PORT ANGELES. PLANNING COMMISSION
321 East Fifth Street
Port Angeles, W A 98362
February 13, 1991
7:00 P.M.
I. CALL TO ORDER
ll. ROLL CALL
ID. APPROVAL OF MINUTES: Special Meeting of January 23, 1991
IV. PUBUC HEARING:
1.
SHORELINE MANAGEMENT PERMIT - SMA 91(02)113 - ITI'
RA YONIER6 North Ennis Street: Proposal to demolish two existing structures
including fill to grade at the site of the demolished structures, including
modification of an existing chip transport system.
2. REQUEST TO CIRCULATE AN ANNU.A nON PETITION - ANX 91(02)01
- HEERSCHAP. Lindbeli/Golf Course Road area: Request to annex
approximately 13.97 acres.
3. CONDlTIONAL USE PERMIT - CUP 9H02l04 - CH11~nERS. Northeast
comer of Eunice and GeoIiiana Streets: Proposal to develop a day care center
for up to 70 children per day in a RS-7, Residential Single-Family District.
V. COMMUNlCA nONS FROM THE PUBLIC
VI. STAFF REPORTS
VII. REPORTS OF COMMISSION l\fEMBERS
VIII. ADJOURN1\fENT
All correspondence pertaining to a hearing item received by the Planning Depanment at least one day prior to the
scheduled hearing wiu be provided to Commission members before the hearing.
Plarm.ing Commiaion: Lany Leonard, Chair; Ray Gruver, Vice-Chllir. Bill Anabel: Roger Cans; Cindy SoudcB: 1im Hulell; Bob Philpott.
P1srming Staff: Brad Collins. PIaDnini Director. Sue Roberds. PIIDlling Office Specialia., JohIl1imeE*)D, Aaociltc Planner.
Planning Commission Agenda
Page 2
.
..
PUBLIC HEARING PROCEDURE:
Spokesmen for the proponents and opponents will be given an opportunity to speak to the
request. Information submitted should be factual, relevant and not merely duplication of a
previous presentation. A reasonable time (10 minutes) shall be allowed the spokesman; others
shall be limited to short supporting remarks (5 minutes). Other interested parties will be allowed
to comment briefly (5 minutes each) or make inquiries. The Chairman may allow additional
public testimony if the issue warrants it. Brief rebuttal (5 minutes) for proponents and opponents '.
heard separately and consecutively with presentation limited to their spokesman. Rebuttal shall
be limited to factual statements pertaining to previous testimony. Comments should be directed
to the Planing Commission, not the City Staff representatives present, unless directed to do so
by the Chairman.
.
.
.
PLANNING COMMISSION
Port Angeles, Washington
February 13, 1991
I CALL TO ORDER
Chairman Leonard called the meeting to order at 7:05 P.M.
II ROLL CALL
Members Present:
Roger Catts, Jim Hulett, Larry Leonard,
Bob Philpott, Cindy Souders, Bill Anabel.
Members Absent:
Ray Gruver.
Staff Present:
Brad collins, John Jimerson, Ken Ridout,
Bruce Becker.
Chairman Leonard introduced John Jimerson, the newly hired
Associate Flanner to those present, and welcomed him to the
staff.
III APPROVAL OF MINUTES
Mr. Philpott moved to approve the minutes of the January 23,
1991, meeting, with kudos to Sue Roberds for doing a fine job
in preparing them. Mr. Hulett seconded the motion which
passed 6 - o.
IV PUBLIC HEARINGS
SHORELINE MANAGEMENT PERMIT SMA-91(02)113 ITT
RAYONIER, North Ennis Street: Proposal to demolish two
existing structures, including fill to grade at the site
of the demolished structures, including modification of
an existinq chip transport system.
Mr. Jimerson reviewed the Department Report. Mr. Philpott
asked for a clarification on the Shoreline Management Program
policy pertaining to open piling construction for a bulkhead.
