HomeMy WebLinkAbout11-77•
RESOLUTION NO.
WHEREAS pursuant to RCW 35.77.010 and RCW 36.81.121, the City of
Port Angeles is required to review its Six Year Comprehensive Street Program
annually, AND
WHEREAS Pursuant further to said laws, the City Council of the
City of Port Angeles, Washington being the legislative body of said City
did hold a public hearing on the review and revision of said comprehensive
plan at 7:30 o'clock PM at the City Council Chambers in Port Angeles,
Washington on the 20th day of June, 1977.
WHEREAS all written and oral objections to the comprehensive plan
as prepared by the City of Port Angeles, Washington relative to the street
program for the ensuing six years within the City of Port Angeles, Washington,
were considered.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of
Port Angeles, Washington, that the comprehensive plan as prepared by the
City Engineer, dated June, 1977 for the City of Port Angeles, Washington,
be and the same is hereby adopted, public hearing on the same being held on
the 20th day of June, 1977 at the hour of 7:30 o'clock PM.
BE IT FURTHER RESOLVED that a copy of said comprehensive street
program for the ensuing six years, attached hereto, together with a copy
of this resolution is filed with the Director of Highways of the State of
Washington.
PASSED by the City Council June 20, 1977.
N. 4e.
ATTEST:
City Clerk
Appr e as to orm:
City Attorney
ayor 75t0 ;40,A,
•
PROJECT DESCRIPTION
1977-83 S"MEET CUNSTRUC LION PROGRAM
FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND 50110ES FUND SOURCES TOTAL
ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT •
COST
1977 - Completed or under construction .
RESURFACING:
"I" Street 13th - 16th St. $6,000
Cherry Hill St. (Phase I)
5th Street - Lincoln St. to Cherry 9,000
8th Street - Lincoln St. to Cherry 9,000
1st & Front St. @ Lincoln
SIGNALIZATION:
Downtown Traffic Lights.
OTHERS:
Residential Sealcoating Program (Phase I)
Rhodes Rd., 10th St, Craig Ave.
Porter St, Olympus Ave, Grant Ave.
1977 - Projects Remaining to be Completed
RESURFACING:
'. Sunrise Hts. alleys (Phase I)
SIGNALIZATION:
'8th at Race Street
OTHERS:
Downtown Pave. Marking
Laurel St. Viewcrest Ave. to Ahlvers Rd. 5,000
6/8/77
-1-
4,000
$ 6,000
9.000•
9,000
4,000
44,000 176,000 220,000
10,000 10,000
15,000 15,000
40,000 40,000
10,000(FASP) 10,000
5,000
1977 TOTAL $5,000 $93,000
$216,000 • ,$14,000 $328,000
PROJECT DESCRIPTION
1978
RESURFACING:
FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES. FUND SO •S FUND SOURCES TOTAL
ART FUND UAB FUND 'STREET FUND FAM OTHER LID PROJECT
COST
Cherry Hill St. (Phase II) $20,000 $10,000 $30,000
Sunrise Hts. Alleys (Phase II) 15,000 15,000
8th St. Lincoln to Race St. 40,000 20,000 60,000
PAVING:
"L" St.' 18th -Blvd.
10th St. "N" St. to West
Race St. 9th - Bryson
16th & "E" St. LID Paving
Laurel St- Viewcrest Ave. to Ahlvers Rd.
Cresthaven- Liberty St. LID
SIGNALIZATION:
8th St. at "C" Street
80,000 80,000
• $200,000 200,000
20,000 20,000 60,000(FED) 100,000
200,000 200,000
20,000 20,000
100,000 100,000
OTHER:
Videning of McDougal St -Craig Ave. to Homestead Ave.
Residential Sealcoating Program (West End)
CBD By -Pass over White's Creek
6/8/77
-2-
20,000
10,000
40,000 40,000
1,700,000
20,000
10,000
1,700,000
1978 TOTAL $20,000
$205,000 $1,790,000 $60,000 $500,000 $2,575,000
Oil/ FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND
ART FUND UAB.FUND STREET FUND FAM OTH
PROJECT DESCRIPTION
CES FUND SOURCES TOTAL
LID PROJECT.
COST
1979
RESURFACING:
Wash. St, Blvd. to Park
Peabody St. -Front to 8th
PAVING:
"M" St. 10th -18th St.
Pine St. Blvd. to Hwy 101
Ediz Hook Roadway
OTHER:
$70,000
.Residential Sealcoating Program
(Phase III)
Tumwater Trestle Reconst.
$270,000
$20,000
30,000
30,000
60,000
30,000
10,000
$30,000
100,000
1979 TOTAL $70,000
1980
RESURFACING:
Downtown (CBD) Resurfacing
PAVING:
Cherry St. -8th to Blvd. (widen) -
Park Ave. Race St- College $20,000
1980 TOTAL
6/8/77
-3-
$270,000 $180,000
$30,000
$ 80,000 $20,000
$135,000 15,000
$100,000 .
$80,000
$20,000
60,000
100,000
60,000
300,000
10,000
100,000
$650,000
$100,000
150,000
100,000
$20;000 $135,000
$ 95,000 $20,000
$80,000 $350,000
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND S ES FUND SOURCES TOTAL- p
ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT
COST
1981 •
PAVING:
Race St.- Bryson to Campbell $40,000 $180,000 $220,000
Milwaukee Dr. 6th -18th St. 85,000 $215,000 300,000
Golf Course Road 70,000 70,000
1981 TOTAL $125,000
1982
RESURFACING:
Race St. Front -9th St.
5th St. Lincoln to Race
Peabody -Front to 8th
1982 TOTAL
1983
RESURFACING:
$80,000
$285,000 $180,000 $590,000
$80,000
$80,000. 80,000
70,000 70,000
$80,000
$150,000 $230,000
Cherry St. -2nd to 8th St. $ 30,000 $ 30,000
2nd St.- Cherry to Pine St. 30,000 30,000
Valley St. -2nd to 1st St. 5,000 5,000
5th St. -Tumwater to "C" St. 30,000 30,000
"C" St -5th St. to Lauridsen Blvd. _ 30,000 30,000
1983 TOTAL
6/8/77
-4-
$125,000 $125,000