HomeMy WebLinkAbout12-10ATTEST: A RESOLUTION of the City Council of the City of Port Angeles, Washington, adopting the Capital Facilities Plan and Transportation Improvement Program for 2010 -2016. WHEREAS, the City of Port Angeles is required to annually update its Capital Facilities Plan and Transportation Improvement Program; and WHEREAS, the City Council of the City of Port Angeles, Washington being the legislative body of said City, on the 1st of June, 2010, the 15th of June, 2010 and the 6 of July, 2010 did hold public hearings on the update of its Capital Facilities Plan and Transportation Improvement Program; and WHEREAS, the proposed Capital Facilities Plan and Transportation Improvement Program for 2010 -2016 are consistent with the City's Comprehensive Plan; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles, Washington that the Capital Facilities Plan and the Transportation Improvement Program, attached hereto as Exhibit A, for the City of Port Angeles, Washington, be and the same are hereby adopted; and BE IT FURTHER RESOLVED that the 2010 -2016 Transportation Improvement Program, together with this Resolution, shall be filed, using electronic format through the Internet, with the Secretary of Transportation of the State of Washington. PASSED by the City Council of the City of Port geles at a regular meting of said Council held on the 6th day of July, 2010. J.� ssa Hurd, City Clerk RESOLUTION NO. 1 o G \LEGAL \a ORDINANCES &RESOLUTIONS\IRESOLUTIONS 2010 \12 TIP &CIP -Adopt 051810 wpd (July 1, 2010) MAYOR AP OVED AS TO F William E. Bloor, City Attorney TOTAL DIVISION PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE PRIORITY PROJECT ID PROJECT TITLE COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE GENERAL PROJECTS 1 GG01 -2005 I Harbor Master Plan 50,000 I 50,000 I 25,000 +I I I I I I I I Y 1 1 GG01 -2010 Phase II�reek Restoration 657,000 I I 157,000 I I 500,000 I I 657,000 N 1 GG03 -2003 I(NICE Infrastructure P Program) Development 575,000 I 575,000 I 75,000 I 100,000 I 100,000 I 100,000 I 100,000 100,000 I N 1 GG03 -2009 I Entryway Monument 50,000 I 50,000 I 15,000 I 35,000 I I I I I I I I N 1 GG04 -2009 (Study'ng HeighWiewshed 75,000 I 75,000 I I 75,000 I I I I I I N 2 GG01 -2002 1 Ediz Hook Rip Rap Repair 715,000 I 79,000 1 1 715,000 I I I I I 636,000 I Y I 3 GG08 -2009 Utility Improvemenitsl Park 500,000 I 500,000 I I 500,000 I I I I N Port Waterfront Utilities 4 GG05 -2009 IExtension 700,000 I 700,000 I I I 700,000 I I I N 5 I GG03 -2007 I City Hall Parking Lot Repair 100,000 I 100,000 I I 100,000 I I I I I I I N I 6 GG06 -2009 land Bluff Stabilization tructure 15,000,000 I 15,000,000 I I I I 15,000,000 I I I I I N 7 GG07 -2009 Underground on Front Street 1,500,000 I 1,500,000 I I I I I 1,500,000 I I I I N I FIRE PROJECTS I 1 FRO1 -2009 R E e le p c o t rt ro m n g ic Medical Incident I 36,000 36,000 I 36,000 I I I I I I I N I 2 FRO2 -2009 lApparatusMobile Data for Fire I 120,000 I I 50,000 I 70,000 I I I I I I 120,000 I I N 3 FRO7-1999 I West Side Fire Station I 1,986,000 I 1,986,000 I I I 171,000 