Loading...
HomeMy WebLinkAboutAgenda Packet 1/24/2012AGENDA ITEM First Page RECOMMENDATION Note The Mavor may determine the order of business for a particular City Council mee ing. The agenda should he arranged to best serve the needs and /or convenience of the Council and the public. The items of businessJbr regular Council meetings nuav include the following: A. CALL TO ORDER REGULAR MEETING AT 6:00 I B. ROLL CALL PLEDGE OF ALLEGIANCE CEREMONIAL MATTERS, PROCLAMATIONS EMPLOYEE RECOGNITIONS PUBLIC COMMENT C. CITY COUNCIL REPORTS D. WORK SESSION 1 Council Assignments to Boards. Commissions Committees 2. City Council Retreat Agenda f'1 6 0 I Determine Assignments 2. Discuss and Finalize Agenda E. LATE ITEMS TO BE PLACED ON THIS OR FUTURE AGENDAS as determined by City Manager or Councihnember F. CONSENT AGENDA 1 City Council Minutes for December 13 and 15. 2011 and January 3.2012. 2. Expenditure Approval List: 12/24/11 to 1/6/12 for $2.011. 111.95 3 Stormwater Education and Outreach Services Interlocal Agreement with Kitsap County 4 Equipment Purchase Parks Maintenance Equipment 5. Western Public Agencies Group (WPAG) Consulting Agreement 6. Simple Steps. Smart Savings Promotion Services Agreement 7 2011 Street Alley Overlay Contract. Project TR03 -11 Final Acceptance F -I F -I3 F -32 F -34 F -36 F -51 F -63 1 Accept Consent Agenda G. ORDINANCES NOT REQUIRING PUBLIC HEARINGS 1 New and Expanded Large Single Electrical Loads G -I I l' Reading Continue to February 7` H. RESOLUTIONS NOT REQUIRING PUBLIC H EARINCS January 17, 2012 PORTANGELES W A S H I N G T O N 11 S AGENDA CITY COUNCIL MEETING 321 East 5 Street JANUARY 17, 2012 REGULAR MEETING 6 p.m. NOTE. HEARING DEVICES AVAILABLE FOR THOSE NEEDING ASSISTANCE MAYOR TO DETERMINE TIME OF BREAK Port Angeles City Council Meeting Page I AGENDA ITEM Page RECOMMENDATION I. OTHER CONSIDERATIONS 1 City County Interlocal Agreement IT Services 1 -1 1 Approve 2. Design Industrial Outfall Repair and Cleaning Project Project 1 -5 2. Approve W W08 -2008 3. Combined Sewer Overflow (CSO) Phase 1 (Project 06 -01) 1 -7 3 Approve Section 106 Archaeological Memorandum of Agreement 4. 2013 Low Interest Loan Application for Concrete Cylinder Pipe 1 -53 4. Approve Replacement, Project WT02 2009 5. Landfill Post Closure Professional Services Agreement Contract 1 -55 5. Approve Extension J. QUASI- JUDICIAL MATTERS REQUIRING PUBLIC HEARINGS (7:00 P.M., or soon thereafter) K. PUBLIC HEARINGS OTHER (7:00 P.M. or soon thereafter) L. FINANCE 1 Economic Development Council 2012 Contract L -I I Approve M. INFORMATION City Manager Reports: 1 Planning Commission Minutes M-1 2. Building Permits MonthlyReport M -10 3. Fire Department -2011 Annual Report M -I I 4. Port Angeles Downtown Association 4 Quarter Report. M -12 5. Public Works Utilities Department 4 Quarter Report M -20 N. EXECUTIVE SESSION O. ADJOURNMENT PUBLIC HEARINGS Public hearings are set by the City Council in order to meet legal requirements. In addition, the City Council may set a public hearing in order to receive public input prior to making decisions, which impact the citizens Certain matters may be controversial, and the City Council may choose to seek public opinion through the public hearing process January 17 2012 NOTE: HEARING DEVICES AVAILABLE FOR THOSE NEEDING ASSISTANCE MAYOR TO DETERMINE TIME OF BREAK Port Angeles City Council Meeting Page 2 NOTICE IS HEREBY GIVEN that, due to severe winter weather conditions, the regular meeting of the Port Angeles City Council, scheduled for Tuesday, January 17, 2012, has been rescheduled and continued to Tuesday, January 24, 2012, at 6:00 p.m., in the City Council Chambers at City Hall, 321 East Fifth Street. Janessa Hurd City Clerk PORTANGELES W A S H I N G T O N U S A City Clerk's Office Distribution: City Manager City Attorney Public Works Utilities Peninsula Daily News KONP Radio Peter Ripley Peninsula Daily Network Olympic Peninsula Leader Front Lobby (Post) Webmaster NOTICE OF RESCHEDULED MEETING PORT ANGELES CITY COUNCIL Phone. 360-417-4634 Fax: 360-417-4609 TTY 360 417 -4645 Website• www.cityofpa.us Email cityclerk @cityofpa.us 321 East Fifth Street P 0 Box 1150 Port Angeles, WA 98362 -0217 Print Name Clearly Address Agenda Topic Plan to S,peak- CNy CtL SI I eas,c_f -cd tA_ ?i(-14 l 6;u YYl4SS �Ylv_r- Y N 1)12. 11)12. 1110:7 1 Idt IbAf 1313 C S7 PA- PU8uic c 7 7flWH o ftco PUO r� Y N ►101 -8- G,:Cv 10ee COX h i re Go j C Gl�'cr'F 3- z q1 usel Lke n 2 Y A4t 1 e c'? 7 io CoRUM-S /Z O /mot 4,- rN 57 N Y/N PORTANGELES W A S H I N G T O N U S A You are encouraged to sign below if: G: \Group \Clerk \Forms \Council Attendance Roster.doc PUBLIC INTEREST SIGN -UP SHEET CITY COUNCIL REGULAR MEETING DATE OF MEETING: January 24, 2012 LOCATION: City Council Chambers 1. You are here to listen to the City Council discussion on a particular agenda item; 2. You want to speak during the Public Comment period of the agenda. If several members of the public are interested in a particular agenda item, the Mayor may move that item so it is discussed earlier in the meeting. Also, the Mayor may use the information provided to organize the Public Comment period. During the Public Comment portion of the meeting, the Mayor will invite citizens to talk with the Council about topics that are not scheduled for public testimony on the evening's agenda. Prior to the start of the "Public Comment" portion of the public hearing, all persons wishing to be heard are asked to sign in with the Clerk, giving their names and addresses, and topic. The Mayor may arrange the order of speakers so that testimony is heard in the most logical groupings. To allow time for the Council to complete its legislative agenda, comments should be limited to no more than 5 minutes per person and a total of 15 minutes for this comment period. At the discretion of the Mayor, these time periods may be lengthened or shortened. Following any public comment, the Mayor may allow time, limited to five minutes, for response from City Council members and /or City staff. No speaker may convey or donate his or her time for speaking to another speaker If many people wish to speak to a particular issue, the Mayor may limit the total amount of time dedicated to that single issue. Written comments may be submitted into the record of a Council meeting by presenting the written document to the Clerk prior to the meeting, in which case a copy of the document will be provided to each Council Member, but the document will not be read aloud, or a document may be distributed to the City Council, with a copy to the Clerk, by a speaker while the speaker is addressing the Council. .5 4 i" oprint:Nirie Clearly h: ,t, ',et, ,,k',“ i, Addee'ss t1 ti :t, L!!Agenda Topic 'r,.,,";::,x3 4 irjo to 14A,11A VIZ/1)(g r); VD6Cazv D rt_c-k- k: c_o c ON 0 avk St(,S-Kce DA v:s S'a I ,.4 1 Ott' Cj Y/N Y/N Y/N Y/N Y/N YIN Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N Y/N PUBLIC INTEREST SIGN-UP SHEET GAGroup \Clerk\Forms \Council Attendance Roster.doc rr+ 0 -1 73 -c Z O r" C rn rn -I =1 O 1 1 rn v 00 z 9. 3a O a n' Coalition Board: Gena Royal— Chairperson Michell Gentry—Vice Chairperson Jim Borte— Recorder Ed McKay— Member At -Large Jamye Wisecup— Member At -Large Community Projects: Social Marketing Campaign Community Drug Awareness Cultural Awareness Seminars Increase Community Collaboration Parenting Classes Coalition Staff: Dale Holiday —Grant Coordinator Jennifer Charles Administrative Secretary Partner Agencies: Port Angeles School District Port Angeles School Board Liquor Control Board Lower Elwha Klallam Tribe University of Washington Port Angeles Police Dept. Olympic Medical Center United Way of Clallam County Serenity House Clallam County Juvenile Services Staff Olympic Peninsula YMCA Prevention Works! A Community Coalition of Clallam County Adolescent Chemical Dependency Treatment Organization Contact Information: Dale Holiday, Ph.D. Port Angeles Healthy Youth Coalition Grant Coordinator 360- 417 -2436 DHoliday@co.clallam.wa.us PORT ANGELES tillair HEALTHY YOUTH COALITION Working toward a Strong, Safe Et Sober Community for our Youth Mission: We will make community -wide changes through education and action that support youth in making safe, sober and strong choices. Vision: AR youth meet their full potential unhindered by addiction. Community Change... through education and legislation. The Port Angeles Healthy Youth Coalition was formed in 2003 and strives to make Port Angeles a place where youth are strong enough to resist the lure of drugs and alcohol and the harmful side effects caused by them. We want the community to know that it is everyone's responsibility to ensure the safety and well -being of our youth and that eliminating drugs, alcohol and tobacco from the equation is the best way to do that. We want lawmakers at all levels to know that we want laws and ordinances that will protect our children. Most of all we want youth in our community to know that they have support to make good decisions at every turn. WE ARE ALL DOWNWINDERS Attend a Town Hall Meeting, Friday, January 27 at 7:OOpm Why Biomass is Bad for the Environment, Health, Local Economy Presenter Kees Kolff, MD, MPH, Public Health Professional, former Port Townsend Mayor, and Jefferson Biomass Committee Chair Sierra Club North Olympic Group Location Olympic Unitarian Universalist Fellowship Hall, 73 Howe Road, Port Angeles Issue Two biomass plants are planned for the North Olympic Peninsula Port Angeles and Port Townsend Biomass is opposed by American Heart Association American Lung Association American Cancer Society More than 70,000 physicians across the country Kitsap County has a moratorium on its proposed plant until more health impact information is learned Awareness is key! www.nobiomassburninq.orq www.energviustice.net/biomass BAD FOR OUR HEALTH Biomass plants emit several air pollutants including dioxins, the most dangerous contaminant known Dioxins increase asthma, heart disease, cancers, multiple allergies, and affect the growth of children Ultrafine Particles can damage lungs, penetrate bones, blood brain barriers, and fetuses of pregnant women Ultrafine Particles are unregulated! BAD FOR THE ENVIRONMENT Increases the amount of Elwha River water Nippon needs to fuel the plant Fuel for the plant will deplete forest soil nutrients -0O2 release will increase, biomass is NOT climate neutral -Air emissions will increase ocean acidification Truck traffic to haul the fuel will pass through neighborhoods 24/7, releasing diesel air emissions, creating day -long noise, and impacting street quality BAD FOR THE ECONOMY Nippon project funded 50% by Taxpayers; the energy created is not for local power and can be sold out of State NOT HEALTHY NOT REALLY RENEWABLE NOT REALLY SUSTAINABLE Hosted by HEALTHY AIR CONCERNED CITIZENS Contact: Rose Marschall, 360 808 -2662 T 4J D VV Ito D ri Washington State Chapter b j J t :J Captain Charles Moore Scientist and Activist Discusses "The Great Infection of the Sea" detailed in his acclaimed new book Plastic Ocean e .uv Date: January 26 2012 Time: 6:30 PM Location: The Landing Mall Upstairs Conference Room 115 East Railroad Avenue Port Angeles, WA Contact: Anne Shaffer •V ua ,s,;.,......•••44,•..,, NORTH PACOPIO GYRE .wv� i t 4.1.474 J. F 5 A i P Armes hatter @ncoastahvatershedinstitut A $5 donation is requested A prominent seafaring environmentalist and researcher shares his shocking discovery of the Great Pacific Garbage Patch in the Pacific Ocean, and inspires a fundamental rethinking of the Plastic Age and a growing global health crisis. In the summer of 1997, Charles Moore set sail from Honolulu with the sole intention of returning home after competing in a trans Pacific race. To get to California, he and his crew took a shortcut through the seldom- traversed North Pacific Subtropical Gyre, a vast "oceanic desert" where winds are slack and sailing ships languish. There, Moore realized his catamaran was surrounded by a "plastic soup." He had stumbled upon the largest garbage dump on the planet a spiral nebula where plastic outweighed zooplankton, the ocean's food base, by a factor of six to one. In this presentation Moore will discuss these observations, what they mean to our planet, and his book Plastic Ocean. A call to action as urgent as Rachel Carson's seminal Silent Spring, Moore's sobering revelations will be embraced by activists, concerned parents, and seafaring enthusiasts concerned about the deadly impact and implications of this man made blight. This event is sponsored by the Sierra Club North Olympic Group with partners the Coastal Watershed Institute the Olympic Peninsula Surfrider Chapter and the Olympic Coast National Marine Sanctuary Bruce Wulkan Stormwater Program Manager Puget Sound Partnership Al hapact o t 8off WOup Goo@ deg) ®plagEin Ql What does oat save Property Owners, Decision Makers Come Listen, Learn and Have Your Questions Answered Thursday, January 19 6:30 8:30 PM P.A. Library Carver Meeting Room Low impact development is a natural way to control and reuse stormwater on site that can provide large benefits and cost savings to property owners and the community at large. Bruce M uikmv will coaxer its: basic principles most commonly used practices available resources to the community current regional policy Bruce Wulkan is the Stormwater Program Manager for the Puget Sound Partnership (PSP). The PSP is the state agency charged with coordinating and prioritizing cleanup projects. Wulkan started in 1993 with that agency's predecessor, the Puget Sound Action Team. He also oversaw the agency's activities related to sustainability, recreational boating, shellfish protection and on -site sewage management. Forum Sponsors. Olympic Fund Environmental for the Environment Council, gtEGoglib North of WA Olympic Superfund Group, Research Program Get with the times! Pledge to save City water! Today's methods are not fads. Proven technologies. Proven on less good to great soils. Existing sites, not for just Phase 2 new bldgs and major remodels. Save money. Save staff work time in the long run. The Economics of Low Impact Development: A Literature Review Ed MacMullan Sarah Reich ECONorthwest ECONorthwest November 2007 www econw.com (There is updated information since this was written.) Bruce Wulkan: Integrating LID Into Local Codes, Nov. 2011 Puget Sound Partnership Lisa Stiffler, former Acenttle PI Reporter, now with the Independent Sightline write a series of articles about stornnvater. http: /daily.sightl ine.org /2012/01/03/ the porous- road -less- traveled/ The Porous Road Less Traveled Rice crispy roadways deliver the goods Lisa Stiffler on January 3, 2012 at 7 00 am Because the pervious roads are thicker, they require more materials and often cost more to install. But in fact, they can actually save cash. In Pringle Creek the porous asphalt took the place of costly, conventional stormwater drainage systems that shunt water to detention ponds or straight into creeks. http. /dai ly.sightl i ne. org/2011 1 1 /30 /a -cal I -to- waterlogged- northwestemers/ A Call to Waterlogged Northwesterners New rules could curb stormwater runoff if Washingtonians demand it. Lisa Stiffler on November 30, 2011 at 11.35 am People of the waterlogged Northwest, it doesn't have to be like this. By changing how we build our streets and structures, more of that polluted runoff can be allowed to soak into the ground or get soaked up by the leaves and roots of plants It can be funneled into large cisterns and saved for a not -so -rainy day It's time to tame the rain We can help do this by implementing rules that will change how we build our roads, sidewalks, alleys, parking lots, roadside gardens, and rooftops http. /daily sightline.org/2011/10/18/a-green-makeover-inside-and-out/ A Green Makeover Inside and Out A greener house cuts energy use and stops stormwater runoff. Lisa Stiffler on October 18, 2011 at 11 49 am (Sustainable Neighborhoods) water utilities are finding that it's less expensive in many locations to help landowners capture and treat their stormwater runoff on their own property with rain gardens cisterns green roofs and by conserving native plants, than it is to build more pipes and treatment facilities to handle fouled rainwater in a centralized location It all adds up to a smaller footprint in terms of pollution and water and energy use. http./ /daily stghtline.org /201 1 /09/23/wholl-catch-the-rain/ Who'll Catch the Rain? Rain barrels are great, but Oregon's ready to seize the cistern. Lisa Stiffler on September 23, 2011 at 7.30 am There's increasing interest around the Northwest in rainwater harvest on a bigger, bolder scale. Stretch that little rain barrel into a 550 gallon cistern installed above ground or below Or don't stop there how about vessels holding 1,000 gallons, 10,000 gallons to catch all that lovely rain. The bigger the better After all, the uses are endless and our rain supply is generous during most seasons. http /daily.sightline org/2011/09/20/portland-the-city-of-sedums/ Portland, the City of Sedums? Ecoroofs are giving an economic boost to the City of Roses. Lisa Stiffler on September 20, 2011 at 10 57 am The City of Roses is being transformed into the City of Sedums as nearly 300 Portland rooftops are now blanketed in the drought tolerant succulents. And as rooftops in Oregon are going green, some of the businesses that design, build, and landscape ecoroofs are having an economic mini boom News headlines cheer sales numbers that have tripled in the past year for one Portland company Another is doing cutting -edge ecosystem research that could help businesses cut costs and benefit the environment. And two local businesses are merging their green products into an exciting new technology http./ /daily sightline.org/201 1 /07 /26/bremerton- seeks- more bang -for- its clean- water -buck/ Bremerton Seeks More Bang for its Clean -Water Buck Bremerton weighs the best investments for clean -water gains. Lisa Stiffler on July 26, 2011 at 2.14 pm Another interesting question is how much money could be saved by using "green" instead of "gray" technology to fix the sewage overflows. Bremerton, because it started its CSO work back in the early 1990s, relied mostly on gray tech building additional and larger pipes, more treatment capacity, new pump stations, etc But Larry Matel, managing engineer for Bremerton's Public Works Utilities overseeing storntwater projects, said that millions of dollars could have been saved by using more green technology The trouble was, when the project got started, the green or low Impact development solutions such as porous asphalt, swales or rain gardens, green or eco roofs, were less well understood. As Matel explained in a report to Ecology Another significant conclusion the City has come to at the end of their CSO reduction project is that LID would have most assuredly saved the City millions of dollars had the potential for LID's role in solving CSO problems been more widely accepted at the start of this major investment ten years ago. Cities contemplating LED as an approach to solving their CSO problems will hopefully learn from Bremerton's experience in this area. http. /daily.sightlrne org/2011/06/23/steps-toward-stormwater-solutions/ Steps Toward Stormwater Solutions Stormwater dumps a toxic soup into the Sound how do we stop it? Lisa Stiffler on June 23, 2011 at 2.37 pm The over simplified takeaway message the most toxic runoff is coming from industrial and commercial sites, so that would be a smart target for projects that clean up and control stormwater The study also showed that the least polluted runoff came from forests, highlighting the importance of preventing sprawl in undeveloped areas. The Porous Road Less '1 raveled 1 Sightline Daily rage 1 or 4 Sightline Da ily Ne for a Sustainable No rtltw at The Porous Road Less Traveled "Rice Crispy roadways deliver the goods. Lisa Snifter an January 3. 2012 at 7.00 am This post is part of the research project: Stormwater Solutions: Curbing Toxic Runoff water flowing Mouth pervwn concrete, courtesy of the Ilahonal Peaty M,•ea Concrete Association A Rice Crispy roadway "31 Sightline Permeable pavement can make old- school road engineers and pavement builders anxious To them, the idea of water seeping through roads like they re made of Swiss cheese just doesn't seem right. Water runs off roads, not through them. Or at least it used to. In the Northwest, there's a growing acceptance of the use of pervious concrete and porous asphalt for roads, sidewalks, parking lots and dnveways. The unconventional pavement does a great job reducing the amount of polluted stormwater runoff that damages homes, streams and lakes Instead of gushing from the roads carrying a slug of toxic chemicals, the water seeps through small pares in the pavement, soaking into the gravel and dirt beneath the road. Some of the poltutants get trapped inside or beneath the pavement, or are consumed by organisms living in the ground below it. Those who've used the pavement praise the technology Advocates can be found around the region, including a 32 -acre eco friendly development near Salem called Pringle Creek where alt of the roads and alleys were built with porous asphalt "It's pretty remarkable to see water disappear into the street." said James Santana, vice president of Pringte Creek "We've been realty impressed with how effective the streets have been The development, which was built in 2007 was deemed the "the nation's first full-scale porous pavement project" by the Asphalt Pavement Association of Oregon But fears about the technology persist Can pavement that's likened to Rice Cnspy treats to illustrate its pervious nature take a pounding from countless cars, trucks, and buses and survive intact? How long can water seep through it before its pores are clogged with dirt and debris? Is it OK to put a bunch of water underneath a road? Permeable pavement has been used for years in the Northwest and even decades elsewhere. A porous stretch of highway in Anzona is more than 20 years old and holding up fine. That's because permeable roads aren't that different from a conventionat road. Instead of laying concrete or asphalt that's completely solid, it's made from a rock and liquid mix that creates a lattice of interconnected pockets of air that allows water to pass through it Beneath the layer of concrete or asphalt is a layer, or multiple layers, of gravel that the water can move through. In many cases, this gravel layer can be thicker than it might be for regutar, impervious pavement Underneath that is the native soil Many experts recommend taking care not to severely compact the native sent and gravel dunng mstaltation so that these sub layers remain absorbent Some projects also include the use of a geotextile fabric beneath the gravel and on top of the native salt This matenal can help maintain the gravel layer and trap pollutants to ensure that they don't travel into the groundwater, causing contamination The fabric can also prevent the gravel from settling and causing depressions in the permeable pavement. (This Oregon SeaGrant document gives a great overview of permeable pavement and descnpnons of how Ws constructed There are restrictions and limitations to installing permeable pavement. It's not recommended for use on slopes or in places where the groundwater is very close to the surface. There are still questions and concerns about how much traffic the permeable roads can withstand, and for the most part, it has been used for lower traffic areas such as parking lots, shoulders of roads. pedestnan and biking paths, dnveways, and quieter, residential roads http: /daily.sightline.org /2012/01 /03 /the- porous- road -less- traveled/ 1/3/2012 The Porous Road Less Traveled I Sightline Daily Page 2 of 4 porous Street Section: 4- 4 5 inches of porous asphalt 1 mch 0Ier layer of washed aggregate �IOr 10 inches of crushed dram rock a te r I Ai 8lnches of angular rock i co try el unJ,atlkcer slue subcirale Ca or rmtm.l in.thafmwutc Nl Pre Rita Road di.,g,am Iron Prink eree■ mane: at tams Santana Rainier Avenue, a two lane street with two additional parking lanes in Issaquah in the foothills of the Cascades I can pave for miles and miles There are endless opportunities to use permeable pavement in lieu of conventional road construction in cities and towns across the Northwest In Seattle alone, 400 mites of ma for roadways need repairs and many streets are in such bad shape that they need to be reconstructed, according to statements made this fall by the city's transportation department. But the city so far has been disinclined to use porous asphalt on busy streets. And to be fair the Northwest has seen some problems with the technology. Seattle itself ran into trouble with some permeable pavement that was laid in West Seattle After it was installed, a cement mixer used for an unrelated project nnsed out its equipment onto the pavement, clogging the pores and requiring some of it to be replaced But experienced engineers say that abundant g eleanD¢slrV kegatretlhplow by Sightline institute traffic is overkill. Mark Palmer, city engineer l 'PTIVAlBpe4V1IStt*Yiet4a3 Seattle, Washington 98101 I department, points to the lasting success of tq killaria tf87naliP6 447 2270 his case "I really don't have a problem," using permeable pavement on high traffic roads, he said But to be realistic, we have to take baby steps to get people convinced (that It works). While Pringle Creek is a residential area, Santana says there are a lot of heavy trucks dnving through the community and the roads are doing well. Other examples of permeable pavement in i the Northwest include Multiple proiects in Bremerton including parking lanes on Pacific Avenue in the city's downtown; the shoulders of a heavily -used road in South Kitsap Industrial Area: sidewalks and parking areas in Lions and Blueberry parks, Schley Boulevard in the East Park military housing development; and Sylvan Way Meadows, a private housing development. Other projects using porous asphalt are being planned. Gresham, a neighbor of Portland, installed wide stnps of porous asphalt along Holladay Street in 2007, making it the city's first 'green street City code strongly encourages the use of permeable pavement and other applications can be found around Gresham. A 32,000 square-foot roadway in Snohomish County's city of Sultan was one of Washington's first uses of permeable pavement in a public right of way when it was installed in 2006. The project, located in a 20 -home development called Stratford Place, also included driveways and sidewalks Dockside Green a 15 -acre redevelopment project that's being built in Victona, BC, wilt use permeable pavement for most of its hard surfaces. Pothole in a non riotous Seattle a,eer 1,eedrV ma, In Bremerton, cars were allowed to park on a stretch of porous asphalt on Pacific Avenue before it had sufficiently cooled and set, causing some of the asphalt to sheer off the top. Despite the damage, the blacktop Is stilt soaking up water and perfectly useable for vehicles "There's just a little bit of unsightliness to it, said Larry Matel, former managing engineer for Bremerton's Public Works Utilities overseeing stormwater projects There was "a little bit of trial and error" in figunng out how long to wait before the road was ready for traffic. Portland has lots of proiects using permeable pavement, beginning with a 2004 installation on residential streets. Washington State University is doing research to better quantify the performance of porous asphalt and to understand what happens to pollutants. The work is being done at the Washington Stormwater Center at WSU's Puyallup campus. http. /daily.sightlinc.org /2012/01 /03/ the porous- road -less- traveled/ 1/3/2012 1 ne porous [toad Less 1 raveled Sightline Daily Similarly, Puyallup's Palmer oversaw the construction of porous asphalt cul-de -sacs m a development in the town of Rainier The streets experienced some "spatting" in which some of the rocks in the asphalt crumbled out of the road Palmer said the road, which was built in about 2004, needed a higher amount of asphalt to make it adhere better And again in this case, the street is stilt performing well "It's more of an atheistic issue," Palmer said. The spatting was mostly a problem in places where cars are parking, torquing their wheels and digging into the asphalt. Putting a stop to potholes? 7prom asphalt ghway n Amsterdam' C hn:mone n,a, Keep in mind conventional roads fail everywhere, all the time. Again, one can look just about anywhere in Seattle to find a street pocked with potholes and other roadway hazards There's a strong case to suggest that permeable roads could and should hold up better than traditional ones. Most often, the pervious roads are built with a thicker subbase of gravel and frequently the asphalt or concrete are deeper as well. 'You're putting a stronger pavement down, so you'll have a more durable lasting pavement," Palmer said Palmer said that many conventional roads in Puyallup have a tendency to "alligator" or break into scalelike chunks because the water table is high and the water soaks the asphalt, causing tt to fail There are plans to install porous alleys in Puyallup and a porous residential street. In Seattle, the roads in the city's northend tend to get the most potholes, said Steve Pratt, street maintenance directoi for the city He explained why in a 2011 story in the Seattle Times: 'Basically they paved asphalt on dirt, with no gravel subbase Instead of draining, stormwater forms puddles beneath the blacktop, he said But if the road was rebuilt to add a thicker layer of gravel so that the city wasn't returning add nauseam to patch the potholes, it could be capped in porous asphalt and the problem solved. Another worry with the permeable roads is that the pores will get blocked with sand and dirt, or even as happened in Seattle, with a foreign source of concrete. If the holes get clogged, water will sheet off the pavement as it would with a normal road, creating the stormwater problems it was meant to resolve. Expenence, however, shows that a little extra maintenance up front can prevent clogging. At the Pringle Creek development, they lay geotech fabric on the street in front of new construction to catch the mud and dirt that trucks can track off a site Builders and landscapers are cautioned not to dump dirt or sand in the street They blow and removed the leaves that fall in autumn. And once a year, they hire a truck to vacuum their roads. It costs about $200. We use a standard vacuum truck that cleans all the (parking Lots at) Walmarts in America," said Santana "It's not special equipment Even if maintenance is less than stellar there are more extreme solutions to choked pavement. One expert recommends something called the BIRD Bunyan Infiltration Restoration Device from Bunyan Industries that blasts damaged pavement with water and then vacuums out the debris The machine is reportedly able to restore permeability to surfaces clogged with concrete grindings, sawdust, and asphalt. Porous asphalt and pervious concrete do present some unique challenges in installation and maintenance They take mare thought and planning than standard roads, and perhaps more sweeping or vacuuming But when done right, they work well. And when you consider the damage caused from the polluted stormwater runoff that gushes from conventional roads and parking lots, it's hard to make the case that they're doing the job we need them to do Permeable roads have proven to be an effective solution in countless situations In addition to the benefits to stormwater the pervious roads are quieter and reduce the risk of hydroplaning and water splashing onto windshields. 4. Because the pervious roads are thicker they require more matenats and often cost more to install But in fact, they can actually save cash In Pringle Creek the porous asphatt took the place of costly, conventional stormwater drainage systems that shunt water to detention ponds or straight into creeks We saved a tremendous amount of money not having to do pipes and gutters and curbs," said Santana. That sort of concrete work is very expensive and maintenance adds up as well. 'Our streets are our pipe and dram system," he said We re really pleased with the results." Page 3 of 4 http: /daily.sightline.org /2012/01/03 /the porous- road -less- traveled/ 1/3/2012 A Call to Waterlogged Northwesterners 1 Sightline Daily Page 1 of 3 Sightline Dally News &Views fora Sustainable Northwest A Call to Waterlogged Northwesterners New rules could curb stormwater runoff if Washingtonians demand it. Lisa Snifter on November 30, 2011 at 11:35 am This post Is part of the research project Stormwater Solutions: Curbing Toxic Runoff nee 11 rlidr The consensus among stormwater experts is that what we've been doing building gutters and settling ponds and pipes that empty into streams isn't working. If you've navigated the pond -sized puddles, and seen your neighbors stacking sandbags in an effort to keep the rain from turning their basements into a musty mess, you don't need much convincing. The question, said Sturdevant, is "how do we continue to develop in ways that doesn't make (stormwater runoff) worse Sightline Stormwater has been kicking the Northwest's butt Armed with back -to -back deluges, the region s polluted runoff has shown no mercy For weeks it has soaked us to our socks with deceptively deep and oily puddles It s sent icy trickles of rain snaking off awnings and splatting our cheeks and foreheads It has forced us to leap, not always so nimbly, Its muddy mini rapids just to reach the safety of the sidewalk. People of the waterlogged Northwest, It doesn't have to be like this By changing haw we build our streets and structures, more of that polluted runoff can be allowed to soak Into the ground or get soaked up by the leaves and roots of plants It can be funneled Into large cisterns and saved for a not-so -rainy day It's time to tame the rain. We can help do this by implementing rules that well change how we build our roads, sidewalks, alleys, parking lots, roadside gardens, and rooftops Right now, Washington's Department of Ecology is accepting comments on just such rules for reducing and cleaning up these soggy torrents of dirty runoff These rules are a big deal not just considenng our personal discomfort and hassle, but for the broader landscape and health of our fragile ecosystems for years to come "Polluted runoff is our number one urban water quality problem In the state," said Ecology director Ted Sturdevant in an interview when the rules were released in October "This permit is about how do we regulate stormwater, how do we deal with development, how do we grow Sturdevant said. "This is going to take us close to 2020 The answer ties with low Impact development, or LID Ecology's proposed rules require more extensive use of these budding technologies and strategies to preserve native plants and sods. However there are critics on both sides of the proposed regulations charging that the rules either don't go far enough, or that they go too far in mandating the use of rain gardens, green roofs, porous pavement and other low Impact development mots (See these stones from the Associated Press and KPLLI ffrS Here's the struggle To really truly save local waterways, the rules are going to have to push local cities and counties beyond their comfort zone Government officials and developers are going to have to Install concrete and asphalt that behaves more like a sponee than a rock in places they would not have In the past They re going to have to figure out ways to get more green roofs on top of buildings perhaps Learning how from Portland They'll have to get more rain gardens in the ground, in yards, and along roadways Local codes need to be updated with an eye to LID for road construction, tree and plant preservation, and water collection for watenng yards and flushing toilets But the rules also need a bit of flexibility so that they don't require the construction of projects that are doomed to fad, ultimately undermining efforts to expand the use of low- impact development No one wants another Ballard roadside ram gardens on their watch http: /dai 1y.sightline.org /2011 11 /30 /a- call -to- waterlogged northwesterners 1/3/2012 A Call to Waterlogged Northwesterners 1 Sightline Daily Page 2 of 3 hernRee Four And the rules don't include other low- impact development techniques including rainwater capture In aster ns or the use of 'pin pilinvs, a type of foundation that preserves the soil around and under a building so that water can soak into and pass through 11 Stronger requirements could provide total businesses a degree of confidence that there would be customers for their LID technologies They could then perfect and sell LID products and services specifically suited to the Northwest, Including porous asphalt, green roofs, water reuse systems, and ram garden landscaping and maintenance businesses Stricter rules could nudge city departments and workers who have resisted low impact development Into learning more about it and incorporating it into their projects Fear of LID and a resistance to change are frequently cited by green stormwater proponents as top reasons for the slow expansion of these strategies- Stricter rules coutd help change that. So just say no more to overflowing ditches that could flush a small dog out to sea, to downspouts spewing water with the force of a fire hose Ecology is takino comments on the rules until 5 p.m on Feb. 3, 2012 Wring out your socks, and make yourself heard. Read more in Environment, Land Use 8 Transportation Comments r Albert Kaufman says' xa. December 1, 2011 at 1 115 am http ldepave org and plant trees Reply Chris Wilke says December 1, 2011 at 5 56 pin Thanks Lisa an excellent perspective on the issue In addition the Important aspect of reducing flooding and slowing down the flow of runoff, we can also point out that LID technologies actually remove toxic pollution from stormwater runoff, making the small amount that leaves a site cleaner and safer for our waterways, and the people and wildlife that use them Reply r Kevin Matthews says December 5, 2011 at 9 02 ani And arguably the most Important aspect of LID curbing sprawl and proteFL9hmatfueil Y 5011$Y Sightline Institute is admittedly challenging to address through stormwater regulations, bur REcttlrhN@YrfiP,StklI 1 Seattle. Washington 98101 tel -'1.204 442 1880 1 tax +1 206 447 2270 Some of the strengths of the proposed rules include the expansion of the stormwater regulations to cover projects less than 1 acre in size, while the existing rules gave a pass to smaller developments. They require on -the- ground monitoring to measure pollution levels and they mandate the use of many LID technologies that were optional before. But there are loopholes and "off ramps" In the regulations that allow developers to duck many of the requirements- Green roofs, for ecarnple, are required tot large commercial buildings unless the developer can make the case that the ecoroof is too expensive. While economic studies have shown that in the long term the planted roots are cheaper because they last much longer, the new rule makes it ridiculously easy for a developer to show that it costs more upfront to build an ecoroof compared to a conventional torchdown, which means the rule rs essentially ineffective ,o y Q Owunn *y u,o, Chns, what happens to heavy metals from runoff in bioswales and other 'LID technologies' Do they just magically disappear http. /daily. sightline org/2011/11/30/a-c all-to- waterlogged-northwesterners/ 1/3/2012 CITY OF PORTANGELES W A S H I N G T O N U S A. CITY MANAGER'S OFFICE MEMO DATE: JANUARY 17, 2012 To: CITY COUNCIL FROM: KENT MYERS, CITY MANAGER SUBJECT: CITY COUNCIL ASSIGNMENTS TO BOARDS, COMMISSIONS AND COMMITTEES This work session is for City Council to discuss assignments to certain boards, commissions and committees. Assignments are determined every two years in January following a City Council election. The current list is attached for reference. The Mayor will have recommendations for changes to these assignments to offer at the work session. So, if you have certain preferences, please contact the Mayor prior to the meeting. Please note the addition of the Marine Resource Committee and the Port Angeles Downtown Association. In addition to these assignments, the City used several ad hoc sub committees during 2011 and these served a very useful purpose. This included Municipal Court, Strategic Budget Goals, and the 215 South Lincoln Street Property It is recommended for Council to also discuss any new ad hoc sub committees you wish to create for 2012. 1 suggest the following ad hoc Sub Committees for your consideration: 1 Municipal Court 2. Port Angeles Fine Arts Center 3 215 South Lincoln Street Property 4 City Branding 5 Employee Salaries and Benefits D -1 cn 4 a a O a X X a x X a Q X X x X X X X X X X X X a M 0 0 0 T p T c f 2 it 2 0 ITY COUNCIL ASS G I I indicates alternate needed BOARD February I S AeM Pe se siaen nday betwe City Hall ittee Mee Thursdai iers Board 3rd Month Jay every c ts as need( is Develor sday of mo It Council :enter, Rm er Meetin rsight 2n al Pool Dis Board Roc "ues of mot and Meet! I Board P is 3rd Thor: It District I Chamber Air Agent mittee 31 2nd Mond tee Meet i I cn 4 a a O a X X a x X a Q X X x X X X X X X X X X a M 0 0 0 T p T c f 2 it 2 0 ITY COUNCIL ASS G COMMITTEE, BOARD or COMMISSION Proposed Assignments Jan. 24, 2012 Members Di Guilio CITY COUNCIL Kidd Bruch ASSIGNMENTS Nelson Downie Mania Collins Human Services United Way Scheduled by United Way 1* Alt X Lodging -Tag Advisory, t as,iieeded_ Real Estate Meets Monday between 1st 3rd Tuesday of each month. 4.30 p m. City Hall g X X Alt- X Utility Advisory Committee Meets 2nd Tuesday of month 3prim to City Hall 3* X X, X At Solid Waste Meets 3rd Thursday of odd months 3pm Clallam Co. Commissioners Board Room 1* Alt X Clallam Transit Meets 3rd,Mohday df each month at fpm. Rotating, locations_-_.__,___, 2* Alt X X PRTPO Meets 2nd Friday every other month, 10am, location varies 1* Alt X Law and.Justice- ,,Meets,as needed -M _-1 Alt Community Economic Development Meets as needed 3 X Alt X X PA Forward 4 2nd Thursday of Monti arn City Hall 2* A_ It Economic Development Council Third Thursday of month, 11 am to 1 pm Lincoln Center, Rm 208 1* Alt X Feiro Marine Lie-Center-Meeting's lobe_determined 1 X Parks, Facilities Oversight 2nd Weds, 4.30 pm VBurton 3* X X Alt X William'Shore'Meinorial Pool Distribt 4th Tues at 3pin Clallam Commissioners Board Room 2 j( X Disability Board 3rd Tues of month at 9am at County Mayor Sequim Fireman's, Pension Board:- Meets once a year Mayor ,X Vol. Fireman's Pension Board Meets once a year Mayor 1 X X Lauridseri,Trust.= Meets.3rd Thurs of month at 4pin Mayor X, ed. Peninsula Development District -4th Thursday 1* X Alt Port Angeles Regional Chamber of Coniiberce 2nd Friday, Noon „location .varies w_, „_.r_._ 1* X Alt Olympic Region Clean Air Agency 2nd Weds 10am Olympia 1 X Marine Resource Committee 3rd Monday 5:30pm 1 X PA Downtown Assoc 2nd Monday 6.15pm PADA Office 1 X... City Wellness Committee q Meets,as heeded_ 1_ X *Indicates alternate needed COMMITTEE, BOARD or COMMISSION Proposed Assignments Jan. 24, 2012 AD HOC SUB COMMITTEES Fire Consolidation CITY COUNCIL ASSIGNMENTS Members Di Guilio Kidd Bruch Nelson Downie Mania Collins 3 X X X i jqT te r Muici ri al'Court'=�a_�r��;, `•,iaf zT... e:.:. ma. i��` s. E.. a :...�.�.....,...:__.._.....:..w ,�3 X ,_._.v X i,..... X .......i._.. Historic Building 215 South Lincoln Street 3 X X X City .ar City Bi'anding�;,r- =r. y� t ,3 Employee Salaries and Benefits 3 X X X Port Angeles. Fine:Aks.Center "r l 2 X- X Indicates alternate needed Notes: City Council determines Chair of PA Forward City Council needs to formally approve appointment of Sequim Mayor to the Disability Board Meeting dates and times subject to change If you cannot attend contact the alternate directly CITY OF PORTANGELES W A S H I N G T O N U S A. CITY MANAGER'S OFFICE MEMO DATE: JANUARY 17, 2012 To: CITY COUNCIL FROM: KENT MYERS, CITY MANAGER SUBJECT: CITY COUNCIL RETREAT AGENDA As you know, the City Council Retreat is scheduled for January 21, 2012, at 9:00 A.M. at the Port Angeles Fine Arts Center Over the past several weeks, a number of items have been suggested for inclusion on the retreat agenda. Based upon this input, 1 have drafted the attached agenda. This work session has been scheduled to receive additional Council input before this agenda is finalized. There may be additional items that you want to add, or you may want to defer one or more of these items for Council discussion later this year Please review the attached draft agenda and be prepared to offer your comments and suggestions. D -3 1. Call To Order Chairman Dan Di Guilio called the meeting to order at 4:00 p.m. IL Roll Call UAC Assigned Councilmembers Present: Dan Di Guilio, Cherie Kidd Other Councilmembers Present: Don Perry, Max Mania, Patrick Downie Other Councilmembers Absent: Brad Collins, Brooke Nelson Utility Advisory Committee Members Present: Dean Reed. Paul Elliott (4:01) Utility Advisory Committee Members Absent: N/A Staff Present: Others Present: Tom Callis PDN, Terry Mundorf Marsh Mundorf Pratt Sullivan. III. Approval Of Minutes Chairman Dan Di Guilio asked if there were any corrections to the minutes of November 8, 2011 Committee Member Dean Reed moved to approve the minutes. Cherie Kidd seconded the motion, which carried unanimously IV. Late Items: None. V. Discussion Items: City Council Special Meeting/Utility Advisory Committee Jack Pittis Conference Room Port Angeles, WA 98362 December 13. 