Loading...
HomeMy WebLinkAboutAgenda Packet 03/15/1999 WASHINGTON, U.S.A. GITY MANAGER'S OFFiGE NOTICE OF SPECIAL MEETING NOTICE IS HEREBY GIVEN that the City Council of the City of Port Angeles will hold a special meeting on Monday, March 15, 1999, at 4:30 p.m. in the City Council Chambers at City Hall, 321 East Fifth Street. The Council will be meeting in joint session with the Commissioners o~the Port of Port Angeles to discuss the folloWing: I. Landfill - Wildlife Management Plan II. Airport Road Relocation Project III. Storm Water Management A. Lincoln Park Drainage B. Industrial Development Park(s) Drainage C. Slope Stabilization - Marine Drive IV. Other Infrastructure Development Needs. A. South Airport Industrial Park Development V. Oak Street Development A. Convention Center Development Options B: Alternate Uses for Oak Street C. Memorandum of Understanding VI. Rayonier Site A. Redevelopment Opportunit!es B. Clean Up Issues VII. DOE - Harbor Wood Waste VIII. Update on Admiral Marine IX. Claim fOr Damage to Port Pier Becky J. Upton City Clerk Distribution: City Manager City Council Peninsula Daily News KONP Radio Peter Ripley Northland Cable Front Lobby (Post) 321 EAST FIFTH STREET ® P. O. BOX 1150 ® PORT ANGELES, WA 98362-0217 PHONE: 360-417-4500 ® FAX: 360-417-4509 ® TTY: 360-417-4645 E-MAIL: CITYM GR~CI. P~RT-AN GEI~ ES.WA. U S CITY OF PORT ANGELES CITY COUNCIL SPECIAL MEETING March 15, 1999 I. CALL TO ORDER - REGULAR MEETING: II. ROLL CALL: Members Present: (~~,~ ~-'~ Mayor Braun /" Councilman Campbell .~ (~..~ ~qO) ~.~~ Councilman Doyle Councilman Hulett ---~ Councilmember McKeown Councilman Wiggins V/ Councilman Williams V/ Staff Present: Other Staff Present: Manager Ibarra V/ Attorney Knutson b~ Clerk Upton B. Becker - S. Brodhun -----' B. Collins b/ K. Godbey ------ S. Ilk -------' J. Pittis V/ III. ADJOURN TO EXECUTIVE SESSION: ~Reason: //" A~proximate Length: // ' Led y-bT~.' CITY OF PORT ANGELES CITY COUNCIL SPECIAL MEETING Attendance Roster DATE OF MEETING: March 15~ 1999 LOCATION: City Council Chambers pORTANGELES WASHINGTON, U.S.A. CITY COIdNCii, lVIElViO DATE: March 11, 1999 TO: MAYOR BRAUN AND CITY COUNCIL FROM: Patrick Ibarra, City Manager SUBJECT: Agenda for joint meeting with Port Commissioners. Attached is the agenda for the meeting and a brief synopsis of each of the items. City staff will be present to provide any further information and respond to any questions. c: Department Directors Tim Smith l//'Becky Upton C:\O FFICE~WPWIN~PO RTANGL\COUNC1L~vl EMOS~JOINTMTG. 399 poR' WASHINGTON, U.S.A. CITY COUNCIL SPECIAL CITY COUNCIL MEETING Joint Meeting City of Port Angeles and Port of Port Angeles Monday, March 15, 1999 · City Council Chambers · . . AGENDA · I. Landfill - Wildlife Management Plan ~ II. Airport Road Relocation Project III. Storm Water Management A. Lincoln Park Drainage B. Industrial Development Park(s) Drainage · C. Slope Stabilization - Marine Drive ' IV. Other InfrastructUre Development Needs A. South Airport Industrial Park Development V. Oak Street Development A. Convention Center Development options B. Alternate Uses for Oak Street C. Memorandum of Understanding VI. Rayonier Site A. Redevelopment Opportunities B. Clean Up Issues VII. DOE - Harbor Wood Waste VIII. Update on Admiral Marine IX. Claim for Damage to Port Pier 321 EAST FIFTH STREET · P. O. I~OX 1150 · PORT ANGELES, WA 98362-0217 PHONE: 360-417-4500 · FAX: 360-417-4509 · TTY: 360-417-4645 E-mall: COU NCl L@Cl. PORT-ANGELES.WA.US I. Landfill Wildlife Management Plan - This is a plan that establishes procedures and protocols to manage wildlife in the vicinity of the airport and landfill. The professional management of wildlife in this area is mutually beneficial to the Port and the City for continued operation of the airport and landfill in close proximity to each other· The Plan establishes that Co-Wildlife Coordinators be appointed, the Airport Manager and the City Director of Public Works. It further establishes who is responsible for what activities, reporting requirements and a schedule for meetings of various parties. Implementation of this plan will require that an Interlocal Agreement be adopted by the Port and the City· II. Airport Road Project - This project is to eliminate the intersection at Airport Road/Edgewood Drive/Lauridsen Blvd by straightening the road. The project also will provide a more direct access to the airport from US101 and the current access road from "L" Street will be eliminated. The project is a partnership of the City, Port, and County using local and state funding sources· The project has been delayed due to right of way difficulties, but is scheduled for construction in 1999. The project will