PUBLIC HEARINGS
1. .CONSIDERATIO~F ALTERNATlYE WHITE'S CREEK
CROSSING AND~NMOTORIZED PRO\ClSIONS IN THE CITY'S.
mOPOSED TRANS~O.RT A TION SERYLCES AND FACILITIES.
PLAN (TSFP).
2. SHORELINE MANAGEMENT PERMIT. SMA 97-01 - K.PL Y, 439
Marine--DriYe.: An application to construct a new structure 80' x 300' X 40' to
replace an existing warehouse facility and two smaller structures that will be
demolished on property within 200' of the shoreline in the Industrial Light
zone.
3. MIJllilCIP AL CODE AMEIIDMENT ~ MeA 96(08)1D. - AMENDMENT
TO SHORELINE PROCED.liRES:. An amendment to bring the City's
shoreline management regulations in accordance with revisions in the
Department of Ecology shoreline management pennit and enforcement
procedures.
v. COMMUNICATIONS FROM THE PUBLIC
VI. ELECTION OF OFFICERS -1997 to 1998
VII.
STAFF REPORTS
PLANNING COMMISSION: Bob King, (Chair), Tim German (Vice), Cindy Souders, BobPhilpoct. .Linda Nutter, Dean Reed, Mary Craver.
STAFF: Brad Collins. Director, Sue Roberds Planning SJX'cialist, David Sawyer. Senior Planner.
.
.,
.
VIII.
REPORTS OF COMMISSION MEMBERS
IX.
ADJOURNMENT
All correspondence pertaining to a meeting or hearing item received by the Planning Department
at least one day prior to the scheduled meeting! hearing will be provided to Commission members
at the meeting.
PUBLIC HEARING PROCEDURE: Spokesmen for the proponents and opponents will be given an opportunity to speak to
the request. Information submitted should be factual, relevant and not merely duplication of a previous presentation, A
reasonable time (10 minutes) shall be allowed the spokesman; others shall be limited to short supporting remarks (5 minutes).
Other interested parties will be allowed to comment briefly (5 minutes each) or make inquiries. The Chairman may allow
additional public testimony if the issue warrants it. Brief rebuttal (5 minutes) for proponents and opponents will be heard
separately and consecutively with presentation limited to their spokesman. Rebuttal shall be limited to factual statements
pertaining to previous testimony. Comments should be directed to the Board, not the City Staff representatives present, unless
directed to do so by the Chairman.
.
.
.
MINUTES
PLANNING COMMISSION
Port Angeles, Washington 98362
February 26, 1997
7 :00 p.m.
ROLL CALL
Members Present:
Linda Nutter, Bob Philpott, Cindy Souders, Bob
King, Dean Reed, Tim German
Members Excused:
Mary Craver
Staff Present:
Brad Collins, David Sawyer, Sue Roberds, Gary
Kenworthy
Public Present:
Jean Fairchild, Kathe Smith, Sarah Matthews, Jack
Glaubert, Ken Sweeney
APPROVAL OF MINUTES
Commissioner Reed moved to approve the January 8,1997, minutes with a minor wording
correction. The motion was seconded by Commissioner Nutter and passed 4 - 0 with
Commissioners German and Souders abstaining.
PUBLIC HEARINGS:
CONSIDERATION OF ALTERNATIVE WHITE'S CREEK
CROSSING AND NON MOTORIZED PROVISIONS IN THE CITY'S
PROPOSED TRANSPORTATION SERVICES AND FACILITIES
PLAN (TSFP).
Commissioner Reed noted for the record that he owns property and lives in the area under
discussion as an alternate crosstown route. Planning Director Collins responded that as this
matter is a legislative issue versus a quasi judicial matter, the location of his residence is not
an issue of fairness.
Director Collins reviewed the departmental memorandum recommending that following
close of the scheduled public hearing, the Planning Commission forward a recommendation
to the City Council to adopt an alternative crosstown route, Scenario om rather than that
originally proposed for adoption, Scenario ill. The recommendation should also include
acceptance of amendments recommended by the City's Nonmotorized Committee for
nonmotorized travel City-wide. He drew attention to a display map that identified the
nonmotorized routes and a report submitted on behalf of the Committee outlining its
findings. Inconsistencies and errors in cost calculations that were found by a member of the
.
.
.
Planning Commission Minutes - Febrnary 16, /997
Page 1
Committee were pointed out for correction in the final document. The Planning
Commission's original recommendation was based on the determination that the consultant's
proposal for a second crossing of White's Creek did not provide for a level of service at Golf
Course Road and Highway 101 that would warrant such an expenditure. The proposed
addendum (llIB) would utilize the existing Bonneville Powerline easement and would be in
an area where little development occurs at present due to the powerline and the terrain.
