Loading...
HomeMy WebLinkAbout29-79• • RESOLUTION NO. 029'79 WHEREAS pursuant to RCW 35.77.010 and RCW 36.81.121, the City of Port Angeles is required to review its Six Year Comprehensive Street Program annually, AND WHEREAS pursuant to said laws, the City Council of the City of Port Angeles, Washington being the legislative body of said City, did hold a public hearing on the review and revision of said comprehensive plan on the 4th day of September , 1979. WHEREAS all written and oral objections to the comprehensive plan as prepared by the City of Port Angeles, Washington relative the street program for the ensuing six years within the City of Port Angeles, Washington, were considered. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles, Washington, that the comprehensive plan as prepared by the City Engineer, dated August, 1979 for the City of Port Angeles, Washington, be and the same is hereby adopted. BE IT FURTHER RESOLVED that a copy of said comprehensive street program for the ensuing six years, attached hereto, together with a copy of this resolution is filed with the Director of Highways of the State of Washington. Passed by the City Council ATTEST: Marian C. Parrish City Clerk CITY OF PORT ANGELES 4 • PROJECT DESCRIPTION FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND SIRES FUND SOURCES TOTAL ART FUND UAB.FUND STREET FUND FAM OTHER LID PROJECT COST 1980 RESURFACING: Downtown Streets Cherry Hill Streets (Phase I) "L" St. -18th to Boulevard Sunrise Heights alleys (Phase I) Race St. -8th to Bryson SIGNALIZATION: 8th & "C" St. intersection (Design) OTHERS: 40,000 20,000 20,000 20,000 20,000 20,000 (Port) 20,000 60,000(FED) 40,000 20,000 40,000 20,000 100,000 6,000 4,000 10,000 14th & "K" St. LID (under const. 1979) Tumwater Bridge Reconstruction 540,000 (Construction) Downtown Pavement Marking Residential Sealcoating (Final Phase) 1980 TOTALS - 546,000 60,000 12,000 196,000 20,000 350,000 20,000(FASP) 350,000 600,000 12,000 100,000 350,000 1,212,000 PROJECT DESCRIPTION FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND *US FUND SOURCES TOTAL ART FUND UAB.FUND STREET FUND FAM OTHER LID PROJECT COST 1981 RESURFACING: Cherry Hill Streets (Phase II) Sunrise Heights alleys (Phase II) Race St. -Front to 8th St. Campbell Ave. -Mt. Angeles Rd. to Wabash Ave. (widen & resurface) 20,000 SIGNALIZATION: 8th & "C" St. intersection 60,000 (construction) PAVING: Laurel St.- Viewcrest to Ahlvers Milwaukee Drive - "N" St. to 10th "0" Street -10th to 18th- St. OTHERS: CBD By -Bass over White's Creek Bridge modifications Blvd at Race(widening) Golf Course Road First St. to Melody Lane (widen, regrade) 20,000 20,000 20,000 20,000 15,000 54,000 20,000 20,000 60,000 65,000 10,000 70,000 6,000 24,000 80,000 20,000 100,000 100,000 1981 TOTALS - 260,000 1,700,000 • 100,000 • 100,000 200,000 100,000 30,000 100,000 100,000. 1,700,000 100,000 500,000 196,000 1,744,000 415,000 150,000 2,765,000 PROJECT DESCRIPTION FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND • CES FUND SOURCES ART FUND UAB.FUND STREET FUND FAM OTHER LID PROJECT COST 1982 RESURFACING: Ediz Hook Roadway 8th St.- Lincoln to Race Peabody St. -Front to 8th Cherry Hills Streets (Phase III) PAVING: 30,000 40,000 30,000 20,000 "M" St.. -10th to 18th St. . 70,000 OTHERS: "N" St. Widening 14th to 18th McDougal St. Widening Craig Ave. to Homestead Ave. Eunice St. connection to Park Ave. Highland View Area LID (Craig, Grant, Olympus) 20,000 - 20,000 1982 TOTALS 230,000 20,000 30,000 270,000 20,000 20,000 50,000 310,000 300,000 300,000 60,000 60,000 20,000 • 70,000 20,000 40,000 20,000 300,000 300,000 890,000 4 • PROJECT DESCRIPTION FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND S(ES FUND SOURCES TOTAL ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT COST 1983 RESURFACING: Washington St. -Blvd. to Park Park Ave. -Race St. to college 10th St. - "N" St. to bluff Race.St.-Bryson to City Limits Old Mill Road - Ahlvers Rd. to City Limits SIGNALIZATION: Blvd & Race intersection (Design) 1983 TOTALS 20,000 20,000 40,000 40,000 80,000 100,000 20,000 100,000 100,000 40,000 40,000 10,000 10,000 120,000 10,000 180,000 310,000 4 PROJECT DESCRIPTION FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND SLOES FUND SOURCES TOTAL - ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT COST 1984 RESURFACING: Cherry Street -8th to Blvd. (widening & resurfacing) 5th St.- Lincoln to Race SIGNALIZATION: Blvd. & Race intersection (construction) PAVING: Milwaukee Drive -loth to 18th OTHERS: Fairmont Ave. to "C" St. Blvd. to 101 area LID 135,000 1984 TOTALS 135,000 15,000 150,000 80,000 80,000 7a,000 70,000 150,000 150,000 400,000 400,000 245,000 70,000 400,000 850,000 4 • PROJECT DESCRIPTION FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND AWES FUND SOURCES TOTAL ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT COST" 1985 RESURFACING: Cherry St. -2nd to 8th St. 2nd St.- Cherry to Pine Valley St. -1st to 2nd 5th St.- Tumwater to "C" St. "C" St. -5th to Blvd. PAVING: 30,000 6,000 5,000 6,000 6,000 24,000 24,000 24,000 30,000 30,000 5,000 30,000 30,000 Pine St. -Blvd. to Highway 101 12,000 48,000 60,000 OTHERS: 8th St. Bridges Replacement(Design) 1985 TOTALS 100,000 40,000 100,000 105,000 60,000 200,000 180,000 385,000 TOTAL SIX YEAR PROGRAM -- 1,041,000 1,092,000 2,074,000 825,000 1,380,000 6,412,000