I 1,815,000 I I I I I 1,986,0001 N PARKS PROJECTS 1 PK05 -2009 I Trail Repair-FEMA Mitigation t on 860,000 I 215,000 I 860,000 I I I 645,000 N 2 PK04 -2009 I epai FEMA Mitigation 100,000 25,000 I 100,000 I I I I 75,000 N 2 PK06 -2009 I Repair-FEMA Rip-Rap FEMA Mitgaton 500,000 125,000 I 100,000 I 400,000 I I I 375,000 N 3 PK03 -2009 I SysteCity Fire Suppression 210,000 210,000 I 150,000 I 100,000 I I I Y 4 PK01 -2010 I Civic Field Upgrades 2,500,000 I 2,500,000 I I 2,500,000 I I I I I I I 2,500,000 I N Olympic Discovery 4 PK04 -2005 I& Armor Replacement Trail Tree 250,000 250,000 I I 50,000 I 50,000 I 50.000 I 50,000 50,000 I I N 4 PK06 -2005 I Replace Roof of Vern Burton 150,000 I 150,000 I I 150,000 I I I I I I I I N 5 PK02 -2005 I Restroom Replacement 375,000 I 375,000 1 I I 125,000 I 125,000 I 125,000 I I I I I N 6 PK08 -2002 I Renovation ood Park 500,000 500,000 I I I 100,000 I 100,000 I 100,000 I 100,000 I 100,000 I N 8 PK02 -2009 (Off -Leash Dog Park 15,000 I I I 15,000 I I I I I I 15,000 I I N 9 PK01 -2009 I Port Angeles Marine Park 100,000 I 1 20,000 I 20,000 I 20,000 I 20,000 I 20,000 I I 100,000 I I N 10 PK03 -2006 'Plan coln Park Development 50,000 I I 50,000 I I I I I 50,000 N N \CFP\2010 \CFP Resolution Exhibit A Revised 070610 xls 2010 2016 CAPITAL FACILITIES PROJECTS CFP TIP SUMMAIOAGE 1 PRIORITY ORDER Exhibit "A" 7/12/2010 DIVISION PRIORITY PROJECT ID PROJECT TITLE City Pier Hollywood Beach 11 PK01 -2002 I Renovation 13 PK06 -2006 I Lions Park Development Shane Elks Ball Field 14 PK04 -2006 I Lighting Project 15 PK11 -2006 I City Pier Float Replacement Tennis Courts at Erickson 16 PK03 -2007 I Park Lighting Fine Arts Center Entrance 17 PK02 -2006 I Improvements POLICE PROJECTS Public Safety Wireless Mobile PD01 -2010 I Network (BTOP) Wireless TerminalsNoice Radio Upgrades 2 PD01 -2009 (Stonegarden) Evidence Relocation Patrol 3 PD02 -2009 Work Area Regional Firearms Training 4 PD03 -2007 Facility 11 TOTAL OF MANDATED GENERAL FUND PROJECTSI TOTAL OF ALL GENERAL FUND PROJECTSI 1 TR01 -2003 1 TR01 -2005 1 TR01 -2006 1 TR01 -2010 1 TR02 -2003 1 TR03 -2009 1 TR04 -2006 1 TR09 -2009 1 TR10 -2000 1 TR10 -2009 1 TR21 -1999 1 I TR74 -1999 2 I TR04 -2005 2 TR04 -2007 2010 2016 CAPITAL FACILITIES PROJECTS CFP TIP SUMMAIOAGE 2 PRIORITY ORDER STREET PROJECTS I Overlay Program I Gravel Road Paving Transportation Comprehensive Plan I Race Street Slide Repair I Waterfront Development Upgrades to the Coho Ferry Terminal Dry Creek Pedestrian Bridge/Trail Phase II Way Finding Signage Concept 16th Street S/W ['G' St to Stevens School] I First/Front Race Street Nodes I Lauridsen Blvd Reconstruction [Trk Rt To 'L' St] I Sidewalk Program I Alley Paving First/Front/Railroad Street Rehabilation N \CFP\2010 \CFP Resolution Exhibit A Revised 070610 xls TOTAL PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS 100,000 100,000 I 225,000 I 225,000 I 200,000 200,000 I 750,000 750,000 75,000 I 50,000 50,000 1 I 3,724,000 I 1,117,000 I 3,724,000 I 500,000 200,000 200,000 300,000 I 45,000 1 300,000 1 35,000 I 255,000 I 975,000 I 339,000 I 175,000 