Mr. Collins explained that policy was for new bulkheads, and
then described the difference between open piling and sheet
piling. Further, Mr. Collins explained to the Commission that
because the SEPA review period has not yet passed, the city
Council will not be taking action on this request at its next
meeting, but will have to continue the matter to the March 5th
meeting before the Council may take action. He explained this
will not affect the Planning Commission, and they may take
action at this meeting.
Mr. Hulett asked if there were any EPA or OSHA requirements
to control particulate matter into the air during the
demolition period. Mr. Collins responded there were no
PLANNING COMMISSION
February 13, 1991
Page 2
.
special requirements of which he was aware, but if the
Planning Commission deemed it necessary, they could impose
conditions to control the dust and particulate matter.
Chairman Leonard asked if in the event the bulkhead does need
to be rebuilt or bulked up, will it need an additional
Shoreline Permit. Mr. Collins responded that since the
rebuilding of the bulkhead is a condition of the approval for
this Shoreline Permit, it would not need an additional permit.
Chairman Leonard opened the public hearing at 7:25 P.M.
Brian Jones, the applicant noted that the materials from the
demolition will either be salvaged or put into the chippers,
and any other materials will be put in ITT's own landfill.
He noted they will not be using the City Landfill, nor will
they be burning any materials on-site. Mr. Jones explained
that 70% of the chip conveyor system is currently exposed.
The demolition of the buildings will result in the remaining
30% being exposed to the outside. He added that this
additional 30% will not result in a significant increase in
noise.
.
Mr. Catts asked if there would be any hazardous materials
encountered in the demolition, such as asbestos. Mr. Jones
responded no, there are not, and if there were, ITT has the
personnel and staff to appropriately dispose of any hazardous
materials.
Scott Bird, 1330 Airport Road, expressed concern pertaining
to the environmental review conducted for the project.
Specifically, he cited concerns over potential erosion on-
site, impacts on wildlife, and noise during the construction
period. Mr. Collins responded by explaining the environmental
review process, adding that the determination of non-
significance is appealable.
Bill Kopp, 1 Whitney Way, expressed concern regarding the
normal operation of the conveyor system. He was concerned
there will be an increase in the noise level with the
additional conveyor belt being exposed and he asked if that
noise level can be quantified before the work occurs so if
there is a solution, it can be addressed at this time, rather
than after the fact. Mr. Collins stated it would require a
technical study to quantify the increase of noise and he cited
the applicant's testimony that the conveyor belt will not
significantly increase the noise.
.
Sue Trump, 1838 Harborcrest, stated she had not received all
the information pertaining to the project as she had
requested, and she asked the Planning commission not to make
a decision tonight to allow her opportunity to review the
information. She also stated the checklist submitted for the
environmental review contains inconsistencies and the
Determination of Non-significance should not be based on that
PLANNING COMMISSION
February 13, 1991
Page 3
.
checklist because of the inconsistencies. She also stated she
was concerned with the potential increase in noise.
Ernest Lato, 1802 Harborcrest, asked what type of conveyor
would be installed. Chairman Leonard explained there would
not be a new conveyor installed; that the existing conveyor
would continue operation.
Mr. Jones made the following statements in response to
questions by the commission:
The operation of the chip handling facilities, including the
conveyor, will not change. The chip storage system will not
change. The truck dumping which occurs outdoors right now
will continue to occur outdoors. He noted that the conveyor IS
noise will be suppressed by hoods to cover the system.
The building height is 100 feet, which is approximately the
height of a four-story building; that the conveyor belts are
located at ground level and rise to approximately half the
height of the building. He noted that there are larger
structures on the Mill to the south, located between the
building to be destroyed and the residential areas.
.
There possibly could be a chip processing facility placed on
the site where the building is being demolished, but that is
some time in the future, and he understands that any change
of use of this site will require additional permit review.