2011 4:00 p.m. Nathan West, Bill Bloor, Larry Dunbar, Mike Puntenney, Yvonne Ziomkowski, Phil Lusk. Sondya Wray, Tom McCabe. Helen Freilich, Randall Brackett .4. BPA Residential Exchange Program Settlement Agreement Amendment No. I (verbal report only) Larry Dunbar, Deputy Director of Power Systems introduced Terry Mundorf, of Marsh Mundorf Pratt Sullivan. There was a brief report on the BPA Residential Exchange Program Settlement Agreement Amendment No. 1 F -1 B. Draft New Large Single Electrical Loads Introduction Information Only Phil Lusk, Power Resources Manager discussed a proposed policy for the Electric Utility's new large single electrical loads that addresses how marginal power supply costs will be recovered under the new Bonneville Power Administration Tier 2 power supply The Western Public Agencies Group assisted staff and prepared a draft of a new large single load ordinance for discussion purposes. There was a brief discussion. Information only No action taken. Staff will return to the Utility Advisory Committee to further consider the proposed ordinance. C Electrical Work Permit Fee Corrections Larry Dunbar, Deputy Director of Power Systems discussed the need to make a few corrections to the fees that were approved earlier this year A brief discussion followed. Cherie Kidd moved to recommend to City Council to proceed with a public hearing on electrical work permit fee adjustments for the Electric Utility. Paul Elliot seconded the motion, which carried unanimously. VL Information Only Items: A. Solid Waste Collection and Recycling Survey (Verbal report only) Information only No action taken. B. Low Income Weatherization Utility Discounts Ordinance (Verbal report only) Information only No action taken. C. Industrial Transmission Electric Rate Ordinance and Letter Agreement Update (Verbal report only) Information only No action taken. VII. Next Meeting Dates: December 13, 2011: 5 -7 p.m. work session December 15, 2011. Continuation 3 -5 p.m. VIII. Adjournment: 4:52 p.m. F -2 7 I. Call To Order Chairman Dan Di Guilio called the meeting to order at 5.00 p.m. IL Roll Call UAC Assigned Councilmembers Present: Other Councilmembers Present: Other Councilmembers Absent: Utility Advisory Committee Members Present: Utility Advisory Committee Members Absent: Staff Present: Others Present: IX. The following items were presented with no action requested or taken: A. B. C. D. Joint Utility Advisory Committee /City Council Work Session Items Council Chambers Port Angeles, WA 98362 December 13, 2011 5:00 p.m. Dan Di Guilio, Cherie Kidd IV. Adjournment: 7:00 p.m. Don Perry, Max Mania, Patrick Downie, Brad Collins Brooke Nelson Dean Reed, Paul Elliott N/A Nathan West, Dan McKeen, Terry Gallagher, Bill Bloor, Larry Dunbar, Mike Puntenney Yvonne Ziomkowski, Phil Lusk Tom Callis PDN, Terry Mundorf— Marsh Mundorf Pratt Sullivan, Anne Falcon -EES Consulting, Lee Afflerbach- Columbia Telecommunications Corporation, Craig Johnson and Bob Jensen Capacity Provisioning, Inc., Chuck Beaudette— OlyPen, Inc., Greg Murphy and Sergio Gutierrez -Aruba Networks, Brian Magnuson and Chris Schueller- Cascade Networks, Inc. Dr Mark Fischer Olympic Medical Center, Steve Baxter- Peninsula College, Richard Bull- Center for Rural Development Wireless Mobile Data System Acquisition and Integration Agreement Columbia Telecommunications Corporation Professional Services Agreement Amendment No. 1 Wireless Mobile Data System Operation, Management Maintenance Agreement Wireless Mobile Data System Retail Service Provider Agreement Next Meeting Dates: December 15, 201: Continuation 3 -5 p.m. January 10, 2012: 3 -5 p.m. F -3 3 I. Call To Order Chairman Dan Di Guilio called the meeting to order at 3 p.m. II. Roll Call UAC Assigned Councilmembers Present. Other Councilmembers Present: Other Councilmembers Absent: 'er Advisory Committee Members Present: Utility Advisory Committee Members Absent: Staff Present: Others Present: III. Discussion Items Continued City Council Special Meeting /Utility Advisory Committee Continuation Vern Burton Meeting Room Port Angeles, WA 98362 December 15, 2011 3:00 p.m. Dan Di Guilio, Cherie Kidd (3:04) Max Mania (left at 4 10), Patrick Downie Brooke Nelson, Don Perry, Brad Collins Dean Reed. Paul Elliott (3:02) N/A Bill Bloor, Larry Dunbar, Yvonne Ziomkowski, Mike Puntenney, Dan McKeen. Terry Gallagher, Kathryn Neal, Ken Debuc, Nathan West, Jeff Young, Helen Freilich, Randall Brackett, Brian Smith Tom Callis PDN, Craig Johnson and Bob Jensen- Capacity Provisioning, Inc., Tony Hudson Clallam County Fire District 111, Phil Charles LEKT, Chuck Beaudette OlyPen, Inc., Jon Bugher Clallam County Fire District 11, Ron Peregrin Clallam County Undersheriff A. Wireless Mobile Data System Acquisition and Integration Agreement Terry Gallagher, Police Chief summarized the proposed agreement. A discussion followed. Paul Elliot moved to recommend to City Council to approve and authorize the City Manager to sign the Wireless Mobile Data System Acquisition and Integration Agreement with Capacity Provisioning, Inc. in an amount not to exceed $2,577,922.00, and to make minor modifications to the agreement, if necessary. Cherie Kidd seconded the motion, which carried unanimously. B. Wireless Mobile Data System Professional Services Agreement Amendment No. I Terry Gallagher, Police Chief summarized the proposed amendment. A discussion followed. Dean Reed moved to forward a favorable recommendation to City Council to authorize the City Manager to sign Amendment No. 1 to the professional services agreement with Columbia 4 F -4 Telecommunications Corporation in an amount not to exceed $164,500.00, which increases the maximum compensation under the agreement from $65,400.00 to $229,900.00, and to make minor modifications to the agreement, if necessary. Paul Elliot seconded the motion, which carried unanimously C. Wireless Mobile Data System Operation, Management Maintenance Agreement Terry Gallagher. Police Chief summarized the proposed agreement. A discussion followed. Paul Elliot moved to forward a favorable recommendation to City Council to approve and authorize the City Manager to sign the Wireless Mobile Data System Operation, Management Maintenance Services Agreement with Capacity Provisioning, Inc. in an annual amount of $28,383.00 beginning in year 2013 for operation and management services and an estimated annual amount of $4,560.00 for maintenance services, and to make minor modifications to the agreement, if necessary. Cherie Kidd seconded the motion, which carried unanimously. D. Wireless Mobile Data System Retail Services Provider Agreement Terry Gallagher, Police Chief summarized the proposed agreement. A discussion followed. Max Mania moved to forward a favorable recommendation to City Council to approve and authorize the City Manager to sign the non exclusive Wireless Mobile Data System Retail Service Provider Agreement with OlyPen, Inc., and to make minor modifications to the agreement, if necessary. Cherie Kidd seconded the motion, which carried unanimously. E. On -Call Wastewater Utility Engineering Professional Services Agreement Amendment No. 1 Kathryn Neal, P.E., Civil Engineering Manager reviewed Amendment No 1 additions to the scope and budget for four additional projects. Each provides as a separate tasks in the contract. Yvonne Ziomkowski, Finance Director clarified that the City has until August 17, 2013 to spend the 2010 bond proceeds. A lengthy discussion followed. Dean Reed moved to recommend to City Council to approve and authorize the City Manager to sign Amendment No. 1 to the Professional Services Agreement with Brown and Caldwell, Inc., in an amount not to exceed $400,000, which increases the maximum compensation under the agreement from $142,109 to $542,109, and to make minor modifications to the agreement, if necessary. Paul Elliot seconded the motion, which carried unanimously. F. Local Source Control Program Grant Randall Brackett, P.E. Deputy Director of Operations summarized a grant that is being offered to the City to support a temporary full time, 18 -month term employment position dedicated to small business education and technical assistance for applying best management practices in handling runoff and wastes. A discussion followed. Dean Reed moved to forward a favorable recommendation to City Council to approve and authorize the City Manager to accept a grant in the amount of 5154,700 with the Washington State Department of Ecology and create a temporary full -time, 18 -month term employment position of Local Source Control Specialist, and to make minor modifications to the contract, if necessary. Paul Elliot seconded the motion, which carried and Cherie Kidd voted no. F -5 5 G. Maintenance Contract WW-11 -036; Wastewater Sewer System Cleaning and Video Inspection Michael Puntenney P.E. Deputy Director of Engineering/City Engineer discussed the contracting format for the jetting, root and debris removal, and cleaning of selected sewer lines in the City A discussion followed. Paul Elliot moved to recommend to City Council to authorize the City Manager to sign the Limited Public Works Process Contract WW -11 -036, Wastewater Sewer System Cleaning and Video Inspection with the low responsible bidder for the contracted not -to- exceed maximum value of 535,000 including sales tax, and to make minor modifications to the agreement, if necessary Dean Reed seconded the motion, which carried unanimously. IV Next Meeting Date: January 10, 2012 V Adjournment: 4:45 p.m. Dan Di Guilio, Mayor Janessa Hurd, City Clerk 6 F -6 CALL TO ORDER- Mayor Di Guilio called the regular meeting of the Port Angeles City Council to REGULAR MEETING: order at 6:00 p.m. ROLL CALL: CITY COUNCIL MEETING Port Angeles, Washington January 3, 2012 Members. Present: Mayor Di Guilio, Councilmembers Bruch, Collins, Downie, Kidd, Mania, and Nelson. Members Absent: None. Staff Present Manager Myers, Attorney Bloor, Clerk Hurd, G. Cutler, T Gallagher, D. McKeen, N. West, T Pierce, D Bellamente, C. Delikat, R. Brackett, and S. Roberds. PLEDGE OF Mayor Di Guilio led the Pledge of Allegiance, to the Flag. ALLEGIANCE. CEREMONIAL 1 Selection of Mayor and Deputy Mayor MATTERS/ PROCLAMATIONS/ Mayor Di Guilio called for nominations for Mayor EMPLOYEE RECOGNITIONS: It was moved by Mania and seconded by Bruch to: Appoint Councilmember Kidd as Mayor Motion carried 7 -0. Mayor Kidd assumed the role of chair and called for nominations for Deputy Mayor It was moved by Nelson and seconded by Di Guilio to: Appoint Councilmember Downie as Deputy Mayor It was moved by Kidd to: Nominate Councilmember Collins as Deputy Mayor Mayor Kidd called for the vote for Councilmember Downie. Motion failed 3 -4, with Bruch, Collins, Kidd, and Mani voting in opposition. Mayor Kidd called for the vote for Councilmember Collins. Motion carried 4 -3, with Di Guilio, Downie, and Nelson voting in opposition PUBLIC COMMENT: Darlene Schanfald, PO Box 2664, Sequim, invited Council to the upcoming meeting, Water is a Resource: Keeping it Clean and Reusable. Frances Charles, Chair of the Lower Elwha Klallam Tribe, thanked and congratulated outgoing and incoming Councilmembers, Mayor, and Deputy Mayor F -7 CITY COUNCIL MEETING January 3, 2012 CITY COUNCIL REPORTS: LATE ITEMS TO BE PLACED ON THIS OR FUTURE AGENDAS: CONSENT AGENDA: ORDINANCES NOT REQUIRING PUBLIC HEARINGS: Break: OTHER CONSIDERATIONS: None. None. It was moved by Di Guilio and seconded by Mania to approve the Consent Agenda to include: 1 City Council Minutes for December 20. 2011 2. Expenditure Approval List: 12/10/11 to 12/23/11 for $2,594,399.05 3. Final Acceptance Tree Trimming Con tract Project WF- 133412/03 4. Amendment to Agreement William Shore Memorial Pool District Motion carried 6 -0, with Bruch abstaining from the vote. 1 Electrical Work Permit Fee Corrections Public Works and Utilities Director Cutler explained this was the second reading of the Ordinance. which is being proposed to increase efficiency and cost effectiveness for the City and the public. Council discussion followed. Mayor Kidd conducted a second reading of the ordinance by title, entitled, ORDINANCE NO. 3444 AN ORDINANCE of the City of Port Angeles, Washington. revising Sections of Chapter 3 70, of the Port Angeles Municipal Code relating to Electrical Work Permit fees. It was moved by Mania and seconded by Downie to: Adopt the Ordinance as read by title. Motion carried 7 -0. Mayor Kidd recessed the meeting for a break at 6:19 p.m. The meeting reconvened at 6:36 p.m. 1 Local Source Control Program Grant Director Cutler introduced Deputy Director of Operations Brackett and complimented him on working to receive the grant from the Washington State Department of Ecology Deputy Director Brackett stated then stated the purpose of the grant was to fund a temporary full -time position. for 18 months, to provide education and technical assistance for the public and local businesses on the best management practices in handling hazardous and dangerous water. stormwater, solid waste, and spill prevention. Council discussion followed. It was moved by Downie and seconded by Nelson to: Approve and authorize the City Manager to sign a contract accepting a grant in the amount of $154,700 from the Washington State Department of Ecology and create a temporary full -time, 18 -month term employment position of Local Source Control specialist, and to make minor modifications to the contract, if necessary Motion carried 7 -0. 2 F -8 OTHER 2. CONSIDERATIONS: Governor's Petition for Marijuana Reclassification CONSENT AGENDA: (Cont'd) INFORMATION: WORK SESSION: EXECUTIVE SESSION: CITY COUNCIL MEETING January 3, 2012 Manager Myers stated the Governor of Washington and Rhode Island have petitioned the U.S. Drug Enforcement Agency (DEA) to reclassify marijuana from a Schedule 1 to a Schedule II drug, so it can be considered a drug with medical value and be prescribed by a doctor or dispended by a pharmacy He stated the City was invited by the Association of Washington Cities (AWC) to submit a letter of support of the Governors petition. Council discussion followed. It was moved by Mania and seconded by Nelson to: Take a position in support of the Governor s petition and authorize the City Manager to send a letter stating such. Motion carried 6 -1, with Di Guilio voting in opposition. 5 Combined Sewer Overflow Pre Clearance Excavation Project 06 -01 Final Acceptance Cduncilmeihlei Mania stated he wanted the item pulled so he did`riof have to Vote no on the entire Consent Agenda. Director Cutler stated the project was completed under budget. It was moved by Di Guilio and seconded by Nelson to: Accept the CSO Pre clearance Excavation. Project No. 06 -01 and authorize release of the retainage upon receipt of required clearances, Motion carried 5 -2, with Mania and Bruch voting in opposition. Manager Myers spoke regarding the special City Council meeting with the Department of Ecology on January 9 the City Council retreat on January 21, and the upcoming solid waste survey regarding recycling and solid waste services. Council discussion followed. 1 Ethics Issues Related Topics Training Attorney Bloor conducted a PowerPoint presentation on ethics and related issues to the City Council. He addressed specific ethics issues, Washington State law and discussed the options regarding the City adopting specific ethics policies Council discussion followed. 2. Public Records Training Attorney Bloor and Clerk Hurd conducted a PowerPoint presentation on public records and public records disclosure as part of the annual training required under the Port Angeles Municipal Code. Council discussion followed. Based upon input from Attorney Bloor. Mayor Kidd announced the need for an Executive Session under the authority of RCW 42.30.110(1)(1), for the purpose of discussing potential litigation with legal counsel, for approximately 15 minutes. The Executive Session convened at 8:00 p.m. The session was extended by announcement at 8.15 p.m. for 5 minutes. 3 F -9 CITY COUNCIL MEETING January 3. 2012 RETURN TO OPEN SESSION: The Executive session concluded at 8:21 p.m. No action was taken. ADJOURNMENT: The meeting adjourned at 8:21 p.m. Cherie Kidd, Mayor Janessa Hurd, City Clerk 4 F -10 Date: January 3. 2012 Expected length of session: 15 minutes Is action expected following the session. No. EXECUTIVE SESSION At the start of Executive Session, remind, participants that: Only announced topics may be discussed No final action can be taken in Executive Session Discussions are confidential Reason for Executive Session: To consider matters affecting national security To consider the selection of a site or the acquisition of real estate by lease or purchase when public knowledge regarding such consideration would cause a likelihood of increased price. To consider the minimum price at which real estate will be offered for sale or lease when public knowledge regarding such consideration would cause a likelihood of decreased price. However, final action selling or leasing public property shall be taken in a meeting open to the public. To review negotiations on the performance of public bid contracts when public knowledge regarding such consideration would cause a likelihood of increased costs. To consider, in the case of an export trading company, financial and commercial information supplied by private persons to the export trading company To receive and evaluate complaints or charges brought against a public officer or employee. However, upon the request of such officer or employee, a public hearing or a meeting open to the public shall be conducted upon such complaint or charge. To evaluate the qualifications of an applicant for public employment or to review the performance of a public employee. However, subject to RCW 42.30 140(4), discussion by a governing body of salaries. wages. and other conditions of employment to be generally applied within the agency shall occur in a meeting open to the public, and when a governing body elects to take final action hiring, setting the salary of an individual employee or class of employees, or discharging or disciplining an employee, that action shall be taken in a meeting open to the public. 1 F -11 EXECUTIVE SESSION January 3, 2012 To evaluate the qualifications of a candidate for appointment to elective office. However, any interview of such candidate and final action appointing a candidate to elective office shall be in a meeting open to the public. X To discuss with legal counsel representing the agency matters relating to agency enforcement actions, or to discuss with legal counsel representing the agency litigation or potential litigation to which the agency, the governing body, or a member acting in an official capacity is, or is likely to become, a party, when public knowledge regarding the discussion is likely to result in an adverse legal or financial consequence to the agency Closed session under RCW 4230.140 To discuss proceedings concerned with the formal issuance of an order granting, suspending, revoking, or denying any license, permit, or certificate to engage in, any_ business, occupation, or profession, or to receive a license for a sports activity or to operate any mechanical device or motor vehicle where a license or registration is necessary; or Meeting of a quasi- judicial body relating to a quasi judicial matter between named parties as distinguished from a matter having general effect on the public or on a class or group. Matters governed by chapter 34.05 RCW. the Administrative Procedure Act. Collective bargaining session with employee organization, including contract negotiations, grievance meetings, and discussions relating to the interpretation or application of a labor agreement or a portion of a meeting which the governing body is planning or adopting the strategy or position to be taken by the governing body during the course of any collective bargaining, professional negotiations, or grievance or mediation proceeding, or reviewing the proposals made in the negotiations or proceedings while in progress. Time session began. 8:00 p.m. Was session extended by announcement: Yes If so, when: 8.15p.m. Time session ended: 8.21 p.m. In attendance: Manor Kidd. Deputy Mayor Collins, Councilmembers Bruch. Di Guilin, Downie. Mania. and Nelson. Manager Myers, and Attorney Bloor. Mayor 2 City Clerk F -12 Vendor BILLS PLUMBING HEATING INC CLALLAM CNN TREASURER DATA FLOW DEPARTMENT OF REVENUE -WIRES MATTHEWS BRONZE PA OMC Foundation Tim Roening SENIUK, JAKE TARGET SAFETY WA STATE PATROL WASHINGTON STATE TREASURER OLYMPIC PRINTERS INC PORT ANGELES CHAMBER OF COMM Legislative AWC -ASSN OF WASHINGTON CITIES CENTURYLINK -QWEST ClaIlam Co Project Homeless City Manager Department CENTURYLINK -QWEST City Manager Department CENTURYLINK -QWEST City Manager Department CENTURYLINK -QWEST Finance Department CENTURYLINK -QWEST DATA FLOW ANNE CASAD Finance Department CENTURYLINK -GWEST DIGITAL IMAGING SOLUTIONS INC EQUIFAX FEDERAL EXPRESS CORP PACIFIC OFFICE EQUIPMENT INC VERIZON WIRELESS Finance Department DIGITAL IMAGING SOLUTIONS INC City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description SANIKAN RAYONIER MILL SIT CVCA TO CLALLAM TREAS 11- Year End Forms Excise Tax Return -Nov Excise Tax Return -Nov WFT BRONZE PLAQUE FOR SIE VBCC DAMAGE DEPOSIT REFUN CLUBHOUSE DEPOSIT REFUND Print Banner Annual Renewal LIVESCAN SUBMITTALS NOV 2 NOV BUILDING SURCHARGE DIST CT REV TO ST TREASUR Business Cards -Bruch ANNUAL MEMBERSHIP DUES Mayor 8 Council Legislative 2012 MEMBERSHIP DUES 12 -14 A/C 3604576684085B SPONSORSHIP /ADVERTISING City Manager Office 12 14 NC 3604576684085B Human Resources 12 14 NC 36045766840856 City Clerk City Manager Department 12 14 NC 3604576684085B Finance Administration 12 -14 NC 3604576684085B Year End Forms Tuition Reimbursement Accounting 12 -14 A/C 3604576684085B December Copies Credit Reports Shipping Chgs TONER MTR READERS 12 -13 a/c 271272753 -00001 Customer Service December Copies Page 1 Account Number 001 0000 239.96 -00 001 0000 229.40 -00 001 0000 237.00 -00 001 0000 237.00 -00 001 0000 237.30 -00 001 0000 239.96 -00 001 0000 239.10 -00 001 0000 239.10 -00 001 0000 237.00 -00 001 0000 237.00 -00 001- 0000 229.50 -00 001 0000 229.10 -00 001 0000 229.30 -00 Division Total: Department Total: 001 1160 511.31 -01 001 1160 -511 49 -01 Division Total: Department Total: 001 1210 -513 49 -10 '001- 1210 -513 42 -10 001- 1210 513.44 -10 Division Total: 001 1220 516.42 -10 Division Total: 001 1230 -514 42 -10 Division Total: Department Total: 001 2010 -514 42 -10 Division Total: 001 2023 -514 42 -10 001 2023 514.31 -01 001 2023 -514 43 -10 Division Total: 001 2025 -514 42 -10 001 2025 -514 45 -31 001 2025 -514 41 -50 001 2025 -514 48 -10 001 2025 514.31 -01 001 2025 -514 42 -10 Division Total: 001 2080 -514 45 -31 Date. 1/11/2012 invoice Amount 85.00 248.82 -15.33 326.16 489.64 115.61 300.00 50.00 -7 10 264.60 134 75 103.50 10, 311.36 $11,877.81 $11,877.81 52.03 702.00 $754.03 $754.03 11, 738.00 7.28 100.00 $11,845.28 1 46 $1.46 0.73 $0.73 $11,847 47 5.10 $5.10 6.55 197 78 1,245.00 $1,449.33 9.46 15.51 60.88 19.75 160.96 71 46 $338.02 262.27 F 13 Vendor GREAT AMERICA LEASING CORP MORNINGSIDE OLYMPIC STATIONERS INC UNITED PARCEL SERVICE Finance Department CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC WEST GROUP Attorney BLACK, JOHN D.PLLC CENTURYLINK -QWEST CLALLAM CNN DIST 1 COURT CLALLAM PUBLIC DEFENDER DIGITAL IMAGING SOLUTIONS INC FOSTER PEPPER PLLC COSCO INDUSTRIES MYERS, STAN WEST GROUP Attorney CENTURYLINK -QWEST RLI Surety OLYMPIC STATIONERS INC Community Development CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC VERIZON WIRELESS Community Development CENTURYLINK -QWEST VERIZON WIRELESS Community Development CENTURYLINK -QWEST Police Department BLUMENTHAL UNIFORMS EQUIP CENTURYLINK -QWEST KEVIN SPENCER Dept of Enterprise Services PENINSULA AWARDS TROPHIES City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/20/2 Description Office Machines Office Machines Janitorial Services COLORED COPY PAPER COPY PAPER Shipping Chgs Reprographics Finance Department 12 -14 NC 3604576684085B December Copies WESTLAW NOV 2011 Attorney Office PCR018541 -Jones 12 -14 NC 3604576684085B Court Costs December Public Defender Fees December Copies CT.RULE COM.ON IND.DEF BUDGET CODE STAMP Pub Def Overage- December WESTLAW NOV 2011 Prosecution Attorney 12 -14 A/C 3604576684085B RENEWAL OF NOTARY BOND OFFICE SUPPLIES, GENERAL Planning 12 -14 NC 3604576684085B December Copies 12 -15 a/c 264230412 -00003 Building 12 -14 A/C 3604576684085B 12 -15 a/c 264230412 -00003 Code Compliance Community Development 12 14 NC 36045766840858 Police Administration CLOTHING APPAREL 12 -14 NC 3604576684085B Uniform Allowance 2012 ADMIN FEE FOR FEDERA 2 DESK PLATES W /HOLDERS R Page 2 Account Number 001 2080 -514 45 001 2080 -514 45 -31 001 2080 -514 41 -50 001 2080- 514.31 -01 001 2080 514.31 -01 001 2080 -514 42 -10 Division Total: Department Total: 001 3010 515.42 -10 001 3010 515.45 -31 001 -3010- 515.31 -01 Division Total: 001 3021 515.41-50 001 3021 515.42 -10 001 3021 515.50 -90 001 3021 515.41 -50 001 3021 515.45 -31 001 3021 515.41 -50 001 3021 515.31 -01 001 3021 515.41 -50 001 3021 515.31 -01 Division Total: Department Total: 001 4010 558.42 -10 001 4010 558.49 -01 001 4010 558.31 -01 Division Total: 001 4020 -524 42 -10 001 4020 -524 45 -31 001- 4020 -524 42 -10 Division Total: 001 4030 559.42 -10 001 4030 559.42 -10 Division Total: Department Total: 001 -5010 -521 42 -10 Division Total: 001 -5021- 521.20 -80 001 5021 -521 42 -10 001 5021 -521 49 -90 001- 5021 -521 41 -50 001 5021 521.31 -01 Date: 1/11/2012 Invoice Amount 638.27 607.63 855 00 82 72 2,111.63 40.00 $4,597.52 $6,389.97 4.37 31.83 386.51 $422.71 .60.00 2.91 9,601.00 5,100.00 31.83 373.95 29.81 3,965.00 386.50 $19,551.00 $19,973.71 5.46 75.00 6.62 $87.08 1.89 15.51 59.67 $77.07 0.29 14.92 $15.21 $17936 11.65 $11.65 276.15 7.28 55.14 400.00 38.55 F 14 Vendor WA STATE CRIMINAL JUSTICE Police Department AIRPORT GARDEN CENTER AMSAN BLUMENTHAL UNIFORMS EQUIP CENTURYLINK -QWEST FEDERAL EXPRESS CORP Shipping Chgs JOE LANCHEROS RADIO PROGRAMMING Radio Develop /Programming LINCOLN STREET STATION SHIPPING AND HANDLING SHIPPING AND HANDLING Shipping Chgs :Y. OLYMPIC MEDICAL CENTER VENIPUNCTURE 12 NOV OFCR PROFORCE LAW ENFORCEMENT SWAINS GENERAL STORE INC_ Police Department JOE LANCHEROS RADIO PROGRAMMING Radio Develop /Programming Police Department CANON USA, INC CENTURYLINK -QWEST DEPARTMENT OF REVENUE -WIRES QUILL CORPORATION WAPRO Police Department CENTURYLINK -QWEST Fire Department CENTURYLINK -QWEST VERIZON WIRELESS Fire Department CENTURYLINK -QWEST TARGET SAFETY City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description CRIME SC INVEST, T PENING Investigation POLICE EQUIPMENT SUPPLY HND SANTZER 150.24 MINUS CLOTHING APPAREL CLOTHING APPAREL CLOTHING APPAREL 12 -14 A/C 36045766840858 POLICE EQUIPMENT SUPPLY POLICE EQUIPMENT SUPPLY POLICE EQUIPMENT SUPPLY POLICE EQUIPMENT SUPPLY POLICE EQUIPMENT SUPPLY POLICE EQUIPMENT SUPPLY Patrol Reserves Volunteers OFFICE MACHINES ACCESS 12 -14 A/C 36045766840858 12 -23 a/c 206T319798358 12 -20 a/c 206Z200017790B Excise Tax Return -Nov Excise Tax Return -Nov OFFICE SUPPLIES, GENERAL OFFICE SUPPLIES, GENERAL OFFICE SUPPLIES, GENERAL FALL CONF 10/20/11 L REID Records Police Department 12 -14 A/C 36045766840858 12 -14 NC 36045766840858 Fire Administration 12 -14 A/C 36045766840858 12 -15 a/c 264395724 -00001 Fire Supression 12 -14 A/C 36045766840858 Annual Renewal Page 3 Account Number 001 5021 -521 43 -10 Division Total: 001 -5022 -521 49 -80 001 5022 521.31 -01 001- 5022 521.20 -80 001 5022 521.20 -80 001 5022 521.20 -80 001 5022 -521 42 -10 001 5022 -521 42 -10 001 5022 521.35 -01 001 5022 -521 42 -10 001 -5022 -521 42 -10 001.5022 -521 42 -10 001- 5022 -521 49 -90 001- 5022 521.31 -80 001 5022- 521.35 -01 001 5022 521.31 -01 001 5022 521.31 -01 001 -5022- 521.31 -01 001 5022 -521 49 -80 Division Total:. 001- 5026 521.31 -80 Division Total: 001 -5029 -521 45 -31 001 5029 -521 42 -10 001 5029 -521 42 -10 001 5029 -521 42 -10 001 -5029- 342.10 -15 001 -5029- 342.10 -17 001 5029 521.31 -01 001 -5029- 521.31 -01 001 5029 521.31 -01 001 5029 -521 43 -10 Division Total: Department Total: 001 6010- 522.42 -10 001 6010 522.42 -11 Division Total: 001 6020 522.42 -10 001- 6020 522.42 -10 Division Total: 001 6021 522.42 10 001 6021 522.43 -10 Date. 1/11/2012 Invoice Amount 100 00 $877 12 65.03 86.11 16.21 -26.82 18.37 20.38 24 74 660.00 32.85 32,85 21:19 600.00 216.69 1,696.30 17.21 30.74 24.81 9.70 $3,546.36 500.00 $500.00 384 71 7.28 64 74 199.03 0.44 23.43 203.78 393.68 54.62 125.00 $1,456.71 $6,391.84 10 19 2.91 $13.10 9.46 26.04 $35.50 0.73 ,7071 Vendor Fire Department TARGET SAFETY Fire Department CENTURYLINK -QWEST Fire Department CENTURYLINK -QWEST Fire Department MRS CLEAN Fire Department CENTURYLINK -QWEST Fire Department AMERICAN PUBLIC WORKS ASSN CENTURYLINK -QWEST INSIGHT PUBLIC SECTOR OFFICE DEPOT VERIZON WIRELESS WENGLER SURVEYING MAPPING Public Works -Gen Fnd ASM SIGNS CENTURYLINK -QWEST DEPARTMENT OF REVENUE -WIRES DIGITAL IMAGING SOLUTIONS INC GREAT AMERICA LEASING CORP OLYMPIC STATIONERS INC SUNSET DO -IT BEST HARDWARE Parks Dept CANON USA, INC CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC GREAT AMERICA LEASING CORP Parks Dept CED /CONSOLIDATED ELEC DIST INC CENTU RYLINK -QWEST DEPARTMENT OF REVENUE -WIRES City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description Fire Volunteers Annual Renewal Special Operations 12 -14 NC 3604576684085B Fire Prevention 12 -14 NC 36045766840858 Fire Training BUILDING MAINT &REPAIR SER Facilities Maintenance 12 -14 A/C 3604576684085B Emergency Management Fire Department Account Number Division Total: 001 6022 -522 43 -10 Division Total: 001 6030 522.42 -10 Division Total: 001 6040 522.42 -10 Division Total: 001 6050 522.41 -50 Division Total: 001 6060 525.42 -10 Division Total: Department Total: Dues Cutler 001- 7010 532.43 -10 12-14 NC 3604576684085B .rJ 001- 7010 532.42 -10 COMPUTER HARDWARE &PERIPHI001 7010 532.31 -60 SUPPLIES SUPPLIES SUPPLIES 12 -22 a/c 571136182 -00001 MEMBERSHIPS Pub Wks Administration Public Works -Gen Fnd SIGNS, SIGN MATERIAL 12 -14 A/C 36045766840858 Excise Tax Return -Nov Excise Tax Return -Nov December Copies OFFICE MACHINES ACCESS OFFICE SUPPLIES, GENERAL HARDWARE,AND ALLIED ITEMS Parks Administration OFFICE MACHINES ACCESS 12 -14 A/C 3604576684085B December Copies OFFICE MACHINES ACCESS Senior Center SUPPLIES SUPPLIES 12 -14 NC 3604576684085B Excise Tax Return -Nov Excise Tax Return -Nov Excise Tax Return -Nov Excise Tax Return -Nov Page 4 001 7010 532.31 -01 001- 7010 532.31 -01 001 -7010- 532.31 -01 001- 7010 532.42 -10 001 7010 532.49 -01 Division Total: Department Total: 001 8010 -574 41 -50 001 8010 -574 42 -10 001 -8010- 347.30 -20 001 8010 347.90 -15 001 8010 -574 45 -31 001 -8010 -574 45 -31 001 8010 574.31 -01 001 -8010- 574.31 -01 Division Total: 001 -8012- 555.43 -10 001 -8012- 555.42 -10 001 -8012- 555.45 -31 001 8012 555.45 -31 Division Total: 001 -8050- 536.31 -20 001 -8050- 536.31 -20 001 8050 536.42 -10 001 -8050- 343.60 -12 001 8050 343.60 -13 001 8050- 343.60 -14 001 -8050- 343.60 -15 Date 1/11/2012 Invoice Amount $1,708.03 1,707.30 $1,707.30 1 46 $1 46 1 46 $1 46 395.00 $395.00 6.55 $6.55 $3,868.40 199.00 22:57 27.39 121.09 160.64 163.99 99.84 1,200.00 $1,994.52 $1,994.52 591.09 2.18 995.70 91 11 52 42 101.30 632.31 298.40 $2,764.51 181.94 2 18 48.39 33.77 $266.28 314.56 309.97 1 46 25.40 31 15 46.91 23.37 F 16 Vendor DEPARTMENT OF REVENUE -WIRES LOBO DESIGNS OLYMPIC STATIONERS INC PEN PRINT INC QUIRING MONUMENTS INC Parks Dept ANGELES MILLWORK LUMBER CO CED /CONSOLIDATED ELEC DIST INC CENTURYLINK -QWEST DEPARTMENT OF REVENUE -WIRES SUNSET DO -IT BEST HARDWARE SWAIN'S GENERAL STORE INC Parks Dept- FEIRO MARINE LIFE CENTER Parks Dept t. CED /CONSOLIDATED ELEC DIST INC SUPPLIES SUPPLIES SUNSET DO -IT BEST HARDWARE SUPPLIES THURMAN SUPPLY SUPPLIES SUPPLIES Facilities Maintenance AMSAN CENTURYLINK -QWEST MARC'S BLIND REPAIR Facilities Maintenance ADT SECURITY SERVICES. INC CED /CONSOLIDATED ELEC DIST INC City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description Excise Tax Return -Nov PRINTING,SILK SCR,TYPSET OFFICE SUPPLY,INKS,LEADS PRINTING,SILK SCR,TYPSET CEMETERY MARKERS CEMETERY MARKERS CEMETERY MARKERS CEMETERY MARKERS CEMETERY MARKERS Ocean View Cemetery TWINE SUPPLIES SUPPLIES SUPPLIES 12 -14 NC 36045766840858 Excise Tax Return -Nov SUPPLIES OFFICE MECH AIDS,SM MACH ENGINEERING EQUIPMENT Park Facilities 4TH QUARTER Marine Life Center Parks Dept BUILDING MAINT &REPAIR SER 001 Custodial /Janitorial Svcs SECURITY,FIRE,SAFETY SERV 001 ELECTRICAL EQUIP SUPPLY 001 SUPPLIES 001 SUPPLIES 001 SUPPLIES 001 SUPPLIES 001 Page 5 Account Number 001 -8050- 343.60 -16 001 -8050- 536.41 -50 001 8050 536.31 -01 001 -8050- 536.41 -50 001 8050 536.34 -01 001 8050 536.34 -01 001 8050 536.34 -01 001 -8050- 536.34 -01 001 8050 536.34 -01 Division Total: 001 8080 576.31 -20 001 8080- 576.31 -20 PAINTS,COATINGS,WALLPAPER, 001 8080 576.31 20. 001 8080 576.31 -20 001- 8080 576.31 -20 001 8080 576.42 -10 001 -8080- 347.30 -18 001 8080 576.31 -20 001 -8080- 576.31 -01 001 8080 576.31 -20 Division Total: Division Total: Department Total: 001 8112 555.31 -20 001 8112- 555.31 -20 001 8112 555.31 -20 001 8112 555.31 -20 001- 8112 555.31 -20 Senior Center Facilities Division Total: JANITORIAL SUPPLIES 001 8130 518.31 JANITORIAL SUPPLIES 001 8130 518.31 01 MACHINERY HEAVY HRDWARE 001 8130 518.31 -01 12 -14 A/C 3604576684085B 001 8130 518.42 8130- 518.31 -01 Division Total: 8131 518.42 -10 8131 518.31 -20 8131 -518 31 -20 8131 518.31 -20 8131 518.31 -20 8131 518.31 -20 Date. 1/11/2012 Invoice Amount 11 11 759.31 38.53 151 76 514.00 544.00 368.00 368.00 201.00 $3,088.59 16.26 128.73 152.18 30.23 45.87 7.28 101 75 10.30 16.12 14.91 $523.63 5,062.50 $5,062.50 $11,705.51 72.54 81.30 4.86 29.47 5.34 $193.51 46.22 786.89 1,862.06 0.73 276.42 $2,972.32 52.46 58.92 110.24 33.15 24.39 76.88 F -17 Vendor CENTURYLINK -QWEST THURMAN SUPPLY Facilities Maintenance CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC GREAT AMERICA LEASING CORP Recreation Activities CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC GREAT AMERICA LEASING CORP Recreation Activities CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC SOUND PUBLISHING INC Recreation Activities PORT ANGELES CHAMBER OF COMM Lodging Excise Tax DEPARTMENT OF REVENUE -WIRES NORTHERN TOOL EQUIPMENT CO ANGELES MILLWORK LUMBER CO BLAKE SAND GRAVEL CENTURYLINK QWEST HOLCOMB COMPANY D INSIGHT PUBLIC SECTOR LTI, INC NORSTAR INDUSTRIES INC City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description 12 -14 NC 36045766840856 12 -05 NC 3604523954268b SUPPLIES Central Svcs Facilities Facilities Maintenance 12 -14 NC 36045766840856 December Copies OFFICE MACHINES ACCESS Sports Programs 12 -14 A/C 36045766840856 December Copies OFFICE MACHINES ACCESS Special Events 12 -14 NC 36045766840858 December Copies Open House Adv Youth /Family Programs Recreation Activities General Fund 2011 Marketing Plan Lodging Excise Tax Lodging Excise Tax Lodging Excise Tax Fund Excise Tax Return -Nov AIR COMPRESSORS ACCESS AUTO SHOP EQUIPMENT SUP Account Number 001 8131 518.42 -10 001 8131- 518.42 -10 001 -8131- 518.31 -20 Division Total: Department Total: 001 8221 -574 42 -10 001 8221 -574 45 -31 001 8221 -574 45 -31 Division Total: 001- 8222 -574 42 -10 001 8222 -574 45 -31 001 8222 -574 45 -31 Division Total 001 8224 -574 42 -10 001 8224 -574 45 -31 001 -8224- 574.44 -10 Division Total: Department Total: Fund Total: 101 1430 557.50 -83 Division Total: Department Total: Fund Total: 102- 0000 237.00 -00 102- 0000 237.00 -00 102 0000 237.00 -00 Division Total: Department Total: ROAD /HGWY HEAVY EQUIPMENT 102 7230 542.31 -20 FASTENERS, FASTENING DEVS HARDWARE,AND ALLIED ITEMS JANITORIAL SUPPLIES TWINE HARDWARE,AND ALLIED ITEMS SALT (SODIUM CHLORIDE) TANKS:MOBILE,PORT,STATION TANKS:MOBILE,PORT,STATION Page 6 102 7230 542.31 -20 102 -7230- 542.31 -20 102 7230 542.35 -01 102 -7230- 542.35 -01 102- 7230- 542.35 -01 HAND TOOLS ,POW &NON POWER 102- 7230- 542.35 -01 HAND TOOLS .POW &NON POWER 102- 7230 542.35 -01 12 -14 A/C 36045766840858 102 -7230- 542.42 -10 ROAD /HWY MAT NONASPHALTIC 102 7230 542.31 -20 COMPUTERS,DP WORD PROC. 102 -7230- 542.48 -02 102 7230 542.31 -01 102 7230 542.31 -01 102 7230 542.31 -20 Date: 1/11/2012 Invoice Amount 0.73 82.24 7.91 $446.92 $3,612.75 0.72 92.75 64 72 $158.19 0.73 92.75 6472 :$158.20 0.73 92.75 148.68 $242.16 $558.55 $79,153.92 2,123.55 $2,123.55 $2,123.55 $2,123.55 19.94 100.80 -15.06 $95.92 495.92 22.88 21.27 6.14 16.37 19.10 154.87 216.79 38.92 3.64 404.67 65.03 4,763 12 10,840.00 831 43 F -18 Vendor NORSTAR INDUSTRIES INC NORTHERN TOOL EQUIPMENT CO OFFICE DEPOT OLYMPIC STATIONERS INC PORT ANGELES POWER EQUIPMENT PUD #1 OF CLALLAM COUNTY PUGET SAFETY EQUIPMENT INC ROADWISE, INC SUNSET DO-lT BEST HARDWARE SWAIN'S GENERAL STORE INC WASHINGTON (DES), STATE OF WASHINGTON (DOT), STATE OF WASTE CONNECTIONS, INC Public Works- Street ATWATER, MALIK VALENTINE CENTURYLINK -QWEST CLALLAM CNN ECONOMIC DEV CNCL INDEPENDENT BIBLE CHURCH SOUND PUBLISHING INC Economic Development CENTURYLINK -QWEST VERIZON WIRELESS Economic Development ABSOLUTE AIR INC AHRENS, KENNETH E CAPTAIN T'S CENTURYLINK QWEST Gary Brooks Steve Romberg Description Account Number TANKS.MOBILE,PORT,STATION 102- 7230 542.31 -25 AIR COMPRESSORS ACCESS 102 7230 542.35 -01 AUTO SHOP EQUIPMENT SUP 102 -7230- 542.35 -01 SUPPLIES 102 -7230- 542.31 -01 SUPPLIES 102 7230 542.31 -01 SUPPLIES 102 7230 542.31 -20 HARDWARE,AND ALLIED ITEMS 102 7230 542.35 -01 SR 101 Euclid 102- 7230 542.47 -10 FIRST AID SAFETY EQUIP 102 -7230- 542.31 -01 SHIPPING AND HANDLING 102 7230 542.31 -01 CLEANING COMPOSITION /SOLV 102 7230 542.31 -01 HARDWARE,AND ALLIED ITEMS 102 7230 542.31 -20 'HARDWARE;AND-ALLIED ITEMS 102 7230 542.31 -20 HAND TOOLS ,POW &NON POWER 102 7230 542.35 -01 SHOES AND BOOTS 102- 7230 542.31 -01 SHOES AND BOOTS 102 7230 542.31 -01 COMPUTERS,DP WORD PROC. 102- 7230- 542.48 -02 CONSTRUCTION SERVICES,GEN 102 7230 542.48 -10 LANDFILL Street Public Works- Street Street Fund FINAL PMT FACADE GRANT 12 -14 NC 3604576684085B 4TH QUARTER FACADE GRANT Buxton Group Economic Development Economic Development Economic Development 12 14 NC 3604576684085B 12 a/c 264230412 00003 Archaeologist Economic Development Cultural Resources Rugmaster Plus Rental Fees Coat Embroidery 12 -14 NC 3604576684085B BACK UP HARD DRIVE FOR LO 2 27" MONITORS FOR CAD MA NATIONAL EMERGENCY NUMBER ASSN Memebership 2012 City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Page 7 102- 7230 542.48 -10 Division Total: Department Total: Fund Total: 103 1511 558.49 -91 103 1511 558.42 -10 103 1511- 558.41 -50 103- 1511 558.49 -91 103- 1511- 558.44 -10 Division Total: Department Total: Fund Total: 106 -1512- 558.42 -10 106 1512- 558.42 -10 Division Total: Department Total: Fund Total: 107- 5160 528.31 -80 107 -5160- 528.45 -30 107 5160 528.20 -80 107 5160 528.42 -10 107 5160 528.31 -60 107 5160 528.31 -60 107 -5160- 528.49 -01 Date 1/11/2012 Invoice Amount 5,420.00 1,300,79 194.31 53.45 27.08 92.80 95.22 16.59 979.28 41.63 6,437.01 17:89 .121:93' m 21.88 116.96 138.64 519.28 2,205.66 6,287.20 $41,491.83 $41,491.83 $41,395.91 4,205.04 0.36 3,750.00 7,150.00 265.00 $15,370.40 $15,370.40 $15,370.40 0.73 37.30 $38.03 $38.03 $38.03 536.58 700.00 141 46 19.65 97 73 615.02 F 13gQ0 Vendor NEW WORLD SYSTEMS PETEK, THOMAS C PHD WA STATE PATROL Pencom FERGUSON ENTERPRISES INC Capital Projects -Pub Wks GF-Pub Wks Projects CRAIG BAAR EXCAVATING L tC`r _f 's'CONSTRUCTION.SERVICES,GEN Capital Projects -Pub Wks BUILDERS EXCHANGE OF WA INC Capital Projects -Pub Wks FEDERAL EXPRESS CORP Capital Proj -Parks Rec BPA -POWER WIRES DEPARTMENT OF REVENUE -WIRES GENERAL PACIFIC INC HUGHES UTILITIES LTD CARLINS, DUANE FARRIS, SARA D GENTILE, CRAIG STAUFFER, LORI A WESCO DISTRIBUTION INC CENTU RYLIN K -QWEST CLALLAM CNTY UTLTY COORD CNCL VERIZON WIRELESS Public Works- Electric CENTURYLINK -QWEST Public Works Electric AMSAN BANK OF NEW YORK -DEBT SVC WIRE City of Port Angeles City Council Expenditure Report From: 12/24/2011 Description COMPUTERS,DP WORD PROC COMPUTERS,DP WORD PROC COMPUTERS,DP WORD PROC COMPUTERS,DP WORD PROC HEALTH RELATED SERVICES Health Related Svcs MANAGEMENT SERVICES Pencom Pencom Pencom Fund BUILDER'S SUPPLIES GF Street Projects COMMUNICATIONS /MEDIA SERV ST -Multi -Modal Transp Ctr Capital Projects -Pub Wks Shipping Chgs Misc Parks Projects Capital Proj -Parks Rec Capital Improvement November Power Wire Excise Tax Return -Nov ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY OVERPAYMENT -1138 W 7TH ST FINAL BILL REFUND FINAL BILL REFUND FINAL BILL REFUND ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY 12 -14 NC 36045766840856 MEMBERSHIPS 12 -22 a/c 571136182 -00001 Engineering Electric 12 14 A/C 3604576684085B Power Systems OFFICE SUPPLIES, GENERAL PORANGEREF05 Dbt Pmt Page 8 To: 1/6/2012 Account Number 107- 5160- 594.65 -10 107- 5160- 594.65 -10 107 -5160- 594.65 -10 107 -5160- 594.65 -10 107- 5160 528.41 -50 107 5160 528.41 -50 107 -5160- 528.48 -10 Division Total: Department Total: Fund Total: 310- 7919- 594.65 -10 Division Total: 310 7930 595:65-10' Division Total: 310 -7965- 595.44 -10 Division Total: Department Total: 310 -8985 -594 42 -10 Division Total: Department Total: Fund Total: 401 0000 213.10 -00 401 0000 237.00 -00 401 0000 -141 40 -00 401 0000 -141 40 -00 401 0000 122.10 -99 401 0000 122.10 -99 401 0000 122.10 -99 401 0000 122.10 -99 401 0000 -141 40 -00 401 0000 -141 40 -00 401- 0000 -141 40 -00 Division Total: Department Total: 401 7111 533.42 -10 401 7111 533.49 -01 401- 7111 533.42 -10 Division Total: 401 7120 533.42 -10 Division Total: 401 7180- 533.31 -01 401 7180 592.81 -10 Date' 1/11/2012 Invoice Amount 4,943.04 7,588.00 813.00 9,430.80 600.00 300.00 1,065.00 $26,980.28 $26,980.28 $26,980.28 3,606.35 $3,606:35 4;355:82 $4,355.82 117 50 $117.50 $8,079.67 6.03 $6.03 $6.03 $8,085.70 210,660.00 1,722.35 167 48 1,417.55 125.00 77.80 43.67 52.64 1,288.88 4,915.85 1,298.63 $221,769.85 $221,769.85 2.18 25.00 36.40 $63.58 2.18 $2.18 82.55 0.10 F 20 Vendor CANON USA, INC CAPTAIN T'S CED /CONSOLIDATED ELEC DIST INC CENTURYLINK -QWEST DEPARTMENT OF REVENUE -WIRES H R PARTS EQUIPMENT INC IMSA -INTNL MUNICIPAL SGNL ASSC BRIAN WAHTO Trent Peppard QWEST DBA CENTURYLINK REFUND FOR NEW 401- 7180 379.00 -00 GENERAL- 401- 7180=533.31' -01- OFFICE SUPPLIES, GENERAL 401 7180 533.31 -01 OLYMPIC LAUNDRY DRY CLEANERS LAUNDRY /DRY CLEANING SERV 401 -7180- 533.41 -50 OFFICE DEPOT PORT OF PORT ANGELES PUD #1 OF CLALLAM COUNTY QUILL CORPORATION OFFICE SUPPLIES, GENERAL SNAP -ON TOOLS CHUGGER DEANE ELECTRICAL EQUIP SUPPLY -SUNSET DO -IT BEST HARDWARE THURMAN SUPPLY VERIZON WIRELESS WESTERN SYSTEMS, INC Public Works- Electric FERGUSON ENTERPRISES INC FOWLER COMPANY, H D AMSAN CENTURYLINK -OWEST City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description RENTAL OR LEASE SERVICES FIRE PROTECTION EQUIP /SUP ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY 12 -14 A/C 3604576684085B Excise Tax Return -Nov ELECTRICAL EQUIP SUPPLY MEMBERSHIPS Outage w /11th MEAL REIMBURSEMENT Floor Mat Exchange Lease Fees ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP& SUPPLY ELECTRICAL EQUIP SUPPLY ELECTRICAL CABLES WIRES ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY 11 -22 a/c 571136182 -00002 MARKERS, PLAQUES,SIGNS Electric Operations Public Works- Electric Electric Utility Fund PIPE AND TUBING PIPE FITTINGS PLUMBING EQUIP FIXT,SUPP PIPE FITTINGS PAPER PLASTIC DISPOSABL 12 -14 A/C 3604576684085B 12 -23 a/c 20611255315BT Page 9 Account Number 401 7180 533.45 -31 401 7180- 533.48 -10 401 7180 533.34 -02 401- 7180- 533.34 -02 401 7180 533.34 -02 401 7180 533.42 -10 401 7180 533.49 -50 401 7180 533.34 -02 401- 7180 533.49 -01 401 7180 533.31 -01 401 7180 533.31 -01 401 7180 -533 41 -50 401 7180 533.45 -30 401 -7180- 533.34 -02 401 7180- 533.31 -01 401- 7180 533.35 -01 401 7180- 533.34 -02 401 7180 533.34 -02 401 7180- 533.34 -02 401 7180- 533.34 -02 401 7180- 533.34 -02 401 7180 533.34 -02 401 7180- 533.35 -01 401 7180 533.35 -01 401 7180 533.42 -10 401 7180- 533.34 -02 Division Total: Department Total: Fund Total: 402 0000 -141 40 -00 402 0000 -141 40 -00 402 0000 -141 40 -00 402 0000 -141 40 -00 Division Total: Department Total: 402 7380 534.31 -01 402 7380 -534 42 -10 402 7380 -534 42 -10 Date' 1/11/2012 Invoice Amount 176.61 71,54 41 19 38.33 38.18 17 47 94,671.02 33.43 40.00 30.50 30.50 '112.26 22.25" 29.66 72.35 72.35 4,100.00 35.06 234.85 249.21 24.37 15.18 10.21 4 79 18.85 43.84 34 19 9.03 294.95 24,999.82 $125,654.64 $125,720.40 $347,490.25 116 15 1,629.10 2,830.07 2,808.42 $7,383.74 $7,383.74 345 45 6.55 64.59 F 21 Vendor CENTURYLINK-OWEST DEPARTMENT OF REVENUE -WIRES DITCH WITCH FERGUSON ENTERPRISES INC LAKESIDE INDUSTRIES INC PORT ANGELES POWER EQUIPMENT SUNSET DO -IT BEST HARDWARE SWAIN'S GENERAL STORE INC THURMAN SUPPLY TWISS ANALYTICAL LABORATORIES TESTING &CALIBRATION SERVI USA BLUEBOOK" FIRST AID SAFETY: EQUIP• Public Works -Water DEPARTMENT OF REVENUE -WIRES CANON USA, INC CED /CONSOLIDATED ELEC DIST INC CENTURYLINK -QWEST DEPARTMENT OF REVENUE -WIRES EDGE ANALYTICAL FASTENAL INDUSTRIAL FEDERAL EXPRESS CORP FERGUSON ENTERPRISES INC KAMAN INDUSTRIAL TECHNOLOGIES LINCOLN INDUSTRIAL CORP NORTHSTAR CHEMICAL, INC OLYMPIC STATIONERS INC PUD #1 OF CLALLAM COUNTY PUGET SAFETY EQUIPMENT INC SEARS COMMERCIAL ONE SUNSET DO-IT BEST HARDWARE City of Port Angeles City Council Expenditure Report From: 12/24/2011 To. 1/6/2012 Description 12 -14 a/c 3604571270975B 12 -10 a/c 360Z100240955B Excise Tax Return -Nov SUPPLIES PIPE FITTINGS Excise Tax Return -Nov OFFICE MACHINES ACCESS ELECTRICAL EQUIP SUPPLY ELECTRICAL EQUIP SUPPLY 12 -14 A/C 36045766840856 12 -14 a/c 36045748592476 12 -08 a/c 36056503656966 12 -14 a/c 36045763156898 Excise Tax Return -Nov TESTING &CALIBRATION SERVI ELECTRICAL EQUIP SUPPLY Shipping Chgs PLUMBING EQUIP FIXT,SUPP SHIPPING AND HANDLING ELECTRICAL EQUIP SUPPLY Pipe /Paint CHEMICAL, COMMERCIAL,BULK SUPPLIES Brook Ave FIRST AID SAFETY EQUIP FIRST AID SAFETY EQUIP CHEMICAL LAB EQUIP SUPP HARDWARE,AND ALLIED ITEMS HARDWARE,AND ALLIED ITEMS Page 10 Account Number 402 7380 -534 42 -10 402 7380 -534 42 -10 402- 7380 -534 49 -50 402 7380 534.31 -20 402 7380 534.31 -01 NAND TOOLS ,POW &NON POWER402- 7380 534.35 -01 ROAD /HWY MATERIALS ASPHLT 402 7380 534.31 -20 ELECTRICAL EQUIP SUPPLY 402- 7380 534.35 -01 PIPE FITTINGS 402 7380 534.31 HARDWARE,AND ALLIED ITEMS 402 7380 534.31 TAPE(NOT DP,SOUND,VIDEO) 402 7380 534.31 -20 402- 7380 -534 41 -50 '402- 7380 534.31 -0.1- Water Division Total: Public Works -Water Department Total: Water Fund Fund Total: 403 0000 237.00 -00 Division Total: Department Total: 403 7480 535.45 -31 403 -7480- 535.31 -20 403 7480 535.31 -20 403 7480 535.42 -10 403 7480 535.42 -10 403 -7480- 535.42 -10 403 7480 -535 42 -10 403- 7480- 535.49 -50 403 7480 535.41 -50 403 7480- 535.31 -01 403 7480 535.42 -10 403 7480 535.31 -20 403 7480 535.42 -10 403 -7480- 535.31 -20 403 7480 535.35 -01 403 7480 -535 31 -05 403 7480- 535.31 -01 403- 7480 535.47 -10 403 7480 535.31 -01 403 7480 535.31 -01 403 -7480- 535.31 -01 403 7480 535.31 -01 403 -7480- 535.31 -20 Date 1/11/2012 Invoice Amount 177.24 149.50 17,924 18 161 14 533.03 821.67 848.08 997.24 -15.59 34 70 56.65 215.00' 16.01= $22,466.62 $22,466.62 $29,850.36 54.57 $54.57 $54.57 174.64 156.10' 134.23 5.82 82.14 41 12 82.24 12,466.67 534.00 28.51 73.22 3,377.07 298.10 1,697.65 113.88 3,653.30 40.32 225.96 54.20 63.04 14.50 29.25 24.37 F 22 Vendor SWAIN'S GENERAL STORE INC TELEDYNE ISCO, INC THURMAN SUPPLY WHITNEY EQUIPMENT CO INC Public Works -WW /Stormwtr DEPARTMENT OF REVENUE -WIRES CENTURYLINK -QWEST CLINICARE OF PORT ANGELES INC DATABAR INCORPORATED''' DEPARTMENT OF REVENUE -WIRES OLYMPIC STATIONERS INC PACIFIC OFFICE EQUIPMENT INC SOUND PUBLISHING INC WASTE CONNECTIONS, INC Public Works -Solid Waste ADAPT CONSULTING INC DEPARTMENT OF REVENUE -WIRES ADAPT CONSULTING INC ASM SIGNS BAXTER AUTO PARTS #15 BLAKE SAND GRAVEL CENTURYLINK -QWEST City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description Account Number HAND TOOLS ,POW &NON POWER403 -7480- 535.35 -01 CONTRL,INDICA,RECORD INST 403 7480 535.48 -10 SUPPLIES 403 7480 535.31 -20 PIPE FITTINGS 403 7480 535.31 -20 Wastewater Division Total: Public Works- WW /Stormwtr Department Total: Wastewater Fund Fund Total: Excise Tax Return -Nov 404- 0000 237.00 -00 12 -14 NC 3604576684085B DOT PHYSICALS (2) COMMUNICATIONS /MEDIA :S ERV' Excise Tax Return -Nov OFFICE SUPPLIES, GENERAL SUPPLIES Thanksgtving Curbside Recycling ENVIRONMENTAL &ECOLOGICAL Solid Waste- Collections Division Total: Public Works -Solid Waste Division Total: Department Total: 404 7580 -537 42 -10 404 7580 -537 49 -90 404: 7580- 53744 =10' 404 7580 -537 49 -50 404 7580 -537 44 -10 404 7580 537.31 -01 404 7580 -537 44 -10 404 7580 -537 41 -51 404 7580 -537 41 -51 Department Total: Solid Waste Collections Fund Total: AMUSEMENT, DECORATIONS, ENT 405 0000 237.00 -00 Excise Tax Return -Nov 405- 0000 237.00 -00 Excise Tax Return -Nov 405 0000 -237 10 -00 Division Total: Department Total: AMUSEMENT,DECORATIONS,ENT 405 -7538 -537 44 -10 SIGNS, SIGN MATERIAL 405- 7538 -537 49 -90 PAINTS,COATINGS,WALLPAPER 405 -7538- 53748 -10 BUILDER'S SUPPLIES 405 7538 -537 48 -10 BUILDER'S SUPPLIES 405 7538 -537 48 -10 12 -14 NC 3604576684085B 405 7538 -537 42 -10 CLALLAM CNTY SOLID WASTE DEPT ENVIRONMENTAL &ECOLOGICAL 405- 7538 -537 41 -51 ENVIRONMENTAL &ECOLOGICAL 405- 7538 -537 49 -90 DEPARTMENT OF REVENUE -WIRES Excise Tax Return -Nov 405- 7538 -537 49 -50 EDGE ANALYTICAL TESTING &CALIBRATION SERVI 405 7538 537 41 -51 TESTING &CALIBRATION SERVI 405- 7538 -537 41 -51 TESTING &CALIBRATION SERVI 405 7538 -537 41 -51 TESTING &CALIBRATION SERVI 405 7538 -537 41 -51 FEDERAL EXPRESS CORP Shipping Chgs 405- 7538 -537 42 -10 FRESH DESIGN ARCHITECT &OTHER DESIGN 405 7538 537 44 -10 Page 11 Date: 1/11/2012 Invoice Amount 36.00 14,473.57 32.93 1,127.36 $39,040.19 $39,040.19 $39,094.76 17.24 $17.24 $17.24 2.91 210.00 -2, 554:89 12,650.40 67.64 920.31 419.93 0.80 48,822.67 $65,649.55 $65,649.55 $65,666.79 -12.37 94.50 81.98 $164.11 $164.11 159.63 150.89 58.79 19.96 12.35 2.91 6,000.00 2,374.61 20,993.54 192.00 264.00 150.00 48.00 27.99 45.00 F 23 City of Port Angeles City Council Expenditure Report Vendor Description LAKESIDE INDUSTRIES INC ROAD /HWY MATERIALS ASPHLT OLYMPIC PRINTERS INC PRINTING,SILK SCR,TYPSET PORT ANGELES POWER EQUIPMENT AUTO TRUCK MAINT ITEMS SOUND PUBLISHING INC Recycle Adv WAK IN MAN, INC ENVIRONMENTAL &ECOLOGICAL WASTE CONNECTIONS, INC ENVIRONMENTAL &ECOLOGICAL BLDG CONSTRUC. SERVICES- ENVIRONMENTAL&ECOLOGICAL ENVIRONMENTAL &ECOLOGICAL ENVIRONMENTAL &ECOLOGICAL Public Works -Solid Waste SW Transfer Station ASPECT CONSULTING, LLC LANDFILL P.ublic.Works -Solid Waste •Solid Waste Landfill Public Works -Solid Waste Solid Waste -LF/Trf Stn CENTURYLINK QWEST 12 -14 A/C 3604576684085B DEPARTMENT OF REVENUE -WIRES Excise Tax Return Nov HERRERA ENVIRONMENTAL CONSULTAr Stormwater Review Stormwater Review USA BLUEBOOK SPRAYING EQUIPMENT WATER SEWAGE EQ SHIPPING AND HANDLING VERIZON WIRELESS 12 -22 a/c 571136182 -00001 Public Works -WW /Stormwtr Stormwater Public Works -WW /Stormwtr Stormwater Fund DEPARTMENT OF REVENUE -WIRES Excise Tax Return Nov PROGRESSIVE MEDICAL INTERNATIONAI SALE SURPLUS /OBSOLETE Medical Supplies Medical Supplies Medical Supplies Medical Supplies BLUMENTHAL UNIFORMS EQUIP CLOTHING APPAREL CENTURYLINK QWEST 12 14 NC 3604576684085B CLALLAM CNTY EMS Medic I Advisory PROGRESSIVE MEDICAL INTERNATIONAI Medical Supplies SALE SURPLUS /OBSOLETE Medical Supplies Medical Supplies Medical Supplies From: 12/24/2011 To: 1/6/2012 Page 12 Account Number 405 7538 -537 41 -51 405 7538 -537 44 -10 405 7538 -537 48 -10 405- 7538 -537 44 -10 405 7538 -537 48 -10 405 7538 -537 41 -51 405 7538 -537 41 -51 405- 7538 -537 41 -51 405- 7538- 582.75 -10 405 7538- 592.83 -10 Division Total: 405 7585 -537 41 -50 Date 1/11/2012 Fund Total: 406 7412 -538 42 -10 406 7412 538.49 -50 406- 7412 538.41 -50 406 7412 538.41 -50 406 7412- 538.35 -01 406 -7412- 538.35 -01 406 7412 538.35 -01 406 -7412- 538.42 -10 Division Total: Department Total: Fund Total: 409 0000 237.00 -00 409 0000 237.00 -00 409 0000 237.00 -00 409- 0000 237.00 -00 409 0000 237.00 -00 409 0000 237.00 -00 Division Total: Department Total: 409- 6025- 526.20 -80 409 6025 526.42 -10 409 6025- 526.41 -50 409 6025 526.31 -01 409- 6025 526.31 -02 409- 6025 526.31 -02 409 6025- 526.31 -02 409- 6025 526.31 -02 Invoice Amount 1,358 17 959.72 36.85 168.00 759.88 5,367.28 234,341.62 1,241 18 25,709.13 37,069.59 $337,511.09 4,246.25 Division Total: $4,246.25 Department Total: $341,757.34 $341,921 45 1 46 3,617.03 885.99 4,528 46 1,620.57 248.24 149.13 19.24 $11,070.12 $11,070.12 $11,070.12 311.92 -4.66 56.33 52.71 -50.69 80.66 $66.87 $66.87 387.91 8.73 600.00 451 73 60.03 680.17 515.91 765.04 F 24 Vendor PROGRESSIVE MEDICAL INTERNATIONAI Medical Supplies Medical Supplies Medical Supplies VERIZON WIRELESS 12 -15 a/c 264395724 -00001 Medic I Fire Department Fire Department AIR FLO HEATING COMPANY INC CENTURYLINK -QWEST DAVE'S HEATING COOLING SVC ENTERPRISE RENT -A -CAR CitjRebate EVERWARM HEARTH HOME INC City Rebate FLUID MARKET STRATEGIES City Rebate City Rebate HABITAT FOR HUMANITY OF CL COUNTY City-Rebate-- TIM DAVIS City Rebate PENINSULA HEAT INC RENOVATION SOLUTIONS, LLC Public Works Electric CAPACITY PROVISIONING INC CTS NORTHWEST, INC IBM CORPORATION WASHINGTON (DES), STATE OF Public Works- Electric CH2M HILL INC Public Works -Water BROWN AND CALDWELL BUILDERS EXCHANGE OF WA INC Public Works -WW /Stormwtr BAXTER AUTO PARTS #15 Description City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Medic I Utility Fund Total: 421 7121 533.49 -86 421- 7121- 533.42 -10 421 7121 533.49 -86 421 7121 533.49 -86 421 7121 533.49 -86 421 -7121: 533.49 =86'" 421 7121 533.49 -86 421 7121 533.49 -86 421 7121- 533.49 -86 421 7121 533.49 -86 421 7121 533:49 -86 421 7121 533.49 -86 421 7121- 533.49 -86 Conservation Division Total: Public Works Electric Department Total: Conservation Fund Total: UNPLANNED POWERED FIBER 451- 7188- 594.65 -10 Street Lighting Upgrades 451 7188 594.65 -10 COMPUTER HARDWARE &PERIPHI451 7188 594.65 -10 COMPUTERS,DP WORD PROC. 451 7188 594.65 -10 Electric Projects Division Total: Public Works- Electric Department Total: Electric Utility CIP Fund Total: Water Utility Prof Svc 452- 7388 -594 41 -50 Water Projects Division Total: Public Works -Water Department Total: City Rebate 12 -14 A/C 3604576684085B City Rebate City Rebate City Rebate City Rebate City Rebate Water Utility CIP Pmt #49 -CSO Project COMMUNICATIONS /MEDIA SERV Wastewater Projects Public Works- WW /Stormwtr WasteWater Utility CIP AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS Page 13 Account Number 409 6025 526.31 -13 409 6025 526.31 -13 409 6025 526.31 -13 409 6025 526.42 -10 Division Total: Department Total: Fund Total: 453 7488 -594 41 -50 453 7488 -594 44 -10 Division Total: Department Total: Fund Total: 501 0000 -141 40 -00 501 0000 -141 40 -00 J. Date: 1/11/2012 Invoice Amount 275.12 138.21 275.77 86.50 $4,245.12 $4,245.12 $4,311.99 1,500.00 1 46 1,900.00 1,900.00 1,500:00 '105:00 275.94 5.340 75 3,095.78 1,200.00 50.00 1,500.00 1,143.18 $19,512.11 $19,512.11 $19,512.11 18,027 19 241,111.97 14,284.95 50,084.03 $323,508.14 $323,508.14 $323,508.14 61,436.10 $61,436.10 $61,436.10 $61,436.10 33,798.38 1,000.25 $34,798.63 $34,798.63 $34,798.63 100.55 200.95 F 25 r.