Chair King opened the public hearing at 7 :20 p,m.
Jean Fairchild, 3524 Mt Pleasant Road, representing the City's Nonmotorized
Committee, requested that amendments as proposed to the TSFP by the Committee be
forwarded to the City Council for inclusion in the final document. The seventeen members
of the Committee included representatives from the transit service, trails, National Parks,
schools, mills, senior citizen, Planning Commission, Planning, Police, Parks, and Public
Works Departments. She thanked the City for the opportunity to work on this transportation
planning effort and commended the Committee members on the product and the enthusiasm
each member exhibited in developing the final product.
Kathe Smith, 607 East Fourth Street, was available for questions regarding the
Nonmotorized Committee's recommendation. She pointed out that errors in the cost
estimates provided by the consultants were because an entire project's cost was listed rather
than a breakdown of the nonmotorized components separately.
Commissioner Nutter, who represented the Planning Commission on the Committee,
reiterated Mrs. Fairchild's comments that the Committee was composed of members of an
excellent cross section of public services who exhibited an eagerness for the issue.
Gary Kenworthy, City Engineer, presented an overhead display identifying the amended
proposed crossing location (Scenario IIIB) of White's Creek. He explained that eventually
a crosstown route at this location could extend east to connect with the County's Heart of the
Hills Parkway proposal and in the meantime extend north on Golf Course Road to a
connection with Highway 101. As the County has adopted the Heart of the Hills Parkway
route the City's adoption of the amended secondary crossing proposal would be consistent
with county transportation planning efforts.
Director Collins summarized by noting that the proposed secondary crossing would not be
used to re-route truck traffic which would stay on Race Street and FirstIFront Streets, but
would be an alternate throughway for emergency use and to ease local traffic congestion. The
City would have to process an amendment to the Comprehensive Plan to incorporate
amendments proposed by the Nonmotorized Committee.
Sarah Matthews, 736 Christman, supported a second crossing of White's Creek in the area
of Golf Course Road. During the past winter snow storms, travel was difficult due to the
grade of Golf Course Road. An alternative route would aid emergency travel as well as local
use.
There being no further testimony, Chair King closed the public hearing.
Planning Commission Minutes - Febrnary 26, 1997
Page 3
.
Commissioner Souders asked what public notification was provided for the amended
crosstown route proposal. In response, Director Collins indicated that only required public
hearing notice was provided as opposed to the intensive public notice procedure used for the
previous hearings where the original route was opposed by owners of properties in that area.
Commissioner Reed agreed that adequate public notification should be provided and
expressed a desire to obtain additional public comment and to conduct further meetings with
property owners who will be affected should a secondary alternate route be adopted.
Although many hours oftestimony were taken for the previous proposals, the amended route
has not been given the same airing with the public. The amended route is further south from
the original area which will relieve certain property owners, but the public needs to be made
aware of the alternative proposal so development such as that which has occurred along the
original route does not repeat itself without advanced knowledge of these future
transportation planning issues. .
Mr. Collins agreed, but noted that as this is the beginning of a very lengthy, involved
process, that could take twenty years or more, and that is very dependent on funding, there
will be ample opportunity for public notification in the meantime. Neither state or local
funding is available at present for such a proposal.
Commissioner German felt that the amended proposal is the most neutral route as it utilizes
the Bonneville Powerline area.
.
Commissioner Nutter moved to recommend that the City Council adopt the addendum
(Scenario IIIB) to the Transportation Services Facilities Plan (TSFP) Executive
Summary as proposed including the recommendations of the City's Nonmotorized
Committee, with final adoption of the TSFP after an opportunity for additional public
input following a town meeting to be held by the City Council. Commissioner German
seconded the motion, which passed 5 - O. It was understood that the Council might decide
to direct the Planning Commission to conduct a town meeting rather than at the Council
level.
SHORELINE MANAGEMENT PERMIT - SMA..9.kOl - K-PLY, 439-
MarineJ2riye.: An application to construct a new structure 80' x 3001 X 401 to
replace an existing warehouse facility and two smaller structures that will be
demolished on property within 200' of the shoreline in the Industrial Heavy
zone.
Senior Planner David Sawyer reviewed the Planning Department's report recommending
approval of the permit as requested. Chair King opened the public hearing.
.
Ken Sweeney, Planning and Environmental Manager for the Port of Port Angeles, 338
West First Street, represented the proposal on behalf of the applicant as no one else was
present to represent the request. He offered to try to answer questions but did not have
specific answers on the operation ofthe K-Ply Mill. It is anticipated that K-Ply will hire
fifteen new employees to work in the enlarged facility. He originally intended to support
the project proposal on behalf of the Port.
K-Ply has the equipment that will be used in the new warehouse. The larger structure will
.
