -2012 'Yard /Area Light Replacement CL03 -2009 Voluntary Peak Power Project I CL03 -2011 Cable Television Franchise Formal Proceeding I CL01 -2006 Eclipse Industrial Park Increase Capacity I CL02 -2006 Upgrade "A" Street Substation Transformer CL02 -2010 Transmission Line Upgrade Washington to I St I CL08 -2007 Olympic Medical Center Redundant Power Source I CL01 -2013 Substaton Security Fencing I CL02 -2013 Repair College Service Entrance CL04 -2010 Metropolitan Area Network Needs Assessment CL03 -2013 Pole Replacement Program CLO1 -2012 Street Light Upgrades Phase 11 CL02 -2002 Feeder Tie Porter To Golf Course CL01 -2004 Feeder Tie Hwy 101, Cherry Street to Pine Street CL07 -1999 Airport Industrial Park Electric Service CL03 -2006 Install Peabody Substation SOLID WASTE PROJECTS SW02 -2012 'Landfill Bluff Stabilization Phase 1 SWO1 -2009 'Post- Closure Beach Nourishment SWO1 -2012 'Decant Facility WATER PROJECTS WT01 -2009 I E Street Reservoir Cover Repair /Replace WT02 -2006 'Biennial Replacements WTO1 -2011 'Liberty Street Water Main Replacement TOTAL OF ALL STREET PROJECTS TOTAL OF ALL ELECTRIC PROJECTS TOTAL OF ALL SOLID WASTE PROJECTS Grants Bonds Total Project 2013 City 2014 City 2015 City 2016 City 2017 City 2018 City 2019 City Priority Net City Costs Contributions Loans Costs Costs Costs Costs Costs Costs Costs Costs 40 41 42 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 2 3 1 2 3 405,000 16,866,825 7,468,000 25,000 2013 2019 Capital Facilities Projects CFP TIP Summary Page 3 Pnority Order 8,015,000 800,000 800,000 8,293,000 800,000 4,000,000 15,861 532,500 4,532,500 15,861 400,000 380,000 480,000 9,690,000 1,000,000 72,321,031 75,000 9,690,000 1,000,000 55,454,206 19,861,650 I 15, 861, 650 245,880 I 245,880 710,000 I 177,500 20,817,530 I 16,285,030 645,000 I 645,000 1,224,000 I 1,224 000 380,000' 380,000 0 0 5,850,000 7,468,000 826,000 2,700,000 2,700,000 300,000 300,000 300,000 200,000 125,000 100,000 25,000 1,000,000 1,000,000 0 65,000 65,000 350,000 350,000 860,000 860,000 220,000 220,000 110,000 110,000 60,000 60,000 33,000 33,000 72,000 72,000 1,275,000 1,275,000 500,000 500,000 260,000 260,0001 60,000 I 60,000 800,000 I 0 770,000 I 770,000 17,028,000 I 8,735,000 1,351,000 1,825,000 20,000 0 1,845,000 620,000 306,000 0 0 0 6,277,779 826,000 300,000 0 50,000 250,000 65,000 200,000 800,000 220,000 110,000 60,000 33,000 0 0 0 0 0 2,914,000 17,440,000 20,000 0 17,460,000 306,000 0 0 0 4,289,125 826,000 300,000 100,000 50,000 250,000 0 0 0 0 0 0 30,000 0 0 0 0 0 0 5,789,625 826,000 300,000 0 250,000 0 0 0 0 0 0 0 42,000 650,000 500,000 0 OI 0 0 0 0 0 1,556,000 I 2,568,000 OI 0 20,000 I 50,000 OI 0 20,000 1 50,000 OI 0 0 I 306,000 50,000 I 330,000 0 0 0 3,216,625 826,000 300,000 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 DI 0 I O I 0 I 480,000 0 I 9,690,000 I 0 I 1,000,000 1,212,625 44,576,000 826,000 300,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,376,000 1,126,000 0 0 50,000 50,000 115,000 I 595,000 165,000 I 645,000 0 306 000 0 826,000 300,000 0 0 0I 0 I 0 0 0 0 I 0 I 0 0 625,000 0 260,000 60,000 800,000 770,000 3,641,000 0 0 0 0 0 CFP Ranking (052813) GAC xlsr Exhibit "A" 6/14/2013 I Project ID Protect Title WT05 -2012 'East 4th Street Water Main Replacement