4
A RESOLUTION of the City Council of the City
of Port Angeles authorizing the execution
of an amendment to the power sales contract
between the City of Port Angeles and the
United States of America, Department of
Energy, acting by and through the Bonneville
Power Administrator, relating to the delivery
of power to the Crown Zellerbach Corporation.
5
WHEREAS, the City of Port Angeles, a municipal corpora-
6 tion of the state of Washington (hereinafter referred to as the
7 "City"), "is authorized by law to enter into contracts for the de-
8 livery and sale of electric power; and,
9
WHEREAS, the United States of America, Department of
10 Energy, acting by and through the Bonneville Power Administrator
11 (hereafter referred to as "Bonneville"), has requested that the
12 City amend its power sales contract (Contract No. 14-03-59315) to
13 permit the transmission of electrical energy delivered at Port
14 Angeles for sale to the Crown Zellerbach Corporation to be deliver-
15 ed to the Crown Zellerbach Corporation plant in Port Townsend,
16 Washington; now, therefore,
17
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
18 ANGELES, as follows:
19 The Mayor of the City of Port Angeles is hereby author-
20 ized and directed, on behalf of the City, to execute with Bonne-
21 vil1e Revision No.1 to Exhibit D to Contract No. 14-03-59315, a
22 copy of which is attached to this ReSOlution, and incorporated by
23 reference. Said provision to expire June 30, 1980.
24 ADOPTED by the City Council of the City of Port Angeles
e 25 at a regular meeting of the Council held on the ~d day
26 of June, 1980.
27
-:"",,,,'..'"'~"
~":-
A~#~..-(
28
29 AT:r~ST : -
30 ~~,/~~".
Mar1an C. Parrish, City Clerk
31
32
APPROVED AS TO FORM:
~ ~~.-'.n
7 ~/
craig~ M111er, C1ty Attorney
"\
~.
I
e
,
...
.
Revision NO~ 1
EXHIBIT D - Page 1 of 2
Contract No. 14-03-59315
Effective at 2400 hours on
December 29, 1979
Points of Delivery to
The City of Port Angeles, Washington
1. CROWN ZELLERBACH POINT OF DELI \ER Y:
Location: the point in the Government's Port Angeles substation where the
69 kV facilities of the Government and Crown Zellerbach Corporation are
connected;
\01 tage : 69 k V;
Meterinq: in the Government's Port Angeles substation, in the 69 kV
circuit over which the Administrator delivers such electric power and
energy to Crown Zellerbach;
Exception: during the term of Contract No. DE-MS79-80BP90129 between
Bonneville and Crown Zellerbach Corporation, the metered amounts for
billing purposes will be increased as follows:
(1)' the kilowatthour metering amount will be increased by 5239
kilowatts multiplied by the hours in the billing periOd during which
the agreement is in effect; provided, however, that if the average
hourly generation from Crown Zellerbach's hydroelectric projects on the
Elwah river drops below 5239 kilowatts for any month, or if the energy
made available for wheeling drops below 5239 average kilowatts, such
lesser amount shall be substituted for the 5239 kilowatts for such
month;
(2) the maximum monthly metered demand for any period during which
energy is wheeled pursuant to section (1) will be increased by 6950
kilowatts to determine maximum demand;
(3) power factor will be calculated from actual metering amounts, not
affected by any adjustment, and the penalty factor will apply if the
power factor is less than 0.95;
2. PORT ANGELES POINT OF DELI \cRY:
Location: the point in the Government's Port Angeles substation where
the 69 kV facilities of the Government and the Purchaser are connected;
\01 tage : 69 k V;
Metering: in the Government's Port Angeles substation, in the 69 kV
circuit over which the Administrator delivers such electric power and
energy to the Purchaser;
-;
.
e
,.
II
...
.
Revision No. 1
EXHIBIT 0 - Page 2 of 2
Contract No. 14-03-59315
Effective at 2400 hours on
December 29, 1979
RAyoNIER POINT OF DELI~RY:
Location: the point in the Government's Port Angeles substation where the
69 kV facilities of the Government and ITT Rayonier Incorporated are
connected;
\t:}l tage: 69 k V;
Metering: in the Government's Port Angeles substation, in the 69 kV
circuit over which the Administrator delivers such electric power and
energy to lTT Rayonier Incorporated.
APPRO \ED:
UNITED STATES OF AMERICA
Department of Energy
TI-E CITY OF PORT ANGELES, WASHINGTCN
~1fI~~
Title ~
PCI-0282A