require that a revised estimate be made and project costs adjusted upward, mainly due to the right of way costs and delay of construction. After right of way is certified, a revised estimate will be presented to TIB to request additional state funding, but the local match amount will also increase· The original estimate and 1992 estimate of costs are below: AGENCY ORIGINAL ESTIMATE REVISED ESTIMATE · 15/92} City $154,000 $204,000 County $100,000 $132,450 Port $100,000 $132,450 WSDOT $20,000 $0 TIB $726,000 $836,100 TOTALS $1,100,000 $1,305,000 III. Long Range plan for stormwater management [specifically around Lincoln Park and Airport Industrial Park] - Stormwater management in general will become increasing more important as an activity needing resources. The listing of the salmon as an endangered species will add more reasons for tighter controls for stormwater and the need for dedicated stormwater funding. A grant application has been submitted to FCAAP [Flood Control Grant] to construct a storm line from Big Boy Pond to the east. This pipeline will allow the valve at Lincoln Park to be opened and drained to Big Boy which can then to drained through this new pipe. By managing the flows, both areas should have flooding reduced. Marine Drive Stabilization status - in regards to stormwater management - Stability of the bluffs is a complex issue as can be seen by our recent weather. Continued education of residents living along the bluffs about appropriate management practices and the management of the flows that create the ponding at Lincoln Park will go along way toward assisting in this problem. Bluff erosion, however, is a natural environmental event that is difficult to totally control without great expense. City and Port officials have been meeting with concerned property owners and businesses for several months. It now looks like the group will organize to hire a feasibility study of the marine bluff geology, hydrology, and vegetation and are expecting the City, the Port, and the County to participate like other property owners in the study area (Tumwater Street to Hill Street). IV. Other Infrastructure Development Needs - South Airport Industrial Park Development - concerns recent acquisition by Port of 100 acres and the installation of water and sewer service. V. Oak Street Development - A Memorandum Of Understanding was prepared by City staff(Attachment A) and reviewed it with the Real Estate Committee. The Port has reviewed it and their revised MOU, along with their comments (Attachment B) is provided. The Real Estate Committee has not yet met to reviewed the revised version, but I did have Tim review it and provide some comments. It appears the Port wants the City to further explore the construction of a conference/convention center on the site prior to exploring alternative uses. While some discussion at the March 15 meeting may be helpful, I would advise the Real Estate Committee further examine the revised MOU before we agree to it. VI. Rayonier Site - discussion will most likely concem clean-up and potential uses of site. VII. DOE - Harbor Wood Waste - An item that was added to the agenda very late. Brad Collins will be present at the meeting to further discuss it. Essentially it concerns the presence of wood waste in the harbor. This item will most likely effect Daishowa. VIII. Update on Admiral Marine -concems the status on their reorganization efforts. IX. Claim for damage to Port Pier -The Port of Port Angeles has filed a claim with the City in the amount of $26,182.62 for damage that occurred to the Port's Terminal 2 pier. The damage was allegedly caused by camel logs that broke loose from the City Pier on January 25, 1998. On that day the harbor was experiencing a high ground swell condition. The City has tendered the claim to General Construction, the company that the City had contracted with to maintain the pier pilings and camel logs. General Construction has refused to accept the tender. The City has informed the Port that it is unwilling to pay the entire claim but is willing to consider a reasonable settlement. The City believes that negligence would be difficult to establish due to the fact that the City did exercise reasonable care in maintaining the camel logs as evidenced by the considerable amount of money that it paid General Construction to keep the camel log system in good condition. The Port apparently believes that the City is liable for failing to properly secure and maintain the camel logs as evidenced by the fact that the City owned the logs and they broke loose. C :\OFFICE\WPWIN~PORTANGL\COUNCIL'uMEMOS~ORTMTG.399 ATTACHMENT "A" MEMORANDUM OF UNDERSTANDING OAK STREET DEVELOPMENT SITE This memorandum