I 815,000 33,898,000 I 27,478,000 I 1,777,000 I 9,095,000 2,880,000 I 2,880,000 I 340,000 I 360,000 175,000 I 175,000 I 25,000 I 25,000 100,000 1 25,000 60,000 1 190,000 I 190,000 I 190,000 4,385,000 I 277,000 I 180,000 I 9,000,000 I 50,000 9,000,000 I 759,400 1 262,200 100,000 I 210,000 1 210,000 75,000 I 400,000 I 175,000 I 50,000 I 50,000 50,000 I 15,000 I 85,000 I 100,000 I 750,000 I I 75,000 I -I 50,000 I I 300,000 380,000 I 25,000 I -I 2,620,000 I 1,585,000 I I 659,400 150,000 400,000 -I -I 550,000 550,000 550,000 250,000 I 250,000 I I 50,000 50,000 I 200,000 I 200,000 I I 50,000 I 855,000 1 855,000 I 1 200,000 1 Exhibit "A" 85,000 75,000 I 65,000 I -I -I -I -I -I -I 3,141,000 I 17,470,000 I 400,000 I 25,000 I 300,000 400,000 I I I I I -I -I -I -I -I I 460,000 I 1,770,000 I 100,000 I 420,000 I 25,000 I 50,000 I 50,000 I 75,000 I I I 450,000 I 25,000 I 50,000 75,000 I 2016 TOTAL COSTS 2,607,0001 500,000 I 300,0001 I 265,0001 I 636,000 I 6,420,000 I GRANTS BONDS OUTSIDE CONTRIB LOANS MANDATE 25,000 50,000 75,000 4,108,000 I 8,950,000 I 497,200 I 225,000 I -I N N N N N N -1 N N -I -I N 4,486,000 -I N -I N Y -I N -I N -I N -I N -1 N IN -I N N I N I N I N 7/12/2010 2010 2016 CAPITAL FACILITIES PROJECTS CFP TIP SUMMA AGE 3 PRIORITY ORDER TOTAL DIVISION PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE PRIORITY PROJECT ID PROJECT TITLE COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE Ediz 2 TR05 -2009 IRepai FEMA Mitigation 250,000 I 62,500 I 250,000 I I I I I 187,500 N 3 TR06 -2009 I Wall Repair -FE Mitigation 350,000 I 87,500 350,000 I I I I I I 262,500 N 4 TR20 -1999 IF t cedess /Racks /Striping 100,000 I 100,000 20,000' 20,000' 20,000 I 20,000 I 20,000 I N 5 TR26 -1999 I ADA Curb Ramps 120,000 I 120,000 I I 20,000 I 20,000 I 20,000 I 20,000 I 20,000 I 20,000 I I I Y 8 TR04 -2009 'Overpass 600,000 Pedestnan 600,000 I 60,000 600,000 I I I I 540,000 N 10 I TR08 -2009 I Downtown Parking Study I 75,000 I 75,000 I I 75,000 I I I I I I N 12 I TR01 -2001 I Laurel St Stairs Replacement 302,500 I 302,500 I I 27,500 I 275,000 I I I I I I N Oak 13 TR03 -2006 IRepl cement 55,000 I 55,000 55,000' 495,000 I I N Lauridsen Blvd Bridge 14 TR01 -2008 I Replacement Study Update 25,000 I 25,000 25,000 I I I N 15 TR42- 1999'Widen 'Widening Blvd Bridge 5,000,000 I 1,030,000 I 440,000 I 3,500,000 I 1,060,000 3,970,000 N 16 TR11 -2009 IRepairs Drive Bulkhead 750,000 I 750,000 I 100,000 I 650,000 I 75,000 N 17 TR09 -2000 ISt� 16th Street S/W ['I' St to 'G' 255,000 I 10,000 50,000 I 255,000 I 245,000 N Lincoln /Laurel Rechannelization /Signal /Roun 18 TR18 -1999 dabout 665,000 112,000 60,000 605,000 553,000 N 20 TR01 -2004 IRestor atio2nd Val ley Pavement 540,000 I 540,000' 48,000' 492,000 I I N 21 TR11 -2000 I'M' Street] S/W ['N' Street to t] 660,000 I 660,000 I I 60,000 I 600,000 440,000 N I 10th 22 TR12- 2000'Strreet] Street ['M' Street to 'I' 675,000 I 225,000 I I 60,000 I 675,000 I 450,000 N 23 TR12- 1999'[Peabodyto Race] Reconstruction 1,455,000' 365,000 I 185,000 1,270,000' I 1,090,000 N 24 TR02 -2006 I Sidewalk Fill In Gaps I 875,000 I 