HomeMy WebLinkAbout29-79•
•
RESOLUTION NO. 029'79
WHEREAS pursuant to RCW 35.77.010 and RCW 36.81.121, the City
of Port Angeles is required to review its Six Year Comprehensive Street
Program annually, AND
WHEREAS pursuant to said laws, the City Council of the City
of Port Angeles, Washington being the legislative body of said City, did
hold a public hearing on the review and revision of said comprehensive plan on
the 4th day of September
, 1979.
WHEREAS all written and oral objections to the comprehensive plan
as prepared by the City of Port Angeles, Washington relative the street
program for the ensuing six years within the City of Port Angeles, Washington,
were considered.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of
Port Angeles, Washington, that the comprehensive plan as prepared by the City
Engineer, dated August, 1979 for the City of Port Angeles, Washington, be and
the same is hereby adopted.
BE IT FURTHER RESOLVED that a copy of said comprehensive street
program for the ensuing six years, attached hereto, together with a copy of
this resolution is filed with the Director of Highways of the State of
Washington.
Passed by the City Council
ATTEST:
Marian C. Parrish
City Clerk
CITY OF PORT ANGELES
4
•
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND SIRES FUND SOURCES TOTAL
ART FUND UAB.FUND STREET FUND FAM OTHER LID PROJECT
COST
1980
RESURFACING:
Downtown Streets
Cherry Hill Streets
(Phase I)
"L" St. -18th to Boulevard
Sunrise Heights alleys (Phase I)
Race St. -8th to Bryson
SIGNALIZATION:
8th & "C" St. intersection
(Design)
OTHERS:
40,000
20,000
20,000
20,000
20,000
20,000 (Port)
20,000 60,000(FED)
40,000
20,000
40,000
20,000
100,000
6,000 4,000 10,000
14th & "K" St. LID (under const. 1979)
Tumwater Bridge Reconstruction 540,000
(Construction)
Downtown Pavement Marking
Residential Sealcoating
(Final Phase)
1980 TOTALS - 546,000
60,000
12,000
196,000 20,000
350,000
20,000(FASP)
350,000
600,000
12,000
100,000 350,000 1,212,000
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND *US FUND SOURCES TOTAL
ART FUND UAB.FUND STREET FUND FAM OTHER LID PROJECT
COST
1981
RESURFACING:
Cherry Hill Streets
(Phase II)
Sunrise Heights alleys
(Phase II)
Race St. -Front to 8th St.
Campbell Ave. -Mt. Angeles Rd.
to Wabash Ave. (widen &
resurface)
20,000
SIGNALIZATION:
8th & "C" St. intersection 60,000
(construction)
PAVING:
Laurel St.- Viewcrest to
Ahlvers
Milwaukee Drive - "N" St. to 10th
"0" Street -10th to 18th- St.
OTHERS:
CBD By -Bass over White's Creek
Bridge modifications
Blvd at Race(widening)
Golf Course Road
First St. to Melody Lane
(widen, regrade)
20,000
20,000
20,000 20,000
15,000 54,000
20,000
20,000
60,000
65,000
10,000 70,000
6,000 24,000
80,000 20,000
100,000 100,000
1981 TOTALS - 260,000
1,700,000 •
100,000 •
100,000
200,000 100,000
30,000
100,000
100,000.
1,700,000
100,000
500,000
196,000 1,744,000 415,000 150,000 2,765,000
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES. FUND SOURCES FUND SOURCES FUND • CES FUND SOURCES
ART FUND UAB.FUND STREET FUND FAM OTHER LID PROJECT
COST
1982
RESURFACING:
Ediz Hook Roadway
8th St.- Lincoln to Race
Peabody St. -Front to 8th
Cherry Hills Streets
(Phase III)
PAVING:
30,000
40,000
30,000
20,000
"M" St.. -10th to 18th St. . 70,000
OTHERS:
"N" St. Widening
14th to 18th
McDougal St. Widening
Craig Ave. to Homestead Ave.
Eunice St. connection to
Park Ave.
Highland View Area LID
(Craig, Grant, Olympus)
20,000 -
20,000
1982 TOTALS 230,000
20,000
30,000
270,000
20,000
20,000
50,000 310,000
300,000
300,000
60,000
60,000
20,000 •
70,000
20,000
40,000
20,000
300,000
300,000 890,000
4
•
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND S(ES FUND SOURCES TOTAL
ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT
COST
1983
RESURFACING:
Washington St. -Blvd. to Park
Park Ave. -Race St. to college
10th St. - "N" St. to bluff
Race.St.-Bryson to City Limits
Old Mill Road - Ahlvers Rd. to
City Limits
SIGNALIZATION:
Blvd & Race intersection
(Design)
1983 TOTALS
20,000
20,000
40,000
40,000
80,000
100,000
20,000
100,000
100,000
40,000
40,000
10,000 10,000
120,000 10,000
180,000 310,000
4
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND SLOES FUND SOURCES TOTAL -
ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT
COST
1984
RESURFACING:
Cherry Street -8th to Blvd.
(widening & resurfacing)
5th St.- Lincoln to Race
SIGNALIZATION:
Blvd. & Race intersection
(construction)
PAVING:
Milwaukee Drive -loth to 18th
OTHERS:
Fairmont Ave. to "C" St.
Blvd. to 101 area LID
135,000
1984 TOTALS 135,000
15,000 150,000
80,000 80,000
7a,000 70,000
150,000 150,000
400,000 400,000
245,000 70,000
400,000 850,000
4
•
PROJECT DESCRIPTION
FUND SOURCES FUND SOURCES FUND SOURCES FUND SOURCES FUND AWES FUND SOURCES TOTAL
ART FUND UAB FUND STREET FUND FAM OTHER LID PROJECT
COST"
1985
RESURFACING:
Cherry St. -2nd to 8th St.
2nd St.- Cherry to Pine
Valley St. -1st to 2nd
5th St.- Tumwater to "C" St.
"C" St. -5th to Blvd.
PAVING:
30,000
6,000
5,000
6,000
6,000
24,000
24,000
24,000
30,000
30,000
5,000
30,000
30,000
Pine St. -Blvd. to Highway 101 12,000 48,000 60,000
OTHERS:
8th St. Bridges
Replacement(Design)
1985 TOTALS
100,000 40,000
100,000 105,000
60,000 200,000
180,000 385,000
TOTAL SIX YEAR PROGRAM -- 1,041,000 1,092,000 2,074,000 825,000 1,380,000 6,412,000