HomeMy WebLinkAboutAgenda Packet 02/24/2004 AGENDA
~'~ --'~I_"ORT/Am'G ELES_ , CITY COUNCIL MEETING
321 EAST FIFTH STREET
WASHINGTON, U.S.A.
February 24 2004
SPECIAL MEETING - 6:00 p.m.
Becky Upton
City Clerk
A. CALL TO ORDER, Special Meeting (6:00 p.m.)
ROLL CALL -
PLEDGE OF ALLEGIANCE -
I I
Consider the siting of the water treatment facility Approve siting
at the Landfill '
C. ADJOURNMENT
G :\CNCLPKT~AGENDAXFeb 24 '04 spec cc mtg.wpd
PUBLIC HEARINGS
Public hearings are set by the City Council in order to meet legal requirements pertaining to matters such as, land use permit applications, proposed
amendments to City land use regulations, zoning changes, annexations. In addition, the City Council may set a public hearing in order to receive
public input prior to making decisions which impact the citizens. Certain matters may be controversial, and the City Council may choose to seek
public opinion through the public hearing process.
NOTE: HEARING DEVICES AVAILABLE FOR THOSE NEEDING ASSISTANCE
MAYOR TO DETERMINE TIME OF BREAK
February 24, 2004Port Angeles City Council Meeting Page - 1
pORTANGErES CITY COUNCIL SPECIAL MEETING
WAS H I N G T O N, U.S.A.
February 24, 2004
I. CALL TO ORDER - SPECIAL MEETING:
II. ROLL CALL:
Members Present:
Mayor Headrick
Councilmember Braun
Councilmember Erickson
Councilmember Munro
Councilmember Pittis
Councilmember Rogers
Councilmember Williams
Staff Present: ~~. Ot~ Sta~
Manager Quinn
Attorney Knutson ' - t
Clerk Upton Ir~
B. Collins
M. Connelly
G. Cutler
D. McKeen
T. Riepe
Y. Ziomkowski
III. PLEDGE OF ALLEGIANCE:
Led by: ~..~
CITY COUNCIL SPECIAL MEETING
Attendance Roster
DATE OF MEETING: February_ 24, 2004
LOCATION: City_ Council Chambers
pOR NGELE$
WASHINGTON, U.S.A.
CITY COUNCIL MEMO
DATE: February 24, 2004
TO: CITY COUNCIL
FROM: Glenn A. Cutler, Director of Public Works and Utilities
SUBJECT: Siting of the Port Angeles Water Treatment Plant
Summary: The National Park Service is planning to construct a municipal water treatment plant
for the City's water system at the south end of the landfill as part of the water mitigation
measures associated with the Elwha River Ecosystem and Fisheries Restoration Act.
Recommendation: Approve the siting of the Port Angeles Water Treatment Plant to be '
constructed by the Federal government provided that construction shall~ot be permitted
until the MOU between the National Park Service and the City is executed. ~
/
Background/Analysis: As part of the water mitigation measures associated with the Elwha
River Ecosystem and Fisheries Restoration Act, the National Park Service is planning to
construct a municipal water treatment plant for the City's water system. The City continues to
work closely with the National Park Service and has agreed to site the facility at the landfill. In
conjunction with our consultant, Parametrix, a site plan has been developed to accommodate a
water treatment plant and facilities associated with the waste export system that will replace the
landfill function.
The attached site plan is the preferred concept alternative. The unnamed right of way at the south
end of the landfill was vacated to accommodate the construction at the February 3, 2004 Council
meeting. The siting of the treatment plant has been discussed with, and endorsed by, the Utility
Advisory Committee at its December 9, 2003 meeting.
Staff will make a presentation on the layout. It is recommended that the Council approve the
siting plan for the Port Angeles Water Treatment Plant.
Attachment: Port Angeles Landfill Post Closure Development Site Schematic Rev 5
N:\CCOUNCIL\FINAL\Siting of the Port Angeles Water Treatment Plant.wpd
n /
ROW "% 71 oo '\
n %. J. NASON /
zoo ~ 5 ACRES /
~ON t '/300
--- :RES % 5' BIKE PATH UNITED STATES OF AMERICA '
-.~.. ~ FENCE 2.2 ACRES \.
'S
RIGHT-OF-WAY
222
22
"'~', " { EDSTO~K
? ? : Q;:__
WkSTE '
.;~ d ~ ~-COM~OST~ ~AO~UTV
(1 ]~ FG 228~ (E~ISTING)
% .~ ~~"~ PLAZ~R ORT GEL
~%~ I FQFND Pest C,esu,e ~eve~o,~men'i
SCALE IN FEET PARCEL LINE ~ RIGH~-OF-WAY,~'//'/~ BIKE PATH S,~e~ SC~=~" ~ ~'~
~~ [~i'!'1 IDEN~FIED FOR
~ ! ~ ] RIGHT-OF-WAY LIMIT DE~LOPMENT ~X PROPOSED FENCE ~SV 5
0 50 lO0
Port Angeles
Municipal Water Treatment Plant
Siting
City Council Meeting
February 24, 2004
Presentation
· Background
· Issues with Municipal Water Treatment Plant Siting
· Siting Plant
· Recommendations
· Questions
Background
· Elwha River Ecosystem and Fisheries Restoration Act
(EREFRA)
- Construct Water Mitigation Facilities
- Municipal Water Treatment Plant ~ Landfill
- Industrial Water Treatment Plant ~ Elwha River
· Bilateral Compliance Agreement w/DOH
- Ground Water Under the Influence of Surface Water aka GWI
- Filter Municipal Water Supply or
- Demonstrate Protection without Filtering
· DOH Accepts the EREFRA Process
(Continued)
Background
(Continued)
· National Park Service
- Needs Designated Site to Proceed with Design
- Potential exists that funding may be removed/reduced
· Not All Issues Resolved
Port Angeles Water Treatment Plant
(PAWTP)
Issues i Resolved Pending Unresolved
1. Final Location X
2. ' Temporary easement for X
construction
as Elwha Heights Water X
A~sociatinn
4. Exterior Finishes X
5. Cutting/filling and stockpile for
solid waste fianctions X
6. Filling hole and compaction al
transfer station location X
7. Moving wesl access road and
firing range berm to the west X
8. Funding for Futm'e Operations &
Maintenance X
Port Angeles Water Treatment Plant Siting
Recommendations
· Approve siting of PAWTP @ Landfill
· No construction until M0U executed
Questions