Loading...
HomeMy WebLinkAbout17-12 RESOLUTION NO. 17 -12 A RESOLUTION of the City Council of the City of Port Angeles, Washington, approving the 2012 Electric Utility Resource Plan. WHEREAS, the City strives to ensure that its citizens have reliable access to electricity resources adequate to meet their projected loads; and WHEREAS, the City must submit an Electric Utility Resource Plan to the Washington Department of Commerce by September 3 2012 as required by RCW 19.280.030; and WHEREAS, the 2012 Electric Utility Resource Plan is consistent with the City's existing energy conservation programs operated in cooperation with the Bonneville Power Administration, and the Electric Power Plan adopted by the Northwest Power and Conservation Council; and WHEREAS, on February 7, 2010 the City Council of the City of Port Angeles adopted Ordinance No. 3391 to create a Conservation and Renewable Energy Program fund for acquiring cost effective energy conservation measures, renewable energy systems, and distributed generation resources; and WHEREAS, RC W 19.280.030 requires the City to regularly update its Electric Utility Resource Plan at minimum intervals of every two years; and WHEREAS, the City Council of the City of Port Angeles Washington, being the governing body of the consumer -owned electric utility did, after public notice, hold public hearings on the 7th of August 2012 and the 21 of August 2012 to provide the public the opportunity to comment on the 2012 Electric Utility Resource Plan. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles Washington that the 2012 Electric Utility Resource Plan as prepared by the Director of Public Works and Utilities and attached hereto as Exhibit A be approved; and -1- BE IT FURTHER RESOLVED that the 2012 Electric Utility Resource Plan, together with this Resolution, shall be electronically filed (through the Internet) with the Department of Commerce of the State of Washington (no later than the 3rd of September 2012) and also be published and made available to the public through the City of Port Angeles website. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 21 day of August 2012. Cherie Kidd ayor ATTEST: BY: (-°7/intfi J J Hurd, City Clerk APPROVED AS TO FORM: By: AL% William E. Bloor, rty Attorney G \LEGAL \a ORDINANCES &RESOLUTIONS\RESOLUTIONS 2012 \17 Council 2012 Resource Plan Resolution docx S -2- EXHIBIT A: Washington State 2012 Electric Utility Resource Plan City of Port Angeles Utility Name Prepared by: Phil Lusk I Base Year 5 Yr. Est., 10 YrEst.'. V 1- 'P n F E tun fe Year 2011 2017 2020 Period Annual Annual Annual "T s t 3x 4',P F� s rn. y F ,n• e 4s r a rva r s j ,-'''..:1/41,1 a 6 i E.* y d Ura `L* (,MIa (MWar N M,Wa)1 J i 3' c o-i3O+� t4 2 a.3 Sc 14- ,-1, ,`4'+> y. 17i .d, `Y ank t 4.1 .9 g...4.4. -v a e 4 04414S, Fa.w' +4 ,VAVA L :"'4 Loads 87 74 88.23 90.79 Resources: a Q New Future Conservation/Efficiency Y �;;.a«''"''7; 2.13 3.67 New Demand Response 4 0.31 0.83 BPA Tier 1 (include BPA PF) 87.50 85.70 86.20 BPA Tier 2 Non BPA: u e f., Co- generation Hydro (critical water) 0.15 0.00 0.00 Wind Other Renewables Thermal Natural Gas Thermal -Coal Market Purchase (non BPA) 0.09 0.09 0.09 Other Total Resources 87.74 88.23" ti °90.79' Load Resource Balance 0.00 s, 0.00_ r, ,0 ''00 Date of City Council Approval 08/12 ((mm /yy)