The building does not act as a sound barrier between a noise-
generating operation and the homes. The only facility to the
north is the dock, which does not generate significant amounts
of noise.
Keith Lawler, project manager for ITT Rayonier, explained the
demolition process; that they would most likely begin with the
top of the building and work down. This is necessary to
protect the conveyor system. He stated the demolition process
will last two and one-half to three months and that hours of
demolition will be normal daytime hours, between 9 AM and 4
PM, Monday through Friday. He then corrected the starting
time to 7:30 A.M.
Mr. Lawler explained there is an existing roadway and rock
bulkhead between the beach and the area where the fill is
going to occur. This roadway and bulkhead will prevent any
erosion from occurring.
.
Chris Thomas, 1836 Harborcrest, stated that the information
she had received on the project had led her to believe there
would be new construction occurring as a result of this
permit. Mr. Collins explained that there were additional
communications between the Planning Department and the
applicant which clarified exactly what the project contained,
.
.
.
PLANNING COMMISSION
February 13, 1991
Page 4
and that Ms. Thomas apparently had not received those
communications.
Ms. Thomas noted there were inconsistencies contained on the
environmental checklist and asked how the determination of
non-significance could be made, based on that checklist. Mr.
Collins responded that the Planning Department had contacted
the applicant after the checklist was submitted to clarify
exactly what the project was, and that the determination of
non-significance was made, based on not only the checklist,
but also on subsequent communications with the applicant.
Chairman Leonard closed the public hearing at 8:05 P.M.
Mr. Hulett asked staff for background information pertaining
to the present situation on noise monitoring of the chip
operation. Mr. Collins responded that a lengthy noise study
had been conducted and a new fence was proposed as a
mitigation to that noise. He added that to his knowledge,
cooperation between the parties for building the noise barrier
has since fallen apart and he understands the neighbors are
proceeding with a lawsuit.
Mr. Hulett asked the applicant if the conveyor system
currently within the building will, once exposed, be covered
by some sort of structure. Mr. Jones responded that initially
it probably will not, but at some time in the future, it very
well may be covered to protect it from the weather. He
explained that the cover would be a fiberglass hood. He noted
the longest exposed area of conveyor would be approximately
70 feet.
Mr. Hulett asked if there are any operations in the Mill which
are louder than the conveyor belts. Mr. Jones explained there
are several operations which are considerably louder than the
conveyor belt.
Mr. Catts stated that well-maintained conveyor belts do not
pose a high noise level.
Mr. Philpott moved to recommend the City Council approve this
Shoreline Substantial Development Permit, subject to the
following findings, and citing the fOllowing findings and
conclusions:
CONDITIONS:
A. Demolition of the existing buildings will require a
demolition permit.
B.
A hydraulic permit must be obtained from the Fisheries
Marine Division for any repairs to the bulkhead/retaining
wall and fill drainage.
PLANNING COMMISSION
February 13, 1991
Page 5
.
C.
Upon completion of demolition, submit to the Public Works
Department a grading plan which clearly shows the loca-
tion and amount of fill to be placed on-site." Additional
retaining walls may be required, based on the City I S
review of the grading plan.
D. Submit to the Public Works Department a sketch and cross
section of the bUlkhead/retaining wall and a letter from
a licensed engineer stating the bUlkhead/retaining wall
will support the additional load created by the fill.
FINDINGS:
1. The proposal does not involve a new use or improvement
to the property.
2. The proposal does not involve any discharges of waste
materials to surface or ground water.
3. The precise amounts and location of fill required will
not be known until demolition has occurred.
CONCLUSIONS:
A.
The proposed work is a relatively minor modification to
the existing industrial use.
.
B. The proposal is consistent with the policies and regula-
tions of the Port Angeles Shoreline Master Program, the
Port Angeles comprehensive Plan, and the Port Angeles
Zoning Code.