• Vendor Description BAXTER AUTO PARTS #15 AUTO TRUCK MAINT ITEMS FIRESTONE COMPLETE AUTO CARE AUTO TRUCK MAINT ITEMS LES SCHWAB TIRE CENTER AUTO TRUCK MAINT ITEMS LINCOLN INDUSTRIAL CORP MCMASTER -CARR SUPPLY CO NAPA AUTO PARTS PETTIT OIL COMPANY SOLID WASTE SYSTEMS, INC SYSTEMS FOR PUBLIC SAFETY, INC ARAMARK BAXTER AUTO PARTS #15 CENTURYLINK -QWEST CUMMINS NORTHWEST INC FEDERAL EXPRESS CORP FIRESTONE COMPLETE AUTO CARE City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK ITEMS n r -a AUTO TRUCK MAINT-'ITEMS' AUTO TRUCK ACCESSORIES AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS FUEL,OIL,GREASE, LUBES FUEL,OIL,GREASE, LUBES FUEL,OIL,GREASE, LUBES FUEL,OIL,GREASE, LUBES FUEL•,OIL,GREASE,- &LUBES FUEL,OIL,GREASE, LUBES AUTO TRUCK MAINT ITEMS RADIO TELECOMMUNICATION AUTO TRUCK ACCESSORIES LAUNDRY /DRY CLEANING SERV LAUNDRY /DRY CLEANING SERV AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS 12 -14 NC 3604576684085B BELTS AND BELTING BELTS AND BELTING Shipping Chgs AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING Page 14 Da[e• 1/11/2012 Account Number Invoice Amount 501 0000 -141 40 -00 65.33 501- 0000 -141 40 -00 1,251.58 501 0000 -141 40 -00 169.56 501- 0000 -141 40 -00 19.36 501 0000 237.00 -00 -20.95 501 0000 -141 40 -00 27.00 501 0000 -141 40 -00 167.22 501 0000 14140 -00 43.27 501- 0000 -141 40 -00 43.27 501- 0000 -141 40 -00 174.39 501 0000 -141 40 -00 38.92 501- 0000 141 40 -00 17.50 501 =0000- 14140 -00 rT. •4771757'`s :h 501 0000 -141 40 -00 501 0000 -141 40 -00 501 0000 -141 40 -00 501 0000 141.20 -00 501 0000 141.20 -00 501- 0000 141.20 -00 501 0000 141.20 -00 501- 0000 141.20 -00 501 0000 141.20 -00 501 0000 -141 40 -00 501- 0000 -141 40 -00 501- 0000 -141 40 -00 Division Total: Department Total: 501- 7630 548.49 -90 501- 7630 548.49 -90 501 7630 548.31 -01 501- 7630 548.34 -02 501- 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 -7630- 548.34 -02 501 7630 548.42 -10 501 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.42 -10 501- 7630 548.34 -02 501 7630 548.34 -02 12.94 9.04 37.87 7,160 32 6,265.02 6,613.91 7,116.49 882.01- 967.59 1,268.29 1,026.05 512.46 $34,241.69 $34,241.69 22.30 22.30 10.49 19.05 5.41 12.19 57.58 18.51 -18.51 5.10 71 19 -48.54 5.61 441.35 65.16 F 26 5 f Vendor H R PARTS EQUIPMENT INC HEARTLINE JOHN WAYNE'S M S SERVICE LEAVITT MACHINERY USA, INC LES SCHWAB TIRE CENTER MATCO TOOLS NAPA AUTO PARTS LINCOLN'INDUSTRIAL CORP MCMASTER -CARR SUPPLY CO PACIFIC OFFICE EQUIPMENT INC PENINSULA TRUCK LINES PETTIT OIL COMPANY PORT ANGELES FORD LINCOLN PORT ANGELES TIRE FACTORY City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES METALS,BARS, PLATES, RODS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING BELTS AND BELTING AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS BELTS AND BELTING AUTO TRUCK MAINT ITEMS OFFICE SUPPLIES, GENERAL SHIPPING AND HANDLING FUEL,OIL,GREASE, LUBES FUEL,OIL,GREASE, LUBES FUEL,OIL,GREASE, LUBES FUEL,OIL,GREASE, LUBES AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES EXTERNAL LABOR SERVICES EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS Page 15 Account Number 501- 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 -7630- 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02. 501- 7630 548:34 -02 501 -7630- 548.34 -02 501 7630 548.34 -02 501 7630 548.35 -01 501 7630 548.31 -01 501 7630 548.31 -01 501 -7630- 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.31 -01 501 7630 548.34 -02 501 7630 548.32 -12 501- 7630 548.32 -13 501 7630 548.32 -13 501 7630 548.32 -13 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501- 7630 548.34 -02 501- 7630 548.34 -02 501- 7630 548.34 -02 Date' 1/11/2012 Invoice Amount 40.57 186.02 17.34 41.93 221.03 98.59 134 12 112.52 26.34 10.84 167.93 32.52 108:31 303.52 77 42 29.65 256.92.- 13.41 40.11 2.37 754.85 79.44 225.00 431.52 146.34 -40.11 7.25 33.50 126.43 112.40 377.38 321.28 3.00 161.91 11.26 112.74 100.00 35.10 19.45 18.37 75.70 24 41 F 27 Vendor PORT ANGELES TIRE FACTORY QUALITY 4X4 TRUCK SUPPLY RUDY'S AUTOMOTIVE SUNSET DO -IT BEST HARDWARE SWAIN'S GENERAL STORE INC TRANCO TRANSMISSIONS INC UNITED PARCEL SERVICE VALLEY FREIGHTLINER INC Public Works -Equip Svcs CHANNEL SOLUTIONS City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description EXTERNAL LABOR SERVICES EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL'LABOR.SERVICES. AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS GASES CONT.EQUIP.LAB,WELD AUTO TRUCK MAINT ITEMS AUTO TRUCK MAINT ITEMS EXTERNAL LABOR SERVICES EXTERNAL LABOR SERVICES Shipping Chgs AUTO TRUCK MAINT ITEMS SHIPPING AND HANDLING Equipment Services Public Works -Equip Svcs Equipment Services DATA PROC SERV &SOFTWARE Page 16 Account Number 501- 7630 548.34 -02 501- 7630 548.34 -02 501 -7630- 548.34 -02 501 -7630- 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501 7630 548:34 -02 '501- 7630 548:34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 -7630- 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501- 7630 548.34 -02 501- 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 548.34 -02 501 7630 -548 45 -30 501 7630 548.34 -02 501 7630- 548.34 -02 501 -7630- 548.34 -02 501 7630 548.34 -02 501- 7630 548.31 -01 501 -7630- 548.34 -02 501 -7630- 548.34 -02 Division Total: Department Total: Fund Total: 502- 0000 237.00 -00 Date 1/11/2012 Invoice Amount 99.08 19.46 411.94 73.45 153.93 220.00 298.78 298.04 792.53 664 19 108.40 632.93 177.51 30.39 73.50 75.70 159.41 138.21 280.88 23.84 275.15 243.90 206.50 190 44 182.11 159.51 36.42 17.80 53.37 16.87 71.20 7.83 3.11 181 74 118.31 7 74 46.24 10.84 $10,829.58 $10,829.58 $45,071.27 252.00 F 28 Vendor DEPARTMENT OF REVENUE -WIRES IT XCHANGE CORP CENTURYLINK -QWEST I.T XCHANGE CORP IBM CORPORATION OLYPEN, INC SUGA WASHINGTON (DES), STATE OF Finance Department CHANNEL SOLUTIONS 'UNGARD•PUBLIC'SECTOR WASHINGTON (DES), STATE OF Finance Department AWC EMPLOYEE BENEFITS TRUST NW ADMIN TRANSFER ACCT City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description Account Number Excise Tax Return -Nov 502- 0000 237.00 -00 COMPUTER HARDWARE &PERIPH1502 -0000- 237.00 -00 Division Total: Department Total: 12 -14 A/C 3604576684085B 502 2081 518.42 -10 COMPUTER HARDWARE &PERIPHI502 2081 518.48 -10 COMPUTER SOFTWARE FOR MIC 502 2081 518.48 -10 STATIC IP RENEWAL 1/1/201 2012 MEMBERSHIP RENEWAL COMPUTERS,DP WORD PROC Information Technologies DATA PROC SERV &SOFTWARE DATA PROC SERV. &SOFTWARE COMPUTERS,DP WORD PROC IT Capital Projects Finance Department Information Technology Med.DenNis Premiums LT Disability Life Insurance Li MedNis Premiums REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC Disability Board December REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC Disability Board December Disability Board- December REIMBURSE MEDICARE -DEC Disability Board December REIMBURSE MEDICARE -DEC Disability Board December REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC S /NW /WT RETIREES Disability Board December REIMBURSE MEDICARE -DEC Disability Board- December Page 17 502 2081 518.42 -10 502- 2081 518.49 -01 502 2081 518.31 -60 Division Total: 502 -2082- 594.65 -10- 502- 2082 594'.65 =.10n. 'er 502 2082 594.65 -10 Division Total: Department Total: Fund Total: 503 1631 -517 46 -30 503- 1631 -517 46 -31 503 1631 -517 46 -32 503 1631 -517 46 -34 503 1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503- 1631 -517 46 -35 503 1631 -517 46 -35 503 -1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503- 1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503 1631 -517 46 -35 503- 1631 -517 46 -35 503 1631 -517 46 -33 503- 1631 -517 46 -34 503 1631 -517 46 -35 503- 1631 -517 46 -35 503 1631 -517 46 -35 Date 1/11/2012 Invoice Amount 72.16 -287 70 $467.54 $467.54 6.55 3,712.70 1,934.94 600.00 195.00 8,314 76 $14,763.95 3,252.00 4 ;254 70 3,325.91 $10,832.61 $25,596.56 $25,129.02 250,319.89 4,742.37 1,878.22 10,873.39 115.40 96.50 96.50 199.02 96.50 565.40 96.50 527 45 318.43 96.50 170.00 96.50 3,990.52 96.50 96.50 96.50 67,775.50 10,245.80 584.51 96.50 174 11 F 29 Vendor Self Insurance GELLOR INSURANCE INC Self Insurance WCIA (WA CITIES INS AUTHORITY) SelfInsurance AWC EMPLOYEE BENEFITS TRUST Fireman's Pension HILLARY'S OLD TOWN BARBER SHOP CENTURYLINK -QWEST DIGITAL IMAGING SOLUTIONS INC GREAT AMERICA LEASING CORP SENIUK, JAKE Esther Webster /Fine Arts AFLAC ASSOCIATION OF WASHINGTON CITIES EMPLOYEES ASSOCIATION LEOFF OFFICE OF SUPPORT ENFORCEMENT City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Description Disability Board December REIMBURSE MEDICARE -DEC Disability Board December Other Insurance Programs EXCESS COMP INSURANCE Worker's Compensation LIABILITY CLAIMS AS OF 12 Comp Liability Self Insurance Self Insurance Fund Retiree Premiums REIMBURSE MEDICARE -DEC ..REIMBURSE MEDICARE -DEC Disability Board December Disability Board December REIMBURSE MEDICARE -DEC REIMBURSE MEDICARE -DEC Fireman's Pension Fireman's Pension Firemen's Pension RFND DEC 2011, BUS CLOSED Off Street Parking Fund 12 -14 NC 3604576684085B December Copies OFFICE MACHINES ACCESS Lighting Telephone Transport Art-Ferry Transport Art-Ferry Kitchen Supplies Postcards Print Banner Esther Webster /Fine Arts Esther Webster /Fine Arts Esther Webster Fund AFLAC SUPP INS AWC SUPP LIFE INS P/R Deductions pe 12 -25 P/R Deductions pe 12 -11 PM DEDUCTIONS PE 12 -11 Page 18 Account Number 503 1631 -517 46 -35 503- 1631 -517 46 -35 503 1631 -517 46 -35 Division Total: 503- 1661 -517 41 -50 Division Total: 503 1671 -517 41 -50 Division Total: Department Total: Fund Total: 602 6221 -517 46 -35 602 6221 -517 46 -35 602 6221 -517 46 -35 602 6221 -517 46 -35 602 6221 -517 46 -35 602 6221 -517 46 -35 602 6221 -517 46 -35 Division Total: Department Total: Fund Total: 650- 0000 213.10 -90 Division Total: Department Total: Fund Total: 652- 8630 575.42 -10 652 -8630- 575.45 -31 652- 8630 575.45 -31 652 -8630- 575.31 -20 652- 8630 575.31 -60 652 8630 575.43 -10 652- 8630 575.43 -10 652 8630 575.45 -30 652- 8630 575.49 -60 652- 8630 575.49 -60 Division Total: Department Total: Fund Total: 920- 0000 -231 53 -10 920- 0000 -231 53 -30 920 0000 231.55 -30 920- 0000 231.51 -21 920- 0000 231.56 -20 Date 1/11/2012 Invoice Amount 28.94 96.50 675.97 $354,246.42 34,911.00 $34,911.00 6,885.74 $6,885.74 $396,043.16 $396,043.16 6,016.98 96.50 :96.50 80.00 4,084.85 96.50 96.50 $10,567.83 $10,567.83 $10,567.83 13.34 $13.34 $13.34 $13.34 2.18 24.20 16.88 51.27 86.87 12.75 12.75 70.40 79.25 91.60 $448.15 $448.15 $448.15 1,111.86 342 20 505.00 23,384 16 712.59 F 30 Vendor OFFICE OF SUPPORT ENFORCEMENT PERS UNITED WAY (PAYROLL) US DEPARTMENT OF EDUCATION VOLUNTEER FIRE ASSOCIATION WSCFF /EMPLOYEE BENEFIT TRUST Totals for check period City of Port Angeles City Council Expenditure Report From: 12/24/2011 To: 1/6/2012 Date 1/11/2012 Description Account Number Invoice Amount P/R Deductions pe 12 -25 920- 0000 231.56 -20 712.59 P/R Deductions pe 12 -25 920- 0000 231.56 -20 169.85 P/R Deductions pe 12 -11 920- 0000 231.51 -10 1,766.53 P/R Deductions pe 12 -11 920- 0000 231.51 -11 9,438.61 P/R Deductions pe 12 -11 920- 0000 231.51 -12 41,754 11 P/R Deductions pe 12 -25 920- 0000 231.56 -10 442.00 P/R Deductions pe 12 -25 920- 0000 231.56 -30 76.19 P/R Deductions pe 12 -25 920- 0000 231.55 -20 40.00 P/R Deductions pe 12 -25 920- 0000 231.53 -20 1,575.00 Division Total: $82,030.69 Department Total: $82,030.69 Payroll Clearing Fund Total: $82,030.69 From: 12/24/2011To: 1/6/2012 $2,011,111.95 Page 19 F 31 PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO Date: January 17, 2012 To: CITY COUNCIL From: Glenn A. Cutler, P.E., Director of Public Works Utilities Subject: Stormwater Education and Outreach Services Interlocal Agreement with Kitsap County Summary:1n 2007, the City was'designated it a'Phase II city bythe Siate of Washingfdn. Since that date, the City has been required to meet the provisions of the Phase I1 Municipal Stormwater permit. This permit allows the City to discharge City stormwater into "Waters of the State" (our creeks and Harbor). The permit requires that the City implement 5 different programs to help clean the stormwater before.it is discharged. One of these programs is education and outreach. The.proposed Interlocal Agreement will allow the City to more economically provide education and outreach programs to satisfy the permit requirements. Recommendation: _Approve and authorize the City Manager to sign the Interlocal Agreement with Kitsap County in an annual amount not to exceed $5,874.42, and to make minor modifications to the agreement, as necessary. Background /Analysis: The Phase II Municipal Stormwater Permit requires the City to conduct stormwater education and outreach activities related to reducing behaviors that cause or contribute to stormwater pollution. In the past, this has been done by having a stormwater informational display at the City's booth at both the County Fair and the Home Show, distributing one utility bill (nailer each year. and direct outreach by the Stormwater Engineer with the general public, including over 60 contacts with businesses. Over the last 5 months, City staff has been working with Kitsap County to enter into an interlocal agreement that would cooperatively provide stormwater education and outreach. The proposed Interlocal Agreement with Kitsap County will allow the City to more effectively meet its education and outreach permit requirements. The program brings together a consortium of stormwater jurisdictions on the Olympic Peninsula including unincorporated Kitsap County, Bremerton. Port Orchard, Poulsbo, Gig Harbor. and Bainbridge Island, each of which has an individual interlocal agreement with Kitsap County It leverages Kitsap County staff to develop effective outreach programs and literature that can be used in common by the group. Combining the resources, expertise, and grant potential of Kitsap County provides a more economical resource and capability that will enhance the City s public outreach to our Port Angeles customers. A summary of the Interlocal Agreement objectives and annual costs follows. N: \CCOUNCIL \FINAL \Stormwater Education and Outreach Services Interlocal Agreement.docx F 32 Jurisdiction Population (2010) Relative Population Annual Cost per Jurisdiction Unincorporated KC 168.900 61 4% $51,196.54 Bremerton 36,190 13.2% 10,969.82 Port Orchard 10,910 4.0% 3.307 01 Poulsbo 8.920 3.2% 2,703.81 Gig Harbor 7,520 2.7% 2 2 79 44 Port Angeles 19,380 7.0% 5,874.42 Bainbridge Island 23.380 8.5% 7,086.89 TOTAL 275.200 100.0% $83,417.92 January 17 2012 City Council Re: Stormwater Education and Outreach Services Interlocal Agreement.docx Page 2 Objective 1 Objective 2 Summary of Interlocal Agreement objectives Build on existing successful outreach efforts by maintaining elevated awareness levels and environmentally positive behavior trends. Review the list of prioritized audiences and practices to be addressed by behavior change campaigns and revise as necessary based on emerging issues, opportunities, and evaluation results. Objective 3 Design or adopt a social marketing campaign with built -in evaluation protocols for the highest priority behavior, Objective 4 Implement social marketing campaign for the highest priority behavior Objective 5 As resources are available, implement additional campaigns using a phased approach for each prioritized behavior and associated target audience. Objective 6 Use adaptive management to refine programs and direct education and outreach resources most effectively Objective 7 Continue to support the development and implementation of the regional Puget Sound Starts Here campaign through participation in STORM. Objective 8 Track and maintain records of education and outreach activities. Publish an annual activities report. Objective 9 Pursue grants and other funding opportunities as available and appropriate. Objective 10 Continue to strengthen partnerships through coordinated messages and activities with other entities involved in storniwater education and outreach programs. This may include non permitted entities such as the Puget Sound Partnership, local ECO Networks, Kitsap County Health District, Kitsap Conservation District, Washington SeaGrant, WSU Extension, Chambers of Commerce, Local Source Control Specialists, professional associations, and non profit environmental organizations. Summary of Interlocal Agreement annual costs On January 10, 2012, the Utility Advisory Committee forwarded a favorable recommendation to Council to approve and authorize the City Manager to sign the Interlocal Agreement with Kitsap County in an annual amount not to exceed $5.874 42, and to make minor modifications to the agreement, as necessary F 33 CITY OF if 'bilge e PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO DATE: January 17, 2012 TO: CITI COUNCIL FROM: Glenn A. Cutler. P.E., Director of Public Works Utilities SUBJECT: Equipment Purchase Parks Maintenance Equipment Summary: The 2012 City budget contains funds to replace five pieces of commercial grade turf maintenance equipment for the Parks Maintenance Division. The proposed replacements are: 3 Toro_ model 3280 -D 4WD rough de"ck (two with 62 mowing decks and one with a 52" mowing W Y deck). 1 Grasshopper model 725D zero turn mower, and 1 John Deere model 1200A ballfield grooming machine. Recommendation: Authorize the City Manager to purchase five pieces of equipment through Washington State Cooperative Contract #8506 as follows: Western Equipment Distributors for 3 Toro mowers at a cost of $74,000, Moridge Manufacturing for 1 Grasshopper zero turn mower at a cost of $17,700, and Pacific Golf Turf for 1 John Deere ballfield grooming machine at a cost of $12,100, and to make minor modifications to the contract, if necessary. Background /Analysis: It is necessary to replace 5 pieces of turf maintenance equipment utilized by the Parks Maintenance Division. The equipment is both economically and conditionally due for replacement. Turf and ballfield equipment normally has an effective operational life of 8 years in a commercial application such as maintaining City facilities. The equipment proposed for replacement has been in use for 12 to 14 years and has reached the point of requiring extensive major repairs. The replacement ballfield grooming machine is to be used by Parks Maintenance to maintain and prepare the dirt portion of 12 baseball fields owned by the City It is also used for where landscape areas need to be leveled. A zero turn mower efficiently maneuvers around close quarters such as trees, landscaping, and parking strips. The rough mowers are the machines used to mow 25 neighborhood parks, open spaces, athletic fields and city -owned facilities and property parcels. The proposed replacements for the existing equipment were carefully evaluated by the Fleet Manager and Parks Maintenance Superintendent. The replacement equipment was selected because it meets the productivity and safety needs. Funds in the amount of $113,684 are included in the 2012 Equipment Services budget. It is recommended that City Council authorize the City Manager to purchase five pieces of equipment through Washington State Cooperative Contract #8506 as follows: Western Equipment Distributors for 3 Toro mowers at a cost of $74,000. Moridge Manufacturing for 1 Grasshopper zero turn mower N. \CCOUNCIL \FINAL \Equipment Purchase Parks Maintenance Equipment.doc F -34 Equipment Description Photo Rough Deck Mower Used for mowing large tracts of grass typical of parks and athletic fields. J L l y Zero Turn Mower w/Hopper Highly maneuverable mower is capable of steering iri'very tight quarters. It can also mow grass at high speed. This unit comes with a metal hopper so that grass clippings can be removed for aesthetic and safety reasons. i�t tv 1 �ss p t`s `a d Ballfield Grooming Machine: Ballfield grooming machines are used on our athletic fields as well as for landscaping and leveling large areas. This machine is needed to dress up ballfields 1,200 times a year, not including the many hours used to prep the fields before the season starts. Without these machines, all the work would require handwork. January 17, 2012 City Council Re: Equipment Purchase: Parks Maintenance Equipment Page 2 at a cost of $17,700. and Pacific Golf Turf for 1 John Deere ballfield grooming machine at a cost of $12,100, and to make minor modifications to the contract, if necessary F 35 PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO Date: January 17, 2012 To: CITY COUNCIL From: Glenn A. Cutler, P.E., Director of Public Works Utilities Subject: Western Public Agencies Group Consulting Agreement Summary: The Westem Public Agencies Group represents the interests of its electric utility members before the Bonneville Power Administration. Each year they propose ari agreement and scope of services to its members. The City's share of the 2012 proposed scope of wotk is $14,838 of the total membership cost of $315,000 Recommendation: Approve and authorize the City Manager to sign an agreement with EES Consulting, Inc., and Marsh Mundorf Pratt Sullivan McKenzie in an amount .not_to.exceed $14,838.00 for Western Public Agency Group 2012 membership dues, and to make minor modifications to the Agreement, if necessary. Background /Analysis: The Electric Utility is a member of the Western Public Agencies Group_ (WPAG) along with twenty other publicly owned electric utilities. WPAG members serve more than 400 thousand customers and purchase more than 11 billion kilowatt hours from the Bonneville Power Administration (BPA). WPAG represents the interests of its members before BPA, and has intervened in every major BPA rate proceeding since 1980 EES Consulting, Inc., provides WPAG engineering and financial services, and legal services are provided by Marsh Mundorf Pratt Sullivan McKenzie. Each year WPAG proposes an agreement and scope of services to its members, which is allocated to each utility based on average customers, energy sales, and capital investments. The City's share of the 2012 proposed scope of work is $14,838 out of the total membership cost of $315.000 The cost of the proposed services is below the amount included in the 2012 Electric Utility budget. The proposed dues are $1,630 or 9.9% below last year's $16,468 membership dues. A copy of the proposed scope of services and contracts are attached. In addition to representing the City in regard to the BPA Residential Exchange Program litigation, WPAG has also assisted the City in efforts such as the Industrial Transmission Rate Ordinance, Telecommunications Ordinance, last year's Tier 2 power supply workshop, and Wireless Mobile Data System. It is recommended that City Council approve and authorize the City Manager to sign the agreement with EES Consulting, Inc., and Marsh Mundorf Pratt Sullivan McKenzie in an amount not to exceed $14,838.00 for Western Public Agency Group 2012 membership dues. Attachment: Proposed WPAG Scope of Services and Contracts for 2012 N: \CCOUNCIL\FINAL \WPAG Consulting Agreement.doc F 36 Consulting December 12, 2011 Mr. Charles Dawsey Benton Rural Electric Assoaatiot Post Office Box 1150 Prosser, WA 99350 Mr Doug Nass Clallam County PUD Post Office Box 1090 Port Angeles. WA 98362 Mr Wayne Nelson Clark Public Utilities Post Office Box 8900 Vancouver. WA 98668 Mr. Bob Titus Coy of Ellensburg, 420 North I'earl Street Ellensburg, WA 98926 Mr Rick Lovely Grays Harbor County PUD P.O. Box 480 Aberdeen. WA 98520 SUBJECT Proposed WPAG Scope of Services and Contracts for 2012 Dear Ladies and Gentlemen: Attached please find consulting and legal contracts from Terry and me for the 2012 scope of services for the Western Public Agencies Group (WPAG). In recognition of the difficult economic times, the proposed total 2012 budget (including base amount, supplemental rate case and out of pocket costs) has been reduced by $75,000 compared to the 2011 budget. If these contracts are acceptable, please sign and return one copy of each contract for our files. Thank you for allowing EES Consulting and Marsh, Mundorf, Pratt, Sullivan McKenzie (MMPS &M) to serve you for another year. Please call Terry or me if you have any questions. Very truly yours, r. Gary S. Saleba President 570 Kirkland Way, Suite 200 Kirkland, Washington 98033 Mr. Bob Geddes Lewis Count' PUD Post Office Box 330 Chehalis. WA 98532 Ms. Steve Taylor Mason County PUD No. 1 North 21971 Highway 101 Shelton. WA 98584 Ms Wyla Wood Mason County P. CD No. 3 Post Office Box 2148 Shelton, WA 98584 Mr. Doug Miller Pacific gimpy P.n.D Pbsf Office Box 472 Raymond. WA 98577 Mr. Larry Dunoar City of Porl Angeles P.O. Box 1150 Pon Angeles, WA 98362 Telephone: 425 889 -2700 Facsimile: 425 889-2725 A registered professional engineering corporation with offices in Kirkland, WA, Portland, OR: and Bellinghmn, WA Mr. Chuck Ward Killitas County PUD 1400 East Vantage Highway Ellensburg. WA 98926 Mr. Robert Gentry Skamania County PUD P.O. Box 500 Carson, WA 98610 Mr. David Trambhe Waltkiakuin County PUD PO Box 248 Cathlamet, WA 98612 Mr. Terry Huber l'ierce Comity Cooperative Association c/o Town of Stedacoom 1030 Roe Street Sledacoom, WA 98388 F 37 Western Public Agencies Group December 12, 2011 Page 2 cc: Dan Sharpe, Alder Mutual Light Company Gary Amtstrong, Town of Eatonville Daniel Brooks,Elmhurst Mutual Power Light Robin Rego, Lakeview Light Power Cmnpany Lettima Neal, City of Milton Isabella Deditch, Ohop Mutual Light Company Mark Johnson. Parkland Light Water Company Mark Burlingame, Town of Steilacoom Terry Mundorf, MMPS &M F 38 Western Public Age. cies Group 2012 Scope of Services and Budget EXHIBIT A The Western Public Agencies Group (WPAG) comprises 21 publicly owned utilities in the state of Washington. Benton REA, Clallam County P U.D No. 1, Clark Public Utilities, the City of Ellensburg, Grays Harbor P U.D No. 1, Kittitas County P U.D No 1, Lewis County P U.D No. 1, Mason County P U.D No. 1, Mason County P U.D No. 3, Pacific County P U.D No. 2, Skamania County P U.D No.1, Wahkiakum County P U.D No. 1, the City of Port Angeles, and members of the Pierce County Cooperative Power Association, which includes Alder Mutual Light Company, the Town of Eatonville, Elmhurst Mutual Power and Light Company, Lakeview Light and Power Company, the City of Milton, Ohop Mutual Light Company, Parkland Light and Water Company, and the Town of Steilacoom. Together the WPAG member utilities serve more than one million customers and purchase more than 6 billion kilowatt -hours from the Bonneville Power Administration "Bonneville each year under both Load Following and /Block Contracts. WPAG member utilities also own or receive output from more than 400 megawatts of non Bonneville generation and purchase more than 300 megawatts of power from sources other than Bonneville. WPAG members are generally winter peaking utilities with lower annual load factors. WPAG members' similar characteristics have caused them to join together to represent their interests before Bonneville, and in other regional and national forums since 1980 WPAG has intervened as a group in every major Bonneville rate proceeding since enactment of the Pacific Northwest Electric Power Planning and Conservation Act of 1980. WPAC's interests have also been represented in Congress, before the Northwest Power Planning Council, and in other regional forums. The scope of services presented here includes areas that various other organizations, of which WPAG members might also be members, cannot advocate for WPAG members due to conflicts of interest within those organizations, lack of staff resources or subject area expertise. WPAG thus fills a need that is unmet by membership in the Public Power Council, the Northwest Public Power Association, the Pacific Northwest Utilities Conference Committee and other similar groups. F Z9 Scope of Services The 2012 scope of services for WPAG is proposed as follows: General WPAG Activities and Meetings Regional Activities WP -14 Rate Proceedings and Related Processes Issues Identified for Workshops EXHIBIT A During 2012, EES Consulting and MMPS &M will monitor and comment on regional and federal activities of specific interest to WPAG members not covered adequately by other public power organizations of mutual interest and relevance. Monthly meetings will be held to brief WPAG members on these activities. BPA will conduct both planning workshops and public processes during'2012'to prepare for a combined power and transmission rate proceeding that will set rates for the next two year rate period. These will present issues in both the power and transmission areas, as well as specific issues identified for workshop treatment prior to the next rate proceeding, as described below Montana Intertie During the last rate case, Montana wind interests made a concerted effort to have the Montana Intertie rolled into the BPA main grid. While the direct cost impacts of this action are minimal, the long term impacts of adding another area of substantial wind resource development to the Federal transmission system are more troubling. The concern is that this action will stimulate requests for BPA to use Federal base system resources to integrate these resources, further straining the Federal base system and its ability to serve preference customer loads. This issue will be decided in workshops, the first of which is scheduled for December 2012. WPAG will oppose any treatment of the Montana Intertie that will result in any increase in the use of Federal base system resources for purposes other than serving preference customer load. This will be staffed primarily by MMPS &M. Cost Allocation To NT and PTP Transmission Rates In the last rate case, Snohomish PUD asserted that BPA's allocation of costs between NT and PTP rates did not recognize the full costs of services provided to NT customers, to the detriment of PTP customers. Snohomish has been joined by Seattle and Tacoma and has continued to pursue this issue. BPA has already held one rate case workshop on this matter BPA's current allocation approach reasonably replicates the method recommended by the FERC in conjunction with the GATT, and is similar to that used by regional IOUs. It appears that Snohomish PUD, as a PTP customer, is seeking to shift costs from the PTP rate to the NT rate in a manner that is not cost justified. WPAG will oppose efforts to shift costs between transmission rates in a manner that is not cost justified and will support efforts to F r4.Q EXHIBIT A fairly allocate costs between NT and PTP rates. This will be staffed by EES Consulting and MMPS &M. Rate Case Process At the last rate case, WPAG urged BPA to undertake an effort to streamline the rate case process to make it faster and more efficient. BPA has commenced a process to determine if there are ways that the rate case process can be streamlined. There is a potential for savings here if the rate case process, which will occur every two years under the TRM, can be materially shortened. WPAG will participate to advocate changes in the process that will shorten the rate case process while preserving legal and procedural rights. This will be staffed MMPS &M. Rate Case Workshops It has been BPA's practice to commence the rate case workshop process in the fall of the year preceding the year in which the rate case is held. This means that the BPA rate case workshops for the 2014 rate proceeding will commence in September /October of 2012. In these workshops, BPA routinely solicits customer input on new issues, and is at its most receptive to customer ideas. WPAG will use this opportunity to iirge BPA to begin the process �f retrieving' capacity from non= preference customers for use in serving preference customer loads, and to abandon the preferential allocation approaches it has used to shelter wind generation from the true costs of the service they receive. This will be staffed by EES Consulting and MMPS &M. Other BPA 2012 Proceedings BPA has already commenced a number of proceedings, and will commence some additional ones during 2012, that will have long -term impacts on preference customers. WPAG will participate in the following BPA processes. Capital Spending BPA has determined that it will run out of borrowing authority well before it expected to when it received its last allocation of borrowing authority This issue has both short term impacts that will be felt in the rate case, as well as longer term impact in how BPA sets priorities for capital projects, and what steps it will take to extend the borrowing authority that remains. This is a complex and important process that will impact the costs of both power and transmission for years to come. BPA will be discussing the implications of this issue in a number of processes, and has already held public meeting to introduce this issue. WPAG will participate in these processes and will advocate the use of reasonable approaches that extend the existing borrowing authority as long as possible to forestall going to Congress for additional borrowing authority WPAG will also urge BPA to give priority access to available capital to projects that provide service to preference customers, and to establish an ongoing process involving customers to ensure that the remaining borrowing authority is wisely and appropriately used in the future. The first meeting on this topic is scheduled for January 30, 2012. This will be staffed by MMPS &M. Environmental Redispatch Recently, wind generation interests filed a petition with the FERC alleging, inter alia, that the application of BPA's Environmental Redispatch ROD did not provide comparable service, and also filed petitions for review F r4 -1 EXHIBIT A in the 9 Circuit seeking legal review of BPA's Environmental Redispatch ROD WPAG filed comments with the FERC defending BPA's Environmental Redispatch ROD, and also filed its own petition in the 9 Circuit. The petitions in the 9 Circuit are still pending. However, the FERC has just ruled in favor the petitioning wind interests, finding that BPA's Environmental Redispatch ROD does not provide comparable service, and gave BPA 90 days to formulate a new policy BPA had been attempting to forge a settlement with the wind interests, the IOUs and certain preference customers. It is expected that BPA will commence a more public process to formulate its response to the FERC. WPAG will participate actively in this process to ensure that the FBS resources are reserved for preference customer use, and that all customers (including wind customers) pay the costs that BPA incurs to serve them. We will also be vigilant that BPA does not take, or agree to take, actions that exceed its statutory authority This will be staffed by EES Consulting and MMPS &M. BOATT Process BPA is currently conducting a process to revise its open access transmission tariff. As originally envisioned, this process was to merely update the BPA OATT However, the objective of this process recently changed to the formulation of a BPA OATT that would be sufficiently compliant with FERC policies to qualify as a reciprocity tariff. This shift means, in effect, that BPA is seeking to become more compliant with the manner in which the FERC wants transmission service to be provided. At this juncture, it is unclear whether this shift will endanger provisions of the current BPA OATT that provide regional benefits, such as the short distance discount. WPAG will continue to monitor this activity with an eye to preserving those aspects of the current BPA GATT that are beneficial to BPA's preference customers. This will be staffed by MMPS &M. Precedent Transmission Service Agreement Process BPA has signed a number of precedent transmission service agreements with wind project developers which commit it to providing transmission service to these projects once they are completed. Many of these developers now seek to either terminate these agreements with BPA, or to delay for an extended period the commencement of service. This raises a number of issues: what conditions (if any) should BPA impose on developers seeking to terminate these agreements in order to hold other transmission customers harmless; how should the transmission capability made available by the termination of these agreements be used; and what changes should BPA institute in order to avoid making such commitments in the future. WPAG has already submitted comments on these and other topics in this proceeding, and will continue to actively participate in order to ensure that unnecessary costs are not imposed on preference customers. This will be staffed by MMPS &M. BPA Network Open Season Process It is generally agreed that the network open season process that BPA has employed has not been a success, and that a revision of this process could benefit the agency and its transmission customers. However, BPA is reluctant to undertake this process until it deals with the issues presented by the PTSA proceeding. WPAG will participate in the NOS revision process with the intention of improving its operation from the point of view of the preference customers. In particular, the availability of transmission capability for both Tier 2 non federal resources and for F 42 EXHIBIT A preference customer load service will be areas of emphasis. This will be staffed by EES Consulting and MMPS &M. Network Transmission Service Process At the insistence of WPAG and other preference customers taking NT service, BPA has agreed to initiate an intensive process with NT customers to address concerns and issues regarding access to and availability of transmission capability for resource and Ioad service for NT customers. It will include issues such as how is transmission capability ear marked for NT customers, how is such capability made available to NT customers, and can NT customers get access to transmission without getting in line behind all the wind generators. WPAG will participate actively in this process, which will commence in late December of 2012. This will be staffed by MMPS &M. Energy Imbalance Market The Administrator recently called together various public power leaders (including WPAG) to discuss whether there was interest in exploring an energy imbalance market to address the need for imbalance energy by various output resources. While there was no great enthusiasin for ibis idea, there was no objection' to an initial exploration either However, as we have seen the development of markets has tended to cloud BPA's focus on its core task, ensuring inexpensive and reliable power supply for its preference customers. It is not clear it this initiative will go anywhere, but WPAG will track it to ensure that any market development is done in a manner that does not erode preference rights to the output of the FBS, or shift BPA's business focus in detrimental ways. This will be staffed by EES Consulting and MMPS &M. TRM Loose Ends and Revisions There have already been some changes to the TRM to correct errors and address omissions. In addition, there are a number of significant issues that were not satisfactorily resolved at the end of the Tier Rate Methodology process that BPA has agreed to revisit, including most importantly the issue of system obligations that BPA treats as off -the -top dedications to the Tier 1 system capability Additionally, there are significant issues that will arise as the TRM is actually translated into rates that will need to be dealt with in the next year. One such issue is the lack of any agreed upon methodology for determining the capability of the Tier 1 system, which impacts how much Tier 1 power is available to WPAG utilities. This will be staffed primarily by MMPS &M. Conservation BPA has been and will remain engaged in discussions regarding how conservation will be funded under the new TRM contracts and rates. The recent admission that BPA has significantly overspent its conservation budget, combined with its premature exhaustion of its borrowing authority, have brought to the fore the questions regarding BPA's desire to run all customer conservation through BPA programs. These events have renewed the desire among many preference customers be have the option of providing their own funding for conservation, not run these dollars through the BPA rates, and obtain thereby more flexibility in how conservation and demand side programs are managed. This will make conservation and demand side more adaptable for meeting Tier 2 loads. WPAG F 43 EXHIBIT A will work to ensure that current BPA funded programs will continue to be available to utilities that want to participate in them, and to give preference customers the flexibility of running their own conservation programs without running the funding through BPA. In addition, WPAG will work to ensure that conservation can be used as a Tier 2 resource for those who wish to do so. This will be staffed by EES Consulting and MMPS &M. Preference to FBS Capacity BPA has been using increasing amounts of FBS capacity to integrate wind generation on the Federal transmission system. This capacity is deducted from the FBS capability made available to preference customers under Tier 1 For the near term, the primary impact of this activity is to reduce the secondary revenues available to BPA to reduce the PF rate by shifting secondary power sales from heavy load hours to light load hours. However, in the future this reduction in FBS capacity may impinge on service to preference customer loads under both load following and Slice contracts. WPAG will bring to the fore in the WP -14 rate proceeding workshops this misuse of FBS capacity, and assert our preference rights to this capacity Vindication of these preference rights may require litigation. This willbe staffed by MMPS &M DSI Long -Term Contracts Alcoa has challenged BPA's recent Residential Exchange Settlement with the IOU's with the .clear intention of using that suit as leverage to obtain a new, 20 year power- supply agreement with BPA. Once again, this will raise issue regarding the cost of such service, the use of FBS resources to provide such service, and what impacts the foregoing will have on the Tier 1 rates paid by preference customers. It will also likely require BPA to negotiate a contract with the DSIs for the delivery of any such benefits. This effort to continue to support the DSIs will be aggressively opposed by WPAG. This will be staffed primarily by MMPS &M. 9Th Circuit Petition for Review WPAG filed a petition for review in the 9` Circuit to question whether BPA's Environmental Redispatch ROD complied with the statutory provisions regarding the rights of preference customers to federal transmission. The recent issuance of the FERC order essentially invalidating the Environmental Redispatch ROD has shifted the center of activity from the 9 Circuit to the FERC on this topic. However, it this suit may yet provide a means of testing the legality of BPA's actions regarding the impacts of wind generation on the federal system. In the near term this petition is likely to be inactive, but that may change depending on how BPA reacts to the recent FERC order. WPAG will continue to keep this matter active until the resolution of the high wind/high water issues becomes clearer. This will be staffed by MMPS &M. Federal Energy Regulatory Commission BPA will need to take action in response to the recent order issued by the FERC, either by requesting rehearing, appealing the order, or attempting to formulate a new policy that will comply with the directions of the FERC order while at the same time complying with its F -44 statutory obligations Regardless of what path or paths BPA chooses to follow, it is clear that there will be much activity in the region that will find its way back to the FERC. WPAG will work closely with other preference customers to defend the financial and operational interest of BPA, and ensure that the statutory rights of preference customers are not subordinated to the interests of non- preference customers. At times, this may require WPAG to take positions that differ from those of BPA and other preference customers. EES Consulting and MMPS &M will continue to assist PPC in its efforts, and will monitor this process to see if WPAG direct participation is needed. In June 2007, under the direction of FERC, the North American Electricity Council (NERC) began enforcing electric reliability standards. As of that time utilities with greater than 25,000 customers are required to register with NERC and their regional reliability organization or the Westem Electricity Coordinating Council (WECC) on the west coast of North America. EES Consulting has been monitoring and advising WPAG members on compliance issues since April of 2007 EES Consulting will continue to monitor compliance issues on behalf of WPAG members in 2011 EES Consulting will alert WPAG members of issues as they arise. To the extent that detailed analysis and /dr representation is by an individual WPAG member with respect to compliance issues, tasks will be completed and billed on an individual utility basis. si Olympia Legislative Session EES Consulting and MMPS &M will monitor the activities of the 2012 legislature on behalf of WPAG's specific interests. Other Matters During the course of each year, matters arise that require WPAG attention to protect the interests of our customers. These matters are undertaken at the direction of the WPAG utilities. Budget The budget for the scope of services described above is calculated at the following billing rates for EES Consulting and MMPS &M. EES Consulting President. Managing Director Manager Senior Project Manager Project Manager Senior Analyst or Engineer Analyst Clerical $165 per hour 160 per hour 155 per hour 150 per hour 145 per hour 140 per hour 135 per hour 120 per hour EXHIBIT A F 45 MMPS &M Principal $175 per hour Associate $170 per hour These billing rates will remain in effect through December 31, 2013 Project Staffing EXHIBIT A On the basis of the above billing rates, the 2012 labor budgets of EES Consulting and MMPS &M combined are estimated to remain at $200,000, which holds the line on budget increases. This labor budget will be split equally between EES Consulting and MMPS &M. In addition, an amount of $75,000 in supplemental funding has been provided to staff the WP -14 Power and Transmission rate cases workshops and related BPA processes. This is a $75,000 reduction to the overall 2011 WPAG budget. In addition to labor costs, out -of- pocket expenses will be billed to WPAG members at their cost to EES Consiilting and MMPS &M: It is•estimatdd that '540,000 in total out- of- pocket expeises will be incurred for all work non -rate case elements in total. Out-of-pocket costs will be billed by whichever organization actually incurs the expense. The total estimated annual WPAG budget for 2012 is estimated at S240,000, and a supplemental budget of $75,000 for rate case activities. As always, the allocation of the budget among WPAG members is open to negotiation by the participants. We have attached an inter utility allocation predicated on the most recent available utility data. After a discussion of the foregoing issue, a final budget by utility will be prepared. An example of the budget's allocation is attached at the end of this narrative. The staffing for these projects will be similar to that for past WPAG activities. Gary Saleba and Terry Mundorf will be the principal representatives for EES Consulting and MMPS &M, respectively, with Ryan Neale providing support for the activities of Terry Mundorf. Additional MMPS &M and EES Consulting staff will assist as needed. F 46 Supplemental Budget Allocation with Cap 0104 co in cn co OSE'9 S 75.000 Standard Budget Allocation with Cap 16EL'9Z 240 000 tlep i %0'8L I %Y1, LL Noo'oot Average of C Energy Sa Investn 0 e3 :1014' A 00 I %£8 I %0001, Net Investment 2 92,402,592 15 %I 1.230,740,106 100.0 %1 Energy Sales' .1) o n 6 c O t o c o o C: CO .