Loading...
HomeMy WebLinkAbout29-81 - . :mr 1/. 8, r 8. t I RESOLUTION NO. ~ '1- ~I A RESOLUTION of the City of Port Angeles authorizing the Mayor and City Clerk to execute an agreement between the City of Port Angeles and the Washington State Department of Transportation for funding of improvements and signing and marking of existing railroad crossings within the City. WHEREAS, the City of Port Angeles wishes to improve the signing and marking of certain existing railroad crossings within the ci~y limits; and WHEREAS, funding for this project is available through the federal aid programs, administered by the Washington State Department of Transportation; and WHEREAS, it is necessary for the City to execute an agreement with the Department of Transportation in'''order to re- ceive these monies; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ANGELES, as follows: Section 1. The Mayor,and'City~Clerk are hereby authorized and directed to execute a properly completed and acceptable as to form agreement between the City of Port Angeles and the Washington State Department of Transportation for funding of improvements and the signing and marking of certain existing railroad crossings within the City of Port Angeles. DATED this 13rJ. day of August, 19 81. ~<~~Pd~ ~ A 0 R ATTEST: ~~.~ Marian C. Parrish, City Clerk APPROVED AS TO FO~1: City of PI rt Angeles Department of Pl 1 c Works DATE FEDERAL AID PROJECT NUMBER if;" ~...--~,- AGENCY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION CITY/COUNTY AGREEMENT R R' P - 0 0 0 S ( AGREEMENT NUMBER The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Tille 23, U.S. Code Highways, (2) the regulations issued pursuant thereto. (3) Office of Management and Budget Circular A-102, (4) the policies and procedures promulgated by the Washington State Department of Transportation and. (5) the Federal-aid Project Agreement entered into between the State and Federal Government, relative to the above project. the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which areto be obligated for the project may not exceed the amount shown herein on line p., column (3) without written authority by the State, subject to the approval of the Federal Highway Administrator. All project costs not reimbursed by the Federal Governmentshalt be eesponsibility of the Local Agency. PROJECT DESCRIPTION Name On r,radp Railroad Crossings Various Crossings within City of Port Angeles Length n/il.' . ,h Termini Description of Work In'~tal1 ati on of ,~ail road crossbuck. advance warning signs and marki ngbnSeattle and"North Coast Rail road tracks. Signs to conform and materi~l with latest MUTCD, to be installed by 'local forces: ' pavement in size >1~ Prog. W.S,D.O,T. USE ONLY Work Order Accounting Plan F.C, c.s. TYPE OF WORK (IJ Estlmaled Total Project Funds ESTIMATE OF FUNDING (2) estimated Agency Funds (3) estlmaled Federal Funds ~~~At. WOAP No ALJ1h. ay Date WOAP AMOUNT AlfIJi CODE P.E. a. Agency Work ............ .. .. .. ., ,.........,........ b. Slate Services ,................... ................... c, Other ....,....................... ............,,,.... ci, Total Prelim. Eng. Cost Estimate Right-of-Way e.-Agency Work,... .. ...... ..."... ",,"...... f. State Services ...."........."... .......... ......". ..., g. Other,.......................,... . .......... ...."... h. Total R/W Cost Estimate Construcllon i. Conlract .,........,.... Engineering {j. Agency Force .. 15 % k. Slate Force .... I. Audit ......................,.... . m. Other ................."......" ,............"".. " .. ..-~.$~,Q,...... .,... .~~.~.... ...., .2J.l5.... ...".. .~~.Q....... ....... 2.5.... .. ..... 22,5:... .. . .... .lO,/!, ,..... ..".. .10. ... .........92.... .. .. .. ..50.0,....... ....... 5.0. ... ....... ~5Q.... n. Other ........."".............. o. Total Construction Cost Estimate p. T~T6'JEg~ST ESTIMATE OF THE ...... 3202.... ... ..... 320.... 32 32 ................ 2882 2882 The Federal-aid participation rate in this project will be determined by the Federald Government. The parties expect that it will be 90 %: however. it is understood that the rate may vary. The Local Agency agrees that this agreement is entered without relying upon any represenlalion by the Stale made outside of this contract, or contained herein. as \0 what the Federal participation rate will be. 1\ further agrees that it will not 'condition any future aClions with respect to the project covered by this agreement upon past, current, or future represenlalions as to the Federal ~.parliclpation rate. The dollar amount 01 Federal participation cannot exceed the amount shown in line p.. column (3), All costs nOI reimbursed by t,lederal Government will be the responsibility 01 the Local Agency. . CONSTRUCTION METHOD OF FINANCING STATE AD & AWARD . '1VIETHODA"'\- Advance Payment - Agency Share of Total Construction Cost (Based on Contract Award) . .. ... . .. . ( "~TI1C~~ Withhold From Gas TalC the Agency's Share of Total Construction Cost (line 0., Co~2) In the amount of $ at $ per month for _ months ............. ( (Check Method Selected) LOCAL FORCE OR LOCAL AD & AWARD METHOD C _ Agency Cost Incurred with Partial Reimbursement ........".......,.".."......."......"...... ( X The Local Aqencv further stipulates that pursuant to said Tille 23. regulations and policies and procedures, and as a condition ,.to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions set forth on the reverse hereof. Adopted by official action on August 18 ,19 81 . Resolution/Ordinance No. 2981 . WASHINGTON STATE OEPARTMENT OF TRANSPORTATION By: By: Sta(e Aid Engin~ DOT FORM 1.lHl39 REVISED 3/l11 ~, Cate Er;ecuted