500,000 I I 175,000 I 175,000 I 175,000 I 175,000 I 175,000 I I 375,000 I I N 25 TR02 -2001 I Ennis St Slide Repair I 300,000 I 300,000 I I I 300,000 I I I I I I I N 26 TR05 -2006 I Valley Creek Loop Trail I 100,000 I 50,000 I I 25,000 I 25,000 I 25,000 I 25,000 I I I 50,000 I I N 28 TR02 -2007 I Laurel St Sidewalk Phase I I 300,000 I 100,000 I I I I 325,000 I I I I 200,000 I I N 29 TR03 -2007 I� aural Street Sidewalk Phase 250,000 I 75,000 I I 260,000 I I 175,000 N 30 TR04 -1999 Reconstruction treet/Ahlvers Road 1,745,000 I 813,000 I 645,000 I 1,100,000' I 932,000 N 31 TR02 -2004 I Improvements Rd 840,000' 840,000 78,000 I 60,000 I 402,000 300,000 I N 32 TR07 -1999 I Milwaukee Drive Phase I 2,905,000 I 2,905,000 I I I 305,000 I 2,600,000 I I I I I I N 33 TR70 -1999 ISt eet LID Road/Porter 3,030,000 I 3,030,000 I I I I 305,000 I 2,725,000 I I 3,030,000 N 34 TR69 -1999 I Rhoads Road Area LID 1,355,000 I 1,355,000 I I I I I I 1,355,000 I I I 1,355,000 I N 35 TR97 -1999 I C Street and Fairmont LID 3,660,000 I 3,660,000 I I I I I I 360,000 I 3,300,000 I I 3,660,000 N 36 TR71- 1999'Llph /13th and "I"/"M" Street 3,330,000 I 3,330,000 I I 305,000 I I 3,025,000' I 1 3,330,000 N N \CFP\ \CFP Resolution Exhibit A Revised 070610 xls Exhibit "A" 7/12/2010 2010 2016 CAPITAL FACILITIES PROJECTS PRIORITY ORDER CFP TIP SUMMAAGE 4 TOTAL DIVISION PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE PRIORITY PROJECT ID PROJECT TITLE COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE 37 TR16 -1999 I Street Reconstruction Phase II I 4,475,000 I 4,475,000 I 1 I I 420,000 I 4,055,000 I I I I N 38 I TR10 -1999 1 10th Street Reconstruction I 968,000 I 968,000 I I I 88,000 I 880,000 I I I I I I N Truck 39 TR17 -1999 1Inte se bo ne at US101 I 600,000 I 600,000 I I I 1 I 1,000,000 5,000,000 1 I N 40 TR13 -2000 118 St) Street Sidewalk [14th St toI 355,000 I 55,000 I I 1 55,000 1 300,000 I I I I 300,000 I I N 41 I TR32 -1999 I 9th Street Widening I 95,000 I 95,000 I I I I I I 95,000 I I I I N 42 I TR08 -1999 I Milwaukee Drive Phase II I 4,545,000 I 4,545,000 I I I I I 4,545,000 I I I I I N 1 City-Wide Traffic Signal 43 TR13 -1999 I In erconnect/Pre empt on 725,000 I 725,000 1 I -1 1 I I 725,000 1 -1 1 N 1 Hill 44 TR05 -1999 Reconstruction rsection 485,000 1 303,000 1 I I 1 I 485,000 1 I 1 182,000 I N 45 I TR14 -2000 I Airport Industnal Park Streets I 2,725,000 I 305,000 I I I 305,000 I 1,650,000 I 770,000 I I I 2,420,000 I I N 46 TR80 -1999 I Street Reconstru tashington 480,000 I 75,000 I I I I 75,000 I 75,000 I 330,000 I I 405,000 1 N 47 TR02 -2008 Study Alternative Cross -Town Route I 220,000 1 220,000 I 1 220,000 1 1 I I 1 I N 48 I TR14 -1999 I White's Creek Crossing I 9,690,000 I 9,690,000 I I I I I 1,825,000 I 7,865,000 I I I N I 49 I TR06 -2007 I Vine Street Paving I 110,000 I 110,000 I I I 110,000 I I I I I I I N I 50 TR03 -2008 Ito 0 Street 16th Streets) (14th 990,000 I 990,000 I I 1 I 990,000 I I I I I I N 51 I TR02 -2009 I Race Street Bicycle Lanes I 50,000 I 10,000 I I 50,000 I I I I I I 40,000 I I N 52 TR07 -2009 Roundabout Streets 400,0001 