-0 906b01'989 11.268.332,816 100 0%1 Customers 11 C1 }f})\(} nr co -r. I %L6 86S'L4 I %0'001, Z92 ;2 0000 W \M 0 0 0 IT (2 I Subtotal Pierce County Cooperative Power Association I 1 1 1 4. F 47 Cfacernbor 9, 2017 This Consulting Services Agreement (herein Agreement) is made between EES Consulting, Inc., (hereinafter "EES CONSULTING and Pierce County Cooperative Association, do Mr. Terry Huber. Town of Steilacoom, 1030 Roe Street, Steilacoom, WA 98388 (hereinafter "CLIENT') EES CONSULTING will provide the services and be compensated forthese services as described in Exhibit A, attached hereto. EES CONSULTING shall render its services in accordance with generally accepted professional practices, EES CONSULTING shall, to the best of its knowledge and belief, comply with applicable laws, ordinances, codes, rules, regulations, permits and other published requirements in effect on the date this Agreement is signed. II. TERMS 8 CONDITIONS OF CONSULTING SERVICES AGREEMENT 1. Timing of Work. EES CONSULTING shall commence work on or about January 1, 2012. 2. Relationship of Parties, No Third-Party Beneficiaries. EES CONSULTING is an independent contractor under This Agreement. This Agreement gives no rights or _benefits to anyone not named as a party to this Agreement, and there are no third party beneficiaries to this Agreement. 3. Insurance a Insurance of EES CONSULTING. EES CONSULTING will maintain throughout the performance of this Agreement the following types and amounts of insurance: i. Workers Compensation and Employers Liability Insurance as required by applicable state or federal law. ii Comprehensive Vehicle Liability Insurance covering personal injury and property damage claims arising from the use of motor vehicles with combined single limits of $1,000,000. In. Commercial General Liability Insurance covering claims for personal injury and property damage will combined single limits of $1.000,000 w. Professional Liability (Errors and Omissions, on a claims -made basis) Insurance with limits of $1,000,000. b Interpretation Notwithstanding any other provision(s) in this Agreement, nothing shall be construed or enforced so as to void, negate or adversely affect any otherwise applicable insurance held by any party to this Agreement. 4. Mutual Indemnification. EES CONSULTING agrees to Indemnify and hold harmless CLIENT and its employees from and against any and all loss, cost, damage, or expense of any kind and nature (including, without limitation, court costs, expenses, and reasonable attorneys' fees) arising out of injury to persons or damage to property (including, without limitation, property of CLIENT, EES CONSULTING and their respective employees, agents, licensees, and representatives) m any manner caused by the negligent acts or omissions of EES CONSULTING In the performance of its work pursuant to or in connection with this Agreement to the extent of EES CONSULTING's proportionate negligence, if any CLIENT agrees to indemnify and hold harmless EES CONSULTING and its employees from and against any and all loss, cost, damage, or expense of any kind and nature (including without limitation, court costs, expenses and reasonable attorneys' fees) ansing out of Injury to person(s) or damage to property (Including, without limitation. property of CLIENT, EES CONSULTING, and their respective employees, agents, licensees and representatives) in any manner caused by the negligent acts or omissions of CLIENT or otner(s) with whom CLIENT contracts "CLIENT'S agents to perform work pursuant to or In connection with this Agreement, to the extent of CLIENT'S or CLIENT's agents proportionate negligence, if any. 5. Resolution of Disputes, Attorneys' Fees. The law of the State of Washington shall govern the interpretation of and the resolution of disputes under this Agreement. If any claim, at law or otherwise, is made by either parry to this Agreement, the prevailing party shall be entitled to Its costs and reasonable attorneys' fees. 6. Termination of Agreement. Either EES CONSULTING or CLIENT may terminate this Agreement upon Thirty (30) days wniten notice to the other sent to the addresses listed herein. In the event CLIENT terminates this agreement, CLIENT specifically agrees to pay EES CONSULTING for all services rendered through the termination date. EES CONSULTING INC i By: Gary Saleba Tile; President Date' December 12, 2011 1 CONSULTING SERVICES AGREEMENT EES CONSULTING INC, Billing Address 570 Kirkland Way, Suite 200, Kirkland, Washington 98033 (425) 889-2700 I. SCOPE, COMPENSATION AND QUALITY OF CONSULTING SERVICES r PIERCE COUNTY COOPERATIVE ASSOCIATION By. Title. Date: F 48 LEGAL SERVICES AGREEMENT THIS AGREEMENT is made between BENTON RURAL ELECTRIC ASSOCIATION, WASHINGTON, CITY OF PORT ANGELES, WASHINGTON; CITY OF ELLENSBURG, WASHINGTON, CITY OF MILTON, WASHINGTON, TOWN OF EATONVILLE, WASHINGTON; TOWN OF STEILACOOM, WASHINGTON, ALDER MUTUAL LIGHT COMPANY, ELMHURST MUTUAL POWER AND LIGHT COMPANY, WASHINGTON, LAKEVIEW LIGHT AND POWER COMPANY, WASHINGTON, OHOP MUTUAL LIGHT COMPANY, WASHINGTON; PARKLAND LIGHT AND WATER COMPANY, WASHINGTON, PUBLIC UTILITY DISTRICT NO 1 OF CLALLAM COUNTY, WASHINGTON, PUBLIC UTILITY DISTRICT NO 1 OF CLARK COUNTY, WASHINGTON, PUBLIC UTILITY DISTRICT NO 1 OF GRAYS HARBOR COUNTY, WASHINGTON, PUBLIC UTILITY DISTRICT OF KITTITAS COUNTY, WASHINGTON; PUBLIC UTILITY DISTRICT NO I OF LEWIS COUNTY, WASHINGTON; PUBLIC UTILITY D ISTRICT NO 4 OF -MASON COUNTY, WASHINGTON, .PUBLIC- UTILITY DISTRICT NO 3 OF MASON COUNTY, WASHINGTON, PUBLIC UTILITY DISTRICT NO 2 OF PACIFIC COUNTY, WASHINGTON, PUBLIC UTILITY DISTRICT NO 1 OF SKAMANIA COUNTY, WASHINGTON, AND PUBLIC UTILITY DISTRICT NO 1 OF WAHKIAKUM COUNTY, WASHINGTON (Public Utilities); and MARSH MUNDORF PRATT SULLIVAN McKENZIE (Attorney) for the provision of legal services and the payment of compensation as specified herein. WHEREAS, the Public Utilities presently purchase electric power from the Bonneville Power Administration (BPA) pursuant to wholesale rate schedules determined by BPA after public hearing pursuant to Section 7 of the Pacific Northwest Electric Power Planning and Conservation Act (Act); WHEREAS, BPA is considering adoption of various policies, rate forms and long -term contracts which would have a major impact on the wholesale rates of the Public Utilities, and WHEREAS, BPA is preparing to conduct hearings and public processes to decide issues which will affect Bonneville's wholesale rate schedules and Power Sales Contracts for the Public Utilities; and WHEREAS, the Public Utilities wish to actively participate in these hearings and processes to protect the interests of their ratepayers, and WHEREAS, the Public Utilities may wish to diversify their power supply sources, It is Therefore Agreed That: 1 The Attorney shall advise, assist and appear on behalf of the Public Utilities in hearings and public processes relating to issues set forth Exhibit A referenced herein attached and as directed by the Public Utilities. Page 1 of 2 F -49 2. Public Utilities shall compensate the Attorney for these services at an average hourly rate not to exceed $175.00 Out -of- pocket expenses, such as telephone, telecopy, copying and postage, and reasonable and necessary travel expenses shall be in addition to the hourly rate. The Attorney shall send each of the Public Utilities an itemized statement for legal services rendered and out -of- pocket expenses on a monthly basis. 3 The Attorney fees and out -of- pocket expenses incurred hereunder shall be divided among the Public Utilities according to the formulas attached in Exhibit A. 4 The activities encompassed by this Agreement are set forth in Exhibit A attached hereto. No other activities shall be undertaken without prior authorization of the Public Utilities. It is understood that the length and amount of work necessary in these proceedings is unique and the cost may exceed these estimates. 5 Files of the Attorney relating directly to the foregoing legal services shall be available for examination by the authorized representative of the Public Utilities or their attorneys and shall, upon reasonable request, be turned over the Public Utilities if the Attorney ceases to act as attorney for the Public Utilities. 6. Because the attorney- client relationship is dependent upon mutual trust and full confidence, an individual Public Utility, the Public Utilities collectively, or the Attorney may terminate this Agreement at any time upon written notice. Date: December 12, 2011 Date: MARSH MUNDORF PRATT SULLIVAN McKENZIE By. 1,e^- 2 49112 Terence L. Mundorf UTILITY By Manager Page 2 of 2 F 50 W A S H I N G T O N U S A. CITY COUNCIL MEMO Date: January 17, 2012 To: CITY COUNCIL From: Glenn A. Cutler, P.E., Director of Public Works Utilities Subject: Simple Steps, Smart Savings Promotion Services Agreement Summary: The City has been offered a new Agreement to deliver energy efficient compact fluorescent lamps and showerheads to the City's low- income customers as a component of the 'upconiiiig'expanded Low- Income Weatherization Project. All City expetises'wdiild be eligiblefor reimbursement under the Bonneville Power Administration's energy conservation program. Recommendation: Approve and authorize the City Manager to sign the Simple Steps, Smart Savings Promotion Services Agreement with Fluid Marketing Strategies including Project Orders 1 and 2 in an amount not to exceed $104,000, and to make minor modifications to the Agreement, if necessary. Background /Analysis: On April 20, 2010, City Council approved the current agreement which expires on January 31, 2012; the proposed agreement provides continuing services through January 31, 2014 The proposed Project Orders 1 and 2 would include the installation of approximately 9,000 compact fluorescent lamps and 396 low -flow showerheads at the residences of 300 of the Cities' low income customers who apply for our Low- Income Weatherization project. These products will lower the electrical demand for our utility customers through reduced consumption. Another benefit will be the development of "snapshot" audits of the homes where these products are installed. These snapshot audits will provide the City with critical information in regards to structural soundness and weatherization opportunities. The snapshot audit will be required for customers to participate in the Low Income Weatherization project. The proposed Agreement and Project Orders are attached. All City expenses are eligible for reimbursement under the BPA's energy conservation program. On January 10, 2012, the Utility Advisory Committee forwarded a favorable recommendation to City Council to authorize the City Manager to sign the Simple Steps. Smart Savings Promotion Services Agreement with Fluid Market Strategies including Project Orders 1 and 2 in an amount not to exceed $104,000, and to make minor modifications to the Agreement, if necessary As part of the recommendation it was recognized that a full -time equivalent Fluid Market Strategies employee will be retained, and where possible, materials will he locally purchased as long as costs do not increase by more than 5 Attachment: Proposed Simple Steps, Smart Savings Promotion Services Agreement Project Proposed Project Orders 1 and 2 N: \CCOUNCIL \FINAL \Simple Steps Smart Savings Promotion Services Agreement.doc F 51 Project Name Simple Steps, Smart Savings. Contract Period February 1, 2012 January 31, 2014 Client Name City of Port Angeles Client Representative Joey Currie Telephone Number 360 417 -4715 Address 321 East 5th Street City, State, Zip Port Angeles, Washington 98362 Contractor Name Fluid Market Strategies Telephone Number 503- 808 -9003 Address 625 SW Broadway, Suite 300 City, State, Zip Portland, Or 97205 Taxpayer Identification Number 20- 3767308 Simple Steps, Smart Savings. Promotion Services Agreement This Promotion Services Agreement "Agreement is entered into as the day of 2012 between City of Port Angeles, 321 East 5th Street, Port Angeles, Washington 98362 and Fluid Market Strategies 625 SW Broadway, Suite 300, Portland, Oregon 97205, hereinafter called "Contractor" City of Port Angeles and Contractor may also hereinafter be referred to individually as, "Party or collectively as, "Parties This Agreement shall remain in force only for the duration of the period specified below, unless extended in accordance with this Agreement (Term). All obligations incurred under this Agreement shall survive the Term until satisfied. The following Exhibits to this Agreement, if any, are by this reference incorporated into and made part of this agreement by the following attachments: Exhibit A Project Orders Incorporated Documents, if any 1. Scope of Services This agreement sets forth the terms and conditions which shall govern services that from time to time, during the Term hereof, may be requested by City of Port Angeles and agreed to by Contractor (the "Services However, execution of this Agreement does not obligate either Party to request or perform any specific services. City of Port Angeles makes no representation to Contractor of the amount of Services, if any, which may be requested from Contractor under this Agreement. This Agreement covers the services specified in Exhibit A Project Orders, which is hereby included and made a part of this Agreement. The Contractor agrees to perform the services specified in Exhibit A in the manner and within the time specified therein. Except as expressly provided elsewhere in the Agreement, any and all modifications or revisions to Exhibit A F 52 1 (including, but not necessarily limited to, additions, deletions, and extensions) must be in writing and signed by both parties. The scope of services offered by Fluid enable City of Port Angeles to customize promotional delivery mechanisms for the Simple Steps, Smart Savings Promotion in their service territory These promotions include retail markdown promotions, builder channel promotions, direct mail fulfillment, online fulfillment, bulk purchase, and direct installation opportunities of the following products: Twist CFLs: Regular Twists, Daylight Twists, A -Lamps Specialty CFLs: Reflectors, Globes, Candelabras, Torpedoes, Outdoor Lighting Fixtures: Indoor Hard -Wired Fixtures Showerheads: 2.0 GPM or less Participation in any or all of the delivery mechanisms is determined by City of Port Angeles and agreed upon with individual purchase orders (Exhibit A). Each purchase orders will define the •process fees'assbciated with the approved'delivery mechanisms in which City of Port Angeles agrees to by signing the agreement and individual purchase orders. 2. Term of Agreement The effective date of this Agreement (Term) is February 1, 2012 and.continues in effect until the 31st of January, 2014, unless the Parties agree in writing to extend the Term, or unless this Agreement is earlier terminated in accordance with the Early Termination provisions below 3. Compensation and Payment The Parties shall specify in each Project Orders executed pursuant to this Agreement the method of compensation and manner of payment for Services provided pursuant to this Agreement the method of compensation and manner of payment for Services provided pursuant to that specific Project Orders. Compensation shall be determined on the basis of the administrative fee and unit prices. Such rates or prices shall be specified in each Project Orders along with any not -to- exceed amount applicable to the Services. Payment for services pursuant to a Project Orders shall be made as follows: a) Upon completion of the Services described herein, Contractor shall submit a monthly invoice with attached expenses to City of Port Angeles and to the attention of City of Port Angeles Attn: Joey Currie 321 East 5 Street Port Angeles, Washington 98362 F -532 The invoice must be itemized to show incentives processed and related administrative fees charged. City of Port Angeles will pay the undisputed portion of the invoice within thirty (30) days of the receipt. 4. Documentation The Contractor shall maintain records documenting all fees and expenses in excess of $75.00, incurred either by Contractor or any subcontractor of Contractor in the performance of this Agreement. During regular business hours and upon reasonable notice, City of Port Angeles, or its designee, shall have the right to inspect and audit all records required to be maintained under this Agreement. 5. Insurance The Contractor, and any subcontractor engaged by Contractor in its performance of this Agreement, shall carry and maintain fully paid commercial general liability, automobile liability and workers compensation insurance. All policies shall be written only by insurers admitted to do business in Washington and having a rating of at least "A" and a financial rating of at least "VIII" on the most' current edition of Best's`Key Rating Guide or comparable rating by another generally recognized rating agency All policies shall be endorsed to (a) specify City of Port Angeles as an additional insured to the full extent of its right to indemnification under this Agreement, and (b) provide that City of Port Angeles shall be given no less than thirty (30) days advance written notice of cancellation or material change in coverage. Certificates of insurance shall be sent to City of Port Angeles before work begins. Contractor shall obtain the following minimum insurance coverage "Required Insurance prior to the Effective Date, at its expense, and keep the Required Insurances in effect during the Term (except with respect to Professional Liability Insurance, when they shall be kept in effect for a period of the Term plus two years); Workers' Compensation Insurance in compliance with statutory requirements; Commercial General Liability Insurance (including contractual liability), on any occurrence basis, with not less than $1,000,000 per occurrence for bodily injury and property damage liability, with an annual aggregate limit of $2,000,000; Professional Liability Insurance, including errors and omissions coverage, with a per occurrence and aggregate limit of not less than $1,000,000, to protect against all loss suffered by City of Port Angeles or third parties, including financial and consequential loss, caused by error, omission, or negligent acts related to provision of the Services; Commercial Automobile Liability Insurance, with a combined single limit, or the equivalent of not less than $1,000,000 per occurrence, for bodily injury and property damage with respect to Contractors vehicles, whether owned, hired, or non owned, assigned to, or used by Contractor in connection with the Services; and F -543 The Required Insurances shall be with insurance companies admitted to do business in the state of Washington and rated "A" or better by Bests Insurance Rating. Contractor shall furnish City of Port Angeles with certificates of insurance for each of the Required Insurances. The Commercial General Liability and Commercial Automobile Liability shall (i) name City of Port Angeles, its directors, offices, and employees, as additional insured, (ii) provide that it is primary insurance with respect to the interests of City of Port Angeles and that any insurance maintained by City of Port Angeles is excess and not contributory, and (iii) include a cross liability and severability of interest clause. 6. Safety Contractor will be solely and completely responsible for the training of its employees, agents and contractors "Personnel and the conditions of the work site, including safety of all persons and property during the performance of services. 7. Governing Law, Venue and Attorney's Fees The laws of the State of Washington hall goiern'this agreement. Exclusive venue'in case oflegal suit or action is instituted to enforce compliance with any terms, covenants, or conditions of this agreement shall lie in Multnomah County Washington. Both parties agree to submit to the personal jurisdiction of any court of competent subject matter jurisdiction in Multnomah County Washington. In the event of legal suit or action, including any appeals there from, brought by either party against the other to enforce any of the obligations hereunder or arising out of any dispute concerning the terms and conditions hereby created, the losing party shall reimburse the prevailing party for its reasonable attorney fees and costs incurred in the suit or action including investigation costs, expert witness fees and costs of depositions. If any part of this agreement.is found to be in conflict with applicable laws, such parts shall be inoperative, null and void so far as it is in conflict with said laws, but the remainder of this agreement shall be in full force and effect. 8. Good Faith Negotiation /Mediation Prior to filing suit or initiating arbitration on any dispute, which arises between the Parties under or relating to this Agreement, the Parties agree to attempt to resolve the dispute through good faith negotiation. If the dispute cannot be resolved through good faith negotiation, the Parties agree to hire an independent, trained and mutually acceptable mediator to mediate the dispute. The cost of the mediator will be shared equally by the Parties. The mediation shall be conducted at City of Port Angeles, Washington. 9. Suspension of Work by Utility City of Port Angeles may suspend, in writing, all or a portion of Contractors services under Exhibit A in the event unforeseen circumstances make normal progress in the performance of the Contractors work inadvisable in the opinion of City of Port Angeles. Contractor may request that the work be suspended by notifying City of Port Angeles, in writing, of circumstances which are interfering with normal progress of the work. The time for completion of the remaining work shall be extended by the number of days the work is suspended by City of Port Angeles, unless both parties can mutually agree upon a new completion time. In the event the period of suspension exceeds 90 days, the terms of this Agreement shall be subject to renegotiation, provided, however, that if such renegotiation of a mutually acceptable replacement contract has F -554 not occurred within 180 days after suspension (Renegotiation Period), then either party may terminate this Agreement in accordance with the early termination provision hereof, provided further, that the failure to renegotiate this Agreement within the Renegotiation Period shall not be construed as a breach of the Agreement by either Party 10. Suspension of Work by Contractor Contractor may suspend, in writing, all or any portion of its services under this Agreement, but only if and to the extent City of Port Angeles, fails to make timely payment in accordance with the terms of this Agreement. City of Port Angeles, shall have a period of sixty (60) days from the date on which payment was due (Cure Period) within which to satisfy any arrearages in payment. Contractor shall resume performance of any suspended services upon receipt of payment of any arrearages from City of Port Angeles, within the Cure Period. 11. Early Termination Either party shall have the right, but not the obligation, to terminate this Agreement, on sixty (60) days written notice, in the event the other party's service or performance fails to conform to the requirements of this Agreement. Contractor shall have the not the obligation to'• terminate this Agreement, effective upon expiration of the Cure Period, in the event City of Port Angeles, fails to pay any arrearage within the Cure Period. Either party shall have the right but not the obligation, to terminate this Agreement in the event work is suspended under this Agreement fora period.in.excess of 90 days and no renegotiation of this Agreement.has.occurred within the Renegotiation Period. Any right of early termination shall be in addition to, not in replacement of, any and all rights and remedies a party may have for breach of the Agreement by the other Party 12. Subcontractors Contractor may contract with one or more qualified subcontractors (Subcontractor Agreement) to perform a portion of the services specified in the Scope of Work; provided, however, that Contractor shall remain solely responsible to City of Port Angeles, for all performance under this Agreement and, provided further, that City of Port Angeles, shall have no responsibility for the review or supervision of the work of any subcontractor or for any payment to any subcontractor All subcontractor agreements shall require the subcontractor to comply with the invoicing, insurance, suspension of work, audit, documentation, confidentiality and return of records obligations imposed on Contractor by this Agreement. No subcontractor shall be deemed to be a third party beneficiary of this Agreement or to have any other rights under this Agreement. 13. Relationship of Parties Contractor is an independent contractor, and this Agreement is not intended to form a partnership or joint venture between the Parties. Individuals employed by Contractor are not employees or agents of City of Port Angeles, nor are Contractors subcontractors employees or agents of City of Port Angeles. Each Party is solely responsible for payment of compensation to its employees and personnel and will withhold and pay to the appropriate authorities all taxes, contributions, and assessments imposed or required under all laws with respect to payment. The Contractor will require these terms in all agreements with subcontractors for work undertaken for this Agreement. F -565 14. Return of Records On termination ofthe contract, the Contractor will consult with the project manager at City of Port Angeles, about whether pertinent records should be returned. If requested, the Contractor will deliver to City of Port Angeles, all records, reports, data memoranda, notes models or publications whether electronic or hard -copy, equipment and supplies of any nature, and receipts for any and all billing made to City of Port Angeles, that are in possession or under control of the Contractor, prepared or acquired in the course of the contract with City of Port Angeles. Further, the Contractor agrees not to keep or withhold such information or data, or reproductions of such information or data that relate to the business activities of City of Port Angeles, or to parties in a contract relationship with City of Port Angeles, Alternatively, if the return of records and equipment or supplies is not requested, Contractor agrees to retain these items for three years after the completion of this contract and to notify the City of Port Angeles, project manager at the end of that time before disposing of them. Contractor shall include a provision substantially identical to the foregoing in all its Subcontractor Agreements. 15. Indemnification The Contractor-wiII iridemnify• hold harmless and defehd City of Port Angeles; and ;its officers employees, agents, representatives, and affiliates (each an Indemnified Party) against any and all losses, liabilities, damages, claims, suits, proceedings, judgments, assessments, costs, and expenses (including interest and penalties), and including reasonable attorney fees and expenses, incurred by City of Port Angeles, and arising from (i) negligent or wrongful acts or omissions of the Contractor or of its officers, employees, agents, representatives, subcontractors, or affiliates of this Agreement, or (iii) any finding, judgment or other determination or settlement whereby the Contractor is deemed or considered to be the employer of the other Party The Parties specifically agree that the provisions of this Section also apply to any claim of injury or damage to the persons or property of the Contractors employees. Contractor acknowledges and agrees that, as to such claims, the Contractor, with respect to City of Port Angeles, hereby waives any right of immunity which Contractor may have under industrial insurance (Title 51 RCW as amended and under any substitute or replacement statue). This waiver was specifically negotiated by the Parties, is solely for the benefit of the Parties and their successors and assigns, and is not intended as a waiver of Contractors right of immunity under said industrial insurance for any other purpose. 16. Force Majeure Notwithstanding anything contained in this Agreement to the contrary, neither Party will be deemed liable or to be in default for any delay or failure in performance under this Agreement deemed to result from acts of God, acts of civil and military authority, acts of public enemy, war, or any like cause beyond the Parties reasonable control. 17. Severability Should any provision of this Agreement be held by a tribunal of competent jurisdiction to be invalid or unenforceable, the remainder of the Agreement will remain in full force and effect. 18. Notices F -576 Notices required to be made under this Agreement shall be served personally, by facsimile transmission, by overnight courier to the address shown above, or by email, with a duplicate sent by certified mail, return receipt requested. Notice shall be effective only upon receipt by the party being served. Effective Date and Term This Agreement, including its exhibits, shall be effective immediately upon execution by both parties. City of Port Angeles Fluid Market Strategies Signature Signature Name :..s -Name Date Date F -587 Contractor's Authorized Representative Megan Milliken 503.808.9003x106 mmilliken @fluidms.com Project Order Title Simple Steps, Smart Savings'"' This Project Order is entered into pursuant to the terms and conditions of the Promotion Services Agreement between City of Port Angeles and Fluid Market Strategies "Fluid dated Fluid's Objective To implement a successful retail promotion for the Simple Steps, Smart Savings promotion. Scope of Services The Simple Steps, Smart Savings Promotion will increase sales of ENERGY STAR® CFLs, ENERGY STAR® indoor hard -wired lighting fixtures and energy saving showerheads in the marketplace. This goal will be accomplished by providing an incentive of $0.50 per general purpose CFL (twist, A- lamp), an incentive of $2.00 on specialty CFL products (Reflectors, Globes, Candelabras, Torpedoes, 3 -way, outdoor lighting), an incentive of $8.00 on indoor hard -wired lightinifiiitures, and an incentive of $7.00 on showerheads (2.0 gpm or An'admihistrative fee of $0.25 per unit will be charged on specialty CFLs and an administrative fee of $0.35 per unit will be charged on all other products. Administrative Support Project Order -01 EXHIBIT A TO PSA Services shall include development, delivery and facilitation of projected unit movement of identified SKUs at approved retail locations. Fluid staff will receive retail sales reports from partnering retailer locations and monitor sales reports into a proprietary tracking and reporting database. Marketing Services Fluid will design and produce retail Point of Purchase (POP) materials for participating retail locations, including those in City of Port Angeles territory Marketing materials will be delivered directly to the stores by the Fluid field representatives. Field representatives will support participating retail stores in City of Port Angeles territory, provide on -site merchandising, sales associate training and event staffing. Reporting Minimum reporting requirements will include: City of Port Angeles will receive detailed electronic reports of promotional product sales once a month. Sales will be distinguished by retail location and individual product SKUs. This data can be provided in a hard copy along with the monthly invoice if requested. Invoices for promotional product sales and administrative costs per unit sold within the prior month will be sent to City of Port Angeles monthly Invoicing is dependent upon Fluid receiving sales data reports from manufacturer /retailer partners in a timely manner; sales data is due from manufacturer on the 15 of each month. However, City of Port Angeles will be invoiced by Fluid within 10 working days of receipt of sales data. Additional necessary reporting requirements will be communicated to Fluid as they are identified Store List Allocations S ee Attachment A MGSA LGL 019 EXH B F 59 Incorporated Documents (Note: In the event of any conflict between the terms and conditions contained in this Project Order and those set forth in any Incorporated Documents, the terms and conditions of this Project Order shall prevail.) Compensation for the Services Contractor shall be compensated for the Services described above as follows: City of Port Angeles commits to fund the following product(s)• (Select all products to include) ENERGY STAR® CFLs Promotional showerheads ENERGY STAR® rated indoor hard -wired lighting fixtures And for the product(s) selected above commits to (Select one funding option) El Funding of 60,000 for promotional products selected above. w- :rime of. Performance •for the Services Commencement Date February 1, 2012 Completion Date April 1, 2012 Except as provided herein, all terms and conditions of the Master Promotion Services Agreement referenced above shall be incorporated into and become a part of this Project Order City of Port Angeles has the right to terminate this agreement at any- time. Termination notice must be received in writing and will have a termination date effective at the end of the month following the month in which written notice is received. Accepted By: City of Port Angeles Please Print Name Signature MGSA LGL 019 EXH B Approved by Fluid Market Strategies Signature Title Date Title Date F 60 P Fluid's Authorized Representative Megan Milliken 503.808.9003x106 mmilliken @fluidms.com Project Order Title Simple Steps, Smart Savings'" Fluid Run Direct Install, Option 3 This Project Order is entered into pursuant to the terms and conditions of and as an amendment to the Promotion Services Agreement between the City of Port Angeles and Fluid Market Strategies, Inc. (Fluid), dated Fluid's Objective To conduct home auditing and implement a successful direct install project in homes within the City of Port Angeles service area in accordance with this document and in conformance with BPA's direct install program requirements. Scope of Services The Fluid run direct installation portion of the Simple Steps, Smart Savings program will increase adoption and use of energy saving products by offering the City of Port Angeles CFL installation and energy- saving showerhead distribution services. An installation fee and a $0.35 administration fee will be applied to all CFLs and showerheads provided to City of Port Angeles utility customers in accordance with this Project Order Fluid will comply with BPA's current Implementation Manual for direct install measures pertaining to this Project Order Administrative and Staff Support Services from Fluid will include development, delivery and facilitation of the direct installation portion of the Simple Steps, Smart Savings promotion as outlined in Attachment A Direct Install Extension Proposal. Fluid's installation team members will: Participate in an orientation detailing customer service expectations, installation best practices and outlining the goals of the promotion. Secure needed CFL and showerhead product supply, and manage product distribution and inventory Recruit select City of Port Angeles utility customers for participation and schedule customer services. Perform installations in compliance with local and state regulations. Collect audit data and track activity on the Home Snapshot Audit form (Attachment B). Provide the City of Port Angeles with reports of project activity and hardcopies of audit forms. Allow the City of Port Angeles representatives to work closely with Fluid's administration of this program to ensure the best possible public relations and the best chance of a successful outcome for Fluid and the City of Port Angeles. Marketing Services Fluid will provide and operate a consumer facing website that provides information about promotional products as well as a one page summary of promotion related services offered by the City of Port Angeles. A customer support telephone number and online signup form will be provided and maintained by Fluid and made available to utility customers for services under this Project Order Fluid will provide program informational handouts to be distributed to customers interested in direct install services. Fluid will provide informational materials, including Home Energy Savings Steps brochures and showerhead Installation Instructions, to utility customers who receive direct install services. Templates will be made available to the City of Port Angeles for utility bill inserts, newspaper ads, customer direct mail letters, door hangers, and newspaper copy /web graphics. Additionally, Fluid is available to design custom marketing materials as needed. The scope of any additional custom marketing will be detailed in a Change Order as an attachment to this document. Reporting Minimum reporting requirements will include: The City of Port Angeles will receive electronic reports of direct installation and auditing activity once a month. The report will document the information collected on Attachment B. Upon request, Fluid will conduct quality control efforts through select site verification to ensure customer satisfaction and proper product installation. PSA EXH B Project Order -02 EXHIBIT A TO PSA F 61 Product Description Administrative Fee Installation Fee Product Cost* Total Cost Per Unit CFL Twist 13 -15 Watt $0.35 $2.25 $1.42 $4.02 CFL Twist 23 -26 Watt $0.35 $2.25 $1.99 $4.59 CFL Reflector 50.35 $2.25 53.24 $5.84 CFL Globe 50.35 $2.25 53.04 $5.64 Showerhead $0.35 58.00 $3.50 $11.85 Fluid will meet reporting standards enabling the City of Port Angeles to obtain reimbursement from BPA for qualifying work performed under this Project Order Additional reporting requirements will be communicated to Fluid as they are identified. ncorporated Documents (Note: In the event of any conflict between the terms and conditions contained in this Project Order and those set forth in any Incorporated Documents, the terms and conditions of this Project Order shall prevail.) Attachments A (Direct Install Extension Proposal) Attachments B (Snapshot Audit Form) Compensation for the Services Fluid shall be compensated for the Fluid Run Direct Install Services described above as follows For selected product only In accordance with the unit prices listed in the chart above the City of Port Angeles commits to fund this direct install project until one of the following is achieved: Project costs for the City of Port Angeles have reached a maximum amount of 44,000. Any chahge in the scope of services in this document will be detailed in a written Change Order signed by both parties and attached to this agreement. Time of Performance for the Services Commencement Date February 01, 2012 Completion Date April 01, 2012 Except as provided herein, all terms and conditions of the Master Promotion Services Agreement referenced above shall be incorporated into and become a part of his Project Order. This Project Order shall remain in effect unless terminated by el her party at any time by giving a thirty (30) day notice to the other party or meeting completion obligations in this Project Order Notice shall be effective when received. Accepted By: City of Port Angeles Please Print Name Signature PSA EXH B Approved by: Fluid Market Strategies Please Print Name Signature Title Date Title Date F 62 Original Contract Amount Change Orders (0) Unit Quantity Variations Final Cost Project Cost Variance $334,376.90 $0.00 ($2.768.01) $331,608.89 -0.8% PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO DATE: January 17 2012 TO: CITI COUNCIL FROM: Glenn A. Cutler, P E., Director of Public Works Utilities SUBJECT: 2011 Street /Alley Overlay Contract, Project No. TR03 11 Final Acceptance Summary: Lakeside Industries, Inc.. has completed the 2011 Street and Alley Paving contract, Project No. TR 03=1 l The work has been inspected and accepted as complete and payment in the amount of $331,608.89, which includes all applicable taxes, has been made with a bond being held in lieu of retained funds. Recommendation: Accept the 2011 Street AIIey Overlay, Project TR03 -11, and authorize release of the retainage bond upon receipt of required clearances. Background /Analysis: Lakeside Industries, Inc., was awarded the contract on September 7th, for the paving of the 5/6 Alley from Chambers to Race Street. the First /Front alley from Francis to Eunice, Albert Street from First to Front Street, Ennis from 4` to 5 Street, and Penn Street from First to Front Street, stormwater separation from sanitary sewer at the 5/6 Alley from Chambers to Washington and Albert Street from 1 to Front, and installation of pervious concrete sidewalk areas at the intersection of 1 s and Race Streets. Construction began on October 10, 2011, and was completed on November 22, 2011 The project has been inspected and determined to be complete, and final payment has been processed. Project design, inspection, and management were performed by the City s Engineering staff It is recommended that Council accept the 2011 Street AIIey Overly, Project TR03 -11, and authorize release of the bond for the retained percentage upon receipt of required clearances. N \CCOUNCIL \FINAL\2011 Street AIIey Overlay Contract, Project TR03 -11 Final Acceptance.docx F 63 CITY OF W A S H I N G T O N U S A. CITY COUNCIL MEMO Date: January 17, 2012 To: CITY COUNCIL From: Glenn A. Cutler, P.E., Director of Public Works 8 Utilities Subject: New and Expanded Large Single Electrical Loads Ordinance Summary: The Electric Utility needs to establish a policy for new large single electrical loads to address how marginal power supply costs will be recovered through rates. With the assistance of the Western Public Agencies Group and EES Consulting, staff has prepared a new large single loads ordinance. Recommendation: Conduct a first reading of the proposed New and Expanded Large Single Electrical Loads ordinance, and continue to February 7, 2012 fora second reading and adoption of the ordinance. Background /Analysis: The Pacific Northwest Electric Power Planning and Conservation Act (Act) defines a New Large Single Load (NLSL) for the Bonneville Power Administration (BPA) to be any new load or expansion of an existing load at a single facility whose power requirements increase by 10 average megawatts (aMW) or more in any consecutive 12 -month period as compared to its consumption during the immediately preceding 12 -month period For the City's Electric Utility, EES Consulting and staff recommend the NLSL be a connected load of 2 MW for a new customer and 1 aMW of energy consumption for an expansion to an existing customer The marginal power supply cost is approximately $135,000 per aMW per year and similar to the annual energy use of about 540 average residential customers. Under the BPA wholesale Tiered Rate Methodology (TRM) that became effective on October 1, 2011, load requirements in excess of our "High Water Mark" (HWM) will be purchased at higher wholesale power prices "Tier 2 The short-term wholesale rate alternative was selected last year by the City Council and is currently 0.04648 per kWh, which is about 50% higher than average Tier 1 costs. Although the Tier 2 rate is significantly higher than Tier 1 it is much less of an impact than anticipated. For each aMW of NLSL that occurs in the future, Tier 2 power costs using today's retail rate setting practices would be rolled into the total Electric Utility's revenue requirement with the potential to increase retail rates by about 0.68% for all of the City's other retail electric customers. In contrast, a I 0 aMW NLSL could increase retail rates by about 6.8% Bonneville Power Administration (2001) New Large Single Load Policy N: \CCOUNCIL \FINAL \New and Expanded Large Single Electrical Loads Ordinance doc G -1 January 17 2012 City Council RE. New and Expanded Large Single Electrical Loads Ordinance Page 2 There are two key policy issues that are addressed in the proposed NLSL ordinance: 1 The MW and aMW levels the City establishes for its NLSL, and 2. if the Tier 2 marginal power supply costs associated with serving a NLSL are shared with all retail electric customers. Staff is confident that Tier 2 power purchases should be delayed until at least 2014 as long as we continue to experience historical customer growth, maintain our expanded energy conservation program, and there are no reductions to the federal based system. However, a NLSL policy should be developed as a safety net in case a general service demand or primary customer expands or a new one locates in our service territory In the absence of a safety net, a NLSL would immediately result in a need to increase retail rates for all other customers. With the assistance of the Western Public Agencies Group and EES Consulting, the attached NLSL ordinance was prepared, which was discussed at the December 2011 Utility Advisory Committee meeting. Given the discussion, staff prepared a revision to the ordinance for the Utility Advisory Committee's consideration on January 10, 2012. The proposed ordinance has been reviewed by the City Attorney The proposed ordinance would go into effect for new and expanded loads on Tuesday, January 2, 2013 In summary, a NLSL could either result in significantly more expensive retail rates for the new customer or a modest retail rate impact for all other customers. The issue presents the classic policy trade -off between encouraging economic development by providing competitive rates for NLSLs, or making new customers face the marginal power supply costs that they impose on the City's Electric Utility On January 10, 2012, the Utility Advisory Committee forwarded a favorable recommendation to City Council to conduct a first reading of the proposed New and Expanded Large Single Electrical Loads ordinance on January 17, 2012, and continue to February 7, 2012 for a second reading and adoption of the ordinance. In addition, the Utility Advisory Committee modified Section B of the proposed ordinance so that it only applies after the City has utilized all of its Tier 1 power supply Attachment: New and Expanded Large Single Electrical Loads Ordinance G -2 ORDINANCE NO AN ORDINANCE of the City of Port Angeles, Washington, relating to Electricity Services and Charges; adding a new section 3 12.074 to Chapter 13 12 of Title 13 of the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS FOLLOWS Section 1 Title 13 of the Port Angeles Municipal Code is amended by adding a new Section 13 12.074 to Chapter 13 12 to 'read as follows: Chapter 13.12 Sections: 13 12.010 13 12.020 13 12.021 13 12.025 13 12.030 13 12.040 13 12.041 13 12.042 13 12.043 13 12.060 13 12.071 13 12.072 13 12.073 ELECTRICITY SERVICES AND CHARGES General Provisions Applicable to All Service. Uniform Electric Rate. Point of Delivery Rate Class Assignment. Schedule R -03 Residential Service. Schedule GS -03 General Service. Schedule GD -03 General Service Demand. Schedule NP -03 Nonprofit Tax Deductible. Schedule GD -04 General Service Demand Primary Metered. Schedule PS -03 Primary Service. Schedule 1T -03 Industrial Transmission. Schedule L -03 Lighting. Schedule MW -03 Municipal Water Pumping. 13 12 074 New or Expanded oads 13.12.080 Contract Sales and Purchases. 