C. Submittal of a grading plan to the city prior to con-
ducting the fill operations will ensure the existing
bulkhead/retaining wall, with any additional support, is
adequate to support the loads created by the fill.
D. The grading plan can also be used to determine if addi-
tional retaining walls are necessary, to be consistent
with policy F.12.e of Article 17 of the Shoreline Master
Program, which requires the perimeters of fill areas to
be provided with retaining walls.
Mr. Hulett seconded the motion, which passed 6 - O.
REQUEST TO CIRCULATE AN ANNEXATION PETITION - ANX-
91(02) 01 - HEERSCHAP, Lindberg/Golf Course Road Area:
Reauest to annex approximatelY 13.97 acres.
.
Mr. Collins reviewed the Department Report. Mr. Collins
answered questions from the Commissioners concerning the
proposal and staff recommendations for assumption of the
city's indebtedess and RS-9 Zoning designation.
PLANNING COMMISSION
February 13, 1991
Page 6
.
Mr. Ridout, Deputy Director of Public Works, answered
questions from the Commissioners concerning the provision of
services to the area proposed to be annexed.
Chairman Leonard opened the public hearing at 8:30 P.M.
Jim Green, 10703 134th Street NW, Gig Harbor, representing
the applicant, stated he is interested in determining what the
costs of annexation would be and also, they are interested in
moving forward with the annexation. He noted he has been in
contact with the property owner for the 6 acres to the south,
which is known as the Freeman property, but does not know what
his intentions are regarding any annexation proposals. He
expressed the desire to have the property zoned RMF and RS-9
prior to annexation.
Chairman Leonard closed the public hearing at 9:00 P.M.
Following discussion, Mr. Hulett moved to approve the request
to circulate a petition to annex the property, with the
assumption of the full bonded indebtedness and adoption of RS-
9 Zoning regulations. This motion was seconded by Mr.
Philpott. The motion carried unanimously.
.
CONDITIONAL USE PERMIT CUP-91(02)04 CHILDERS,
Northeast corner of Eunice and Georgiana Streets:
Proposal to develop a day care center for up to 70
children per day in an RS-7, Residential Single-Family
District.
Mr. Jimerson reviewed the Department Report and answered
questions from the Commission. Chairman Leonard opened the
public hearing at 9:20 P.M.
Jane Childers, 3235 Durrwachter Road, explained her intention
to construct a day-care center. She explained there is a need
for day-care facilities in residential areas. She addressed
the traffic concerns, stating that a school bus stop is
located at the corner of the property and many of the after-
school children will be getting off the bus and going to the
day-care center. She also noted that many clients have two
children who will be under the care of the day-care center,
thereby reducing the number of trips generated. Ms. Childers
explained to the Planning Commission the State's requirements
for providing interior floor area and exterior play areas for
the children, and noted that once the facility is constructed,
the State will inspect it to ensure that it meets Code
requirements.
.
Dan Hayward, 636 Georgiana Street, expressed concern with the
proposed day care center, citing concerns with traffic, noise,
and preservation of the residential character of the
neighborhood. He noted he has circulated a peti tion in
opposition to the day-care to people within the neighborhood
PLANNING COMMISSION
February 13, 1991
Page 7
.
and had presented it to the Planning staff. He feels the
residents have been working hard to improve the neighborhood
and introduction of the day-care facility would be contrary
to the improvements they have been striving for. He stated
the intent of the zoning in allowing day-care usess in
residential zones should be limited to those types of centers
that might have only a few children, and where the day-care
provider lives on the premises.
Glen Wiggins, 702 Caroline Street, stated he had moved to the
neighborhood because of the quiet character of the street and
the view of the water it provides. He stated a concern that
the residential character would be lost with the construction
of the day-care center, citing traffic and noise concerns.
He asked the Planning Commission to deny the request for a
Conditional Use Permit.