400,000 I 1 1 1 I 1 400,0001 1 I I N 56 TR13 -2009 land Tu Creeks er Valley' 75,000 1 1 1 I I I 75,000 1 1 75,000 I I N TOTAL OF MANDATED STREET PROJECTS( TOTAL OF ALL STREET PROJECTS( 220,000 I 77,559,900 I N 1CFP120101CFP Resolution Exhibit A Revised 070610 xls 145,000 51,252,700 60,000 I 10,620,000 I 20,000 I 20,000 I 20,000 I 20,000 I 6,141, 500 I 14, 207, 000 I 16,492, 000 I 5,024,400 I Exhibit "A" 20,000 I 11, 670, 000 I 20,000 I 18,910,000 I 75,000 I 26, 822, 200 I 11, 375, 000 ELECTRIC PROJECTS 1 CL01 -2009 IF- Street 1202 Upgrade I 170,000 I 170,000 I 170,000 I I I I I I I I N 1 CL03 -2008 'Infrastructure t Electric I 2,777,000 I 2,777,000 1,000,000 1,777,000 I I I I I 2,777,000 I N 1 CL03 -2009 Program 'Residential Demand Response' I 1,750,000 1 250,000 500,000 250,000 250,000 1 250,000 1 250,000 I 250,000 1 1,500,000 I N 1 CL06 -2007 1Transm Transmission Line Renovation I 230,000 I 230,000 200,000 I I I I I N 1 CL06 -2010 'College ementtation Switch 1 80,000 1 80,000 80,000 I 1 I I I N 1 CL07 -2010 I BPA Conservation Program I 4,660,000 I I 440,000 I 520,000 I 740,000 I 740,000 I 740,000 I 740,000 I 740,000 I 4,660,000 I I N 1 CL09 -2009 (Tier 2 Conservation Program I 1,200,000 I 1,200,000 I 300,000 I 300,000 I 300,000 I 300,000 I I I I I 1,200,000 I N 2 CL01 -2006 (Eclipse Add Second Source I 385,000 I 385,000 I I 35,000 I 150,000 I 200,000 I I I I I I N 3 CL01 -2010 (Cable Restoration Phase III I 100,000 I 100,000 I I 100,000 I I I I I I I I N 4 CL02 -2010 'Transmission Wash ngton t Line I St Upgrade- I 220,000 I 220,000 I 220,000 1 I I 1 1 I I N 5 I CL03 -2010 I Fac lilies nt Fiber Optic I 150,000 I 150,000 I 150,000 I I I I I I I N 7/12/2010 DIVISION PRIORITY PROJECT ID PROJECT TITLE Upgrade "A" Street Substation 6 CL02 -2006 (Transformer Commercial Demand 7 CL08 -2009 Management Study I 8 I CLO5 -2010 (Pole Replacement Program I PUD Assumption in Previously 9 CL04 -2007 Annexed Areas IBI-Annual Replacements and 10 CL06 -2008 Improvements 1 I CL07 -2007 (Underground Feeder F -1202 Street Light Upgrades Tier 2 12 CL05 -2009 Conservation Program 13 I CL07 -2009 Tier 2 Generation Program Olympic Medical Center 14 CL08 -2007 Redundant Power Source Feeder Tie Porter To Golf 15 CL02 -2002 Course 16 I CL03 -2006 Install Peabody Substation Airport Industrial Park Electric 17 CL07 -1999 Service Feeder Tie Hwy 101, Cherry 18 CL01 -2004 Street to Pine Street Metropolitan Area Network 19 CL04 -2010 Needs Assessment TOTAL OF MANDATED ELECTRIC PROJECTS' TOTAL OF ALL ELECTRIC PROJECTS' SOLID WASTE PROJECTS 1 I SW01 -2009 Nourishment Beach I 93,000 I 93,000 I 28,000 I 30,000 I TOTAL OF MANDATED SOLID WASTE PROJECTS' 93,000 I TOTAL OF ALL SOLID WASTE PROJECTSI 93,000 1 N \CFP\2010 \CFP Resolution Exhibit A Revised 070610 xls 2010 2016 CAPITAL FACILITIES PROJECTS CFP TIP SUMMAIOAGE 5 PRIORITY ORDER TOTAL PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE 860,000 I 860,000 I I 60,000 I 800,000 I I I I 800,000 I N 30,000 I 30,000 I I 30,000 I I I I I I N 6,000,000 I 6,000,000 I I 1,000,000 I 1,000,000 I 1,000,000 I 1,000,000 1,000,000 I 