HomeMy WebLinkAbout17-12 RESOLUTION NO. 17 -12
A RESOLUTION of the City Council of the City of Port Angeles,
Washington, approving the 2012 Electric Utility Resource Plan.
WHEREAS, the City strives to ensure that its citizens have reliable access to
electricity resources adequate to meet their projected loads; and
WHEREAS, the City must submit an Electric Utility Resource Plan to the
Washington Department of Commerce by September 3 2012 as required by RCW
19.280.030; and
WHEREAS, the 2012 Electric Utility Resource Plan is consistent with the City's
existing energy conservation programs operated in cooperation with the Bonneville Power
Administration, and the Electric Power Plan adopted by the Northwest Power and
Conservation Council; and
WHEREAS, on February 7, 2010 the City Council of the City of Port Angeles
adopted Ordinance No. 3391 to create a Conservation and Renewable Energy Program fund
for acquiring cost effective energy conservation measures, renewable energy systems, and
distributed generation resources; and
WHEREAS, RC W 19.280.030 requires the City to regularly update its Electric
Utility Resource Plan at minimum intervals of every two years; and
WHEREAS, the City Council of the City of Port Angeles Washington, being the
governing body of the consumer -owned electric utility did, after public notice, hold public
hearings on the 7th of August 2012 and the 21 of August 2012 to provide the public
the opportunity to comment on the 2012 Electric Utility Resource Plan.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Port Angeles Washington that the 2012 Electric Utility Resource Plan as prepared by the
Director of Public Works and Utilities and attached hereto as Exhibit A be approved; and
-1-
BE IT FURTHER RESOLVED that the 2012 Electric Utility Resource Plan,
together with this Resolution, shall be electronically filed (through the Internet) with the
Department of Commerce of the State of Washington (no later than the 3rd of September
2012) and also be published and made available to the public through the City of Port
Angeles website.
PASSED by the City Council of the City of Port Angeles at a regular meeting of
said Council held on the 21 day of August 2012.
Cherie Kidd ayor
ATTEST:
BY: (-°7/intfi J
J Hurd, City Clerk
APPROVED AS TO FORM:
By: AL%
William E. Bloor, rty Attorney
G \LEGAL \a ORDINANCES &RESOLUTIONS\RESOLUTIONS 2012 \17 Council 2012 Resource Plan Resolution docx
S
-2-
EXHIBIT A: Washington State 2012 Electric Utility Resource Plan
City of Port Angeles Utility Name
Prepared by: Phil Lusk I
Base Year 5 Yr. Est., 10 YrEst.'.
V 1- 'P n F E tun fe Year 2011 2017 2020
Period Annual Annual Annual
"T s t 3x 4',P F� s rn. y F ,n• e 4s r a rva r
s j ,-'''..:1/41,1 a 6 i E.* y d Ura `L*
(,MIa (MWar N M,Wa)1 J
i 3' c o-i3O+� t4 2 a.3 Sc 14- ,-1, ,`4'+> y. 17i .d, `Y ank t 4.1 .9 g...4.4. -v a e 4 04414S, Fa.w' +4 ,VAVA L :"'4
Loads 87 74 88.23 90.79
Resources: a Q
New Future Conservation/Efficiency
Y �;;.a«''"''7; 2.13 3.67
New Demand Response 4 0.31 0.83
BPA Tier 1 (include BPA PF) 87.50 85.70 86.20
BPA Tier 2
Non BPA: u e f.,
Co- generation
Hydro (critical water) 0.15 0.00 0.00
Wind
Other Renewables
Thermal Natural Gas
Thermal -Coal
Market Purchase (non BPA) 0.09 0.09 0.09
Other
Total Resources 87.74 88.23" ti °90.79'
Load Resource Balance 0.00 s, 0.00_ r, ,0 ''00
Date of City Council Approval 08/12 ((mm /yy)