13 12.100 Electrical Work Permits and Fees. 13 12.110 Contract and Administration Charge. G -3 13.12.074 New or Expanded Loads A. Definitions. For purposes of this section, the following definitions apply "New Load" means a General Service Demand or Primary Service account that is first connected to the electrical distribution system after December 31, 2012 and that is equal to or exceeds 2 MW "Expanded Load" means a General Service Demand or Primary Service account previously connected to the electric distribution system that is increased in an amount equal.to or exceeding 1 aMW when compared to the customer's monthly energy and demand consumption in the same calendar month in calendar year 2011 A New Load can also have an Expanded Load component subject to this section. B Applicability Subject to the exclusions stated in the following two paragraphs, this section applies to all New Loads and all Expanded Loads. This section is intended to establish rates only for sales of Tier 2 power The rates established in this section do not apply to the extent Tier 1 power is available to serve all or a portion of the New Load or Expanded Load. This section does not apply to loads designated by the City or the Bonneville Power Administration as New Large Single Loads as defined by the Bonneville Power Administration in their New Large Single Load Policy document, dated April 2001 This section also does not apply to loads that are served under Section 13 12.071 of Title 13 of the Port Angeles Municipal Code. Except as provided in paragraph C. 2. below, sections 13 12.041, 13 12.043, and 13 12.060 do not apply to New Loads and do not apply to the portion of any load that is an Expanded Load. C. New Loads. After December 31, 2012, a New Load shall be charged the following rates and charges based on the energy and demand usage for each month as measured by the account meter 1 Uniform Rate. New Loads will be charged the cost of generation and transmission services incurred for such service by the City from the Bonneville Power Administration under the Priority Firm Public Rate, Tier 2 Charges, including without limitation the charges for Unanticipated Load Service as defined in the BPA Administrator's Record of Decision for the BP -12 Rate Adjustment Proceeding and the 2012 Power Rate Schedules and General Rate Schedule Provisions (FY2012- 2013). The City in its sole discretion shall have the right to determine what Tier 2 rate alternatives it procures from the Bonneville Power Administration. -2- G -4 2. Basic Charge. A basic charge in accordance with Section 13 12.041. 13 12.043. or 13 12.060 of this Chapter shall apply to New Loads. 3 Distribution Charge. A distribution charge determined by multiplying 0.40 times the sum of items 1 -2 shall apply to New Loads. D Expanded Loads. After December 31, 2012, any customer with an Expanded Load shall be charged on the Expanded Load the following rates and charges based on the energy and demand usage for each month as measured by the account meter 1 Uniform Rate. The customer's monthly energy and demand consumption in excess of its energy and demand consumption in the same calendar month in calendar year 2011 will be charged the cost of generation and transmission services incurred for such service by the City from the Bonneville Power Administration under the Priority Firm Public Rate, Tier 2 Charges, including without limitation the charges for Unanticipated Load Service. The City in its sole discretion shall have the right to determine what Tier 2 rate alternatives it procures from the Bonneville Power Administration. The customer's monthly energy and demand consumption that is equal to or less than its energy and demand consumption in the same calendar month in calendar year 2011 shall be charged as determined by the Director in accordance with Section 13 12.041, 13 12.043, or 13 12.060 of this Chapter E. Other Applicable Charges and Adjustments. The following charges and adjustments shall be applied to any New Load or any Expanded Load served under this schedule. 1 Diurnally Differentiated Rate. if the City can procure power from the Bonneville Power Administration under the Priority Firm Public Rate, Tier 2 Charges, with deliveries differentiated diurnally, the City may in its sole discretion offer service hereunder that is diurnally differentiated. 3. Adjustments to Rate. The City may reduce the rate applicable to a New Load and /or an Expanded Load under this schedule, as a part of the annual budget process or at such other time as the City deems appropriate, if the City determines in its sole discretion, by use of a cost of service analysis or other accepted econometric methods, that the economic impact within the City of the New Load and /or Expanded Load will generate additional revenues for the City such that an adjustment to the rate applicable to a New Load and /or an Expanded Load under this schedule will not increase result in shifting service costs to other City electric customers 3 Transmission Charges. The monthly wholesale transmission costs to the City, including energy, demand and any other charges incurred by the City to provide service to an account for a New Load or an Expanded Load under this schedule. -3- G -5 4 Charges and Credits. Any other wholesale generation or transmission charges or credits accrued by the City to provide service to a New Load or an Expanded Load under this schedule. 5 Taxes. An amount calculated to recover the actual tax obligation of the Electric Utility and City for State Public Utilities tax and City Public Utility tax and any other applicable taxes. Section 2 Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of the scrivener's /clerical errors. references, ordinance numbering, section/subsection numbers and any references thereto. Section 3 Severability If any provisions of this Ordinance, or its application to any person or circumstances. are held invalid, the remainder of the Ordinance, or application of the provisions of the Ordinance to other persons or circumstances, is not affected. Section 4 Effective Date. This Ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This ordinance shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the day of 2012. MAYOR, CHERIE KIDD ATTEST APPROVED AS TO FORM. Janessa Hurd, City Clerk William E. Bloor City Attorney -4- G -6 PUBLISHED• 2012 By Summary -5- G -7 January 24, 2012 City Council New and Expanded Large Single Electrical Loads Ordinance Larry Dunbar, Deputy Director of Power Systems Proposed Agenda 1. Terminology 2. Applicability 3. Key policy issues 4. Summary what's next 1 Terminology 1 Diurnally Differentiated Rate 2. Kilowatt (kW) 1,000 watts of power or what it takes to turn -on 10 100 watt light bulbs 3 Kilowatthour (kWh) The amount of energy 10 100 watt light bulbs would consume if left on for 1 hour 2 Terminology Continued 4. Megawatt (MW) 1,000 kW (or 1,000,000 watts) of power or what it takes to turn -on 10,000 100 watt light bulbs 5. Average Megawatt (aMW) The amount of energy 1,000 kW (or 1,000,000 watts) of power would consume if left on for a year Roughly equal to 540 homes, the Clallam County Courthouse, or Port Angeles Hardwood 3 2 Applicability A. General Service Demand and Primary Rate Classes B. A new customer after December 31, 2012 with a 2 MW or greater connected load C. Expansions to a customer load of 1 aMW or greater compared to calendar year 2011 D Only applicable if /when BPA charges the City for Tier 2 wholesale power supply E Rate may be adjusted by City Council as part of the annual proposed budget process 4 Key Policy Issues A. Each aMW has a marginal wholesale power supply cost of $135,000 and has a 0.68% retail rate impact B. The MW level the City establishes for a new load, 2 MW is proposed C The aMW level the City established for an expanded load, 1 aMW is proposed D. If the Tier 2 marginal wholesale power supply costs will be shared with all other customers, no cost sharing is proposed E. Economic development 5 3 Summary Tier 2 wholesale power purchases are not anticipated until 2014 or later The proposed ordinance is progressive and will serve as a safety net What's Next? 1 Questions? 2. Conduct a first reading tonight 3. Conduct a second reading and adoption February 7, 2012 6 4 PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO DATE: JANUARl 17, 2012 TO: CITY COUNCIL FROM: KENT MYERS, CITY MANAGER SUBJECT: CITY- COUNTY INTERLOCAL AGREEMENT IT SERVICES Summarp:'The attached "agreement ificludes the cooperative sharing of knowledge, expertise, services, purchasing, and emergency equipment needs between the IT Departments of the City and Clallam County Recommendation: Approve and authorize the City Manager to sign an inter -local agreement for IT services between the City of Port Angeles and Clallam County and make minor modifications to the_agreement as necessary Background Analysis: Last year the City /County Cooperative Services Study Group identified a number of areas where the City and County could share services that would increase coordination and cooperation between the two entities. One of the areas identified was Information Technology (IT) services. With increasing technological requirements, specialized skill sets and decreasing budgets, our IT staffs are experiencing an increasing need for temporary assistance with problem solving, issue resolution and project implementation. With the large number of common technology platforms and systems between the City and County, sharing of technological expertise, experiences, and professional communications makes good business sense and will eventually benefit local taxpayers. Instead of relying on paid consultants, we have a real opportunity to consult with each other, at little to no cost, and result in a more timely response to our needs. The purpose of the agreement is to allow both agencies to be more efficient while sharing resources and not duplicating new technological and education efforts. With this agreement, we can embrace the sharing of spare equipment and parts for emergencies; realize cost savings with group purchasing and share technological services such as communication pathways, emergency operation centers and redundant data centers for business continuity During the next several months, we hope to have additional City/County inter -local agreements to present to the City Council recommended by the City /County Cooperative Study Group. INTERLOCAL AGREEMENT BETWEEN THE CITY OF PORT ANGELES AND CLALLAM COUNTY REGARDING SHARING OF INFORMATION SERVICES TI -fIS AGREEMENT is entered into and executed this day of January 2012 pursuant to Chapter 39.34 RCW by and between Clallam County, a political subdivision of the State of Washington, (hereafter "County and the City of Port Angeles, a non- charter code city of the State of Washington, (hereafter "City In consideration of mutual benefits to be derived herefrom and covenants made herein, the City and County agree: Section 1 Purpose. The purpose of this Agreement is to set forth the terms and conditions between the City and the County for sharing of information technology services between the Parties. By entering into this Agreement, the Parties can more effectively and efficiently share information and expertise, improve the quality and compatibility of the information, and better serve both Parties. The City and County will save resources by not duplicating efforts and by sharing information and expertise. Section 2 Shared Information. Subject to the conditions of this Agreement, the Parties shall share __knowledge, expertise, and services related tothe following: Collectively, the above services may be referred to as the "cooperative undertaking." Phone Systems and associated hardware /software Network Infrastructure and Telecommunications Camera Systems Web Filtering Hardware Platforms (Desktops /Servers) Microsoft Products Database Platforms and Products Desktop Virtualization Server Virtualization Hosted Email /Archiving Redundant Datacenters and Disaster Planning Emergency Operations Centers Interconnectivity and Resources Records Management /Document Management and File Indexing Fiber Optics and Redundant Data Paths Wireless Mesh Telecommunications Expansion to include new technologies, common platforms and general IT services, including but not limited to: o Technology knowledgebase o Training o Hosting o Troubleshooting /Problem solving o Prc /Post testing and capabilities 1 -2 Section 3 Scheduling /Accountability Services provided pursuant to this Agreement shall be classified as either non intrusive, scheduled, or emergency All services will be classified non intrusive if they are found to be not labor intensive, inquiry only, and do not require written response. All Non intrusive tasking will not be charged if less than one hour at any one time is utilized. If any tasking is found to require more than 60 minutes and /or outside the scope of non- intrusive services, it will be classified as either a schedule or emergency service and accounted for accordingly All services classified as scheduled will be agreed to between the department head of both parties. They shall agree on the scope of the project, personnel to be involved, schedule and projected project time. This will be done via a form to be established for this purpose, and signed off on by both the parties prior to start. All time will be accounted for in I hour increments falling into either straight (reg. duty hours), overtime (after reg. duty hours /weekends) or emergency All emergency services will be agreed upon by the department head of both parties on a case by case basis With an email authorizatidit for emergency assistance. Completion of the established form With signatures, project scope, personnel, and project time will be done upon the next business day All time will be accounted for in 1 -hour increments and be assigned as emergency A completed copy of each project form will be supplied to each party upon completion with signatures of requester authorizing the completion of the project and the accounting of hours for the particular project. Both parties will keep a running accounting of hours utilized by both parties based on three criteria: straight, overtime, or emergency This will allow for a working hours credit /debit balance. Quarterly, both parties will audit their project accounting and compare findings. At calendar end, both parties will meet, and settle the balance. Straight 1 hour 1 hour base rate Overtime 1 hour 1.5 hours base rate Emergency 1 hour 2 hours base rate A base rate of $50 per 1 hour will be utilized. Section 4 Materials S ies and Purchasit Any technology materials, if declared surplus by one Party, may be used by the other Party if such use is in furtherance of the scope of this inter -local Agreement. Any such declaration by the County will need to occur in compliance with applicable provisions of County Administrative Policy Any materials that are not deemed surplus, not needed currently for production but needed in a temporary basis between parties may be borrowed. All borrowed materials and equipment will be tracked in writing with part numbers, serial numbers and approximate value. All borrowed materials shall be returned to the rightful owner within 30 days from the date of expiration or termination of this Agreement. Any purchasing for general support and operations will be done by each Party for its own production capabilities regardless of the final physical location of the materials. This will allow for continued ownership and auditing capabilities. 1 -3 When fiscally responsible and appropriate, sharing of purchasing contracts, maintenance or support contracts and volume purchasing when allowed will be utilized on a case by case basis. Section 5 Insurance and Waiver of Claims. Each party is a member of a self insurance pool. Each party will rely on its own self insurance pool for indemnification of any loss, injury or damage that might arise or result from the services provided pursuant to this Agreement. Each party waives any claim or cause of action it may accrue against the other arising from or as a result of the services provided pursuant to this Agreement. Section 6 Representation. No separate legal entity is created by this Agreement. The sharing provided for by this Agreement shall be administered by a joint board consisting of one representative of the City and one representative of the County The representative of the County is shall be Deborah Earley at 360.417.2345 and the City's representative shall be James Harper at 360.417 4513 Section 7 -Term of Agreement. The term of this Agreement shall commence immediately when signed by both parties, and it shall continue for five years, or until terminated by notice. Either party may terminate this Agreement by giving written notice at least 30 -days prior to the effective date of termination._ Section 8- Miscellaneous Provisions. A. Amendment. This Agreement may he amended only in writing and only by agreement of all Parties except as set forth in this section. B. Assignment. The parties may not assign or subcontract any of their rights or duties under this Agreement except as otherwise provided herein. C. Counterparts. This Agreement may be executed in two or more counterparts, and each such counterpart shall be deemed to be an original instrument. All such counterparts together will constitute one and the same Agreement. D Disputes. Any action to enforce this Agreement will be brought in Clallam County Washington. E. Listing. Pursuant to RCW 39.34.040, this Agreement shall be listed on the County and City's websites. IN WITNESS HEREOF, this Agreement is executed this seventeenth day of January 2012 by Clallam County and by the City of Port Angeles, Washington. CITY OF PORT ANGELES CLALLAM COUNTY BOARD OF COMMISSIONERS Kent Myers, City Manager Howard V Doherty Jr., Chair Attest: Attest: Janessa Hurd. City Clerk Approved as to Form: William E. Bloor, City Attorney Trish Holden, CMC, Clerk of the Board Approved as to Form: tttt2 Mark Nichols, Chief Deputy Prosecuting Attorney 1 -4 J W A S H I N G T O N U S A. CITY COUNCIL MEMO Date: January 17, 2012 To: CITY COUNCIL From: Glenn A. Cutler, P.E., Director of Public Works Utilities Subject: Design Industrial Outfall Repair and Cleaning Project Project WW08 2008 Summary: This design project is for engineering services to develop design documents for repair and cleaning of the Port Angeles industrial outfall. This is an element of the CSO program (W W08- 2008). The eventual placing of this outfall in service will provide environmental betterment by allowing WWTP effluent and CSO discharges to occur outside the mouth of the harbor and closer to the currents of the Strait of Juan de Fuca. Recommendation: Approve and authorize the City Manager to add -this, planned program_ element to the CSO Professional Services Agreement with Brown and Caldwell in an amount not to exceed $47,000, and to make minor modifications to the agreement, as necessary. Background /Analysis: The Rayonier industrial outfall was acquired by the City in order to increase the capacity for Wastewater Treatment Plant (WWTP) discharge and to enhance the pollution control function of the Combined Sewer Overflow (CSO) program. In 2009, during the design of the CSO Project, the Lower Elwha Klallam Tribe (LEKT) requested that the industrial outfall be reassigned as the primary outfall from the WWTP, with the existing City outfall used only in a backup role. This change in configuration of use of outfalls will have significant environmental benefit. Because of the industrial outfall's greater length (7,940 feet) and location outside the mouth of the harbor better mixing and dispersion of discharges to the currents of the Strait of Juan de Fuca will occur The industrial outfall diffuser ports are in deeper water, in a location that studies have determined is more suitable for effluent dispersion away from the inner Port Angeles Harbor than the existing WWTP outfall. The City agreed with this, and in 2010 the Department of Ecology approved an amendment to the CSO Reduction Facilities Plan. An underwater inspection of the industrial outfall was conducted by Cosmopolitan Engineering Group in August and October of 2010 from which it was determined that the outfall was serviceable. In order to place the industrial outfall into service, some of the diffusers do need repair, and seafloor sediment that has entered the outfall pipeline at a number of spots should be removed. In addition, some of the diffusers will need to be modified in order to accommodate the range of flow levels expected from the WWTP (2 MGD to 50 MGD) and equalize the necessary dispersion from all 48 ports under all conditions. The design work includes hydraulic modeling in N: \CCOUNCIL \FINAL \Design Industrial Outfall Repair and Cleaning Project Project W W08- 2008.doc 1 -5 January 17 201 City Council Re: Design Industrial Outfall Repair and Cleaning Project —Project WW08 -2008 Page 2 order to analyze the flow related design requirements. in addition to developing plans and technical specifications for the repair and servicing work. Because of the specialty nature of this underwater work, the City intends to award an independent construction contract. After the design is complete, bids will be solicited and staff will return to Council to seek approval for award of the construction project. This sub project of the CSO program is proposed to be added to the Professional Services Agreement with Brown and Caldwell in an amount not to exceed $47,000, which increases the maximum compensation under that agreement from $4,206.611 to $4,253,611 Funds are available for design and construction of the Industrial Outfall Repair and Cleaning project from CSO reserves accumulated through rates and the Washington State Public Works Trust Fund loans. The task elements for this work are shown in the following table: On January 10, 2012. the Utility Advisory Committee forwarded a favorable recommendation to the City Council to approve and authorize the City Manager to add this planned program element to the CSO Professional Services Agreement with Brown and Caldwell in an amount not to exceed $47,000, and to make minor modifications to the agreement, as necessary 1 -6 TASK BUDGET 1. .:Design.Analysis:._,_ $22.500 2 Contract document preparation 19,000 3 Bidding /construction support 1.500 4 Project management 4,000 TOTAL $47.000 January 17 201 City Council Re: Design Industrial Outfall Repair and Cleaning Project —Project WW08 -2008 Page 2 order to analyze the flow related design requirements. in addition to developing plans and technical specifications for the repair and servicing work. Because of the specialty nature of this underwater work, the City intends to award an independent construction contract. After the design is complete, bids will be solicited and staff will return to Council to seek approval for award of the construction project. This sub project of the CSO program is proposed to be added to the Professional Services Agreement with Brown and Caldwell in an amount not to exceed $47,000, which increases the maximum compensation under that agreement from $4,206.611 to $4,253,611 Funds are available for design and construction of the Industrial Outfall Repair and Cleaning project from CSO reserves accumulated through rates and the Washington State Public Works Trust Fund loans. The task elements for this work are shown in the following table: On January 10, 2012. the Utility Advisory Committee forwarded a favorable recommendation to the City Council to approve and authorize the City Manager to add this planned program element to the CSO Professional Services Agreement with Brown and Caldwell in an amount not to exceed $47,000, and to make minor modifications to the agreement, as necessary 1 -6 PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO Date: January 17, 2012 To: City Council From: Nathan A. West, Director Community and Economic Development Subject: Combined Sewer Overflow (CSO) Phase 1 Project (Project 06 -01), Section 106 Archaeological Memorandum of Agreement Summary: As part of the delegation of funds through the Clean Water State Revolving Fund (CWSRF), Washington State Department of Ecology (Ecology) and EPA are required to meet conditions of the National Historic Preservation Act (NHPA). Due to the sensitivity of the Port Angeles Waterfront regarding archaeological resources, a Memorandum of Agreement (MOA) and Archaeological Work Plan (AWP) are required for the project. Parties to this MOA are Ecology, the City of Port Angeles (City), the Lo er Elwha Klallam Tribe (LEKT). the Washington Department of Archaeology and Historic Preservation (DAHP), and the EPA.T Recommendation: Approve and authorize the Mayor to sign the CSO Phase 1 (Project 06- 01) Section 106 Memorandum of Agreement. Background: The City proposes to construct Phase 1 of the CSO project with Washington CWSRF loans from Ecology The EPA has determined that projects that are offered Federal assistance through the CWSRF are undertakings subject to review under Section 106 of the NHPA, 16 U.S.0 470f, (Section 106) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800 With consultation of the City, DAHP, and interested tribes, Ecology requested EPA participation in the federal compliance process due to the potential for adverse effects on historic properties. EPA concurred and initiated consultation with seven regional tribes under N1-IPA Section 106. Three tribes responded. The responses were from the LEKT stating their intention to participate, the Port Gamble S'Klallam Tribe deferred to the LEKT reserving their right to engage at a later date if significant cultural resources are inadvertently discovered, and the Skokomish Tribe declined to participate. The MOA is a result of these consultation efforts and was authored by staff members from the City, EPA, DOE, LEKT, and DAHP The City Archaeologist recently completed pre- construction archaeological excavation and sampling in the areas of the CSO footprint with the highest probability for containing buried 1 -7 cultural resources. No significant archaeological properties were observed. The City Archaeologist has used the information gathered from the sampling project and other archaeological identification efforts to develop an Archaeological Work Plan (AWP) for the CSO project that defines responsibilities, outlines archaeological monitoring and notification procedures. and provides schedules for reporting. An MOA was developed in order to formalize the satisfaction of EPA's NHPA Section 106 responsibilities and its acceptance by all parties. The MOA authorizes EPA and Ecology to proceed with their processes for distributing CWSRF loans for the CSO Phase 1 project. It also adopts the City's AWP and supersedes a previous MOA dated January 2010 between the LEKT and the City by terminating that agreement for the CSO project. The MOA and AWP are included as attachments to this memorandum. On January 10. 2012, the Utility Advisory Committee forwarded a favorable recommendation for Council to approve and authorize the Mayor to sign the MOA. Attachment: Section 106 Archaeological Memorandum of Agreement and Workplan 1 -8 MEMORANDUM OF AGREEMENT BETWEEN THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 10, THE WASHINGTON DEPARTMENT OF ECOLOGY, THE CITY OF PORT ANGELES, THE LOWER ELWHA KLALLAM TRIBE, THE WASHINGTON STATE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION, REGARDING THE COMBINED SEWER OVERFLOW PROJECT PHASE 1, PORT ANGELES, WASHINGTON WHEREAS, the United States Environmental Protection Agency Region 10 (EPA) awards capitalization grants to the Washington State Department of Ecology (Ecology) for the Clean Water Stale Revolving Fund (CWSRF) Program under Title VI of the Clean Water Act, as amended; and WHEREAS, EPA has determined that projects offered Federal assistance through the Washington CWSRF are undertakings subject to review under Section 106 of the National Historic Preservation Act (NHPA), 16 U.S C 470f, (Section 106) and its implementing regulations at 36 Code of Federal Regulations (C.F.R.) Part 800: and WHEREAS, in order to meet more efficiently and effectively EPA's responsibilities under Section 106, a nation -wide Programmatic Agreement (PA) was executed on March 28, 1990, among the Advisory Council on Historic Preservation (ACHP), the EPA, and the National Conference of State Historic Preservation Officers concerning compliance with the National Historic Preservation Act under EPA's State Water Pollution Control Revolving Fund Program pursuant to 36 C.F.R. 800.13, and WHEREAS. the PA stipulates that the EPA shall require that the State SRF Agency, which in this case is Ecology, to carry out the requirements of 36 CFR 800.4 through 800.6, with reference to 36 CFR 800 1 800.2, 800.3, 800.8. 800.9 800 10, 800 11 800 12 and 800.14 for all actions that receive EPA Federal assistance; and WHEREAS. the Washington Department of Ecology (Ecology) administers the Washington State CWSRF Program and expects to offer the City of Port Angeles financial assistance under this program; and WHEREAS, the City of Port Angeles "the City proposes to construct Phase 1 of a combined sewer overflow (CSO) project (the Undertaking) with CWSRF funding in Port Angeles. Clallam County, Washington; and WHEREAS, Ecology has invited the City to participate in this consultation and the City has elected to participate: and 1 I -9 WHEREAS. the Lower Elwha KlaIlam Tribe, the Jamestown S'Klallam Tribe. the Port Gamble S'Klallam Tribe and the Skokomish Indian Tribe are federally recognized Indian tribes and signatories to the 1855 Treaty of Point No Point with the United States; and WHEREAS, in the Treaty the above mentioned Tribes ceded aboriginal territory that includes Port Angeles Harbor and waterfront, and reserved fishing rights in their usual and accustomed areas. which the Lower Elwha Klallam Trihe has regularly exercised in the Harbor and along the waterfront; and WHEREAS, the Lower Elwha Klallam Tribe's Reservation is located just west of Port Angeles at the mouth of the Elwha River. the Tribe has regularly exercised its treaty fishing rights in Port Angeles Harbor. and the Tribe's membership includes Klallam Indians born on Ediz Hook and /or descended from the tribal villages located on Pori Angeles Harbor, including the village of Y'innis along Ennis Creek that overlaps the Area of Potential Effects "APE for this undertaking, illustrated in Attachment A hereto: and WHEREAS, consistent with the PA, Ecology has contacted potentially interested tribes consisting of the Lower Elwha Klallam Tribe, Jamestown S'Klallam Tribe, Port Gamble S'Klallam Tribe, Skokomish Indian Tribe. Makah Tribe. Puyallup Tribe of Indians, Confederated Tribes and Bands of the Yakama Nation and has consulted with the City, the Department of Archaeology and Historic Preservation (DARN). and interested tribes regarding NHPA Section 106 requirements; and WHEREAS. Ecology requested EPA participation as part of the NHPA Section 106 process to address any discoveries of cultural resources during the Undertaking; and WHEREAS, the EPA initiated consultation under NHPA Section 106 with Jamestown S'Klallam Trihe, Lower Elwha Klallam Tribe. Port Gamble S Klallam Tribe. Skokomish Indian Trihe, Makah Trihe. Puyallup Tribe of Indians. and Confederated Tribes and Bands of the Yakama Nation; and WHEREAS, the EPA received responses from three Tribes, in which the Lower Elwha Klallam Tribe stated its intention to participate, the Port Gamble S'Klallam Tribe deferred to the Lower Elwha Klallam Trihe for comments and participation for now and reserved their right to engage at a later date if significant cultural resources are inadvertently discovered, stating that the project is within its usual and accustomed fishing area, and the Skokomish Indian Tribe declined to participate; and WHEREAS. Ecology, in consultation with the City, DAHP and interested tribes, has determined that the Undertaking has the potential to cause adverse effects on historic properties and EPA concurs: and 2 1 -10 WHEREAS. Ecology, in consultation with the City. DAHP and interested tribes. has determined that the APE for this Undertaking is briefly defined as: a 30 foot wide corridor centered on the CSO Project centerline extending east from Front and Oak Streets along Railroad Avenue and following the Olympic Discovery Trail to Ennis Creek., after the creek crossing the APE tums to the south and expands to a 60 foot wide corridor to and out of the existing wastewater treatment plant (WWTP), to and out of an existing 4 9 million gallon tank, and ultimately connecting to the existing Rayonier industrial outfall (see Attachment A); and WHEREAS. Ecology, in consultation with the City, DAHP, and interested tribes concurs that "historic properties." as defined by 36 C.F.R. 800 16(1)(1) and properties potentially eligible for inclusion in the National Register of Historic Places (NRHP). may be discovered within the APE, and WHEREAS, Ecology has considered the applicable requirements of Washington's Indian Graves and Records Act, Revised Code of Washington (RCW) Ch. 27 44. and Archaeological Resource and Sites Act, RCW Ch. 27.53, and acknowledges, with the concurrence of the other parties, that there is potential for the Undertaking to encounter human remains, associated or unassociated funerary objects or sacred objects, or objects of cultural patrimony within the purview of Washington's Indian Graves and Records Act; and WHEREAS. the City and the Lower Elwha Klallam Tribe previously entered into a cultural resources MOA for the Undertaking (hereinafter referred to as "Port Angeles /Lower Elwha Klallam Tribe MOA ofianuaiy 7, 2010"): and WHEREAS. the City of Port Angeles completed pre- construction archaeological sampling in the area of the Undertaking where the city believes there is the highest probability for finding cultural resources, and no eligible historic properties were observed during sampling; and WHEREAS, the tribal village and archaeological sites (Site Numbers 45CA468 and 45CA523) on Port Angeles Harbor. including portions of the APE for this Undertaking, are of profound religious and cultural significance to the Lower Elwha Klallam Tribe and possibly other Tribes: and WHEREAS, the Parties to this Agreement include the following. the Washington State Department of Ecology, the City of Port Angeles, the Lower Elwha Klallam Tribe, the Washington Department of Archaeology and Historic Preservation, and the EPA. NOW THEREFORE, in order to satisfy the EPA's NHPA Section 106 responsibilities to take into account the effects of the Undertaking on historic properties, the Signatories identified above agree that the Undertaking shall be implemented in accordance with the following stipulations: 3 STIPULATIONS: The EPA. in cooperation with Ecology and the City. shall ensure that the following stipulations are met in the event that the EPA authorizes Ecologys intended use of the CWSRF Federal funding for the Undertaking: L TERMINATION OF PORT ANGELES /LOWER ELWHA KLALLAM TRIBE MOA. The City of Port Angeles and Lower Elwha Klallam Tribe agree that the Port Angeles /Lower Elwha Klallam MOA ofJanuary 7. 2010, shall be superseded and replaced when the present MOA becomes effective. and this MOA shall control compliance with the NHPA for the Undertaking. II. AUTHORIZATION TO PROCEED WITH UNDERTAKING. Execution of this MOA constitutes authorization to the City to proceed with the Undertaking and implement the Archaeological Work Plan (AWP). This authorization is solely for purposes of compliance with the NHPA and does not constitute any authorization for approvals that may be required under other state and federal statutes. 111. ARCHAEOLOGICAL WORK PLAN. A. The Parties approve, adopt and ratify the attached AWP (Attachment B). Its terms and provisions shall govern and control the process, procedures, and methods for conducting ground disturbances associated with the Undertaking and for handling cultural resources and any human remains discovered in the B If the City determines that material changes have been made to the construction plans and that. because of these changes, the AWP may need to be modified, the City shall develop the necessary modifications to the AWP and submit these proposed modifications to Ecology. who will notify the Parties and the interested parties. The Parties shall have ten working days to review the revised AWP and respond to Ecology and the City with questions and concerns. Ecology shall have ten working days to review and approve the revised AWP, unless a longer period (not more than 30 days) is agreed to by all the signatories. Ecology shall notify the Parties of its approval and shall enclose the approved revised AWP The revised AWP will replace the AWP currently included as Attachment B to this MOA, and shall he subject to all of the stipulations contained herein. C. If the City determines that the changes to the construction plans do not necessitate modifications to the AWP, the City shall notify Ecology Ecology in turn shall notify the Parties in writing that review under this Stipulation has been completed. IV MONITORING AND REPORTING A. The City shall notify Ecology ten days prior to the date when the project construction starts. Ecology in turn shall notify the Parties. In addition, Ecology may notify other persons and entities who have requested such notification. and shall inform the Parties of 4 1 -12 any such persons or entities who have requested and received such notification from Ecology Notifications under this paragraph may occur by email. B The City shall provide monthly interim reports to Ecology Ecology will in turn provide the interim reports to the Parties. If other persons or entities request copies of any interim report, Ecology shall notify the Parties of such request and afford a reasonable opportunity for any Party to object to the release of such report based on the application of specific exemptions from release found in the Public Records Act (RCW 42.56) or other state or federal law If a Party objects to the release of such report where no exemption applies. the Party may seek an injunction preventing release as provided by RCW 42.56.540. Reports and notifications under this paragraph may be provided by email. C. By January 31 of each year until the Signatories determine in writing that the project is complete or the MOA is terminated, the City shall prepare and provide an annual report to Ecology addressing the following topics: 1 Progress in constructing the CSO Project: 2. Progress on archaeological measures; 3 Any problems or unexpected issues encountered during the year and 4 Any changes that the City believes should be made in implementation of this agreement. Ecology will provide the annual report to the Parties. The Parties shall review the annual report.and provide comments to Ecology. who shallprovide them to the.City D Following completion of the Undertaking as defined in Stipulation V below, or Termination as defined in Stipulation VIII below, the City shall provide to Ecology, who will distribute to all Parties, a final summary report detailing work undertaken pursuant to its terms, including pursuant to the AWP V. DURATION OF AGREEMENT This Agreement will continue in full force and effect until the Signatories accept a final summary report for the project or the MOA is terminated in accordance with Stipulation VIII. At any time in the three -month period prior to such occurrence, any Party to this MOA may request the Signatories to consider an extension or modification of this MOA. No extension or modification will be effective unless all Signatories have agreed with it in writing. VI. DISPUTE RESOLUTION Any Signatory may request that the EPA assist the Parties in resolving any dispute related to this MOA. In the event that a Signatory makes such a request, the EPA will assist the Parties in resolving the dispute through a process of informal negotiations. If informal negotiations do not successfully result in resolution of the dispute within thirty (30) days of the date the request was made to the EPA, the EPA shall take the following steps. 5 1 -13 A. The EPA shall forward all documentation relevant to the dispute. including the EPA s proposed resolution. to the ACHP The ACHP will have the opportunity to provide the EPA with its comments on the resolution of the dispute within 30 days of receiving adequate documentation. The EPA shall make a decision on the dispute within ten working days after receiving comments from ACHP B The EPA's final decision on the dispute will be in writing and will include a written response that takes into account any timely comments regarding the dispute from the ACHP and the signatories, and the EPA shall provide a copy of this written response to all signatories and the ACHP C The EPA will then proceed according to its final decision. D Should the ACHP not provide its comments regarding the dispute within the 30 -day period, the EPA may make a final decision on the dispute and proceed accordingly The EPA's final decision on the dispute will be in writing and include a written response that takes into account any tiniely comments regarding the dispute from the Signatories. and the EPA shall provide a copy of such written response to all Signatories and the ACHP E, At any time during implementation of the stipulations contained in this Agreement, should an objection pertaining to this MOA be raised by a member of the public, the EPA shall notify the Parties and take the objection into account, consulting with any of the Parties to resolve the objection, if the.EPA decides that such consultation is appropriate. F During the pendency of any dispute. the responsibilities of each signatory to carry out all other actions pursuant to the terms of this MOA that are not the subject of the dispute shall remain unchanged. VII. AMENDMENTS A. Any Signatory may request that the MOA be amended, whereupon the Signatories will consult in accordance with 36 C.F.R. 800.61c)(7) to consider such amendment. B. This MOA may be amended when such an amendment is agreed to in writing by all Signatories. The amendment will be effective on the date a copy signed by all Signatories. EPA will file the amended MOA with the ACHP, with copies to all Signatories. VIII. TERMINATION A. If any Signatory believes or concludes that the terms of this MOA will not or cannot be carried out. the Parties shall pursue the Dispute Resolution process set out in the Section VI above with respect to the claim that the terms of the MOA will not or cannot be carried out, or that Signatory shall promptly consult with the other Signatories to attempt to develop an amendment per Stipulation VII above. if within 30 days the Signatories cannot reach agreement on an amendment, any Signatory may terminate the MOA upon 30 days' written notification to the other Signatories. If at the conclusion of 6 1 -14 the Dispute Resolution process a Signatory determines that the terms of the MOA will not or cannot be can out, the MOA shall be terminated. B Termination shall include the submission of a technical report and /or other documentation by the City to the Parties on work done up to and including the date of termination. as set forth in Stipulation IV Section D and the AWP C. Once the MOA is terminated, the EPA must either (a) execute an MOA pursuant to 36 C.F.R. 800.6. or (b) request, take into account, and respond to the comments of the ACHP under 36 C.F.R. 800 7(c)( 4). The EPA shall notify the Parties as to the course of action it will pursue. Prior to EPA s decision or after the City may request and EPA may authorize the City to proceed with the Undertaking if the City can demonstrate compliance with 36 CFR §800.4 IX. EXPIRATION. If the City has not commenced the Undertaking by January 31, 2017, this Agreement shall be considered null and vdid. lti such event the City shall so notify the Parties and if it chooses to continue with the Undertaking. shall re- initiate review of the Undertaking. X. ANTI DEFICIENCY ACT This MOA is neither a fiscal nor a funds obligation.document of the EPA. Any funding to be provided by the EPA will be done pursuant to a separate funding agreement. XI. SCOPE OF AGREEMENT A. This MOA is limited to the instant Undertaking and is entered into solely for that purpose. B. This MOA is neither intended nor shall he construed to diminish or affect in any way the right of the Lower Elwha Klallam Tribe to take any lawful action to protect Native American graves from disturbance or desecration. to protect archaeological sites from damage, or to protect the Lower Elwha Klallam Tribe's rights under cemetery and Native American graves protection laws or other applicable laws. C This MOA in no way restricts any Party from participating in any activity with other public or private agencies, organizations, or individuals, except as provided for in the AWP This MOA will he subject to, and will be carried out in compliance with, all applicable laws, regulations, and other legal requirements. D This MOA does not create any right or benefit, substantive or procedural, enforceable by law or equity. by or against persons or entities who are not a party to this MOA, against the DAHP. Ecology. the City, Lower Elwha Klallam Tribe, or the EPA, or their officers. agents, or employees. This MOA does not waive the sovereign immunity of any Party 7 1 -15 E. If, following execution of this MOA, Ecology decides not to offer financial assistance from the CWSRF to Port Angeles for the Undertaking that is the subject of this MOA, this MOA will automatically become null and void. F This Agreement shall not be interpreted as limiting, superseding, or otherwise affecting the EPA's normal operations or decisions in carrying out its statutory or regulatory duties. XII. PRINCIPAL CONTACTS The principal contacts for this MOA are as follows: Port Angeles (City of): Signatory Mayor City of Port Angeles, WA 321 E. 5th Street Port Angeles, WA 98362 @cityofpa.com with a.copy to Kent Myers, City Manager City of Port Angeles, WA 321 E. 5th Street Port Angeles, WA 98362 kmyers @cityofpa.us Party Representative: Derek S. Beery, City Archaeologist City of Port Angeles, WA 321 E. 5th Street Port Angeles, WA 98362 dbeery@cityofpa.us Lower Elwha Klallam Tribe: Signatory• The Honorable Frances Charles, Chairwoman Tribal Council Lower Elwha Klallam Tribe 2851 Lower Elwha Road Port Angeles, Washington 98363 frances.charlesZ.elwha.nsn.us Party Representative: 8 1 -16 Ecology: DAHP: Bill White, Tribal Archaeologist Tribal Council Lower Elwha Klallam Tribe 2851 Lower Elwha Road Port Angeles, Washington 98363 bill.white @elwha.nsn.us Signatory Mr. Kelly Susewind, Program Manager Water Quality Program Washington Department of Ecology P.O Box 47600 Olympia, Washington 98504 -7600 kelly.susewindnecy.wa.gov Party Representative: Alice Rubin, Environmental Review Coordinator Water Quality Program Washington Department of Ecology P 0 Box 47600 Olympia, Washington 98504 -7600 alice.rubin @ecy wa.gov Signatory. Dr Allyson Brooks, State Historic Preservation Officer Washington Department of Archaeology Historic Preservation 1063 S. Capitol Way, Suite 106 PO Box 48343 Olympia. W A 98504 -8343 aliyson.brooks@dahp.wa.gov Party Representative: Rob Whitlam, State Archaeologist Washington Department of Archaeology Historic Preservation 1063 S. Capitol Way, Suite 106 PO Box 48343 Olympia, WA 98504 -8343 rob.whitlam @dahp.wa.gov EPA: Signatory• Michael A. Bussell, Director 9 1 -17 Office of Water and Watersheds Environmental Protection Agency Region 10 1200 Sixth Avenue, Suite 900, OWW-137 Seattle, WA 98101 -3123 bussell.mike@epa.gov Party Representative: David Carcia, WA CWSRF Project Officer Office of Water and Watersheds Environmental Protection Agency 1200 Sixth Avenue, Suite 900, OWW-137 Seattle, WA 98101 -3123 care ia.dav id r&epa.gov All notifications required pursuant to this MOA shall be made to the principal contacts in this Stipulation. XII. EXECUTION OF AGREEMENT A. This Agreement may be executed in counterparts, with a separate page for each signatory The EPA will ensure that each Party is provided with a copy of the fully executed MOA. The EPA will file the MOA with the ACHP B. Execution of this MOA by the EPA and the.SHPO and its submission to the ACHP in accordance with 36 C.F.R. 800.6(b)(I)(iv), will, pursuant to 36 C.F.R. 800 6(c), be considered to be an agreement pursuant to the regulations issued by the ACHP for the purposes of Section 110(1) of the NHPA. 16 U.S C. 470h -2(I Execution, submission, and implementation of the terms of this MOA demonstrate that the EPA has afforded the ACHP an opportunity to comment on the proposed Undertaking and its effect on historic properties and that the EPA has taken into account the effect of the Undertaking on historic properties in accordance with Section 106 of the Nl -[PA. 16 U.S.C. 470(F). C. This Agreement shall be effective on the date of the latest signature below 10 1 -18 SIGNATORIES: Each undersigned official certifies that he or she is fully authorized to enter into the terms and conditions of this MOA and to execute and legally bind the Party he or she represents to this document. THE LOWER ELWHA KLALLAM TRIBE By Date: The Honorable Frances Charles, Chairwoman THE CITY OF PORT ANGELES By Date: Mayor THE WASHINGTON DEPARTMENT OF ECOLOGY Bv• Date: Kelly Suswind, Program Manager Water Quality Program UNITED STATES ENVIRONMENTAL PROTECTION AGENCY By Date Michael A. Bussell, Director Office of Water and Watersheds THE WASHINGTON STATE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION By Date. Dr Allyson Brooks, State Historic Preservation Officer 11 1 -19 4: CSO Projected Path :7W Phave (oat FM' of ludo oar.np =1 se 3 iv v: Fad 01 tothrftiO"og! [xi/ 4-.1 Ri3vmet Gale ciO N vv. '4 Outfaill Intertie "4, 7',.; Francis 4 l' Street Park 7. i",. i' 4 1 v fr"., c 1 ;4 4 7. 