1,000,000 I I 6,000,000 I N 100,000 I 100,000 I I 100,000 I N 900,000 I 900,000 I I 300,000 I I 300,000 I I 300,000 1 I 900,000 N 100,000 I 100,000 I I I 10,000 I 100,000 I I I I I I N 1,200,000 I 1,200,000 I I 1,200,000 I I I I I 1,200,000 N 1,150,000 I 1,150,000 1 I I 150,000 1 1,000,000 I I I I I 1,150,000 I N 110,0001 110,0001 I -I -I 110,0001 -I I -I -I N 260,000 I 260,000 I I I 30,000 I 230,000 I I I N 770,000 I 770,000 I -1 I I I 440,000 I 330,000 I I I I N I 800,000 I I I 400,000 I 200,000 I 200,000 I I -1 800,000 N I 60,0001 60,0001 I I I I 60,0001 I I -I N 72,000 I 72,000 I I I I I I 30,000 I 42,000 I I N -I -I 24,134, 000 I 17,174, 000 I -I -I -I -I -I 2,690,000 I 5,392,000 I 4,200,000 I 3,900,000 I 3,020,000 I 2,580,000 I 2,332,000 I 93,000 I 28,000 I I 30,000 1 93,000 1 28,000 1 1 30,000 1 6,960,000 I 14, 027, 000 Exhibit "A" I I 35,000 I I I Y I I -I 35,0001 -I -I I I 35,0001 -1 -1 WATER PROJECTS 1 WT02- 20011E1wha Dam Mitigation 1 210,000 1 1 110,000 1 100,000 I I I I I 1 210,000 I 1 N 1 1 WT02 -2006 1131-Annual Replacements 1 930,000 1 930,000 I 340,000 1 I 360,000 1 I 380,000 1 I 1 I 1 N I 1 WT02 -2009 'Replacement nder Pipe I 6,295,000 I 6,295,000 I 575,000 I 1,430,000 I 1,430,000 I 1,430,000 I 1,430,000 I I I I 6,295,000 I N I 1 WT64 -1999 'McDougal Improvements ssure Subzone I 540,000 I 540,000 I 40,000 I 500,000 I I I I I I I 540,000 I N 1 WT65 -1999 I UGA Water Customers I 20,000 1 20,000 I 5,000 1 5,000 I I I I I I I 1 N Advanced Metering Infrastructure 2 WT01 -2008 Water/Wastewater 2,226,000 2,226,000 1,000,000 1,226,000 2,226,000 N 3 I WT01 -2007 I Dry Creek Water Settlement I 150,000 I 150,000 I 150,000 I I I I I I I I I N 4 I WT03- 2005 'Vulnerability Improvements I 210,000 1 210,000 1 1 65,000 I 70,000 I 75,000 I I I I I I N 7/12/2010 DIVISION PRIORITY PROJECT ID PROJECT TITLE Transfer Morse Creek Water 5 I WT03 -2009 Lines to Clallam PUD I E Street Reservoir Cover 6 T01- 2009 I W 'Airport Industrial Park Water I 7 I WT01- 2000 1 1 1 1 1 1 2 3 3 4 4 5 6 11 12 13 TOTAL OF MANDATED WATER PROJECTS' TOTAL OF ALL WATER PROJECTS' WASTEWATER PROJECTS Plant Headworks W W03 -2005 Improvements WW03 -2000 'Lindberg Rd Sewer LID WW02- 2000 'Airport Industrial Sewer IGolf Course Road Sewer W 14 I W05 -1999 Interceptor West UGA Basin 2 Sewer W 15 W07- 2008 'E West UGA Basin 3 Sewer 16 WW09 -2008 Extension West UGA Basin 4 Sewer W 17 W11-2008 I Extension 18 I WW01- 2010 'Turbo Blower Installation WW03 -2008 (Pump Station #3 Replacement I WW04 -2008 'Carbon Scrubbers WWTP First Street Stormwater WW04 -2010 Separation Waste Activated Sludge WW06 -2008 Thickening WWTP Combined Sewer Overflows WW08 -2008 Phase I WW27 -1999 III-Annual Replacements Lines Dry Polymer Feeder WW01 -2008 Replacement WWTP Digester Mixing Improvement WW05 -2008 I WWTP Plant De- Watenng W W02 -2005 Improvements Septage Receiving Station WW02 -2008 WWTP Combined Sewer Overflows WW10 -2008 I Phase II Plant Programmable Logic WW02 -2010 Controller /HMI replacement WW05 -2006 I Sewer Trestle at Francis 8th I 1 TOTAL OF MANDATED WASTEWATER PROJECTS' TOTAL