.
.
Planning Commission Minutes - February 26, /997
Pnge 4
enable expansion of the K-Ply product line and the hiring of possibly 30 new employees.
The Port is in line to begin the estuary project that is associated with the site this year.
The Commission discussed safety issues associated with the Waterfront Trail use in the
proposed area and planned public access around the site's planned estuary project at length.
A barrier between pedestrian, nonmotorized travel and the operations of the mill was
discussed at length.
Ken Sweeney, Port of Port Angeles, noted that travel along the trail from the east side of the
estuary project to the mill is relatively safe; however, travel in the area west of the mill is
complicated by truck and operations activity.
There being no further testimony, Chair King closed the public hearing.
Commissioner German moved to approve the shoreline permit as proposed with the
staWs proposed conditions, findings and conclusions. Commissioner Philpott seconded
the motion.
Discussion continued regarding the public's use of the working mill area and ingress/egress
of mill activity across the walking trail area. Commissioner Reed stated that a condition
should be included regarding the City's policy on archaeologically significant areas in the
event that excavation is proposed. It was decided that K-Ply management must be aware of
the liabilities involved with the proposed pedestrian activities and will plan for the safety of
pedestrians and mill workers. There should be a separation between the recreational and mill
uses of the site; however, the area will always appear industrial as that is what it is.
Condition No.6 and Conclusion No.2 were added for consistency with other City
approvals in areas where culturally significant artifacts may be found. On call for the
question, the motion passed 5-0 with the following conditions, rmdings, and
conclusions:
Conditions.:
1. The project shall comply with the regulations ofthe City's Shoreline Master Program,
specifically those requirements of Chapters 4, 5 and 6.
2. The project shall meet all requirements of the Port Angeles Municipal Code including
environmentally sensitive areas, fire, and building code requirements.
3. All signs shall be consistent with the City's appropriate zone regulations and Chapters
4 and 5 of the City's Shoreline Master Program.
4.
The applicant shall comply with the requirements of the Public Works Department in
their memorandum dated January 30, 1997, attached as Attachment "c" to the staffs
report, which reads "The property fronts on Marine Drive and Front Street which are
minor arterials. The Comprehensive Plan Urban Services requires sidewalks along all
arterials. A I O-foot wide City standard sidewalk, adjacent to the northerly curb, will
be required to be extended from that completed portion opposite Valley Street easterly
670+/- feet to connect to the existing sidewalk opposite Cherry Street. This missing
link requires Waterfront Trail hikers to cross the busy arterial twice and has been a
.
.
.
Planning Commission Minutes - February 26, /997
Page 5
source of many complaints."
5.
The applicant shall confirm the number of additional employees, if any, resulting from
the proposed project and shall submit a parking plan to meet the requirements of the
Off-Street Parking Ordinance.
6. If the subject site has not been previously inventoried, evaluated, and reviewed to the
satisfaction of the Lower Elwha SKlallam Tribe, the subject site shall be evaluated by
a cultural review team which shall include a professional archaeologist, a
representative of the Lower Elwha SKlallam Tribe, the site owner, and the City
Planning Department. This team shall determine the extent of excavation monitoring
for the project during the permit review process. As an alternative, the applicant may
volunteer to have an approved archaeologist on site during any excavation in lieu of
a review by the aforementioned cultural team. If during an excavation that by decision
of the cultural review team occurs without an approved archaeologist on-site, any
phenomena of possible archaeological interest are uncovered, the developer shall stop
such work and provide for a site inspection and evaluation by a professional
archaeologist to ensure that all possible valuable archaeological data is properly
salvaged.
Eindings;.
Based on the information provided in the staff report (including all of its attachments),
comments and information presented during the public hearing, and the Planning
Commission's discussion and deliberation, the City of Port Angeles Planning Commission
hereby finds that:
1. The applicant, K-Ply, Inc., applied for a Shoreline Substantial Development Permit on
December 12, 1996. The application was determined complete on January 24, 1997
(See Staff Report Attachment A).
2. A Determination of Non-Significance was issued by the Port of Port Angeles SEP A
Responsible Official for the proposal on February 7, 1997.
3. The application and hearing process was advertised in accordance with the legal
requirements of the City of Port Angeles and the State of Washington.
4. The Port Angeles Shoreline Master Program, Comprehensive Plan, Zoning Ordinance
and critical areas ordinances have been reviewed with respect to this application.
5. The site is designated Industrial in the City's Comprehensive Plan; Industrial, Heavy
in the City's Zoning Ordinance; and Urban-Harbor in the City's Shoreline Master
Program.
6. A sawmill and log storage operation is a water-related industrial use permitted in the
Urban-Harbor designation of the City's Shoreline Management Plan.
7.