3 t i s e... 4.. 4.9 volition v ft, 2 t ir r e ,e, -1 4' gallon tank "I fa ‘e" ft 'is ',a. C, a 1 a‘.. an, a"ct, ...:t ji,...;r "tt 4.: 'I a 3, a ot a• r •.'-ijo.''`-:: 73:, 4 4 f,pi "4 s 4,. 43 7; it 4 ,Ir 17,1:1/..:/"Hil 1;:i4s-r:j:14:45'"14 y Attachment A Maps of the Area of Potential Effects 1 3 12 I 20 Attachment B Archaeological Work Plan 13 I -21 Archaeological Cla llarn County, Washington City of Port Angeles, Washington 321 E. Fifth Street Port Angeles, WA 98362 Derek S. Beery, City of Port Angeles Archaeologist 12/13/2011 1 Work Plan Combined Sewer Overflow (CSO) Project, Phase 1 1-22 City of Port Angeles, WA CSO Archaeological Work Plan Table of Contents Introduction .1 CSO Project .8 Previous Investigations and Potential for Discovery .10 Archaeological Procedures .7 Briefing 14 Qualifications 15 Review ofFinal Construction Plans Archaeological Monitoring .16 Work Stoppage 18 Human Remains .19 Inadvertent Collection 20 Confidentiality .20 Reporting .21 Schedule .22 References Cited ,23 APPENDIX A. Contact List 24 Page I -23 City of Port Angeles, WA CSO Archaeological Work Plan List of Figures Figure 1. CSO Phase 1 Project Location on USGS 7.5 min Port Angeles, WA Quadrangle .2 Figure 2. CSO Phase 1 Project Design Plan and Profile (Rayonier and WWTP structures) .3 Figure 3 Generalized CSO Phase 1 Project APE Overview on 2006 Orthophoto 4 Figure 4. CSO Phase 1 Project APE detail for Ravorner and WWTP structures .5 Figure 5 CSO Phase 1 Project APE and recorded historical properties .7 Figure 6. High probabiliy area of the CSO and archaeological sampling locations. .11 Page 1ii I -24 City of Port Angeles, WA CSO Archaeological Work Plan Introduction The City of Port Angeles (City) is proceeding with a Combined Sewer Overflow project (CSO) in Clallam County, WA. Phase 1 of the CSO project, the current Undertaking, is proposed to begin at the intersection of Oak and Front streets in downtown Port Angeles and proceed north one block and then continue east within the existing 48" diameter Industrial Water Line (IWL) beneath the Olympic Discovery Trail (ODT) (Figure 1). At Francis Street Park a secondary line will stretch from the top of the bluff to the ODT in a trench and parallel the IWL within the ODT to the east. Once the IWL reaches the former Rayonier Mill the lines exit the existing pipeline and will be buried or covered by a berm into and out of the existing wastewater treatment plant (WWTP), into and out of an existing 4.9 million gallon tank, and ultimately connect to the existing Rayonier industrial outfall (Figure 2). A new light vehicle bridge over Ennis Creek will be necessary to convey the pipelines (see Figure 2). The Area of Potential Effect (APE) for'' the'Underfakiiig is briefly defined-as a 30 foot wide corridor centered' on the CSO Project centerline extending north then east from Oak and Front streets and along Railroad Avenue and the ODT to Ennis Creek after which it turns south to the WWTP (Figures 3 and 4). At the turn to the south the APE expands to a 60 foot wide corridor continuing to the WWTP to accommodate an increase in the number of pipes in the common trench and two diversion structures (See Figure 4). The CSO Project will be partially funded by a Clean Water State Revolving Fund (CWSRF) loan from the Washington Department of Ecology (Ecology). The Environmental Protection Agency (EPA) has determined that projects offered Federal assistance through the Washington CWSRF are undertakings subject to review under Section 106 of the National Historic Preservation Act (NHPA), 16 U.S.0 470f, (Section 106) and its implementing regulations at 36 Code of Federal Regulations (C.F.R.) Part 800. As such, the CSO Project is subject to Section 106 of the NHPA. NHPA requires that federal agencies identify and assess the effects of an undertaking on historic properties. Historic properties are those that are listed, or are eligible for listing on the National Register of Historic Places (NRHP) and may include buildings or other structures, archaeological sites, and traditional cultural properties. Eligible properties generally must be at least 50 years old, possess integrity of physical characteristics, and meet at least one of four criteria of significance (36 CFR 60.4). This Archaeological Work Plan (AWP) is necessary for NHPA compliance for the CSO Project because of the proximity of the Undertaking to recorded archaeological sites and the potential for new archaeological discoveries in areas of high probability for archaeological resources where archaeological sampling has not cleared the full extent of the APE. Page 11 25 c ti N (p N 13 4 44 g c s 4 "9. 5 g %Ss 9 14l If 6 1 I s -__.,t 1, I ‘1‘ i er- r t i,!..„ ts ..4.n 1 .4 0 m 3 114rt; r g., ‘0„ ,c--, a z i -1 ‘l4 s p 0 0 to ri E E -3_ 44=7, i 4 44 4 i" I I :4? a 5 ;115 I g ft, 7' r 4-- A--- I OS_ 1 a 4' V6\ J City of Port Angeles, WA CSO Projected Path C5'J he 1 t icor n21 part of uri. ruohny 'l. t3 2 ,n.lt p1 rtt vevial,v4411 ;vivvv Oco.o (MI AI afet !et: N CSOArchneological Work Plan -kicrancis r ,t•— --t t 1 "'•{5trect Park i i\ •14 2 i ,,i i. 4 t4 4- 4 4 s t i ts S i ■s n .2. 9. „Sy it e 4S,„ C'S 14: gatton tan if -.4—(2 14.9 minion g ,„,7,.,,I• 3. 4 WI f' '1 'v f v v, v v. P... vif v ..".t:sr::;;,1(v, :44.2-:54:4:;ii 44 1% vv., 1 "P "n;^ 1 I f 1— .s.,, t i: .4 :g. 42 r. S f4Is 4,,,,,,, ;"C-i.,, e 41 s i i v-v „ec 0 ‘),F 4,,,, +7 rdnil qproject 1- t? -4 4 4- 4 4 4 *-2 4 ..t. t, t .Inta 2 1 4. i .r "4:' ctl 1 r ft? .1„ Cy '1* V y vS,vv C:vi T l L. e 1 0 4 ^-42 7 ti,4 4 Figure 3. General CSO Phase 1 APE Overview on 2006 Orthophoto Page 4 28 City of Port Angeles, WA CSO Archaeological Work Plan `,10 .15 deep 30,ft cattle APE: 1 1 F �;Ta`nk oam 0 5 -'10 ft Deep 1 30ft Wide APE; 1 !Budge "Site 1 5 ft Deep P I:60 it Wide APE except atbridge abutments (pilings up to 40 ft deep) F SS 10- '.15LLftDeep Op ft,Wide APE 1 nt:- :,10 2D -ft Deep h r S U U Ciu re y ',`�e6Qft -1P: 1 s ff Deep; 3D if-Wide APE f A 5 -10ft Deep '30 ft Wide APE .Pump Station 5,ft to,10 ft deep„ Tank' Influent Diversimi< st(d tw '5 ft to-15 ftdeep 1 1 -I -0 ft Deep: 1 3 0.1k,Wide A' E' ®1 5 9 valv?t'ault 10 :15 ft Deep f i 30 ft Wide APE 1 1 sni Figure4. CSO Phase 1 Project APE detail for Rayonier and WWTP structures Page 15 I -29 City of Port Angeles, WA CSO Archaeological Work Plan The CSO Project will follow the former Milwaukee, St Paul, and Pacific/ Seattle and North Coast Railroad grade (45CA458) and cross near the Hollywood Beach ethnographic site (45CA235). The project corridor follows the former railroad, now the ODT, either within a new open trench or slip -lined within the IWL from the corner of Oak and Railroad east to the edge of the Rayonier property (Figure 5). Through this area, the railroad does not retain structural integrity and is not considered contributing to the potential NRHP eligibility of the site in other areas of Clallam County The IWL is not eligible for the NRHP and the placement of the CSO force mains within the IWL will not affect the potentially eligible Hollywood Beach ethnographic site. Once the project exits the IWL at the western edge of the Rayonier property, the CSO runs about 150 feet east of previously recorded site 45CA468 and through (although above the original elevations) the Puget Sound Cooperative Colony site (45CA236h) (see Figure 5). The CSO APE does not appear to adversely affect sites that currently meet the criteria for National Register of Historic Places (NRHP) inclusion. To date, ground surface inventory, archaeological sampling of higher probability areas, and archaeological monitoring of the geotechnical and utility locate projects for the CSO Project have not resulted in the observance of significant or intact pre- contact or historical archaeological features, artifacts, or deposits associated either with 45CA236h or 45CA468 within the APE. Regardless, there remains some possibility that construction of the CSO may encounter archaeological evidence during ground disturbing actions where archaeological sampling has not taken place- necessitating the preparation this AWP The City, Washington State Department of Archaeology and Historic Preservation (DAHP), Lower Elwha Klallam Tribe (LEKT), EPA, and Ecology (the MOA Parties) agreed that archaeological monitoring would be part of the City's effort to arrive at a conclusion of "no adverse effect to NRHP eligible historic resources" for the Undertaking Ecology staff in the Water Quality Program serves as the primary contact for the cultural resources compliance process for the CSO Project since they are acting as the project permitting and funding lead delegated on behalf of the EPA Region 10 for NHPA Section 106 compliance. EPA must, however, direct the tribal consultation process for the CSO Project. The LEKT is the primary tribal contact for the project as designated in the MOA. Other tribes consulted by EPA for the Undertaking included the Jamestown S'Klallam Tribe, Port Gamble S'Klallam Tribe, Skokomish Tribal Nation, Makah Tribe, Puyallup Tribe of Indians, and Confederated Tribes and Bands of the Yakama Nation. Page 16 30 m City of Port Angeles, WA CSO Archaeological Work Plan CSO Project The CSO Project is located in northwest Washington in Sections 2, 3, and 11 of Township 30 North, Range 6 West, in Port Angeles, Ciallam County (see Figure 1). The CSO project includes installation of large sewer mains, added storage, capacity improvements to the City's existing wastewater treatment plant system, and a new light vehicle bridge over Ennis Creek. The project also involves placing an abandoned industrial outfall into service as the primary outfall from the WWTP The APE, for the purpose of this NHPA Section 106 compliance process, is a 30 foot wide corridor centered on the CSO Pro }ect centerline extending north one block from Oak and Front streets then turning east along Railroad Avenue and the ODT to Ennis Creek after which it turns south to the WWTP (sees Figures 3 and 4). There it expands to a 60 foot wide APE past the existing 4.9 million gallon tank and into the WWTP (see Figures 3 and 4). One additional area of APE, the Outfall Intertie, is present near the Ennis Creek estuary to connect nvo existing large pipes for use of the Rayonier industrial outfall (see Figure 4). In general, pipelines will be placed within the,existing IWL corridor until it terminates at the Rayonier Property Then it will be constructed within new trenches. Engineers working with the City Archaeologist have minimized trench depths in an attempt to remain in previously disturbed or fill soils when possible. An earlier effort to engineer the project without ground disturbances in all areas of archaeological sensitivity was unsuccessful but did serve to reduce disturbance in higher probability areas. CSO Project construction will require a variable degree of ground disturbance at the former Ravonier Mill including areas where pipes will be buried up to 20 feet deep and others where the piping will be laid above existing ground surfaces in order to meet required grade elevations (see Figure 2). Near Ennis Creek force main trenches average three to six feet deep. The gravity pipes on the upper (lower probability) elevations are deeper; up to 15 feet deep near the WWTP The approximately 85 foot long connection of the industrial outfall intertie will also be deep, again 14 to 15 feet, to connect the two existing lines already buried at that depth to bypass the existing foam tank. City consultations with the LEKT have identified the intertie component not only as a high probability area for archaeology but also as a high priority component of the project for the environmental health of the harbor. The LEKT have agreed that the potential for archaeology is outweighed by the ecological benefits provided by the incorporation of the Industrial Outfall component. Pagel 8 32 City of Port Angeles, WA CSO Archaeological Work Plan The CSO Project includes the following Phase 1 improvements: 1) Three new force mains connecting to the existing force mains at Front and Oak streets to be laid over the existing IWL from the intersection of Front and Oak to the intersection of Oak and Railroad one block north. 2) Three new force mains, slip -lined within the IWL (two 14 inch diameter and one 30 inch diameter) from Oak Street to the Rayonier property Between downtown and the Rayonier site, six pits will be needed in order to pull new pipelines through an abandoned 48" diameter concrete cylinder pipe (the IWL). 3) Two new force mains, 24- inches and 36- inches in diameter extending from the edge of the Rayonier property to the Wastewater Treatment Plant (WVVTP), 4) Gravity wastewater pipeline (36 inches in diameter) from Francis Street Park to the WWTP trenched within the ODT parallel to the IWL. 5) A new 100 foot long bridge to carry the three wastewater mains over Ennis Creek. The bridge will also be used for the ODT, and in the future it may carry traffic loads, depending on future uses of the Rayonier site. 6) No work is planned within Ennis Creek itself except the removal of an abandoned creosoted- timber railroad bridge (non contributing component of 4SCA45S): The new bridge span is enough to enable future stream restoration projects'by others. 7) A new influent diversion structure, located west of the headworks of the W WTP just inside the boundary of the Rayonier site, to pump flows in excess of treatment plant capacity to the storage tank. 8) Pipelines to and from the storage tank, a return pump station, and associated components. 9) Modifications to the 4.9 million gallon storage tank that includes a stair tower requiring its own foundation excavation. Other improvements include demolition of pipes inside the tank, new coatings inside and outside, and a system for cleaning the tank. 10) New 36 inch diameter emergency overflow pipe from the storage tank. 11) Internal WWTP improvements (chlorine contact tank, headworks, trickling filter) within the footprint of the existing plant. 12) Effluent diversion structure with weir system to route most flows to the industrial outfall and utilize the City outfall under high flow, high tide conditions and a separate, 36 inch diameter gravity outfall pipeline from the effluent diversion structure to a connection with existing industrial piping. 13) Retrofit of abandoned 42 inch diameter Rayonier piping to a location in the vicinity of an existing vault and tank, where a connection will be made to the 48 inch diameter industrial ourfall Pagel9 f -33 City of Port Angeles, WA CSO Archaeological Work Plan 14) Outfall Intertie connection to 48 inch industrial outfall requires an 85 foot long trench about 15 feet deep. 15) Minor repairs and maintenance of the 48 inch industrial outfall (from within the Strait). The IWL with three internally slip -lined force mains; the western 1,700 linear feet of the gravity pipeline from Francis Street, and the improvements inside the WWTP are located either on City owned or leased property This includes Oak Street, Railroad Avenue, the ODT along the shoreline from Lincoln Street to the western edge of the Ravonier property and the W WTP property The City has also recently purchased 12 acres of the Rayonier property adjoining the WWTP including the 4.9 million gallon tank and obtained pipeline easements and temporary construction easements in order to secure appropriate property rights for the Project. The remainders of CSO Project components are located on Rayonier property where the City has negotiated right of way with ITT Rayonier. Previous Investigations and Potential for Discovery It is well documented that the CSO Project crosses Klallam village 'tnd historical, Euro American industrial/domestic sites (Klallam village ofTtnis, Puget Sound Cooperative Colony; 45GA46S/236h) (see Figure 5). However, no obvious pre- contact or NRHP eligible historical archaeological resource's were observed by the archaeological monitors during earlier CSO Project related, exploratory ground disturbances (Beery 2010) or during archaeological sampling for this CSO Project (Beery 2011a). A few of the previous subsurface exposures have exhibited some shell and animal bone fragments, a few historic artifacts, and dark organic soil layers and isolated fire altered rock; but generally lack any definitive midden -like or other culturally relevant identifiers. Based on occurrences of isolated archaeological information and available background information from previous studies, higher probability areas were defined in the CSO Cultural Resources Assessment Report (Beery 2010:118). Several professional compliance projects have generally failed to identify widespread and intact archaeology and there maybe relatively few areas of the Klallam village (45CA468), or the PSCC site (24CA236h) that remain undisturbed except potentially below the £ill along Ennis Creek and in the vicinity of the historic shoreline. Therefore the highest probability areas are those with observed Holocene beach and alluvial soils along Ennis Creek and near the primary clarifier on the Rayonier Property (Beery 2010 and Shannon and Wilson 2009). As part of the compliance effort the City Archaeologist placed 14 large archaeological sample units along the CSO centerline within these higher probability areas during a July 2011 exploratory effort (Figure 6 and see Beery 2011a and b). Page110 I -34 City of Port Angeles, WA Figure 6. High probability area of the CSO and archaeological sampling locations. CSO Archaeological Work Plan Archaeological Sampling Units Existing Utilities and Outfalls Proposed CSO Trench Extents Creek nch:E Trench F Treiich.G Trench 1 Page 111 I -35 City of Port Angeles, WA CSO Archaeological Work Plan The placement of the archaeological trenches intended to: 1) identify any substantial archaeological sites within the higher probability areas that might be disturbed by CSO Project construction, 2) gain better understanding of soil types within the CSO ground disturbance zone every 80 to 100 feet within the higher probability areas of the APE, and 3) provide buffer areas where the full extent of the CSO ground disturbance zone was cleared to vertical limits and the horizontal width of the proposed CSO Project construction trench every 80 to 100 feet through the higher probability areas ahead of the main construction phase. Based upon the results of the archaeological sampling, the City Archaeologist hypothesized that the project may move forward with confidence that any inadvertent archaeological finds, if encountered .during construction, can.be handled efficiently and confidently with the understanding.thatany finds will not extend more than 80 to 100 feet within the linear CSO APE (Beery 2011a). The archaeological sampling project found that it appears both natural and anthropogenic disturbances associated with an energetic shoreline and the construction of the Foam Tank and associated utilities have impacted the integrity of the historic shoreline at the Outfall Intertie location and there is little likelihood of an intact archaeological discovery there (Beery 2011a: 63 -64). The few historic and potentially pre contact finds associated with main CSO centerline on either side of Ennis Creek do not constitute significant cultural resources in the opinion of the City Archaeologist. Regardless, there remains some likelihood that out -of- context or isolated pre- contact artifacts or historical features and artifacts may be encountered during the CSO construction. The City has planned to monitor all ground disturbances as part of the CSO Project construction along the main centerline and at the Outfall Intertie connection. This decision correlates to several agreements that are withstanding on the former Rayonier Mill property and as a result of the WSDOT Graving Dock lawsuit settlement (see Beery 2010: 14 -15). Previous archaeological investigations, including the archaeological sampling project, did not intend to reduce or remove the stipulation for monitoring but were instead designed to give planners, engineers, permitting agencies and consulting tribes additional information on what to expect during the CSO Project construction and identify any large issues with time for adequate planning Based upon the results of previous archaeological work for the Undertaking, it is not very likely that the City will encounter intact and significant archaeological or historic sites during the ground disturbing work. The likelihood that a large intact site remains beneath the fill at Rayonier is low in areas where the Page 112 36 City of Port Angeles, WA CSO Archaeological Work Plan CSO Project will have ground disturbing impacts. It remains very likely, however, that there will be isolated occurrences of cultural resources, perhaps even human remains, which will need to be handled appropriately during the project. For this reason this AWP is being enacted for the Undertaking. The MOA and this attached AWP devise and implement protocols and guidelines should such occurrences be encountered. Archaeological Procedures Archaeological monitoring and inadvertent discovery protocols were developed through consultation between the MOA Parties (City, EPA, Ecology, DAHP, and LEKT). The policies are consistent with the NHPA, the Archaeological Resources Protection Act (ARPA), Chapter 25.48 Washington Administrative Code, and Chapters 27 44 and 27.53 of the Revised Code of Washington. The AWP also follows protocols established in the LEKT Monitoring and Discovery Plan where consistent with state and federal laws. This AWP also follows the August 14 2006 Settlement Agreement among the State of Washington, Lower Elwha Klallam Tribe, City of Port Angeles, and Port of Port Angeles for construction areas within the City of Port Angeles but excluding the former Rayonier Mill site. The Rayonier property is also subject to an Intergovernmental Agreement, dated March 1999, between the Ecology and the LEKT pertaining to cultural and environmental issues associated with the Rayonier Mill cleanup; and a Cooperative Agreement between Rayonier, Inc. and the LEKT, dated June 1999, also pertaining to cultural and environmental issues associated with the Rayonier Mill cleanup. The City will employ qualified archaeologists to monitor construction- related ground disturbances. The City Archaeologist will serve as the project Principal Archaeologist. The Lower Elwha Klallam Tribal Archaeologist or one or more cultural monitors may also monitor these locations. Typical markers of archaeology usually include such things as discarded shell, fire altered rock, animal bone, lithic debitage, stone tools, heat altered sediment, charcoal, ash, or other organic materials like cordage and fiber, or exotic materials not normally found in the region. Historic materials may also be encountered and typical historic period artifacts, in addition to many of the items discussed in the previous sentence, include items pre dating 1950 A.D such as milled lumber, masonry features, concrete, glass, ceramic, brick, wire, nails or other evidence of historic occupation and industry Newly discovered archaeological sites or components that appear to be significant (eligible for listing on the NRHP) would include resources with intact, stratified deposits or diagnostic artifacts or features that could provide chronological data as well as information about pre contact Native America or important historic activities associated with the Puget Sound Cooperative Colony or early establishment of the mill. Page 113 I -37 City of Port Angeles, WA CSO Archaeological Work Plan Discovery of human remains, either in primary context or disturbed fill, would require additional archaeological and legal measures. Criteria and integrity requirements for listing on the NRHP (36 CFR 60.4) will provide the standards for identification and evaluation of significance for any identified cultural material. If a discovery is made during construction, the EPA/Ecology, in consultation with the State Historic Preservation Officer (SHPO) at DAHP, may assume eligibility for purposes of Section 106 and begin consultation for resolution of adverse effects [36 CFR 800.13 (c)]. If project effects to a significant historic property cannot be avoided, a treatment plan addendum to the MOA will be developed by the City and implemented through consultation with the MOA Parties. The Secretary of the Interior's Standards and Guidelines for Archaeology and Historic Preservation will apply to the treatment plan, including provisions for a research design, documentation, reporting and curation. It is noted as General Policy that NRHP eligible historical resources will be actively protected in place when feasible and that the collection of artifacts by employees, construction personnel, or others with access to the construction zone is strictly prohibited and subject to criminal prosecution. The contractor's construction operators will report any items of archaeological interest encountered during the project to archaeological monitors immediately upon discovery of the items and shall.not continue.with ground disturbing activity until directed by the Principal Archaeologist. Briefing The City will provide training on archaeological monitoring issues to construction personnel at a pre work meeting to ensure that contract personnel understand the duties of the archaeological monitors and will comply with any and all necessary conditions imposed by them. Operators who have not received this training to the satisfaction of the Principal Archaeologist will not be allowed to perform ground disturbing work. The briefings will be conducted by the Principal Archaeologist and the Ciry Project Manager. The briefing will include information about the roles of personnel, the legality of cultural resources compliance, and issues of respect and sensitivity of archaeological issues for modern Native American cultures. The briefing will also focus on the procedures to be followed if an archaeological discovery is made during construction either in the presence of an archaeological monitor or in the event one is not present. Tailgate discussions led by the Principal Archaeologist will also occur throughout the project construction phase to keep monitors and construction personnel up to date on cultural resources issues. Page I 14 I -38 City of Port Angeles, WA CSO Archaeological Work Plan Qualifications All project related ground disturbances will be supervised by the City Archaeologist, acting as the Project Principal Archaeologist who meets the Secretary of the Interior's Professional Qualifications Standards for Archeology (48 FR 44738). At least one City employed or contracted archaeologist is required to be on location during any ground disturbance along the CSO Mainline or the Outfall Intertie. Appointees not meeting the criteria of a professional archaeologist under WAC 27.53.030(8) cannot monitor unsupervised. The LEKT Tribal archaeologist and one or more Cultural Monitors, selected by LEKT for their expertise in tribal cultural practices as related to archaeological and construction activities, may also be present at any time the Archaeological Monitors are present. Cultural Monitors shall have the same access as the Archaeological Monitors and shall advise as to cultural protocols and practices that must be adhered to in the event of discovery of archaeological deposits or human remains. The City has previously agreed to reimburse the LEKT the hourly rate for Cultural Monitors at a ratio of one Cultural Monitor per City employed archaeologist for the duration of the archaeologically monitored ground disturbing components on the Undertaking. Review of Final Construction Plans The current CSO Phase 1 construction plans are 90% design. 100% design is anticipated by March 2012. Final plans cannot be produced without approval from Ecology as part of a Stormwater Management Permit that is currently undergoing public comment and agency review at the time of production of this AWP It is anticipated that small "tweaks" may be required to manage the stormwater runoff in the construction plans but that these will have marginal, if any, effect upon the APE as described previously in the CSO Assessment Report (Beery 2010) The APE has not changed from the 60% design plans and APE changes are not anticipated as the City finalizes the 90% design plan and begins construction of the Undertaking. Prior to construction excavation for any project element, The City Archaeologist will review the final construction plans for that element to determine if construction techniques or maximum depths of construction excavation have changed requiring changes to this AWP In this case the Principal Archaeologist will revise this AWP and notify Ecology of the revision. Ecology will provide the revised AWP to the MOA parties who will then have fourteen (14) working days to review and accept the changes or advise Ecology that further consultation is necessary Once all MOA Parties have accepted a revised AWP it will replace the existing version. Page I15 I -39 City of Port Angeles, WA CSO Archaeological Work Plan Archaeological Monitoring The primary goal of archaeological monitoring will be discovery and documentation of previously unknown items of archaeological interest from the exposed construction trenches within the CSO Project APE. Monitoring procedures are general guidelines that usually include examination of cleared and graded surfaces. These surfaces are sometimes exposed by grading and trenching so that they have greater potential to display previously unexposed pre- contact or historic archaeological materials. The following steps outline what steps will occur to meet the archaeological monitoring requirements for the Undertaking and defines the procedures to follow if pre- contact or significant historic archaeological resources are discovered during project construction: 1. Archaeological Monitors will be responsible for notifying the Principal Archaeologist of any archaeological discoveries. The Principal Archaeologist is then responsible for notifying the City Project Manager, Construction Supervisor and Ecology of any significant historical archaeological find or any Pre- contact or Native American archaeological discovery The attached Chain of Communication (Appendix A) defines one contact for each signatory party to the CSO MOA who shall be contacted by Ecology in the event of a notable discovery Ecology may also notify other interested tribes and parties of archaeological efforts or discoveries as part of their NRHP responsibilities. If the find includes human remains, the Principal Archaeologist will also immediately notify the Clallam County Coroner and the Port Angeles Police as stipulated by State Law (see subsection on Human Remains). 2. Archeological monitoring will focus on ground clearing, grading, and trenching activities. Monitoring will include visual inspection of trench walls, physical inspection of excavated sediments, description and documentation of stratigraphic exposures, and compilation of detailed monitoring notes and reports. The archaeological monitors shall observe ground disturbances from several perspectives during the activities including observation of the sidewalls of the trench excavations and examination of the spoil piles as necessary Archeological monitors will keep detailed field notes on all monitoring related activities. Screening of sediments will be to the discretion of the Principal Archaeologist. 3. Archaeological monitoring will require close communication with the construction contractor. The monitor may enter the excavation area and examine the sidewalls and surfaces more closely if any signs of cultural resources are observed. In limited cases the Page 1 16 I 40 City of Port Angeles, WA CSO Archaeological Work Plan 4 Archaeological monitors will have the authority to temporarily halt construction while examining possible discoveries and will immediately notify the Principal Archaeologist in the case of a work stoppage of longer than 30 minutes. If the Principal Archaeologist determines the find, or portions thereof, require supplemental investigations and the discovery may result in a longer delay, he will inform the Construction Superintendent and City Project Manager immediately The Construction Superintendent will halt Contractor activity in an area defined by the Principal Archaeologist to ensure the integrity of the find is not compromised (though construction activities may continue elsewhere in the project area). It will be the duty of the Principal Archaeologist to notify Ecology and confirm the work stoppage area. 5 If cultural materials that are not isolated finds are confirmed by the Principal Archaeologist or Archaeological Monitor additional identification and evaluation may be required. For the purposes of this project a site is.defined as two or more archaeological objects (artifacts or features) found on the same landform and within reasonable proximity to each other. An isolate is defined as any single artifact or single object broken into multiple pieces (such as a glass jar broken into multiple fragments). Any features such as fire hearths or other domestic features, refuse dumps /midden, concentrations of more than five prehistoric artifacts, or ten or more historic artifacts will require further investigation. If such finds are encountered supplemental investigations may be conducted to determine the significance of the archaeological resource. 6. Archaeological monitors will ensure the proper documentation and assessment of any items of archaeological interest that are encountered during the undertaking (i) archaeologist may request that equipment operators modify their procedures to expose subsurface stratigraphy in thin lifts in an effort to identify additional archaeological evidence. Archaeological monitors will always place safety first during monitoring activities. All archaeological materials discovered during the project will be recorded by an archaeological monitor in field notebooks for later transfer to the DAHP site form format. (ii) Site overviews, features, and artifacts will be digitally photographed as applicable. Page 117 I -41 City of Port Angeles, WA CSO Archaeological Work Plan (iii) Artifacts and archaeological samples will not be collected unless specified as a condition in a treatment plan or other addendum to this AWP (and the 1\4OA) or after Ecology provides notice to the MOA parties that additional documentation and analyses are required to make a determination of NRHP eligibility for the discovery (iv) Stratigraphic profiles and soil descriptions will be prepared for soil exposures when appropriate. (v) Discovery locations will be documented on scale plans and site maps. (vi) Features and objects identified by the monitors as requiring recordation will be plotted using professional grade GPS. 7 Ih the event of newly discovered 'cultural material the Archaeological Monitor will notify the Principal Archaeologist of the find. The Principal Archaeologist will ensure that the Construction Supervisor, City Project Manager, and Ecology are notified of the discovery within one (1) day The Principal Archaeologist will assemble all documentation produced by the archaeological monitors and compose a preliminary assessment of significance. If a discovery is made during construction, the EPA, Ecology, the City, DAHP and LEKT may assume eligibility for purposes of Section 106 and begin consultation for resolution of adverse effects. (i) Any samples or artifacts collected during such documentation and analysis will be held in secure storage until such a time as they can be conveyed to a repository that meets federal standards or returned to their original location. The LEKT may provide this service. (ii) The City /and or ITT Rayonier have previously agreed (ITT Rayonier through other existing legal agreements) to donate to the LEKT any artifact discovered that the LEKT Tribal Archaeologist determines is of significance to the Tribe. Work Stoppage In the event of a longer -term greater than one day) work stoppage the Principal Archaeologist will work with the City Project Manager and Construction Superintendent to secure and buffer the area of the find with fencing, barricades, or by other means to ensure protection of the find during the process of notification or for additional archaeological recording and /or recovery There is not a set time limit for work stoppage in the buffer zone. Resumption of work in the area of the discovery will be consistent with Page 18 I 42 City of Port Angeles, WA CSO Archaeological titlark Plan the results of consultation between the NIOA signatory parties. A treatment plan may be necessary to direct a course of action in the event that a significant historical resource cannot be avoided during construction. In the event of a work stoppage the following steps will be taken: 1) Ecology shall ensure that the MOA Parties are contacted within one (1) working day 2) Ecology, working with the City Project Manager and Principal Archaeologist, shall arrange for all MOA Parties who so chose to conduct a joint viewing of the discovery within forty -eight (48) hours of the notification; or at the earliest feasible time thereafter. 3) EPA will consult with the MOA Parties regarding adverse effect resolution. Resumption of the work in the area of the discovery will be consistent with the results of the consultation. 4) If consultation results in the conclusion that the project effects to an historic property cannot be avoided, the MOA Parties (EPA, Ecology, DAHP, LEKT, and the City) will work together to develop a treatment plan that applies the guidelines found in the Secretary of the Interior's Guidelines for Archeology and Historic Preservation. This will include provisions for research design, documentation, reporting and curation. Particular measures will depend upon the development of research questions and design of excavation strategies that are required to address such questions. The City will prepare such plan and submit it to Ecology within five (5) working days of identification. The MOA parties will have a maximum of seven days (7) to review and comment. If comments are not received then concurrence will be presumed and the treatment plan will be immediately implemented. Human Remains If construction activity unearths human remains, including intact burials or isolated human teeth or bones, or other mortuary items; then all activity must cease that may cause further disturbance to those remains and the area of the find must be secured and protected from further disturbance (see subsection on Work Stoppage). The finding of human skeletal remains must be reported to the Clallam County Coroner and the Port Angeles Police Department in the most expeditious manner possible. The remains should not be touched, moved, or further disturbed. The Coroner will assume jurisdiction over the human skeletal remains and make a determination of whether those remains are forensic or non forensic /archaeological. If the Coroner determines the remains are non forensic, then they will report that finding to DAHP who will then take jurisdiction over the remains. The State Physical Anthropologist will make a determination of whether the remains are Indian or Non Indian and report that finding to any appropriate cemeteries and the affected tribes. DAHP will then handle all Page I 19 I -43 City of Port Angeles, WA CSO Archaeological Work Plan consultation with the affected parties as to the future preservation, excavation, and disposition of the remains. The Principal Archaeologist shall make the notification of human remains to the Clallam County Coroner and the Port Angeles Police Department. Concurrent with this notification the Principal Archaeologist will also notify the City Project Manager, the Construction Supervisor, and Ecology consistent with all other work stoppage requirements. In following this protocol, EPA and Ecology, should not at any point have possession or control over Native American human remains, associated or unassociated funerary objects, sacred objects, or objects of cultural patrimony as contemplated in the Native American Graves Protection and Repatriation Act (25 U.S.0 Section 3001 et seg.) (NAGPRA). Inadvertent Collection Collection of artifacts or other items of archaeological interest by contractor's employees, construction personnel, or others with access to the APE as guests or employees of the City are strictly prohibited except as discussed under the protocols above when professional archaeological analysis is required to make a determine of the significance of an inadvertent discovery or to better define research questions as part of preparation of a Treatment Plan. If Native American human remains or associated or unassociated funerary objects are inadvertently collected during archaeological investigations then the reporting protocols discussed above under Human Remains shall take precedence. If sacred objects or objects of cultural patrimony are inadvertently collected during any archaeological investigation, the EPA in consultation with the other MOA parties will notify the concerned tribes so that the City may return the objects or artifacts to the LEKT at a time acceptable to the LEKT Human remains and funerary or sacred artifacts shall remain unwashed and without further analysis under 24 -hour security until DAHP, law enforcement or LEKT takes possession. Confidentiality The parties of the MOA recognize that archaeological properties are sensitive and that archaeological sites are susceptible to vandalism and illegal removal activities. For this reason any information regarding discovered archaeological resources, their location, and other information should be held secure in order to protect the resources. To the extent allowed by law, all information concerning the discovery and /or location of archaeological resources, especially human remains, will be treated as CONFIDENTIAL and exempt from public disclosure under RCW 42.56. Page I 20 I 44 City of Port Angeles, WA CSO Archaeological Work Plan 1. The Construction Contractor personnel shall not photocopy documents containing information on culturally sensitive findings. The Contractors may be required to keep a log identifying all persons who access the sensitive information and the date the access was permitted. Contractors and their representatives may be required to sign non disclosure statements. 2. The Contractors may not release any information regarding archaeological discoveries to any media or third party or share information with the general public. All requests for information regarding archaeological or cultural matters shall be submitted to the City Director of Community and Economic Development. 