of understanding (MOU) is executed by and between the City of Port Angeles ("City") and the Port of Port Angeles ("Port") (hereinafter jointly referred to as "the parties") for the purpose of outlining principles, guidelines and responsibilities for the joint marketing of the Oak Street Site in downtown Port Angeles to the private development sector. The parties make and enter into this MOU effective the __ day of ,19 ., for the purposes and under the terms contained herein. RECITALS WHEREAS, it is the mutual desire of the City of Port Angeles ("City") and the Port of Port Angeles ("Port") to support the revitalization of downtown Port Angeles through comprehensive planning efforts, investment in downtown public properties and public infrastructure owned by the parties, and WHEREAS, the parties cooperated in moving the Port Angeles Harbor Line and rezoning the Oak Street Site to support opportunities for commercial development, and WHEREAS, the parties recognize development of the Oak Street Site will be a significant contribution toward downtown revitalization, and WHEREAS, the parties have consistently supported the concept of a private or public/private partnership toward a commercial development of the Oak Street Site; UNDERSTANDINGS NOW THEREFORE, in consideration of the mutual promises and covenants contained herein, the parties hereby agree to the following understandings: 1. The City and the Port will each be co-sponsors of the overall development effort including equal responsibilities in support of activities that may be necessary such as a feasibility study, an environmental impact statement, or so forth, thereby recognizing the significant benefits to City residents and allowing the Port to balance its responsibilities among county-wide responsibilities. 2. The parties shall continue to pursue an appropriate development of the site in accordance with the Downtown Forward Plan including completion of the adjacent Valley Creek Estuary Project and Waterfront Trail segment. 3. The City shall share responsibility with the Port for marketing the site including contacting prospects, soliciting from them possible uses and developments, and discussing potential financial terms. Should either the City or the Port make contact with a prospect that leads to a point necessitating the discussion of financial terms or negotiations, the other party shall be contacted and the parties shall both be included in such discussions or negotiations. 4. Until such time as a prospect begins development, the Port shall maintain vegetation control at the development site at a height of 5-10 inches, and the City shall maintain litter control on a quarterly basis at a minimum. 5. When the development of the site takes place, the City will assist the developer and the Port by endeavoring to expedite City permits for development of the site as a top priority application once received by the City from the Port or developer. 6. MODIFICATIONS: This MOU may be modified by written agreement of the parties. 7. TERMINATION: This MOU shall terminate unless terminated earlier by mutual written agreement of both parties. Whereby, the parties have executed this memorandum of understanding in duplicate by the subjoined signatures of their duly authorized officials. CITY OF PORT ANGELES PORT OF PORT ANGELES Patrick Ibarra, City Manager Chris Anderson, Executive Director ATTEST: Becky J. Upton, City Clerk APPROVED AS TO FORM: Craig D. Knutson, City Attorney ATTACHMENT "B" PORT i~l~OF PORT ANGELES W A S H I N G T O N March 2, 1999 Patrick Ibarra City Manager City of Port Angeles 321 E. Fifth St. Port Angeles, WA 98362-0217 Dear Patrick: Enclosed is a revised draft of the proposed MOU for Oak Street. I have not had an opportunity to discuss this with my Commission yet, but will do so on March 8th. I had some concerns with the original draft because it seemed to be vague relative to responsibilities of the parties. I also don't believe it is a good idea for both agencies to be talking terms of agreements with developers. The Commissioners have previously indicated that the negotiation responsibility should remain with the Port unless the City is willing to enter into an agreement where the City takes on an actual liability for the property. You have indicated on several occasions that the City is not interested in taking that step at this time, therefore I have rewritten the MOU accordingly. Also, I changed the vegetation control to the City's responsibility. If this is a contentious issue, then I suggest we drop it from the agreement. Both Commissioner Foster and I expressed concern about maintenance of the site when the City requested permission to grade and seed