OF ALL WASTEWATER PROJECTS' TOTAL PROJECT COSTS 500,000 I 200,000 I 1,500,000 I -I 12,781, 000 I 250,000 I 230,000 I 53,000 I 1,610,100 I 260,000 I 28,955,500 I 900,000 I 54,000 300,000 1,240,000 699,500 12,200,000 100,000 475,000 I 1,200,000 I 1,300,000 I 1,000,000 7,100,000 I 6,100, 000 I 2,500,000 183,000 41,458,500 66,710,100 I N• \CFP\2010 \CFP Resolution Exhibit A Revised 070610 xis TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE 250,000 I 100,000 1 400,000 I I I I I -1 250,000 I I N 200,0001 -I 200,0001 -1 -I -1 -I -I -I -I N -1 I -1 I 180,000 1 660,000 I 660,000 I -1 1,500,000 I I N -I -I -I -I -I -I -I -I -I 10,821,000 I 2,320,000 I 3,926,000 I 1,860,000 I 1,685,000 I 2,470,000 I 660,000 I I 1,960,000 I 9,061,000 41,458, 500 I 47, 510,100 I 2010 2016 CAPITAL FACILITIES PROJECTS CFP TIP SUMMAIOAGE 6 PRIORITY ORDER 25,000 I 145,000 I 250,000 230,000 I 53,000 I 1,610,100 I 260,000 1 28,955,500 I 900,000 I 54,000 I 54,000 300,000 I 1,240,000 699,500 102,500 12,200,000 100,000 475,000 183,000 53,000 I 955,100 I 105,000 1,600, 000 I 268,000 I 75,000 I 1,678, 000 I 3,382,600 I 350,000 I 85,000 I -I 655,000 I 155,000 I 11, 370, 500 I 300,000 I 300,000 1,175, 000 100,000 400,000 11,720,500 1 15,073,500 I 9,890,000 I 65,000 597,000 1,125, 000 11,015,000 I 11,942,000 I Exhibit "A" -1 -I -I -I -I -I -I -1 -1 -I 4,945,000 I 325,000 I 3,800,000 8,745,000 I 12,155, 000 I -I I I 1,610,100 I -1 1 I I 28,555,500 1,240,000 8,700,000 I -I I I I 1,075,0001 I I 1,200,000 I 150,000 I 575,000 I 575,000 I I 1,300,000 1 140,000 1 860,000 I 1 I I 1,000,000 I I I I 1,000,000 I 6,100,000 1 1 7,100,000 1 I I 1 I 900,000 I 5,200,000 I I 6,100,000 1 I I I 1 I 500,000 I 2,000,000 I 2,500,000 I I 183,0001 -I -I -I -I -I -I 7,275,000 I I I I 37,255,500 14,850, 000 I 6,275,000 I 2,000,000 I 20, 810,100 I 38,495, 500 7/12/2010 2010 2016 CAPITAL FACILITIES PROJECTS PRIORITY ORDER CFP TIP SUMMAFINAGE 7 TOTAL DIVISION PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE PRIORITY PROJECT ID PROJECT TITLE COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE STORMWATER PROJECTS 1 DR01- 2004 armwater d 200,000 I 200,000' 50,000' 50,000 I 50,000' 50,000 I 50,000 I I I I Y 1 DR02- 2009'Culvert Repair 170,000 170,000 I 50,000 I I 50,000 I I 50,000 I I 50,000 I I I N 1 DR04 -2004 IAhlversater at Canyon Edge 500,000' 500,000' I 250,000' 200,000' I I I I I Y 1 DR14- 1999'Cu 'Culvert Rehab St 760,000 I 380,000' 3,000 I I 122,000 I 635,000 I I 380,000 I I Y 2 DR01 -2006' Improvements rosion 40,000 I 40,000 I I I I I 40,000 I I Y 2 DR02- 1999'Modificatons Basin 585,000' 585,000 I I I 100,000 I 1 0 110,000 I 115,000 I 120,000 I I Y 3 DR01 -2008 'Water Quality Project 150,000 I 150,000 I I I 30,000 I 30, 000 I 30,000 I 30,000 I 30,000 I I I Y I 4 DR03 -2009 provementts 825,000 I 825,000 I 325,000 I 575,000 I I I I I I 625,000 N 5 DR06 -2004 IPorterwater at Campbell 500,000' 500,000 I I 50,000 I 200,000' 250,000' I 425,000 I Y 5 DR08 -2004 'Lincoln Park/Big Boy Pond 300,000 I 300,000' I I I 30,000 I 270,000 I I I 255,000 I Y 5 DR53- 1999'Bluff iStormwater Discharges