The City's waterfront trail runs east and west adjacent to the property's south property
line.
.
.
.
Planning Commission Minutes - February 26, 1997
Page 6
8.
The nearest residents are over 300 feet south of the site and are atop a marine bluff
which is over 100 feet above sea level.
Conclusions.:.
Based on the information provided in the staff report including all of its attachments,
comments and information presented during the public hearing, the Planning Commissionts
discussion and deliberation, and the above listed findings, the City of Port Angeles Planning
Commission hereby concludes that:
A. The proposed project as conditioned, is consistent with the following adopted City
policies, Comprehensive Plan Land Use Element Policies A.2, H.3&4, and the
Conservation Element Policies B.1, D.S, and 7, the City's Industrial, Heavy zone, and
the City's Shoreline Master Program Chapter 4, Policies J.l and 2, L.l and N.l and 2,
Chapter 5, Policies D.I-6, and 10, and all associated regulations.
B. The project will not be detrimental to the shoreline.
C. As conditioned, the proposed project will enhance public access to the shoreline.
D. As conditioned, the proposed project will not interfere with public use of lands or
waters subject to the public trust doctrine.
Commissioner Souders noted that it is not the City's policy to act on a proposal when the
applicant is not present. As the applicant was notified of the meeting but did not attend, she
wondered if the issue should be tabled. Director Collins urged the Commission to continue
with the deliberation as Mr, Sweeney offered to represent the applicant as best he could.
Senior Planner Sawyer suggested that the applicant would work with staff to develop
satisfactory answers to the expressed safety concerns prior to finalization of building issues.
On call for the question, the motion passed 5 - o.
The Commission took a break at 8:50 p.m. The meeting reconvened at 9:20 p.m.
MUMCIP AL COJlE AMENDMENT - MCA2.6(DB)10 - AMENDMENT
T-O-8HORELINE PRO_CEDURES.: An amendment to bring the City's
shoreline management regulations in accordance with revisions in the
Department of Ecology's shoreline management permit and enforcement
procedures.
Planning Director Collins indicated that the State Department of Ecology adopted amended
shoreline management regulations in October, 1996, that local jurisdictions were required
to adopt as well. To date, the City has not adopted those regulations, hence, the City's
operational procedure is not in compliance with the state's direction. The proposed
ordinance was drafted by the City Attorney's Office to correct the discrepancy. Additionally,
during the City's consolidated permit processing hearings it was decided that the Planning
Commission would become the City's decision making body for shoreline permits with
appeal to the City Council. This issue was inadvertently not included in the amendments
proposed to the Municipal Code and is being included with the ordinance under
.
.
.
Planning Commission Minutes - February 26,1997
Page 7
consideration at this time. The later is the only significant deviation from the City's
operating procedure in the case of shoreline permits.
Chair King opened the public hearing. There being no one present to speak to the issue, the
hearing was closed. Following specific review by Commission members, it was decided to
strike Sections 15.08.070 B. and C., and revise wording referring to the "Advisory
Committeetl with "Plarming Commission", and amending the title in Section 15.08.1 00 to
read "Council :A-ction Appeal." Commissioner Souders moved to recommend approval
of the Municipal Code Amendment as amended. The motion was seconded by
Commissioner German and passed 6 - O.
COMMUNICATIONS FROM THE PUBLIC
None.
ELECTION OF OFFICERS
Chair King opened nominations of officers for the 1997 term, Commissioner Nutter
nominated Commission German as Chair for the 1997 terms of office and
Commissioner Reed as Vice Chair. There being DO further nominations, nominations
were closed and passed 6 - O.
STAFF REPORTS
Planning Director Collins informed the Commission that Martie Lucas had been appointed
by the City Council at its February 18, 1997, meeting to replace Commission Bob Philpott.
He thanked Mr. Philpott for his faithful service to the City and invited all the Commission
members to attend the City Council's March 4, 1997, meeting where Mr. Philpott would be
recognized for his service on the Planning Commission.
REPORTS OF COMMISSION MEMBERS
Chair King thanked Commissioner Philpott for his generous service on the Planning
Commission for the past ten years as did other commissioners.
Mr. Philpott thanked the City for the opportunity to serve its citizens and indicated that he
is willing to continue as a commissioner but unfortunately he is only able to serve two
consecutive terms.
Commissioner Souders restated her earlier expressed concern that it is a long-standing policy
of the Planning Commission to not act on an application if an applicant or a designated
representative is not present. An exception was made to that policy in dealing with the K-Ply
shoreline permit because of the desire to expediently deal with the issue, but it is a practice
that she questioned and encouraged not be continued.
P/mming Commissio'l Miml/es - Febroary 26, 1997
Page 8
. ADJOURNMENT
The meeting adjourned at 10:00 p.m.
~~