3. Any disregard for these protocols on behalf of the Contractors or their subcontractors may .constitute a Class C felony offense under.RCW 27 44.040 or result in civil penalties and/or require compensation of the City and/or DAHP for all restoration costs under RCW 27.53.095 4. All records resulting from archaeological investigations conducted under this AWP will be securely stored at an authorized curation facility with copies presented to consulting parties if requested in writing. Reporting The City Archaeologist will prepare monthly monitoring summaries and annual reports. The monthly reports will contain summaries of work conducted and review the archaeological information collected during the work period. The information will be accompanied with appropriate maps and photo figures as requested by DAHP The annual report will summarize the year's monthly reports by reviewing progress on archaeological measures and also discuss any problems or unexpected issues encountered during the year while identifying any changes that the City believes should be made during the following year. These reports will be delivered to Ecology who will then distribute them to the MOA parties. The schedule for monthly reports will be delivery to Ecology within seven (7) working days after the final day of the month. The City will provide Ecology with the yearly reports by January 31" of the following year (31 days after the end of the calendar year). A final report on the Archaeological Construction Monitoring will be filed with DAHP in a form acceptable to DAHP and include, if information warrants, updated site forms for sites 45CA468 and/or 45CA236 (or any newly discovered historic or prehistoric archaeological site) in a format acceptable to Page 121 I 45 City of Port Angeles, WA CSO Archaeological Work Plan DAHP The City will prepare this report and deliver it to Ecology within four (4) months after the completion of the ground disturbing construction components of the CSO Phase 1 Project. Ecology is responsible for forwarding all necessary communications and reports from the City to the MOA Parties. Schedule The City will provide notice of intent to proceed ground disturbing actions to the MOA parties ten (10) working days prior to initiating project construction. Monthly reports from the City, as discussed above, will be delivered to Ecology within seven (7) working days after the end of each month during construction and will contain summary review of archaeological work and address work schedules for the corning months as best as possible. The City Archaeologist will produce an annual monitoring report and provide it to Ecology on or before the end of January for each previous calendar year during the CSO construction phase. When the ground disturbing construction components for the CSO Phase 1 Project are complete the City Archaeologist will notify Ecology of the completion of construction monitoring on the project. Within four (4) months of this 'final ridtice the City Archaeologist will provide Ecology with a final monitoring report for the project. The City Archaeologist will not provide monthly updates after the final monitoring notice and before the submission of the final report. Any changes in this schedule shall be agreed upon, in writing, by the MOA parties. Upon acceptance of the final summary report by the MOA signatories the MOA and the conditions of this AWP will be terminated. Page 122 I 46 City of Port Angeles, WA CSO Archaeological Work Plan References Cited Beery, Derek S. 201la Pre Construction Archaeological Sampling Report Combined Sewer Overflow (CSO) Project, Phase 1. Report on file at the City of Port Angeles, WA. 2011b Pre Construction Archaeological Sampling Plan. Combined Sewer Overflow (CSO) Project, Phase 1. Report on file at the City of Port Angeles, WA. 2010 Cultural Resources Assessment for CSO Phase 1 Project, City of Port Angeles, WA. Report on file at the City of Port Angeles, WA. Shannon and Wilson 2009 Draft Interim Geotechnical Report, City ofPort Angeles Francis Street CSO Project, Port Angeles Washington. Report prepared for Brown and Caldwell by Shannon and Wilson Seattle. Page I23 I -47 City of Port Angeles, WA Mailing Address: Water Quality Program PO Box 47600 Olympia, WA 98504 -7600 Phone: 360 -407 -6429 CSO'Project Contact: Alice Rubin email: alice.rubin @ecology wa.gov Mailing Address: Clean Water State Revolving Fund, Office of Water and Watersheds 1200 Sixth Avenue, Suite 900 Mail Code: OWW -137 Seattle, WA 98101 Phone: 2 06- 553 CSO Project Contact: David Carcia Appendix A: Contact List email. Carcia.David @epamail.epa.gov CSO Archaeological Work Plan Page l24 I 48 City of Port Angeles, WA Mailing Address: DAHP /SHPO PO Box 4 Olympia, WA 9 -8 343 Phone: (360) 586 -3065 Fax: (360) 586 -3067 Director /SHPO; D'r Allyson Brooks, Allvscn.Hrot s.s(&e..ahp.w t.pcn: (36o) 586 -3066 Physical Anthropologist, Dr Guy Tasa i Guy tasa'itdahn sva.gov (360) 5 (360) 790 -1633 after hours cell phone Rob. VVhitlainobdaha.wa gpv (36o) 586 -3080 CSO Archaeological Work Plan CSO Project Contact: State Archaeologist, Dr. Rob Whitlam Page I25 I 49 City of Port Angeles, WA Address: 321 E 5` St., Port Angeles, WA 98362 s CSO Project Contact: Derek S. Beery, City Archaeologist Phone: 360 -417 -4704 (office) 360- 461 -9131 (cell) Email. dbeely {t;cityofpa us City ty Project Manager, James Burke Email: .:m r ke::9: Phone: 36o 417 4809 Email: nveest(d cic }-olDa.us Phone: 36o- 4 Director of Community and Economic Development, Nathan West Construction Supervisor TBD Phone: CSO Archaeological Work Plan Page 1 26 I -50 City of Port Angeles, WA Address: 2851 Lower Elwha Road, Port Angeles, WA 98363 CSO Project Contact Name. William White, Lower Elwha Klallam Archaeologist Phone: 360- 452 -8471 ext. 163 (office) 36o- 460 -1617 (cell) Email. Gi1I th;te (%P/el Council Chair, Frances Charles Email: frihceschailes @e lw!1a.neii.us Phone: 36o- 452 -8471, ext. 106 CEO, Sonya Tetnowski Email: Son a.te inousl<i� elwl:a.usil.us Phone: 36o- 452-8471, ext. 1.15 CSO Archaeological Work Plan Page 27 I -51 City of Port Angeles, WA City of Port Angeles Police Chief, Terry Gallagher (360) 417 -4901 Bsmith@cityofpa.us (360) 417 -4902 (360) 912 -0184 Clallam County Sheriff, Bill Benedict City of Port Angeles Deputy Police Chief, Brian Smith (360) 417 -2262 Admin: (360) 417 -2262 Clallam County Coroner/ Prosecuting Attorney, Deborah S. Kelly dkelly@co.clallam.wa.us (360) 417 -2368 CSO Archaeological Work Plan Page I 28 I -52 PORTANGELES W A S H I N G T O N U S A. CITY COUNCIL MEMO DATE: January 17, 2012 TO: CITY COUNCIL FROM: Glenn A. Cutler, P E.. Director of Public Works Utilities SUBJECT: 2013 Low interest Loan Application for Concrete Cylinder Pipe Replacement Project WT02- 2009. Summary: There are opportunities to apply for low- interest loans. through the Drinking Water State Revolving Fund (DW -SRF) and Public Works Trust Fund (PWTF) construction loan programs. Applications are due March 1, 2012 and May 15 2012, respectively Before preparing loan applications, staff is seeking Council direction to initiate loan,applications. The potential loan applications would be for about $2.2 million to support construction of the second phase of the Concrete Cylinder Pipe Replacement Project, Project number WT02 2009 in 2014 Recommendation: Authorize staff to submit loan applications for the second phase of construction of the Concrete Cylinder Pipe Replacement Project, number WT02 -2009 through the DW -SRF and PWTF low- interest loan programs. Background /Analysis: The Concrete Cylinder Pipe (CCP) Replacement Project involves the systematic replacement of approximately 19,000 lineal feet of the City's primary water main. The project was identified in the 2010 Water System Plan, and is critical transmission infrastructure. The total cost was estimated to be $7,750,000 and the project was envisioned to be completely designed, and then constructed in 3 to 4 phases over 5 6 years. The CCP transmission pipeline was installed mostly in the late 1950s. Originally used to transmit water from the Morse Creek System, it is now used to tie many of the reservoirs to the distribution system. The pipes are 20, 24, and 30 inches in diameter The pipeline has experienced several ruptures and significant leaks over a long period of time going back at least to the 1980s. This particular type of CCP is "bar wrapped," and is subject to corrosion when the cement mortar coating and lining cracks. If the reinforcing rods fail due to corrosion, additional stress is placed on the steel cylinder, and when a leak occurs it can be catastrophic because the cylinder can burst. Design of the entire project, and the first phase of construction will be complete in 2012, and remaining construction is scheduled for 2014, 1016, and 2018. The 2012 design and construction N: \CCOUNCIL \FINAL \Low Interest Loan Applications for CCP Replacement WT09- 2009.docx I -53 OPTION DESCRIPTION MONTHLY RATE IMPACT (per S1M) 25- year bond 100% financed, 5.5% APR similar to 2010 bond $0.85 Drinking Water SRF loan 100% financed, 1.5% interest, 1% loan fee $0.66 PWTF loan 85% financed, 0.5% APR interest $0.58 January 17 2012 City Council Re. Low Interest Loan Applications for CCP Replacement WT09 -2009 Page 2 were funded with 2010 Utility Bond funds for $2,005,000 Construction may also incorporate street and storm drain improvements that will be combined with approved CFP projects and paid from the street fund and the stormwater fund. Construction costs in 2014 are estimated at approximately $2.2 million. The table below illustrates funding options. The table shows rate impacts for each $1 million of the construction cost financed. The monthly rate impact is based on a typical 5/8 inch metered customer that consumes 5.8 HCf /month. Receiving either the SRF loan and PWTF loan provides the lowest rate impact for the phases of this project. The City currently has matching funds available from reserves for these loans. These programs are competitively sought after, so Staff anticipates applying under both loan programs, and is seeking Council approval to initiate the process. Should either or both loan applications be successful, we will return to Council to seek authorization to accept the funds in 2013/2014 It is requested that Council authorize staff to prepare and submit loan applications for the second phase of construction of the Concrete Cylinder Pipe Replacement Project, number WT02 -2009. through the DW -SRF and PWTF low- interest loan programs. I -54 PORTANGELES W A S H I N G T O N U S A CITY COUNCIL MEMO Date: January 17, 2012 To: CITY COUNCIL From: Glenn A. Cutler. P.E., Director of Public Works Utilities Subject: Landfill Post Closure Professional_ Services Agreement Contract Extension Summary: In October of 2008, the City entered into an agreement with Aspect Consulting to provide engineering services in support of the Port Angeles Landfill 30 -year post closure permit. Since the award of the original agreement, it has been extended twice on an annual basis. The City continues to require landfill post closure professional services. Staff is now proposing a two year extension to the existing agreement with Aspect Consulting. Recommendation: Approve and authorize the City Manager to sign a two.year extension to the Professional Services Agreement with Aspect Consulting for landfill engineering services in an amount not to exceed S189,117.72, and to make minor modifications to the agreement, as necessary. Background /Analysis: The thirty -year post closure phase of the Port Angeles Landfill (Landfill) began in 2008 after the last two cells of the landfill were covered and the seawall at the beach was constructed in 2007 Management of the landfill is regulated through the Solid Waste Post Closure Permit (SLW08 -0001) issued by Clallam County Environmental Health Services (CCEHS) working in close cooperation with Washington State Department of Ecology (DOE). The permit covers the entire Landfill and addresses the different regulations that were in place at the time each of the particular cells of the landfill were closed. The permit was issued on August 29, 2008 and was amended on April 15, 2009 Additional groundwater wells were added along the beach in 2007, and the post- closure permit established new requirements for monitoring the seawall and beach morphology Groundwater and leachate monitoring is also required by CCEHS and DOE under the permit and includes associated sampling, analysis, and documentation. In addition, there are various annual requirements for surface water quality monitoring and documentation, air quality, minimizing explosive gases, and documentation of inspection and maintenance activities. In October of 2008, the City entered into an agreement with Aspect Consulting to provide engineering services in support of the landfill post closure permit requirements. Unless extended, this contract will lapse on February 15, 2012. The City seeks to extend the Aspect Consulting professional services agreement by two years to maintain continuity of engineering services that N \CCOUNCIL \FINAL \Landfill Post Closure Professional Services Contract Extension.docx I -55 Task No. Description Proposed Fees 1 1 Groundwater Monitoring Reports 1 1 1 Biannual Reports Annual Groundwater Report $19,124.00 29.507.00 1 1.2 1.2 Annual Beach Morphology Monitoring Report and Transect Technical Memo 1.2.1 Transect Technical Memo 12,670.00 1.2.2 Annual Beach Morphology Report 21,159.00 1.3 Operations Support for the Landfill Gas System 44.658.72 1 4 Maintenance Support 12.000.00 1.5 Macro -Algae Survey 50,000 00 Totals $189,117 72 January 17 2012 City Council Re: Landfill Post Closure Professional Services Agreement Contract Extension Page 2 ensure the regulatory requirements under the permit continue to be satisfied. The tasks to be accomplished in this next two year period are similar to previous requirements, with the exception of additional operations, maintenance. and monitoring support for the landfill gas collection system and leachate collection systems. In addition, the 2012 work includes a macro -algae study of the marine environment in front of the bluff This study is a specific permit requirement and serves the purpose of determining the health of the marine fauna and wildlife proximate to our closed landfill. Macro -algae studies have been conducted in front of the landfill every two years since its closure. Funding for the proposed amendment is available from the 2012 Solid Waste Landfill budget and from planned transfers from the Landfill Post Closure Fund for the budget periods after 2012. The Landfill post closure fund currently has a balance of $3,590,563 The tasks and fees included for Aspect Consulting for the next two -year period are summarized in the following table. Summary of tasks and fees for Post Closure Landfill Professional Services On January 10, 2012, the Utility Advisory Committee forwarded a favorable recommendation to City Council to approve and authorize the City Manager to sign a two year extension to the Professional Services Agreement with Aspect Consulting for landfill engineering services in an amount not to exceed $189,117 72, and to make minor modifications to the agreement, as necessary I -56 WHEREAS, a Declaration of Emergency was issued by the City Manager on January 17. 2012 based on the following. RESOLUTION NO A RESOLUTION of the City Council of the City of Port Angeles, Washington, affirming and ratifying the Declaration of Emergency issued by the City Manager on January 17, 2012. 1 Heavy snowfall, coupled with below freezing temperatures, was causing disruptions in the City's Fire, Police, and Public Works and Utilities operations throughout the City; and 2. Heavy snowfall was causing severe disruptions in traffic flow, including emergency services response; and 3 The heavy snowfall was expected to continue, with the National Weather Service forecasting snow accumulation of 8 additional inches; and 4 Persons and /or property would be in peril unless special efforts were taken to reduce the threat to life and property; and 5 Conditions may have necessitated activation of the City of Port Angeles Comprehensive Emergency Management Plan. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles: The Council finds and declares that conditions of January 17, 2012 constituted an emergency in the City of Port Angeles due to heavy snowfall and cold temperatures. The City Council affirms and ratifies the Declaration of Emergency issued by the City Manager on the 17' of January, 2012. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 24th day of January, 2012. G U.EGALV OROINANCESG RIhSOLU (IONS RESOI.UTIONS,201201 Decimation of Eniergent Affirm R.mry 0121 l S pd wpd MAYOR, Cherie Kidd ATTEST APPROVED AS TO FORM. Janessa Hurd, City Clerk William E. Bloor, City Attorney CITY OF r 9 LEGAL DEPARTMENT William E. Bloor City Attorney [4531] Heidi L. Greenwood Assistant City Attorney [4562] Christopher C. Cowgill Assistant City Attorney [4532] Jeanie DeFrang Legal Administrative Assistant [4536] Randi Mahlum Legal Records Specialist [4576] Holly McKeen Legal Administrative Assistant [4530] pORTANGELEIS W A S H I N G T O N U S A. DATE: January 24, 2012 To City Council FROM. William E. Bloor, City Attorney RE: FEMA Lawsuit SUMMARY: The National Wildlife Federation (NWF) has sued the Federal Emergency Management Agency (FEMA) to compel changes to the National Flood Insurance Program (NFIP). The changes could have major implications for any development in flood plain areas. Cities are not currently represented in this lawsuit. RECOMMENDATION: Authorize the City Manager to enter into agreements with other cities seeking to intervene in the lawsuit. BACKGROUND: FEMA is the federal agency that administers NFIP The NFIP provides subsidized insurance for properties within flood prone areas, but it is contingent upon each local jurisdiction enacting requirements that regulate development. Port Angeles has adopted such an ordinance. NWF previously sued FEMA over this program. That prior lawsuit led to a ruling in 2004 that FEMA must "consult" with the National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA). The consultation was to determine what impacts the NFIP had on listed species and critical habitats in the Puget Sound area. That consultation led to the issuance by NMFS in September 2008 of a biological opinion (BiOp). It found that elements of the NFIP jeopardized several ESA listed species in Puget Sound including salmon and orca whales. The elements included FEMA flood plain mapping, community rating system, and the minimum development standards. One element of the BiOp directs FEMA to significantly tighten the minimum development criteria that local jurisdictions, including Port Angeles, are mandated to adopt FEMA proposed three options for Page 2 Memo to Council Re: FEMA Lawsuit affected cities, which include about 120 cities, selected option number 3 This option provides that the City will review each permit application on a case -by -case basis to assure that the proposed action is "not likely to adversely affect" a listed species. NWF is dissatisfied with FEMA's efforts to implement the BiOp. That has led to this new, second lawsuit. NWF now asks the US District Court for a preliminary injunction to prohibit the sale of flood insurance policies for new development or substantial redevelopment in the Puget Sound Region. That would effectively halt the development, or redevelopment, in flood plain properties, at least until the lawsuit is decided. Oral arguments are likely to be heard in early February, 2012. This would be significant for Port Angeles since the entire shoreline from the Rayonier site to Dry creek, as well as our five City urban independent streams, are designated flood plain. The outcome of this lawsuit will likely mandate the development of regulations applicable within the flood plains in Port Angeles and other affected cities. As it is currently structured, the cities have absolutely no voice in this lawsuit. The Association of Washington Cities and the Washington State Association of Municipal Attorneys have conducted a series of conference calls to discuss the lawsuit and whether cities should seek to intervene. The latest conference call was on Monday, January 23 Since the lawsuit is on a very tight schedule, there has been little time for most of the approximately 120 affected cities to react. That has been compounded by the fact that in January, most cities have had new council members coming on. Given these facts, several cities have already filed a motion for intervention. They, of course, are hoping that other cities will join with them. The cities that already have acted included. Auburn, Burlington, Lake Forrest Park, Mount Vernon, Orting, Snoqualmie, Sultan, and Tukwila. As a result of the latest conference call, a number of other cities probably will join in the lawsuit, but the official number won't be known until Thursday of this week. After that other cities might still have the opportunity to join, but there is no certainty Because of these significant impacts that the lawsuit could have on Port Angeles, staff recommends that the City Council authorize Port Angeles to join with other cities in intervening with this lawsuit. Page -3 Memo to Council Re: FEMA Lawsuit The estimated cost to Port Angeles for the intervention phase is not to exceed $1,000.00 If intervention is granted, then the estimated costs of the next phase would be determined in connection with the interlocal agreement. William E. Bloor City Attorney WEB •jd G \LEGAL\a MEMOS\MEMOS.20121Councit FEMA Flood.01 24,12 wpd P W A S H I N G T O N U S A. CITY COUNCIL MEMO DATE: January 17, 2012 TO: CITY COUNCIL FROM: Nathan A. West, Director Community and Economic Development SUBJECT: Clallam County Economic Development Council 2012 Contract Summary: In 2011 the City Manager, Community and Economic Development Director and City Council representatives to the EDC participated in meetings to redefine the roles and responsibilities of the EDC organization. The EDC has developed one standard contract for all funding partners which is being presented for Council approval. Recommendation: Approve and authorize the City Manager to sign the contract. Background Analysis: The City contracts with the Clallam County EDC for economic development support services. In 2008 City Council approved a multi -year contract with the EDC that was valid through December 31, 2012. However, last year the EDC learned that due to significant State budget cuts substantial changes to the agency would be required. The City has an ongoing relationship with the EDC to support economic development in Port Angeles and throughout Clallam County During a number of 2011 EDC meetings and working committees with partner executives it was determined that in order to function more efficiently the EDC needed some established work plan priorities and one contract for all partners. As part this renewed approach the EDC identified seven (7) new goals as well as other potential tasks. The goals include: 1 Promote job growth and economic activity in the four industry areas of focus: Renewable Energy, Innovative Manufacturing, Natural Resources, and Marine Trades 2. Develop environment for job creation. business retention, assistance and growth 3 Advocate for positive economic development issues that affect the economic wellbeing of the county 4 Develop economic development toolbox 5 Provide and convene a council of private and public economic development entities to enhance connections, communications and group problem solving 6. Be recognized and valued as promoting and communicating an environment of economic opportunity in the county 7 General administration and consultation L -1 The attached work plan provides more details on each of the goals mentioned above including objectives and tasks. Attached is the agreed upon standard contract that all funding partners will be signing. The City's contribution towards this contract will be maintained at $15.000. The contract has a term limit of one (1) year Staff recommends that Council approve and authorize the City Manager to sign the contract. Attachment A Attachment B EDC letter. contract and workplan Prior contract to be negated L -2 I tiainEDC Ciallam County Economic Development Council December 14, 2011 City of Port Angeles Kent Myers, City Manager P O. Box 1150 Port Angeles, WA 98362 Dear Kent: Truly, 2012 is going to be a challenging year in economic development. It is going to take an elevated level of community collaboration and cooperation to overcome dramatic program and agency budget cuts from both the state and federal levels. The support you provide to your state recognized Associate Development Organization (ADO) doing business as the Clallam Economic Development Council is vitally important to the continued economic viability of our county' Thank you for your support. Enclosed you will find a signed 2012 Partner Contract along with the 2012 Work Plan that was adopted by the Board of Directors at its meeting on October 20, 2011 The Work Plan represents the documented input from the three Working Committee meetings your organization participated in. This contract acts as a foundation in defining the working relationship between City of Port Angeles and the Clallam Economic Development Council. We are looking forward to working with you in the coming year. Best regards, _inda Executive Director Enclosure oor PO Box 1085 'arc Angeles, W 9 Phone: 360.457 7793 Fa::: 360,452.96 t 8 Web: www.claaamarg IVe 5 LO part Mal L -3 IFSEDC Clallam County Economic Development Council AGREEMENT BETWEEN CLALLAM COUNTY ECONOMIC DEVELOPMENT COUNCIL AND CITY OF PORT ANGELES THIS AGREEMENT, made this day of 201 by and between the City of Port Angeles, a Washington municipal corporation (hereinafter referred to as "City and the Clallam County Economic Development Council, a non -profit corporation, hereinafter called "Council" WHEREAS, the Council is a nonprofit educational and research corporation of the State of_Washington; and WHEREAS, the City is therefore interested and concerned 'w ith the economic Utilization of services; and WHEREAS, the City has need of research and education in regards to these and other aspects of its operations; now, therefore, In consideration of the mutual covenants and agreements herein and per the attached 2012 EDC workplan the parties agree it as follows: Performance by Council A. The Council recognizes that the importance of family wage jobs with health benefits is necessary for the success and viability of Clallam County's economy and it will continue to encourage businesses of this caliber in the county Dependent on available funding, the Council will produce a statistical analysis of current economic conditions in Clallam County B. Council will identify existing businesses and expansion potential. Council will identify industry trends and County strengths, matched to the needs of targeted companies for recruitment. C. Dependent on available funding, the Council shall collect and maintain comprehensive demographic information for use by public and private entities. The Council will also serve as a general research and reference service for the officials and employees of the City D The Council shall report to the City employees and Commissioners /Councilors on the status of economic trends, industrial conditions and general economic concerns. E. The Council shall serve as a countywide contact for development activities, and it will facilitate the development process with prospective companies and appropriate governmental entities. Through EDC participation, the City will be kept apprised of the planning, development, and construction of necessary infrastructure to support various projects. 1 L -4 F The Council shall maintain records and report to the City as follows: 1 The Council shall maintain accounts and records that accurately reflect the revenues and costs for the Council's activities. These financial records, and all records related to the performance of the contract, shall be available for inspection at monthly EDC Board meetings. The Council shall use its best efforts to economize on overhead expenses to the maximum extent feasible in providing the services to be performed pursuant to this Contract. G. Council shall become actively engaged in advocacy for the unique needs of Clallam County's citizens and agencies. 11. Performance by the City of Port Angeles A. For the services rendered by the Council, the City will provide, by payment in cash, the amount of Fifteen Thousand 15.000) Dollars. Attest: 2, B Payment by the City shall be made in four installments, payment to be made during the first month of each quarter C. The City shall participate, when applicable as determined by the City, by providing expertise to accomplish the actions of the Clallam Economic Development Council. III. Term This agreement shall be for a term of one year, commencing on January 1, 2012. IV Assignment This agreement may not be assigned by either party to this agreement except by signed amendment. V Termination This agreement may be terminated upon thirty (30) days' notice. IN WITNESS WHEREOF, the parties hereto caused this contract to be executed the day and year first here in above written. City of Port Angeles Clallam County Economic Development Council By. By Kent Myers. City Manager President Janessa Hurd, City Clerk Approved as to Form. William E. Bloor, City Attorney By Executive Director 2 L -5 a Ft' 000'; 0 085'TT$ pataidwop t£T•S$ 0 S68ZS 589 M tTS' w Partners' Sequin) Marine Lab, CleanTech West Carlsborg Business Community. WWU County Department Community Development Port of Port Angeles Public partneri: County, cities, port EDC Board of Directors, NOTAC Port of Port Angeles and City of Port Angeles WA State Dept. of Commerce /Peninsula College Internship Business Service Providers Peninsula College and Olympic Workforce Development Council cr Establish Olympic Peninsula as a leader 'Completed analysts Identify fundirg sources and write econ dev portion'of grant Promote and prioritize.' wage jobs" Seck and respond to rebiuitment opportunities s' No net loss of timber related jobs Promote and prioritize 'family wage jobs" Meet annually with large /med business employers and'develop strong working relationships ADO contract 25 vislts %yeaar sfuana Maintain board i nember status on Workfd ce Bd /PC workforce Educ Advisory Committee Plan and provide energy conference 'Facilitate development of economic Impact analysis Identify and pursue gap funding with partners Respond to potential composite campus sitings Collaborate with appropriate '...partners In business attrattlon. Implement Target Industry Sector Strategies Wild Olympics Initiative Promote and prioritize "family wage job?' Utilize established BRE program Business Information events as required by ADO contiact Actively advocate for regional job training programs and associated funding Provide BRE services Sponsor business edu events Participate in job training policy and trend development C L 0 N O u a o O V 0 G s N E C m l O C O C Y N c' Q Y o y v o N G a N tt a, j ti n I N N bLSL$ A I SL8`9$ EPS`tr5 %Jr Z$ Contract Partners, Department of Commerce, Impact Washington, Peninsula College, Export Assistance 9 p m 9 cc Member and President of OFDA; Member of RC C m N 3 G O t s 11, 6 O J r y u d C 0" j 0. Innovation Partnership Zone, especially Kitsap, Jefferson and Mason EDCs State and Federal partners such as USDA, COM, Impact I RI ZI Work with partners to facilitate the alignment of planning efforts and model a seamless delivery of business support services. Marketing and utilizing CERB, DOE, USDA, and other Infrastructure funding resources. Complete required economic development portions of applications An increase in decisions made in favor of economic advancement and higher profile of economic Issue impacts. 30 engagements with other' organizations and local 12 community forums actively involved in on topics such as transportation, housing, cluster/targeted industry strategies, comniunityservices, etc. Funding awarded Lending to protects that create or expand job base Sustainable programs that deliver long -tei in economic benefit Atign efforts with Comm three strategies:. Talent/ rce development; Investment and entrepreneurship; Infrastructore. 'development Be aware of and participate iri activities that development broadband /telecommunications 'and 'water /sewer options and ,solutions to the county 'Bring appropriate issues to the Board of Directors for consideration and document positions of EDC Board on Issues that have potential economic Impacts: Participate in hearings and testimonies. Prepare news releases:Convene stakeholders' meetings Network with regional, state; and federal peer boards Events, seminars, other structural activities involving the community focus on topics other than workforce issues which the ADO is involved in planning, organizing, sponsoring or co= sponsoring Identifying and writing asuccessful application Next step development of new organization Expand network that fosters working relationships with state and federal agencies Align economic Idevelopment plan with the state Economic Development Commission 'plan Development and support of readiness /capacity building Secure funding for renew energy roadmap Participate in Olympic Finance Development Authority Seek and obtain applicable business tools as they become available J Lee'65 8 09'x$ ETT'6$ 990'5 ZT6'6$ bmm'6$ paialdwop DTS'9$ DGL'S$ Ecs'E$ 1 568'Z$ 6TS'TS Peninsula College County. Cities, Port SCORE, SBDC, COM Battelle, PNNL, College 1 and industry partners EDC Board of Directors EDC Executive Committee EDC Officers Peninsula College paeoe aAunoax3 Sequim Gazette Business Service Providers Board of Directors ZT 8 ZT ET Successfully respond to data inquiries Able to respond to Inquiries from possible site selectors 25,Interactions with any start up company asking for assistance, resources, or data regarding business factors in the A0O's 4 year redesignation focused on :eattelie's marine energy business 'plan Provide guest speakers, supporting initiatives, policy dots, financials and minutes Be recognized for sustainable, long term, visionary economic development Meet quarterly and perform as a guiding force for econ. Dev. Successful transition of C81 into BDC Targeted audience attendance Completed project in January 2012 11 shows tier year j Excellent speaker with good attendance and appropriate message Identify essential data sets and' resource solutions (i.e: yearly Community Profile). Develop and maintain a database of industrial and commercial properties and buildings Referral and networking for start' up businesses Complete apblication [Perform support services for board and officers I Perform support services for board and officers Perform support services :Assist in the development of Business Development Center Build and execute a communication) plan Develop theme, identify articles and topics, assist Sequim Gazette staff Communicate EDC activities, topics, and initiatives: -Promote utilization of available business services Secure venue, speaker and establish theme Collect and disseminate data, demographics and reports to foster business attraction and growth Participate in system:wide discussions regarding gaps in start -up business .I ,assistance :Apply for Innovation Partnership Zone re- designation tabs tabs Convene monthly board mtgs, Convene CEO lunch to enhance coordination of efforts with areas of focus _stab Re- establish Executive Board Perform CBI back office activities Engage in community forums and associations Publish annual report highlighting econ dev activities in the county Bring topics and business services guests to monthly goNP Hold successful Annual Event 1 N O R Mt y L z A CL Y c O G L I G N L .W P. E o 0 O E C p y d U C y N L u 'a C 0 N, m u L c E L N 9l O ,C 5 u p 0 0 u G A. 3. m a gt A 5 EL I nv PC i cwgn ccra aua .mucu n t,...n.... 11g and communicating an environment of economic opportunity In the county J 1 l k'09'5$ 44,594.00 1 tEE'09$ ZLS'L$ £CS'4$ EvS'P$ 5,000 0 00's 000'5t 000'59 1 000'59 j 000 0Z$ S 205,000.00 1 S66T£'9LT S6'6TE'ISE EDC Officers SE ZT ZT 9 e/u e /ui e/u e/u 8 180E Bills paid, reputation in tact, processes followed Long -term staff with consistency in the EDC's performance of business Acquisition of new tools, services, networks Development of network, recognized as a partner and a Additional revenue andEDC promotion EDC can successfully recruit [Current software capabilities J '.Additional education, networking, new concepts, resources Elevated presence in county, region and state. Higher level of fundraising Dedicated staff person, consistently meeting with community businesses, Jeah Jadg Subtotal of 48 other potential activities Subtotal of tt17 activities Perform daily back office activities that support EDC's continuation Daily decisions in the operation of the EDC Availability to projects, ideas, opportunities Available outside of daily tasks to phone calls, emails and requests Annual Golf Tournament AJnsnpul zad sapeles jjeis aseanul [upgrade computers Staff is able to attend conferences .and training that will bring benefit to the organization and to the county Marketing, public relations, events. Business Retention, Expansion and Recruitment Promote Ciallam County at national trade shows WWI Insure that Clailam EDC stays open for business Supervision of organization Evaluation of proposals and opportunities nst i. Responding to constituents, funding partners and board i!Fundraising events 1Competittve salaries 'Equipment upgrades Conferences and Training Fund additional staff positions Attend key trade shows supporting four areas N as _Y cs R A V C d 0 O. w O 00 st I -J AGREEMENT THIS AGREEMENT is entered into this `day of December, 2008, by and between the City of Port Angeles, Washington, a municipal corporation, hereinafter called "City", and the Clallam County Economic Development Council, Inc., a non -profit corporation, hereinafter called "Contractor." WHEREAS, the City is a municipal corporation of the State of Washington authorized to contract for economic development services; and, WHEREAS, it is in the public interest for economic development activities to be performed that will enhance the economy and employment opportunities in the City of Port Angeles; and, WHEREAS, the City has need of research and assistance in regards to these and other aspects 1 PERFORMANCE BY THE CONTRACTQR. A. Promote Economic and Employment Opportunities. B. Business Retention, Expansion and Recruitment. of its operations; NOW, THEREFORE, inconsideration of the above representations and the mutual covenants and agreements herein, it is agreed by the parties as follows: The Contractor shall promote and enhance economic development and employment opportunities in the City in accordance with the mission and goals set forth in the attached Exhibit "A." The Contractor shall use its resources to market the facilities and capabilities of the City to new and existing businesses with the goals of increasing City revenues and employment opportunities for City residents. (I) The Contractor shall work cooperatively with the City and shall serve as an economic development research and reference service for the City In this capacity the Contractor shall conduct ongoing basic market research; identify target markets; provide business retention, expansion and recruitment services aimed at existing businesses and target markets; and participate with the City in the process of responding to inquiries, site selection consultation, and case management, regarding existing or new industries or other commercial ventures which seek information concerning the facilities and resources managed by the City or which may involve properties and/or infrastructure within the City and the Port Angeles Urban Growth Area (UGA). 5.131p L -10 (2) The Contractor shall provide effective programs aimed at better planning, utilization, promotion, and advertisement of City services, facilities, infrastructure, and property and shall forward to the City all industrial inquiries as received from the Washington State Department of Community Trade and Economic Development or other not yet identified sources. (3) The Contractor shall help the City to make optimum use of local infrastructure and promote infrastructure and developability of Port Angeles. (4) The Contractor shall maintain and enhance working relations with existing businesses to assist them with start-up and expansion needs, technical assistance, access to business counseling and financing resources including aid and assistance to at -risk businesses. (5) The Contractor shall assist the City in preparing replies to inquires received by the City or the Contractor regarding City facilities and resources or which may involve properties and/or infrastructure within the Port Angeles Urban Growth Area (UGA) relative to economic development retention and growth opportunities. (6) The Contractor shall assist the City in applying for and administering economic development related grants, including any potential to support the development of infrastructure. (7) For the purpose of promoting economic development within the City and its Urban Growth Area the Contractor shall advise and focus urban uses and services to appropriate urban areas and encourage proper siting per the Washington State Growth Management Act. In that regard, the Contractor shall assist the City in working with Clailam County to: (a) Expand City Limits into the Port Angeles UGA, (b) Extend the Port Angeles UGA, and (c) Extend City services and utilities into such areas. Where appropriate the Contractor shall solicit board support and provide letters in support of rezones, annexations, and appropriate infrastructure installation that promote economic development. (8) The Contractor shall maintain an up -to -date community profile specific to the Port Angeles area, which highlights demographic and development data customarily of interest to industrial/commercial developers. -2- L -11 (9) The Contractor shall maintain a database of City properties beginning with a data export from the City and County identifying those developable Commercial and Industrial lands within the City of Port Angeles and its Urban Growth Area. The spreadsheet should identify property availability and assets. (10) The Contractor shall work with the City to research, identify, and implement the addition of new development incentive programs or packages as may be applicable to Port Angeles economic development efforts. C. Prospect Management. The Contractor will be primarily responsible for providing services in connection with industrial and business retention, expansion and/or relocation. The Contractor will represent the attributes for appropriate site locations within the City that meet the prospects criteria. In such dealings, the Contractor shall participate in the handling of prospects, in with the following guidelines: (1) Contacts made directiv to the Contractor or referred to Contractor by Outside Sources. (a) The Contractor will provide general information and other data requested by the prospect. Within 24 hours of being contacted regarding a prospect, the Contractor shall notify the City Manager, or his designee, by phone and /or e -mail, regarding details of the contact. (b) If the prospect indicates an interest in specific business locations, the Contractor shall notify other affected parties and property owners as appropriate, make appropriate introductions, and assist in follow -up marketing. (c) If the prospect requests confidentiality, the Contractor will keep the City Manager, or his designee, fully informed without revealing the identity of the prospect. (2) Contacts made directly to the City When the City receives a direct contact or is managing a development prospect and desires support from the Contractor, it may request such assistance, and Contractor will render such assistance. The Contractor to supply recruitment information and services as described in 1A and 1B. -3- L 12 (3) Public Events, and Media. Any public events such as media conferences, ground breaking ceremonies, and ribbon cuttings in which the Contractor is involved within the City and or the Port Angeles UGAs will be coordinated with the City Manager or his designee, the siting jurisdiction, and other affected partners. D The Contractor shall provide to the City and to such persons as the City may direct, free of additional charge, materials prepared by the Contractor. E. The Contractor shall maintain records and report to the City as follows: (1) The Contractor shall maintain accounts and records that accurately reflect the revenues and costs for the Contractor's activities under this Contract. These financial records, and all records related to the performance of this Contract, shall be available for City inspection. (2) The Contractor shall provide the City with monthly emails, outlining work that has been performed pursuant to this Contract. The emails shall consist of reports, minutes, and current statements of revenues and costs as prepared for and provided to the EDC board. (3) The Contractor shall provide the City with a written report quarterly as outlined in Exhibit A Reporting Performance Measures, fully describing how the Contractor's activities have benefited the City, the greater Port Angeles community and the economy of Port Angeles. In addition, the Contractor's Executive Director shall appear before the City Council at least quarterly to report on the Contractors activities pursuant to this agreement and to answer questions. (4) The Contractor shall use its best efforts to economize on overhead expenses to the maximum extent feasible in providing the services to be performed pursuant to this Contract. (5) The Contractor shall provide the City with an annual budget, including cumulative salaries and benefits for all employees. 2. PAYMENTS BY THE CITY A. For the services to be rendered by the Contractor, the City will provide payment as follows: For 2008: $15,000, and in -kind telephone service in an amount not to exceed $2,500. -4- L 13 B. Payments shall be made in four, equal, quarterly installments. Payment by the City shall be due upon receipt and acceptance by the City Manager of the Contractor's written quarterly report. The Contractor will invoice the City for all quarterly payments. C. Nothing contained in this agreement shall be construed as (1) binding the City to expend in any one calendar year any sum in excess of appropriations made by the City in its budget process for the purposes of this agreement for that calendar year, or (2) obligating the City to further expenditure of money in excess of such appropriations, 3. TERM. 4 ASSIGNMENT For subsequent years: Upon receipt and acceptance by the City Manager or designee of the Contractor's monthly invoices, the City will reimburse the Contractor for services rendered in amounts stated in Exhibit A for each calendar year, which is subject to change on a year -to -year basis depending upon the City budget. Contractor shall submit its proposed Exhibit A each year no later than August 31" for consideration as part of the City's budget process. Exhibit A for 2009 will be adopted as part of the 2009 budget process. An Exhibit A for subsequent years will be developed through the budget process for each year. The performance of the Contractor shall commence on Januaiy 1 2008, and continue until December 31, 2012; provided, however, that this Contract may be terminated by either party at any time and without cause by giving to the other party at least 90 days written notice of termination. This agreement may not be assigned by either party to this agreement except by signed amendment. 5 BREACH. A. In the event of either party's material breach of the terms or conditions of this Contract, the non breaching party reserves the right to withhold payments or services until corrective action has been taken or completed. However, the party shall not exercise this right until they have given written notice of such material breach to the breaching party and ten days have passed since the receipt of such notice. This option is in addition to and not in lieu of the parties' right to terminate this Contract or any other right which State law offers for breach of contract. -5- L 14 B. If either party shall materially breach any of the covenants undertaken herein or any of the duties imposed upon it by this Contract, such material breach shall entitle the other party to terminate this Contract, provided that the party desiring to terminate for such cause shall give the offending party at least twenty days' written notice, specifying the particulars wherein it is claimed that there has been a violation hereof, and if at the end of such time, the party notified has not removed the cause of complaint, or remedied the purported violation, then the termination of this Contract shall be deemed complete. 6. NON DISCRIMINATION. A. The Contractor shall conduct its business in a manner which assures fair, equal and non discriminatory treatment of all persons, without respect to race, creed or national origin, and, in particular: B. The Contractor shall maintain opeii hiring azd employment practices and wil] weloorne applications for employment in all positions, from qualified individuals who are members of minorities protected by federal equal opportunity /affirmative action. requirements; and, C. The Contractor shall comply with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of non- discriminatory requirements in hiring and employment practices and assuring the service of all persons without discrimination as to any person's race, color, religion, sex, Vietnam era veteran's status, disabled veteran condition, physical or mental handicap, or national origin. 7 DISPUTE RESOLUTION The parties agree that any dispute related to this Agreement shall first be submitted to the City Manager and the Contractor's Executive Director, and they shall attempt to resolve that dispute If the City Manager and Executive Director are not able to resolve that dispute, the dispute shall next be submitted to the City Council and to the Contractor's Board of Directors. Those entities shall attempt to resolve the dispute. If they are not able to resolve the dispute, the dispute shall be submitted to mediation. The parties shall agree on one mediator. If mediation is unable to resolve the dispute, then either party may take such legal action as they deem appropriate. The venue of any lawsuit related to this Agreement shall be in Clallam County, Washington. 8. INDEPENDENT CONTRACTOR STATUS. The relation created by this Contract is that of independent contracting entities. The Contractor is not an employee of the City and is not entitled to the benefits provided by the City to its employees. The Contractor, as an independent contractor, has the authority to control and -6- L -15 ATTES F. g 1� Becky J direct the performance of the details of the services to be provided, The Contractor shall assume full responsibility for payment of all Federal, State, and local taxes or contributions imposed or required, including, but not limited to, unemployment insurance, Social Security, and income tax. 9 HOLD HARMLESS AND INSURANCE. The Contractor shall protect, defend, save harmless, and indemnify the City, its officers, agents, and employees from and against any and all claims, damages, losses, and expenses, including reasonable attorney's fees, occurring, arising, or resulting from supplying work, services, materials, or supplies in connection with the performance of this Contract. The Contractor shall provide a Certificate of Insurance evidencing occurrence -based Commercial General Liability insurance with limits of no less than $1,000,000 combined single limit per occurrence, with the City shown as a named additional insured. 10 ENTIRE CONTRACT. The parties agree that this Contract is the complete expression of the terms hereto and any oral representation or understanding not incorporated herein is excluded. Further, any modification of this Contract shall be in writing and signed by both parties. IN WITNESS WHEREOF, the parties hereto caused this Contract to be executed the day and year first herein above written. CITY OF PORT ANGELES By: C Gary Braun, Mayor APPROVED AS TO FORM i William E. Bloor, City Attorney By G LLegal 0ukup■AGRBEME NTS &CONTRACT512000 Agmis&Conlrect WDC 2009 Contract 111109 wild Noeanibt, 21, 2006 CLALLAM COUNTY ECONOMIC DEVE!,R• I CIL i _7- President By Vice Presiden L -16 Exhibit A 1 Summary report on all activities from January 1, 2008 to June 30, 2008. 2. Required elements of each monthly /quarterly /annual report from July 1, 2008 to December 31, 2008: a. Describe the results of the EDC's efforts to support City and County-wide economic development strategies. Please be specific. b. Advise City on investments and infrastructure needed for the long -term economic growth of the City as part of the above strategy this month/quarter /year. (Give special emphasis to those directly related to the Port Angeles area). c. Identify new businesses/business people recruited to be EDC members this past month/quarter /year (again, give special emphasis to those directly related to Port Angeles), along with the following information: i. Key personnel and contact information ii. Business sector iii. How you will engage them in furthering local economic development strategies. d. Report knowledge of business activity, such as: new business startups and expansions in/near Port Angeles, along with the following information: i. Key personnel and contact information ii. Business sector iii. Number of new jobs iv. Reason they chose Port Angeles v If available, why did they not choose Port Angeles vi. How might they be further engaged in community involvement? e. The Executive Director of the EDC shall hold monthly meetings with the City's Director of Community and Economic Development for information sharing purposes. 3. Quarterly reports will include the quarterly financials for the EDC. Reports shall reflect how the EDC is increasing corporate sponsorship and investment in the EDC while reducing reliance on public agency funding. 4. As compensation for performance of the deliverables to be provided as described in this contract the City shall pay for the calendar year of 2008 the sum of $15,000 to be paid upon completion of deliverables not later than December 31. 