Over 670,000 I 670,000' I I 190,000 I I 120,000 I 120,000 I 120,000 I I I Y 5 DR65- 1999'Sttorm Detention reet Regional 550,000 I 550,000 I I 300,000 I 250,000 I I I I I 505,000' Y 7 DR07 -2004' Extension er "C" Street 500,000 I 500,000 I I I I 50,000 I 200,000 I 250,000 I I I I Y 8 DR05 -2004 IStormwater at Rose Thistle 500,000 I 500,000 I I I I 50,000 I 200,000 I 250,000 I I 425,000 I Y 9 DR03 -2004 IStormwater at Laurel US101 I 500,000 I 500,000 I I I I I 50,000 I 200,000 I 250,000 I I I Y 10 DR02 -2004 IStormwater water Rd Area 500,000' 500,000 I I 50,000' 200,000' 250,000 I I 425,000' Y 11 DR03 -1999 I !Improvements Stormwater 1,200,000 I 1,200,000 I I I 150,000' 150,000' 150,000 I 750,000 I I I Y 1 2 D R01- 2001 250,000 I 250,000 I I I I I I 50,000 I 200,000 I I Y I TOTAL OF MANDATED STORMWATER PROJECTS' 7,205,000 I 6,825,000 I 53,000 I 300,000 I 870,000 I 887,000 I 2,015,000 I 1,415,000 I 1,510,000 I 380,000 I 1,610,000 I TOTAL OF ALL STORMWATER PROJECTS' 8,700,000 I 8,320,000 I 428,000 I 875,000 I 970,000 I 1,087,000 I 2,315,000 I 1,415,000 I 1,560,000 I 380,000 I 2,660,000 1 TOTAL OF ALL MANDATED UTILITY PROJECTS' 48,756,500 I 48,376,500 I 1,759,000 I 12,020,500 I 11,915,000 I TOTAL OF ALL UTILITY PROJECTS' 112,418,100 I 83,918,100 I 8,848,600 I 25,266,500 I 19,002,000 I 9,632,000 I 9,290,000 I 1,450,000 I 1,510,000 I 380,000 I 38, 865, 500 18, 827, 000 I 22,655, 000 I 10, 965, 000 I 5,892,000 I 30,110,100 I 64,243, 500 INFORMATION TECHNOLOGY PROJECTS 1 I IT01 -2010 IServ (s) Data Backup Equip I 240,000 240,000 I 240,000 I I I I I I I N 1 I IT02 -2010 'Public Address l Audio System I 70,000 I 70,000 I I 70,000 I I I I I I 'Novell OS Platf &I 1 I IT03 -2009 Apps Mig a o 250,000 I 250,000 I 150,000 I 60,000 I 40,000 I I I I I I N 1 I IT05 -2006 IDatalloice Equipment I 370,000 I 370,000 I 290,000 I I I I I I I I I N N, \CFP\2010 \CFP Resolution Exhibit A Revised 070610 xls Exhibit "A" 7/12/2010 2010 2016 CAPITAL FACILITIES PROJECTS PRIORITY ORDER CFP TIP SUMMAIRAGE 8 TOTAL DIVISION PROJECT TOTAL CITY 2010 TOTAL 2011 TOTAL 2012 TOTAL 2013 TOTAL 2014 TOTAL 2015 TOTAL 2016 TOTAL GRANTS BONDS OUTSIDE PRIORITY PROJECT ID PROJECT TITLE COSTS COST COSTS COSTS COSTS COSTS COSTS COSTS COSTS CONTRIB LOANS MANDATE 2 I IT01 -2009 'Replacement Data Storagetralized 1 180,000 1 180,000 I I 180,000 I I I I I N 3 I IT02 -2009 IUpgrade/HA Redundancy I 140,000 I 140,000 I I 140,000 I 1 1 I I N 3 I IT03 -2010 'Upgrade P Products and Training Office I 65,000 I 65,000 1 I 65,000 I I I I I N TOTAL OF MANDATED IT PROJECTSI I -I TOTAL OF ALL IT PROJECTSI 1,315,000 I 1,315,000 I 680,000 I GRAND TOTAL OF MANDATED PROJECTSI GRAND TOTAL OF ALL PROJECTSI 49,951,500 I 225,191, 000 I N \CFP\2010 \CFP Resolution Exhibit A Revised 070610 xls -I 48, 860, 500 I 1,994,000 I 163, 963, 800 I 21, 925,600 -1 I 515,000 I 40,000 I 12,855,500 I 39,900,900 I 11, 935, 000 I 28,324,500 I Exhibit "A" 9,652,000 I 50,504,000 I -I -I -I -I -I -I -I 9,310,000 I 1,470,000 I 1,530,000 I 1,091,000 I 38,865,500 39,607,000 I 24,405,000 I 24,902,000 I 63,352,300 I 80,104,500 7/12/2010