I WT64 -1999 'McDougal Pressure Subzone Improvements WT01 -2012 110th Street Water Main Replacement WT02 -2012 (East 6th Street Water Main Replacement WT03 -2009 Transfer Morse Creek Water Lines to ClaIlam PUD WT03 -2005 Vulnerability Improvements WT03 -2012 'North Liberty Street Water Main WT06 -2012 (Third Street and Vine Street Main Replacement WT04 -2012 'West 4th Street Water Main Replacement TOTAL OF ALL WATER PROJECTS WASTEWATER PROJECTS W W 10 -2008 W W 02 -2010 W W02 -2011 W W 01 -2011 W W 27 -1999 W W 04 -2008 I W W 01 -2008 I W W 02 -2008 I W W 02 -2005 I W W 03 -2008 WW05 -2008 W W 01 -2010 W W 06 -2008 W W 11 -2008 W W07 -2008 I W W 09 -2008 I W W 03 -2000 Combined Sewer Overflows Phase II SCADA System Upgrade /Replacement Fiber Optic Connections to CSO Sites Sanitary Sewer Infiltration /Inflow Reduction Phase 1 Biennial Replacement Lines Carbon Scrubbers WWTP Dry Polymer Feeder Replacement WWTP Septage Receiving Station WWTP Plant Dewatering improvements Pump Station 03 Replacement Digester Mixing Improvement WWTP Turbo Blower Installation Waste Activated Sludge Thickening WWTP West UGA Basin 4 Sewer Extension West UGA Basin 2 Sewer Extension West UGA Basin 3 Sewer Extension Lindberg Rd Sewer LID STORMWATER PROJECTS DR03 -2009 14th Street Stormwater Improvements DR02 -2011 'Annual Stormwater System Rehabilitation 0R03 -2012 IStormwater Enhancement LID Program 1 0001 -2008 'Annual Water Quality Project CFP Ranking (052813) GAC xisx TOTAL OF ALL WASTEWATER PROJECTS Grants Bonds Total Project 2013 City 2014 City 2015 City 2016 City 2017 City 2018 City 2019 City Priority Net City Costs Contributions Loans Costs Costs Costs Costs Costs Costs Costs Costs 4 5 6 7 8 9 10 11 12 2 3 4 5 6 7 9 10 11 12 13 3 4 200,000 200,000 14 2,500,000 15 7,100,000 16 6,100,000 17 1,200,000 16,900,000 1 1,000,000 2 70,000 105,000 2013 2019 Capital Facilities Protects CFP TIP Summary Page 4 Priority Order 550,000 990,000 1,150,000 3,470,000 12,501,000 2,100,000 14,601,000 400,000 550,000 990,000 290,000 400,000 210,000 100,000 390,000 1,150,000 6,729,000 15,728,000 855,103 200,000 2,225,000 1,123,000 53,000 150,000 1,140,000 2,163,000 4,000,000 1,000,000 470,000 1,210,000 2,500,000 7,100,000 6,100,000 1,200,000 47,217,103 1,681,500 1,484,000 245,000 210,000 400,000 550,000 990,000 290,000 200,000 210,000 100,000 390,000 1,150,000 6,529,000 15,728,000 855,103 200,000 2,225,000 1,123,000 53,000 150,000 1,140,000 2,163,000 4,000,000 1,000,000 470,000 1,210,000 0 0 0 0 30,317,103 1,681,500 1,484,000 175,000 105,000 0 0 0 0 0 0 926,000 1,445,000 730,103 25,000 300,000 173,000 50,000 0 0 0 0 0 0 0 0 0 0 0 2,723,103 1,121,500 170,000 35,000 30,000 01 01 01 01 306,000 100,000 4,191,000 10,092,000 100,000 25,000 35,000 40,000 300,000 300,000 300,000 0 0 0 0 0 0 0 0 0 0 0 4,626,000 300,000 170,000 35,000 30,000 50,000 0 0 10,757,000 0 191,000 35,000 30,000 350,000 0 50,000 500,000 100,000 890,000 40,000 0 0 0 0 0 0 1,136,000 1,430,000 0 0 0 325,000 325,000 317,000 0 30,000 120,000 120,000 900,000 0 0 475,000 1,662,000 0 0 191,000 192,000 35,000 35,000 30,000 30,000 0 0 0 250,000 0 0 0 0 0 556,000 0 0 0 325,000 0 0 0 0 2,100,000 400,000 0 0 0 0 0 0 0 2,825,000 0 200,000 35,000 30,000 400,000 210,000 100,000 390,000 1,150,000 