2008. -8- L 17 ROLL CALL MINUTES PLANNING COMMISSION Port Angeles, Washington 98362 December 14, 2011 6:00 p.m. Members Present: Doc Reiss, Amanda Anderson, David Miller, John Matthews, Tim Boyle, Sissi Bruch, Members Excused: Nancy Powers Staff Present: Sue Roberds, Nathan West, Scott Johns, Roberta Korcz, Heidi Greenwood Public, Present:,. ;Greg Clampett, Jim and Roxi Baxley, Tamsan. Harmon. Rick and Kim Melvin, Jim Ervin, Jeff Konopaski, Daryl and Kim Wakefield. Phil Beirnes, Laurel Rickells, Patrick Wakefield, Ron Wilcox, Wayne Brown. Dan and Kelli Morrison, Randy Alderson, Jim and Linda DeBord, Martin Hammer, Dick Pilling, Rick Parr, Katie Jung. Darren and Terri Delroy, Logan Deane Katie Wakefield, Connie Warren, Dan Konopaski, PJ Morrison, Kathie Charlfour, Kevin A., Miki Zozowski, Byrd Alderson, Marlene Hamilton, Sandra Lorrance, Melody Pozgay, Brian Hansen, Brian Jackson, Kelly Johnson, Mark Ostroot, Adam Johnson, John Currie, Greg Hopf, Mike Halberg, Connie Curtis, Derick Halsey, Ken McGee, Cordi Fitzpatrick, Patti Koelle. Scott Ackerman, Jason Gizoves, Dale Holiday, Eric W., Jerry Payne. Kurt and Dustin Taylor, Rick Sinclair, Brian Haire, Tim Crowley, Russ Morrison, Walt, Tony, and Tracy Kepler, Sean and Shawna Linn, Jim Maynard, Andrew May, C. Blore. David Ellis, Mike Libera, Joe Swordmaker, S. Taras, Mike and Barb Lundstedt, Ken Simpson, PAHS Cheer Leaders, Roger and Dena Wheeler, Cameron Field, Jordan Vaughn, Kim Baublits, Angie Wilhelm. Jimmy Roberts, Jaden Rockwell, Sierra Baublits, Laurel Gieske, Salina Harmon, Taylor Rutz, Brade McFarlen, Emily Asher Stone, Anna Raemer, Michelle Danelson, Katelyn Coffman, Kara Lindley, Karissa Trople. Megan Weisner, Tang Menlove,Lexie Pankewski, Kelsey and Dana Snell. Sonja Coventon, Paul Breitbach, Carole Brown, Douglas Ridjay, Megan Ginley, Holly and Dylan Wickersham, Christian Carpenter. Laura Almaden, Tabin Beckett, Robin Tweter, Evan and Rick Alderson PLEDGE OF ALLEGIANCE Chair Reiss opened the regular meeting at 6:00 p.m. and led the Pledge of Allegiance. APPROVAL OF MINUTES Commissioner Anderson moved to approve the October 26, 2011, regular meeting minutes. The motion was seconded by Commissioner Boyle and passed 4 0 with Commissioners Anderson and Matthews abstaining due to absence at the meeting. M 1 Planning COMMIS s ton Almmes December 14 20/1 Page 2 PUBLIC HEARINGS: Chair Reiss read the qualifying questions for Commissioners regarding Appearance of Fairness matters with regard to both items on the agenda. All Commissioners responded for the record that they had no Appearance of Fairness issues to report. The Chair then reviewed the quasi judicial public hearing procedures for audience members. No issues were noted by audience members. Commissioner Sissi Bruch indicated that, as a newly elected City Council person and as an employee of the Lower Elwha Klallam Tribe that is a relevant party to both of the actions before the Commission this evening, she would be stepping down from taking action on the agenda items. She also submitted her official resignation to the Planning Commission as a result of her election to the City Council and left the meeting. EXTENSION REOUEST UNCLASSIFIED USE PERMIT UUP 11 -01 A2Z ENTERPRISES, 2917 Edgewood Drive: Request for extehsion of a permit allowing outdoor recreational uses such as sprint boat racing-imthe Industrial Heavy zone. Planning Manager Sue Roberds reviewed the Department Report recommending that a 5 year extension be approved for the Unclassified Use Permit with 5 conditions. Planner Roberds included a revision to the written staff report addressing compliance with Condition 6 of the original conditions of approval and provided amended wording to Finding 6 in the written staff report in support of that revision. Chair Reiss opened the public hearing. Dan Morrison, 408 E. Scrivner Road spoke of the community's overwhelming support for the sprint boat track and said that the activity stimulated the economy in a significant manner The race event has always been about the community's need for alternative recreation. It has been about providing an opportunity for outdoor recreation that is not available in this area and bring something really special to the area that defines the area. The results were overwhelming. He spoke about the outpouring of community support and encouragement that was witnessed throughout the final planning and actual operation of the sprint boat races. The Chamber of Commerce roughly estimated that the event brought $2M in tourist dollars for the weekend event. He appreciated working with City staff on this project. He wanted it known that the City has supported the event from Day 1 In response to Commissioner Boyle, Mr Morrison said that if extended, race dates for the 2012 season would be August 4 and September 8, 2012. Andrew May, Port Angeles Business Association presented a letter from the Business Association providing unequivocal support for the sprint boat track use and extension of same. The sprint boat track operation far exceeded the Association's expectations and provided immeasurable benefit to the community as a whole. Jim DeBord, 1309 E. 7 Street expounded on the terrific community support exhibited during the event and how well handled the crowds were by just volunteers. He encouraged extension of the use permit. M -2 Planning Ca,nm,ssam Ah naes December 14. 2011 Page 3 Rick Parr, 1602 W. Lauridsen Boulevard said that the sprint boat activity provided an activity for people in the area other than hiking and kayaking. His parents developed the Port Angeles Raceway many years ago for just such reasons. He recalled how many people over the years were thrilled to participate in the race track use. Not everyone likes to kayak. The race track is gone, but the sprint boat race attendance shows how people are hungry for a variety of well run outdoor activities that are not all passive. Scott Ackerman, Spokane, Washington also spoke in favor of extension of the Unclassified Use Permit as a needed recreational opportunity for the area. It is good for the economy and is a good, well run, clean event. No issues were noted. Everyone had a lot of fun. There being no further testimony, Chair Reiss closed the public hearing. Following discussion as to revisions included in staff's presentation, Commissioner Miller moved to extend the Unclassified Use Permit for 5 years citing the following 5 conditions, 9 findings, including the ani'endment proposed by staff. and 4' Conclusions: Conditions: 1 The Unclassified Use Permit is extended for a five year period to December 14. 2016 to permit the continuation of sprint boat racing at 2917 Edgewood Drive. If events other than the sprint boat races are planned such that modification to the property are anticipated, the applicant shall inform City staff to determine if an amendment to any pertinent permit is required. .2. Overnight camping,for spectators and event participants is permitted only during scheduled events. 3 To prevent trespass that could result in inadvertent damage to the environmentally sensitive areas, all environmentally sensitive areas shall be identified and separated from the rest of the site using a physical barrier such as flexible fencing during all events. 4 The access road from Edgewood Drive shall be developed in such a manner that it can, at minimum, facilitate two lanes of continuous traffic and provide stable foundation so that mud or debris is not transported onto county roads. 5 Event operators shall be responsible for controlling dust generated by vehicle parking and use during events. Findines: Based on the information provided in the Community Development Staff Report for UUP 11-01 dated March 23, 2011, the October 11, 2011, request for extension, all information in the public record file, comments and testimony presented during the public hearing. the Planning Commission discussion and deliberation, the City of Port Angeles Planning Commission hereby finds that: 1 Unclassified Use Permit (UUP) UUP 11-01 was approved by the Planning Commission on March 23, 2011 with 6 conditions. The UUP permitted the development of an outdoor sprint boat track use in the industrial Heavy zone at 2917 Edgewood Drive for an initial one year period. M -3 Planning Comnnssiun A Lnures December 14. 2011 Page 4 2. On October 11, 2011, a request for extension was received from Dan Morrison on behalf of A2Z Enterprises in compliance with Condition 1 of Unclassified Use Permit UUP 1 1- 01 approval. The extension request included information as to how the conditions of approval were implemented and outlined anticipated future events. 3 An unclassified use is a use that requires a special degree of control to make such use consistent and compatible with other existing or permissible uses in the same zone. The sprint boat track use is an outdoor activity that is not identified as a permitted or conditionally allowed use in any zone in the City Due to the unique nature of the proposed use, an Unclassified Use Permit is the appropriate method of review 4 Per 17 96.070(E) PAMC, Extensions of approved conditional use and unclassified use permits shall be considered in accordance with the same procedures as for the original permit application, and may be granted for a period of one to five years. provided that the following minimum criteria are met: 1 The use complies with the permit conditions. 2. There have been no significant, adverse'changesiin circumstances. 5 Section 17.96.070(F) PAMC Minor Amendment of Approved Conditional Use Permits provides that "Upon written request submitted to the Department of Community and Economic Development a minor amendment may be made to an approved conditional use permit if the amendment does not increase the intensity of the use by more than 10% of the original approval, the amendment will not be materially detrimental to the public welfare or injurious to property or improvements in the vicinity and zone in. which :the subject property is located, and the site has been posted and adjacent property owners notified fifteen (15) days prior to the decision. Any applications that are not granted a minor amendment pursuant to this section must obtain an amendment through the City s normal conditional use permit procedure." 6. The property owner is working with Department of Ecology and Port of Port Angeles staff regarding the potential supply of water for future site activities. Any existing water well(s) on the property are available for onsite use. however, the daily withdrawal from any existing onsite wells is limited to 5000 gallons per day Any withdrawal greater than 5000 gallons per day will need a water right permit from the Department of Ecology 7 Following track development, the City's Public Works and Utilities Department noted that the clearing and grading permit issued for the original site development needed to be corrected. A farm road located in the southwest area of the property had been considerably widened during track development but did not appear on the initial clearing and grading pennit. The applicant modified the map that was originally submitted for the clearing and grading permit and, following review including storm water regulations, the necessary land use permits have been revised and are current. Site development did not require a storm water permit. The City's Fire Department had no concerns to report as a result of the initial sprint boat event that served approximately 9,500 spectators. 8. County Road Department staff noted that traffic for the event was not an issue. 9 Public notice of the request appeared in the Peninsula Daily News on November 24, 2011 The site was posted and notification was mailed to property owners within 300 feet of the site and to parties of record to the original application process on November 23, 2011 M -4 Planning Commission ALmoes December 14, 201/ Page 5 Three letters were received in opposition to extension of the use as a result of the public notification process: One letter was received from the Dry Creek Coalition that raised issues regarding water usage and wetland intrusion. A second letter from the Center for Environmental Law Policy (CELP) raised the same issues. The third letter from Shirley Nixon echoed the concerns of the first two letters but included discussion regarding the clearing and grading, water use, and storm water matters. None of the issues raised in opposition to extension of the permit related to operation of the use, which is the subject of the extension review Water usage is under the purview of the Department of Ecology and wetland concerns are under the jurisdiction of the Army Corps of Engineers. The City of Port Angeles permitting realm is that of land use. The property owners are working with jurisdictional agencies to address any matters of concern. City staff spoke with representatives of both the Department of Ecology and Army Corps of Engineers on December 7, 2011 No violations were reported that were not being satisfactorily addressed following said agency site visits. Several'e -mails Were also received as a-resultof the publicmotification that commented on the success of the September, 2011, sprint boat event and encouraged continuation of such events at the site as being in the best interest of the Port Angeles community Conclusions. Based on the information provided in the Department of Community Development Staff Report for CUP 11 -01 dated March 23, 2011, the October 11, 2011, request for extension, all information in the public record file,'comments, and testimony presented during the public hearing, the Planning Commission's discussion and deliberation, and the above listed conditions of approval and findings, the City of Port Angeles Planning Commission hereby concludes that: The initial sprint boat race was conducted in accordance with permit conditions. The clearing and grading permit necessary for development of the track was amended when it was determined that it did not include all of the work done in track development. All local permits have been obtained for the work done in developing the site and permits are up to date including storm water 2. As conditioned, provisions have been made to address public health and safety matters with regard to future events. No significant or adverse changes in circumstance are known to exist. 1 3 The extension request was processed in accordance with Section 17.96.070 PAMC. 4 Following review of all information presented during the review period. it is appropriate to grant the extension as requested. The motion was seconded by Commissioner Boyle and passed 5 0. CONDITIONAL USE PERMITS CUP 11 -03 AND 11 -04 LOWER ELWHA KLALLAM TRIBE 2917 Edgewood Drive: Request to allow (2) free standing off site directional signs in the IH Industrial Heavy zone. Planning Manager Sue Roberds stated that two conditional use permits were submitted for two off site directional free standing signs on a property zoned Industrial Heavy The applications M -5 Planning Conumsnmt ASnutes December 14. 2011 Page 6 were submitted by the Lower Elwha Klallam Tribe (LEKT) for property owned by A2Z Enterprises. The applications are essentially exactly the same, e.g., size, informational content, design. with the exception of where they are placed on the site and one sign is single sided. Conditional Use Permit CUP 11 -03 is for a double sided sign at the northeast corner of Lower Elwha Road and Edgewood Drive that will replace a very outdated minimally done wooden sign that has existed at that location for many years. Conditional Use Permit CUP 11 -04 is a new sign to be located at the intersection of Dry Creek Road and Edgewood Drive to direct travelers to the Lower Elwha Road location. At this time, the applicants, with knowledge of the property owner, would like to proceed only with application CUP 11 -04 to allow time for further negotiation with the property owner as to the property owner s signage needs. Planner Roberds asked that the public hearing for Conditional Use Permit CUP 11 -04 be continued to January 11, 2012. Chair Reiss opened the public hearing. 'Carol 'Brown', Lower Elwha Klallam Tribe, 2861 'Lower Elwha 'Road 'stated' that staff'had done a thorough job describing the proposed use and asked that Conditional Use Permit CUP 11- 03 be approved and that CUP 11 -04 be continued to allow further negotiation with the property owner She noted that the free standing proposed under CUP 11 -03 is much more aesthetically pleasing than the existing sign. The sign area on the 100 sq.ft. structure is 24.6 sq. ft. Jackson Smart, 472 Mt. Pleasant Road stated that the sign area contains directional information to the Lower Elwha River Casino but does not contain changeable advertising information of a commercial nature. There being no further testimony, Chair Reiss closed the public hearing. Commissioner Matthews moved to continue Conditional Use Permit CUP 11 -04 to January 11, 2012. Commissioner Anderson seconded the motion which passed 5 0. Lengthy discussion ensued regarding how sign area is calculated. Staff pointed out that the Industrial Heavy (IH) zone allows up to 300 square feet of off site advertising signage. The proposed sign structure is 100 square feet per side with sign area of 24.6 square feet per side, as testified by the applicant. No matter how the sign area is measured, it doesn't exceed the off site signage permitted in the IH zone. Chair Reiss discussed the sign definitions in Section 14.36.320 PAMC with Attorney Greenwood and Planning staff Following continued discussion, Commissioner Miller moved to approve Conditional Use Permit CUP 11 -03 with the following conditions, findings, and conclusions: Conditions: 1 Conditional Use Permit CUP 11 -03 is issued to the Lower Elwha Klallam Tribe and Elwha River Casino for the installation of an off site directional sign as shown in application materials presented to the City of Port Angeles on November 14 2011 The sign shall be constructed as is presented in the application materials and shall be no larger M -6 Planning Commzsszon ,VLnmes December. 14 2011 Page 7 than is shown in the application materials (10' x 10'). Subdued directional lighting may be used between dusk and dawn. Internal and /or backlighting is not permitted nor is signage that chases, blinks, flashes, etc. The signs must provide direction to an ongoing use. If the use ceases, the signs) shall be immediately removed. Signage must be directional in nature and shall not contain event advertising. 3 Signs shall be placed entirely on private property as is described in the application materials and shall not interfere with ingress /egress to said private property Findings: 1 A conditional use permit application (CUP 11-03) was submitted to the City of Port Angeles by the Lower Elwha Klallam Tribe (LEKT) and Elwha River Casino representatives on November 14, 2011 to place an off site directional sign on property zoned Industrial Heavy (IH). The sign structure is intended to provide direction to the Lower Elwha River.Casino and is planned to be.10' x 10' in size with a.sign area (double sided) of approximately 24 sq.ft. Sign location is at the northeast corner of the intersection of Lower Elwha Road and Edgewood Drive, 2917 Edgewood Drive. 2. The subject property is owned by A2Z Enterprises. A2Z Enterprises representative Dan Morrison signed the application acknowledging the submittal. 3 The site is located at the southwest City limits in the Southwest Planning Area of the City Properties within the City limits in the area include the Port Angeles International Airport and small industrial complex buildings north and northeast of the site. Residential uses south and west of the site are located in the County A residence exists immediately adjacent to the site (east) that is owned by a business partner of the subject property owner Properties in the area are suburban in use and design and are much larger than standard City lots. 4 The subject property is approximately 80 acres in area with dimensions of approximately 2500+ lineal feet (east /west) x 1390 lineal feet (north /south). Minimum lot area in the IH zone is 7,000 square feet in area. Section 17.34.010 Port Angeles Municipal Code (PAMC) Purpose reads This is the least restrictive industrial zone intended to be the area that heavy industry could develop causing the least impact on other land uses. Significant adverse impacts can be expected from permitted industrial uses that involve hazardous materials, noise. air and water pollution, shift work around the clock, entertainment businesses with adult -only activities, and outside storage yards and manufacturing activities. This zone provides the basic urban land use pattern, for heavy industrial uses with direct access to major transportation facilities, design standards ,far greater truck traffic. and buffers for non industrial uses unless deemed impractical 5 Section 14.36.070(4) PAMC states "One off- prernise sign containing a commercial message unrelated to any use or activity of the property on which the sign is located, including billboards and other outdoor advertising signs not exceeding three hundred (300) square feet in total sign area and thirty -five (35) feet in height, may he permitted on any site that does not contain any sign for businesses located on said site, subject to approval of a conditional use permit No billboard or other off premise outdoor 2. M -7 Planning Commission Minutes December 14. 20/1 Page 8 advertising sign shall be located within 1, 000 feet of another such sign that is on the same side of the street. 6. Section 17.34 040 PAMC outlines conditional uses that may be considered in the Industrial Heavy zone. Subsection "G" allows "Off premise outdoor advertising signs" while Subsection "L" allows "Other uses compatible with the intent of this Chapter" by conditional use permit. 7 Section 17.96.050 (A) PAMC Conditional Use Permit reads "The Planning Commission shall consider applications for Conditional Use Permits of uses as specified in the applicable Chapter of the Zoning Regulations. The Planning Commission may grant said permits that are consistent and compatible with the purpose of the zone in which the use is located. consistent with the Comprehensive Plan, and not contrary to the public use and interest. The Planning Conmtission may refuse to issue a Conditional Use Permit if the characteristics of the intended use as related to the specific proposed site are such as would defeat the purpose of these Zoning Regulations by introducing incompatible, detrimental, or hazardous conditions, 17 96.050(B) PAMC reads In each application the Planning Commission may itnpose whatever restrictions or conditions they consider essential to protect the public health, safety, and welfare, and to prevent depreciation of neighboring property -17.96.050(C).PAMC reads "The purpose of a Conditional Use Permit shall be to assure that the maximum degree of compatibility between uses shall be attained. The purpose of these regulations' shall be maintained with respect to the particular use of the particular site and in consideration of other existing and potential uses within the general area'in which such use is to be located.'' 8. The proposal will allow an off site free standing advertising sign in the Industrial Heavy zone. The number of off site signs in the IH zone is restricted by a placement distance of 1,000 feet between such signs. No signs currently exist on the subject property that most recently supported a sprint boat race event. 9 Application materials indicate that the directional sign will be indirectly lit and will contain directional information to the Elwha River Casino Total sign area is noted as being 100 square feet. Sign area is measured as being the sign face plus any recognizable logos or commercial wording. 10 The Elwha River Casino is not located in the City limits, but is located on Tribal land. A directional sign to the Lower Elwha Klallam Reservation has existed at the southwest corner of the City limits, on the subject property for many years. With construction of the Elwha River Casino, it is desired to be able to direct travelers from Highway 101 or from within the City to the Casino location with some success such that travelers do not wander throughout residential areas without direction. The proposed location will legally permit a previously nonconforming sign use at that location. 11 Public notification of pending conditional use permit applications is required per Section 17.96.070 PAMC. The site was posted and notice sent to surrounding property owners within 300 feet of the site by U.S. Mail on November 17 2011 Public notice was M -8 Planning Commission Minutes December 14. 2011 Page 9 provided in the Peninsula Daily News on November 20, 201 I No written comment has been received as a result of the public notification process. 12. The application was reviewed with respect to the Goals, Policies, and Objectives of the City's Comprehensive Plan and Land Use Map. The site is designated as Industrial on the Comprehensive Plan Land Use Map. Goals and policies specific to directional signage are not addressed in the Comprehensive Plan. However, the entire Comprehensive Plan was reviewed with regard to the proposal. The Goals and Policies found in Attachment "C' to this staff report were found to be relevant to the proposal. Conclusions: A. The application was processed according to Section 17.96 PAMC for conditional use permits. As conditioned, the proposal is in compliance with Section 17.34 040(G) PAMC that allows off premise advertising signs in the Industrial Heavy zone by conditional use permit. Approval is in compliance with Title 17 (Zoning) PAMC. B. As conditioned, the sign placement provides for the public interest, welfare, and safety and does not introduce incompatible, detrimental, or hazardous conditions to the general area. Commissioner seconded the motion which passed 5 0. COMMUNICATIONS FROM THE PUBLIC None STAFF REPORTS Sue Roberds stated that several Commissioners' terms of' office will expire in February Comissioners Powers, Miller, and Boyle will need to reapply for their positions if they wish to continue on the Commission. A vacancy has been created with election of Commissioner Bruch to Council. REPORTS OF COMMISSION MEMBERS None ADJOURNMENT The meeting adjourned at 8:00 p.m. Sue Roberds. Secretary Doc Reiss, Chair PREPARED BY S. Roberds M -9 0 ZW W W m a uj O W W w W O re V O 0 t z w w a w a F} z x Z SO O c75 Q us 0 W A S H I N G T O N U S A. DATE: JANUARY 17, 2012 TO: CITY COUNCIL FROM: DAN MCKEEN, FIRE CHIEF SUBJECT: FIRE DEPARTMENT ANNUAL REPORT It is with great pride that the Fire Department presents to the community and to the Council our 2011 Annual Report. The report reflects the accomplishments and activities of the Department during our-120 year of dedicated service•to.the citizens and visitors.of Port Angeles: 2011 brought many challenges and successes, with some of the year's highlights listed below and contained within the report: Successful in receiving a grant from the Department of Homeland Security -As part of the grant, the Department will be receiving at least five mobile data terminals (MDTs) that will be installed in our primary emergency response vehicles. Coupled with the recently approved wireless mesh network, these MDTs will be a considerable enhancement to our field operational capability Worked closely with the Police Department on a collaborative effort to provide automatic external defibrillators (AEDs) for placement in patrol vehicles. Since these AEDs have been placed in patrol cars, they have been utilized on several occasions. Started conducting a review of the City's Comprehensive Emergency Management Plan (CEMP). Initiated by a change at the state level. this review will ensure that both the City and County CEMPs are up to date and are formatted the same as the state and federal planning documents. 1 would like to thank the Council for your continued support. The Fire Department realizes that it is through this support that we can carry out our mission to provide exceptional emergency services directed at improving the quality of life for the citizens and visitors of our area. The Annual Report is available on the City's website and can be accessed at www. citvofpa .us /firedeptAnnualReport.htm. In an effort to reduce costs and preserve our environment, the Fire Department is no longer providing paper copies of our annual report. 1 can he reached at 417 -4651 to answer any questions that you may have regarding our annual report. Pc: Kent Myers, City Manager M -11 Port Angeles Downtown Association October 2011 Barb prepared and sent quarterly report for Main Street Presented third quarter report for city council and presented it October 18, 2011 Design committee sponsored a Window Display Class Oct. 20, attended by 15 people Attended ribbon cutting at Cabled Fiber Studio Worked with Corey Delikat on ribbon cutting for restrooms on Front Street, between Family Shoe and Odyssey Bookshop Promotionscommittee sponsored .Great.powntownCrab Hunt Oct 8 9,.,, 27 businesses participated and most reported 30 -40 people came in to have their cards punched Board members and Youth Volunteers manned the PADA booth at Dungeness Crab Seafood Festival, youth volunteers also assisted with the Crab,Trap Trolley How Sweet It Is at The Beanery Heritage Days Committee sponsored Whispers of our Past, a tour of Ocean View cemetery that introduced 6 people who shaped our community Design committee worked with Kiwanis on contract for services to install the Winter light in the street trees Promotions committee had a planning meeting to set the calendar for 2012 on Oct. 23 Promotions sponsored downtown Trick or Treat, Youth volunteers helped businesses pass out candy Committee meetings. Promotions 3 Design Business Development Budget Organization Youth Volunteers 5 Parking Art on the town M -12 Port Angeles Downtown Association November 2011 Barb Attended Main Street Managers Retreat Alderbr000k Resort November 9 10 and attended Girls Night Out in Gig Harbor on her way home Design committee worked with City Light to replace lights on the Christmas Decorations with LED lights. The committee, and local Boy Scouts worked over 2 days to remove the strings of old lights and replace them with new ones on over 70 decorations. Design committee supplied 10,000 lights for the Community Christmas Tree and over 100,000 lights for the street trees Barb Nominating Committee communicated with city to receive aging report for PBIA to determine who is eligible for elections, made copies of nomination forms and adcompanyirig materials, collated and stuffed envelopes, mailed nomination forms. Made sure updated PBIA list received November 1, 2011 matched names and addresses in database and on mailing labels. Sent list to Jan for cross checking with website listings. Business Development facilitated a Flu shot clinic Nov 22 for businesses Youth Volunteers assisted Grace Barb with decorating a tree for Festival of Trees that featured downtown and local businesses. The tree had $5400 worth of premiums and sold for $2200 Several board members and Barb attended Buxton meeting at city council chambers, approximately 13 downtown businesses also attended Promotion Committee presented Community Christmas Tree Lighting ceremony with 4 musical acts. Santa arrived accompanied by Port Scandalous Derby Dolls to light the Community Christmas Tree Charlie Smith attended Hurricane Ridge marketing meeting on Nov 16 Committee Meetings: Art on the town Parking Budget Business Development Promotions 2 Organization Youth Volunteers 3 M -13 Port Angeles Downtown Association December 2011 Barb attended a meeting at city hall to discus the CSO and Waterfront construction projects this summer The board hosted How Sweet It Is! at the PADA office, 18 people attended Barb attended memorial service for Len Beil, a long time volunteer in the community and downtown As part of Port Angeles Ambassadors, Barb attended ribbon cutting at Pie Shack and Ambassador Christmas party Promotions committee sponsored Shop Til You Drop, Youth Volunteers offered gift wrapping services. Several board members attended Open House at Olympic Peninsula Visitor Bureau Nominating committee distributed, collected and counted ballots for the election of 2012 Board of Directors Organization committee worked with graphic designer Charlie Comstock to design a brochure for the B 0 Tax program which was then sent to several businesses and hand delivered to others as well. Charlie Smith, Richard Stephens, Bob Lumens, Jan Harbick Barb met with Nathan Roberta to go over plans for the Waterfront project and to voice some of the design committees concerns Barb Richard met with Richard Bonine to discuss plans for Heritage Days Barb Richard Stephens are on the Sesquicentennial committee and continue to meet with them. Barb Grace Kauffman attended Choose Local meeting Dec. 14 Committee Meetings. Design Promotions Heritage Days Business Development Organization Youth Volunteers 3 M -14 4:18 PM PADA Profit Loss •ccrual Basis October through December 2011 01/11/12 Ordinary Income /Expense Income 4150 Art on the Town Contributions 4200 City Contract 4400 Holiday Lights Contributions 4450 Membership Dues Fund Raising 4451 B 0 Fundraiser 4450 Membership Dues Fund Raising Other Total 4450 Membership Dues Fund Raising 4550 Parking Income 4552 Dupar 4553 Parking Permits Total 4550 Parking Income 4600 PBIA Assessments 4700 Promotions Income 4702 Heritage Days Income 4703 Steam Ball Income 4700 Promotions Income Other Total 4700 Promotions Income 4999 Interest Income Total Income Expense 6050 Administrative Expenses 6054 Newsletter 6056 Economic Development Fund 6050 Administrative Expenses Other Total 6050 Administrative Expenses 6090 Art on the Town Expenses/Trans 6100 Communication 6102 Postage 6103 Telephone /Internet Total 6100 Communication 6120 Contract Labor Admin. Asst. 6130 Design Expense 6131 Design Exp Benches 6130 Design Expense Other Total 6130 Design Expense 6160 Dues, Licenses, Fees 6161 Bank Service Charges 6160 Dues, Licenses, Fees Other Total 6160 Dues, Licenses, Fees 6190 Holiday Lights 6220 Office Expense 6221 Maintenance 6223 Supplies Total 6220 Office Expense 6250 Organization Committee 6251 Youth Volunteers Total 6250 Organization Committee 6300 Parking Expense 6309 Parking Lot Planters 6312 Sweeping /Snow Removal Total 6300 Parking Expense 6410 Printing, Photocopies 6430 Promotions Oct Dec 11 6,950 00 320 00 5,958.00 834.97 100 00 2,700.00 600 00 32,774 62 115.00 24.32 308.51 190 95 813 77 7 45 142 90 7.50 250.00 113.82 226 03 151.76 379.40 1,000 00 5,000 02 300.00 7,270.00 6,792.97 9,000.68 3,400.00 17.34 10.95 447 83 252 00 1,004 72 390.00 150 35 257.50 1,253.57 339.85 17.34 531 16 500 00 M -15 Page 1 4:18 PM PADA 01/11/12 Profit Loss Accrual Basis October through December 2011 6432 Heritage Days 6436 Steam Ball 6430 Promotions Other Total 6430 Promotions 5,689.22 6440 Rent 6500 Payroll Expenses 6501 Net Wages 6511 Employee Pd Medical 6501 Net Wages Other Total 6501 Net Wages 6502 Employment Security Taxes 6503 FICA 941 Employer 6504 FICA 941 Employee 6505 L &I Taxes Total 6500 Payroll Expenses 6600 Employee Benefits 6602' Medical Insurance Total 6600 Employee Benefits Total Expense Net Ordinary Income Net Income Oct Dec 11 445 00 149 88 5,094 34 169.16 7,853.35 8,022.51 11844 793 74 2,080.14 128 41 750.00 11 143 24 763.62 763.62 23,490 40 9,284.22 9,284.22 M 16 Page 2 4:19 PM 01/11/12 •Accrual Basis PADA Balance Sheet As of December 31, 2011 ASSETS Current Assets Checking /Savings 1110 Art on the Town 1120 Emerg. Op Fund CD 1130 First Federal 1140 Parking 1141 Parking CD 1150 Petty Cash 1160 Plaque Resery Acct 1165 Segway Account 1170 Downtown Dollars Account Dec 31, 11 2,393.36 13,912.00 5,210.14 2,868.42 1,135.79 30 00 2,519.85 439.86 5,702.29 Total Checking /Savings 34,211 71 Accounts Receivable 1200 Accounts Receivable 1220 A/R City Contract 5,000.00 1230 A/R Dupar 2.000,00 1240 A/R Parking Permits 708 33 1250 A/R PBIA 3,000.00 Total 1200 Accounts Receivable 10,708.33 Total Accounts Receivable 10,708.33 Total Current Assets 44,920.04 Other Assets 1610 Association Equip 1615 Assn Equip Accum Depr 1620 Tree Lighting 1625 Lighting Accum Depr Total Other Assets 0.00 2,138.20 2,138.20 1,525 00 1,525.00 TOTAL ASSETS 44,920.04 LIABILITIES EQUITY Liabilities Current Liabilities Other Current Liabilities 2200 Downtown Dollars Liability 2201 DT Dollars Purchased 66,452 29 2202 DT Dollars Spent 57,850 00 Total 2200 Downtown Dollars Liability 8,602 29 Total Other Current Liabilities 8,602.29 Total Current Liabilities 8,60229 Total Liabilities 8,602 29 Equity 3000 Opening Bal Equity 42,520.75 3900 Retained Earnings 6,695.79 Net Income 492.79 Total Equity 36,317 75 TOTAL LIABILITIES EQUITY 44,920.04 M 17 Page 1 548 PM 01/09112 Accrual Basis Ordinary Income/Expense Income 4100 Admrnlstrattoe C0Ilections 4110 Newsletter 4100 Administrative Collections Other Total 4100 Administrative Collections 4150 An 0n the Town Contributions 4200 City Conireq 4300 Design 4301 Design (Benches) Total 4300 oeslgn 4400 Holiday Lights Contribution 4450 Membership Dues Fund Raising 4451 8 O Fundraiser 4450 Membership Dues- Fund Baking Other Total 4450 Membership Dues Fund Raising 4550 Parking Income 4552 Duper 4553 Parking Permits Total 4550 Parking Income 4600 PBIA Assessments 4700 Promotions Income 4702 Heritage Oays Income 4703 Steam Ball Income 4700 Promotions Income Other Total 4700 Promotions Income 4600 Youth Volunteer Income 4999 interest ncome Total income Expense 6050 Administrative Expenses 6053 Annual Meeting 6054 Newsletter 6055 Travel Reimbursements 6056 Economic Development Fund 6050 Administrative Expenses Other Total 6050. AOmrnlslnllva Expenses 6060 Advertising Expense 6090 Ad on the Town Expenses/Trans 6091 installation 6092 Sculpture Purchase 6090 An on the Town Expenses/Trans Other TOal 6090 Art 0n the Town Expenses/Trans 6100 Communication 6102 Postage 6103 Telephone/Internet Total 6100 Communication 6120 Contract Labor Admin Asst. 6130 Design Expense 6131 Design Exp- Benches 6132 Downtown Paint Expenses 6130 Design Expense Other Total 6130 0esign Expense 6140 Donation 6160 Dues. Licenses, Fees 6101 Bank Service Charges 6160 Dues. Licenses, Fees Other Total 6160 Dues. Licenses, Fees 6170 Business Oevelopemenl 6190 Holiday Lights 6200 Insurance 6202 Liability Total 6200 Insurance 6210 Office Equlpmenl 6220 Gigue Expense 6221 Maintenance 6222 Other Expense 6223 Suppll0a Total 6220 ONlce Expense 6250 Organization Committee 6251 Youth Volunteers 6250 Organlaatlon Committee Other Total 6250 Organization Committee 6300 Parting Expense 6304 Legal 6305 Lot Weed /Moss Control 6307 Paving /Striping 6300 Seel Looting 6309 Perking Lot Planters 6312 Sweeping0now Removal Total 6300 Parking Expanse 6410 Printing, Ph0tocOpies 6430 Promotions 6432 Heritage Orris 6436 Steam Bell 6430 Promotions Other TOlal 6430 Promotions 6440 Rent 6460 Web Site 6500 Payroll Expenses 6601 Net Wages Jan Dec 11 PADA Profit Loss Budget Performance January through December 2011 Budget Jan Dec 11 YTD Budget Annual Budget 400 00 1.000 00 400 00 1.000 00 1.000 00 670 00 670 00 1,070 00 1,000 00 1,07000 1,00000 1,00000 2133600 1,500 00 21.33600 1,50000 1500.00 18.333 10 20,00000 18.333 10 20.00000 20,00000 000 3,00000 000 3,00000 3.000 00 000 3.00000 000 3,00000 3.00000 300 00 1.000 00 300 00 1,000 00 1,000 00 745000 3,00000 7,45000 3,00000 3,00000 48000 50000 48000 50000 50000 7,93000 3.50000 7.93000 3.50000 3.50000 2360820 24,00000 23,50525 20,000 00 24,00000 5,77857 8.50000 5,77857 8.50000 8,50000 2958685 32,500 00 29.506 85 32.500 00 32 500 00 35,95317 36,00000 35,95317 36,00000 36,00000 3.200 00 3.20000 7.82000 782060 6,86342 5,00000 6.86342 5,00000 5,00000 17,88342 5,00000 _17.80342 5.00000 5,00000 64000 64000 4034, ,10000 4634 10000 133,078 58 107600 00 133,076.88 103 600 00 103,60000 072 BO 500 00 87280 500 00 50000 55002 77500 55002 71500 77500 1,264 52 1.000 00 1,284 52 1.00000 1,000 00 2,65602 4.91000 2,65682 4,91000 4,91000 2,980 60 1.000 00 2,900 60 1.000 00 1.000 00 8,32476 8,16500 832476 8,18500 5.18500 50 00 1,000 00 50 00 1000 00 1,000 00 578 56 578 56 20,000 00 20.00000 1,61643 2,00000 1.61643 2,00000 2,00000 22,19499 2,00000 22,19499 2.00000 2,00000 32095 30000 32495 30000 30000 1,97108 2.55000 2,97106 2,55000 2,55000 3.29603 785000 3,29603 2,85000 2.85000 198875 1,500 DC 1,980.75 1,50000 1.50000 1,50745 150 D0 1,50745 15000 150 00 43 35 03 35 1,14107 5.00000 114107 5,00000 600000 2,69157 515000 2.69187 5.15000 5,150.00 25000 85000 25000 85000 85000 20948 1000 20948 1000 1000 47500 45000 47500 45000 45000 68448 46000 68445 46000 46000 525 74 500 00 525 74 500 00 500 00 475357 350000 475357 3.50000 3.50000 183300 2.00000 1.83300 2,00000 2 000 00 183300 2,00000 1,03300 2.000 00 2.000 00 000 50000 000 50000 50000 53090 65000 53090 65000 65000 000 10000 000 10000 10000 75234 75000 78234 75000 75000 1313 24 1,500 00 1.313 24 1500 00 1,500 00 124447 1,24447 20994 50000 20994 50000 50000 1.454 41 500 00 1.454 41 500 00 500 00 0 00 1,000 00 0 00 1.000 00 1,000 00 135 50 135 50 000 1.50000 000 1,50000 1,50000 1,409 20 1.500 00 1.409 20 1 500 00 1 500 00 72096 1,00000 75006 1,00000 1,00000 3.577,20 3.000 00 3,57720 3,00000 3,00000 5,84276 6,000 00 5,84276 8,00000 8,00000 991 50 1.500 00 991 80 1,500 00 1,500 00 2424.13 2.42413 6,32131 6.32131 17,63647 10,000 00 17.63647 10,000 00 10 00000 26,361 91 10,000 00 26,391.91 10,000 00 10.000 00 el 3 000 00 3,00000 3,00000 3.000 00 3,000 00 000 25000 000 25000 25000 M -18 peg 540 PM 0509612 Accrual Basle 6516 Employee Pd Medical 6501 Net Wages Omer 101016501 Net Wages 6502 Employment Security Taxes 6503 FICA 941 Employer 6504 FICA 941 Employee 6505 LEI Taxes 6506 FBTA Taxes 1940) Total 6500 Payroll Expenses 6600 Employee Benellls 6601 Annual Pkg Permit 6602 Medical Insurance Total 6600 Employee Benefits Total Expense Net Ordinary Income Nei Income Jen Dec 11 930 38 31.406 10 PADA Profit Loss Budget Performance January through December 2011 32236 48 339 32 321361 632653 378 29 5600 44,70073 1.961 00 31,20000 Budge) Jan -Dec 11 YTO Budget Annual Budget 33,161 00 129 00 3,18000 9,200 00 300 00 930 30 31.40510 3233548 33932 3.21361 6 37653 37879 56 00 06,470 00 44,700 73 1,951 00 31,20000 33,16100 129 00 3.18000 9.20000 300 00 1,961.00 31,20000 33 16100 129 00 3.10000 9 20000 300 00 46,470 00 4642000 000 16500 000 16500 16500 3,98448 3,22000 3 984 45 3,22000 322000 3,98408 3.68500 3 984 48 3,85500 3 855 00 134 252 52 103.600 00 134,262 52 103 600.00 103,600 00 1,18364 000 118364 000 000 1,16360 000 1,18364 0.00 000 M 19 Paget r AVERAGE DAILY WATER DEMAND 'EAST YEAR TO DATE (MG) 2 YEAR TO DATE (MG) 2.491 We J.00..11191, 9tPORT 2111174$ CITY OF PORT ANGELES PUBLIC WORKS UTILITIES DEPARTMENT 2011 4th QUARTER REPORT January 2012 WATER DEMAND 02010 02011 RAINFALL SEWER/STORM SYSTEM MAINTENANCE MONTH (FTj YR. 01,1101 230 5,7671 SEWER SYSTEM JETTED 3,870 STORM DRAINS JETTED 0 SYSTEM TV INSPECTED 0 JUN [2010 02011 -10 Year Average RAINFALL DATA (inches)_ 10 YR AVG TOTAL TO DATE 1 24.271 THIS YR TO DATE I 29.77, M -20 TEMPERATURE e 21'..r. TEMPERATURE [Degrees F] o Pl tl 8 8 8 d P LET I I I I I IIII II ce. 4 r..= .7........ F i I 1 1 1 1 1 o JAN FEB APR MAY J N L ADO SEP OCT DEC 02010 0201 10 Year Average TONNAGE RECEIVED THIS YR TO DATE (TON R 93,886 1 LAST YR TO DATE (TON: 93,820j PO UOIMICAL•KEINYC AVERAGE ELECTRICAL USE LAST YEAR TO DATE (M 16.V 62.21841 THIS YEAR TO DATE (M Kw 62.2793 ;REGIONAL TRANSFER STATION DISPOSAL' M 21 PUBLIC WORKS UTILITIES DEPARTMENT QUARTERLY REPORT .WATER Responded to 20 customer service requests Repaired 21 water service leaks Repaired 14 water main breaks, Assisted contracters as needed Replaced 2 water meter Performed required Deptartment of Health testing Repaired or replaced 1 tire hydrant Performed utility locates as requested Fire hydrant water main flushing 266,545 gallons Water loss due to lea WATks 820,550 gallons WASTEWATER COLLECTION_ Unplugged 5 non -city sewer lines and 2 city lines Performed maintenance at Pump Stations, Jetted, Dye tested Downtown Bldgs Assisted Light Operations hydro-excavate several pole holes with the Vactor Assisted WWTP crew with hot water line replacement, Attended CMMS Training Assisted Fleet Maintenance repair the front reel on the let truck Unplugged several pumps at Pump Station 4, Worked at Pump Stations 1 3 Fixedgenerator at Pump Stations 4 12gblown fuses) Widened manhole at 3rd /4th Oak/Cherry to allow access for video equipment Replaced bad propane gauge at Pump Station 4 on the 500 gallon tank WA TREATMENT NPDES monthly discharge mondonng report submitted Worked with local dischargers on pretreatment issues Performed process control on secondary treatment system Completed monthly 0 M on leachate collection and treatment systems Conducted CSO inspections in compliance with Pollution Prevention Plan Submitted Wastewater outfall inspection report to Ecology Completed heat system line replacement Continued work on 4' HRR /HRS heat system line replacement Pumped Landfill seawall o.6 Emptied Landfill sludge storage pond for inspection Continued pumping Sodium Hypochlonte to headworks for odor control Contractor tested overhead hoists all passed, Attended PNCWA conference EQUIPMENT SERVICES SW1080 SW1081 Box hinges cracked Warrantee repair by manufacturer Extended bollards at Transfer Station scale shack for flood lighting installation Complete suction hood rebuild on ST4500 Used 10,899 gallons of diesel fuel citywide and 13,680 gallons of unleaded Rebuilt box floor and packer blade slides on SW5801 1,158 Total mechanic hours billed for 10/1/11 to 12/31/11 Completed 390 job orders, Cost of pads used was $38,406 00 Repaired major crack in mower arm on 1506 LIGHT OPERATIONS Repaired 18 street lights Performed 14 service connections Performed 432 electncal Inspections Completed 179 utility locates Large projects this quarter included Maloney Heights Subdivision, Re- routing feeder at Olympic Medical Center and Francis Street Park, and Converting overhead line to underground at Milwaukee Grade and Dry Creek SOLID WASTE Submitted Landfill Post Closure quarterly reports, MSDS HAZ Plan updated Attended Joint Solid Waste Advisory Board meeting Developed and distributed Solid Waste customer survey Submitted Waste Discharge permit DMR to Dept of Ecology Attended Waste Connections quarterly meeting and PW U Safety meeting Compost testing, Transfer Station 2012 rates, Landfill gas testing Conducted post- closure monthly inspections at the Landfill STREETS KS STEETS &PAR Repaired asphalt and concrete utility cuts, Patched potholes citywide Planted fall and winter plants, Performed Atrium maintenance at City Hall Sign maintenance including that from yearly inspections per retro reflectivity regmremei Traffic control for Crabfest, Cut brush that impedes visibility of signs citywide Performed repairs City Hall, Vern Burton, Senior Center, Carnegie Library, Gateway Managed contracts for major asphalt repairs due to water breaks at 18 /Butler 6/H Sts Assisted with burials, ground maintenance,-and equipment servicing at Cemetery... Turf mowing weed eating at parks facilities Cleaning of downtown tree pits Citywide mowed /graded/ graveled /ground /educted /swept/apphed herbicide Downtown/Edrz Hook restroom repairs CFO project, Ungation repairs Installed Christmas tree at Conrad Dyar Fountain, Field. Facility Playground inspectic Managed contract for raised pavement marker maintenance citywide (centedme button. Sports Maintenance Painting and maintaining soccer and football fields W ntenzed restrooms for closure dunng cold weather, Farmers' Market General sign, building, and key maintenance, and curb painting citywide Dead animal control citywide, Adopt a Highway and illegal dump trash pick up Completed catch basin cleanings total of approximately 950 catch basins cleaned Installed thermoplastic crosswalk at Marine Dnve and Tumwater Street Installed stormwater inlet structure and tied it to existing culvert on Hill Street Assisted SW Division tracing storm lines, sampling, and repairs to west pond intake Completed maintenance on thermo-plastic street markings citywide. School crosswalks Assisted stormwater engineer with culvert inspections and creek walks Continued street name sign changeout, All edge lines painted with County assistance ENGINEERING_ Industrial Wastewater Plant oudal( repair design Septage Receiving Station design, Pump Station 3 preliminary design Wastewater Treatment Plant PLC Replacement design, VWJTP Engineering Advanced Metenng Infrastructure (AMI) construction Pole Replacements construction; Street Lighting Upgrades construction Sewer Trestle at 8th and Francis Streets repair design Border Patrol Office construction, ACTI Expansion construction Morse Creek Hydro SCADA Improvements construction Lower Elwha Klallam Tribe Sewer Line and road design construction support Valley Creek Culvert Maintenance construction complete, landscaping Dry Creek LWD Placement /design and permit complete Olympic Discovery Trail Rip -Rap Landslide Repair construction, shut down for wine City Pier Fire Suppression construction Dry Creek Bndge and Discovery Trail trail construction tbndge complete) CSO Phase 1 Project design and permitting, CSO Monitonng Wastewater Treatment Plant Headworks Screen Replacement design 4th St Stormwater Improvements design Concrete Cylinder Pipe Transmission Line Replacement design Eclipse Industnal Park, Second Source design, A St Substation Transformer design Lauridsen Bndge Replacement engineering contract award FEMA Projects Tumwater St retaining wall, Ediz Hook rip -rap, boat dock) design Stormwater Program Needs Assessment Study design Landfill Cell Stabilization design M -22