Glenndia witherow, 318 North Eunice Street, owner and operator
of the GlenMar Bed and Breakfast located half a block north
of the property, said her clients come to the GlenMar in large
part because of the quiet solitude the area provides. She is
concerned that noise from the day-care center will adversely
impact her business. She also noted that her business has
very little impact on the neighborhood itself: that for the
most part, the neighbors do not realize she is serving guests.
.
James Clark, 218 East Front street, stated his concern over
the increas in traffic the proposal would generate in the
neighborhood. He added he was concerned with the fact there
is a cliff located a half block north of the site. He was
concerned that children, once they leave the site and are
unsupervised, may be subject to danger with this cliff in the
neighborhood.
Ed VanWald, 708 Caroline Street, stated his concern that the
intersection of Eunice and Georgiana streets poses a hazard,
as there are no stop signs at that intersection and the school
bus drops the children at that point after school. He added
that he thought the water pressure in the area was inadequate
to support a new facility. He was also concerned with the
impact the additional noise of the children playing in the
yard would create.
Jim McPherson, County resident, stated that the property has
been vacant for a significant period of time and believes that
development would benefit the area. He stated he did not
believe noise impacts would be significant.
.
April Ginn, 710 Georgiana Street, stated she is concerned with
the potential traffic hazard of having the day-care center in
the vicinity, especially with the fact there is a school bus
stop at the same intersection.
Anthony Galgano, 715 Caroline street, asked the Planning
Commission to consider the need to preserve the residential
.
.
.
PLANNING COMMISSION
February 13, 1991
Page 8
character of the area, noting it is one of the oldest
residential neighborhoods left in the community.
Kenneth Berg, 704 Georgiana Street, stated he is opposed to
the project, citing the noise impact.
Jane Childers responded to the safety hazards that had been
raised. She noted the Department of Social and Health
Services closely monitors the activities on-site to ensure
that the safety of the children is protected at all times.
She noted that all children cannot be outside at one time and
they are under close supervision. She pointed out that her
staff members assist children off the school buses and lead
them into the day-care center, and that she also coordinates
the bus stops with the School District.
Dan Hayward stated that he recognizes the need for day-care
facilities in the community and that the applicant provides
a good service. However, he feels this is not the appropriate
location, and there are better locations wi thin the City.
Once again, he stated concerns with traffic hazards,
particularly with children getting off the bus.
Glen Wiggins, 702 Caroline Street, asked the Planning
Commission members if they would want to live in a
neighborhood with this day-care center. He stated if they
answered yes, then they should vote for the proposal.
There being no further discussion or comment from the
audience, Chairman Leonard closed the public hearing at 10:25
PM.
Mr. Collins stated staff had noted in the Department Report
that the increase in traffic which will occur as a result of
the development will be significant, but noted it would not
result in significant adverse impacts, per the environmental
review. He stated the SEPA determination is appealable.
Mr. Hulett questioned Condition NO.8, which allows for review
of the day-care operation after one year, at which time this
Conditional Use Permit may be revoked. He was concerned with
the fact that the proposal requires a new building to be
constructed. What would happen with that building after a
year if the Conditional Use Permit was revoked?
Mr. Hulett moved to continue the item to the February 27,
1991, meeting of the Planning commission. Mr. Philpott
seconded the motion, which passed unanimously.
V COMMUNICATIONS FROM THE FUBLIC
None.
PLANNING COMMISSION
February 13, 1991
Page 9
4It VI STAFF REPORTS
The Planning Commission reviewed Bill wilbert's request for
clarification on the location of Lot 3 recreational facilities
for the proposed DelHur Planned Residential Development, and
determined that individual planning Commissioners, if desired,
could speak to the alternative at the Council's public hearing
on February 28th. The Planning Commission modifications would
go forward to the Council as approved at the January 23, 1991,
meeting of the Planning Commission.
VII REPORTS OF COMMISSION MEMBERS
None.
VIII ADJOURNMENT
There being no further business, the Planning
meeting was adjourned at 11:15 P.M.
~