I 2,250,000 I 350,000 333,000 3,600,000 1,000,000 470,000 1,200,000 2,500,000 7,100,000 6,100,000 1,200,000 23,853,000 01 0 200,000 35,000 0 Exhibit "A" 6/19/2013 Project ID Project Titte 1 DRO4 -2012 Outfall Dredging DR14 -1999 Peabody Creek /Lincoln St Culvert Rehab 1 0601 -2013 H Street Stormwater Outfall Improvements DR02 -2012 Peabody Creek Fecal Coliform Bacteria Reduction 0603 -2004 Stormwater at Laurel US101 DR04 -2011 Liberty Street Stormwater Improvement DR04 -2004 Stormwater at Canyon Edge Ahlvers DR06 -2004 Stormwater at Campbell Porter DR01 -2012 Valley Creek Culvert/Outfall Replacement DR08 -2004 Lincoln Park /Big Boy Pond TOTAL OF ALL STORM WATER PROJECTS INFORMATION TECHNOLOGY PROJECTS 1 102 -2012 Redundant Data Center Fire Suppression /Security Upgrade 1703 -2012 Replace Data Center Server Management Hardware IT10 -2013 Cognos 10 Upgrade /replacement 1T02 -2013 Thin Client Virtual Desktop Conversion /Replacement IT06 -2013 GIS /Cityworks Server Upgrade /Replacement IT02 -2011 Council Chambers Visual Aids Upgrade IT05 -2013 Backup System Remote Redundant Equipment \Comm IT07 -2013 Electrical SCADA Server Upgrade /Replacement IT01 -2012 Replacement Computer Room Battery Backup Systems 1703 -2013 'Water SCADA Server Upgrade /Replacement IT08 -2013 'Administrators /City Council Electronic Work Platforms 1711 -2013 'Proximity Access Control IT04 -2013 Physical Records Digital Conversion /Archival /Destruction IT09 -2013 iSeries SunGard System Upgrade /HA Redundancy 1T12 -2013 'Enterprise Information System Upgrade /Replacement TOTAL OF ALL INFORMATION TECHNOLOGY PROJECTS TOTALS CFP Ranking (052813) GAC xlsz Grants Bonds Total Project 2013 City 2014 City 2015 City 2016 City 2017 City 2018 City 2019 City Priority Contributions Loans Costs Net City Costs Costs Costs Costs Costs Costs Costs Costs 5 7 9 10 11 12 13 14 3 4 5 6 7 8 9 10 11 12 13 14 15 Count' 145 460,000 300,000 125,000 2,060,000 31,000 31,000 161,227,774 2013 2019 Capital Facilities Projects Pnonty Order 460,000 575,000 1,035,000 3,450,000 3,450,000 50,000 9,020,000 0 84,093,722 165,000 920,000 400,000 250,000 575,000 1,035,000 3,450,000 3,450,000 600,000 50,000 14,515,500 50,000 60,000 45,000 200,000 105,000 55,000 80,000 127,000 90,000 55,000 30,000 151,000 220,000 150,000 3,200,000 4,568,000 449,667,760 165,000 1 0 55,000 0 1 55,000 460,000 1 0 0 120,000 1 800,000 100,0001 0 0 400,000 0 125,0001 0 0 50,000 50,000 575,000 0 0 0 75,000 1,035,000 0 0 0 3,450,0001 0 0 0 3,450,0001 0 0 0 600,0001 0 0 0 50,000 0 0 0 13,455,500 1,356,500 590,000 826,000 1,236,000 50,000 60,000 45,000 200,000 105,000 55,000 80,000 96,000 90,000 55,000 30,000 151,000 220,000 150,000 3,200,000 4,537,000 290,439,986 50,000 0 0 60,000 0 0 45,000 0 0 120,000 80,000 0 O 105,000 0 O 55,000 0 O 80,000 0 96,000 0 90,000 0 55,000 0 30,000 0 0 0 0 0 0 0 225,000 30,236,038 0 0 0 0 591,000 67,289,558 60,000 55,000 0 0 115,000 37,640,250 54,786,250 50,000 500,000 135,000 942,000 55,000 0 0 50,000 0 900,000 0 0 0 0 1,270,000 0 0 0 0 0 0 0 0 0 0 60,000 31,000 0 55,000 55,000 55,000 150,000 0 0 0 0 3,200,000 265,000 86,000 3,255,000 28,240,250 49,259,250 CFP TIP Summary Page 5 50,000 0 3,450,000 3,450,000 600,000 50,000 7,835,000 171,010,000 Exhibit "A" 6/14/2013