the site. We even suggested seeding the site for wild flowers so that mowing would not be an issue. It was my recollection that the City (or a group of volunteers) were going to make sure the property was maintained. The Port has a limited number of maintenance staff and since we do not have parks or other similar grounds to maintain we also have limited equipment for this type of grounds maintenance. We expressed all of these concerns at the Downtown Forward meetings when Tim Smith originally suggested grading and seeding the site. If the City still wants to consider pursuing a tidelands swap with DNR we could also include some provision for discussing this issue and approaching DNR in this agreement. 338 West First Street (360) 457-8527 COMMISSIONERS EXECUTIVE DIRECTOR P.O. Box 1350 Fax: (360)452-3959 Glenn Beckman M. Christine Anderson Port Angeles, WA 98362 portofpa~olypen.com Dick Foster lBARA399.DOC Jack Waud I will be out of the office March 4th and 5th and will return to work on March 8th. I will discuss the MOU with the Commission when I return. We can discuss the drafts any time during the week of the 8th. Let me know when you are available. Sincerely, PORT OF PORT ANGELES M. Christine Anderson Executive Director IBARA399.DOC MEMORANDUM OF UNDERSTANDING OAK STREET DEVELOPMENT SITE This memorandum of understanding ("MOU") is executed by and between the City of Port Angeles ("City") and the Port of Port Angeles ("Port"), hereinafter jointly referred to as "the parties," for the purpose of outlining principles, guidelines and responsibilities for the marketing and development of the Oak Street Site in downtown Port Angeles to the private sector. The parties make and enter into this MOU effective the __ day of ,19__., for the purposes and under the terms contained herein. WHEREAS, it is the mutual desire of the City and the Port to support the revitalization of downtown Port Angeles, and WHEREAS, the Oak Street Site is owned half in fee by the Port and half controlled under a Port Management Agreement between the Port and the Department of Natural Resources, and WHEREAS, the parties cooperated in moving the Port Angeles Harbor Line and rezoning the Oak Street Site to support opportunities for commercial development, and; WHEREAS, the parties recognize that development of the Oak Street Site will be a significant contribution toward downtown revitalization, and; WHEREAS, the parties have supported the concept of a private or public/private partnership in the development of the Oak Street Site; and, WHEREAS, the City has financial resources available to support development and promotion of tourism related facilities; NOW THEREFORE, in consideration of the mutual promises and understandings contained herein, the parties agree to the following: CITY RESPONSIBILITIES: 1. The City will pursue the development and operation of an expanded conference facility either through private development or a public/private partnership. 2. Once an agreement is reached for the development of the conference center then the City will advise the Port of the agreement and the proposed location of the center. 3. The City will subsequently provide the Port with suggested concepts for the development of Oak Street. 4. Once the Port has approved a development optiOn or options for the site, the City will cooperate with the Port in marketing efforts and will provide the Port with information on any potential private developers. 5. If the proposed development requires assistance in infrastructure development or other financial assistance, the City will consider, but is not required to provide, the use of a portion of the 2% tax collected on hotel room revenues to support the promotion of or development of the Oak Street Site. 6. The City shall maintain vegetation and litter control at the Oak Street Site. 7. The City will endeavor to expedite City permits for development of the site. PORT RESPONSIBILITIES: 1. Upon notification from the City of an agreement for development of a conference center and receipt of suggested development options for the Oak Street Site, the Port will pursue development of a Request for Proposals or a marketing package for the development of the Oak Street Site including a description of acceptable development alternatives. 2. The Port will negotiate all necessary agreements for development of the site including leases or others and will take appropriate actions to meet requirements of the Port's agreement with the Department of Natural Resources. Port may request assistance from City as needed and will involve City in negotiations if the City's participation in any agreement is needed. Port will keep City informed of progress in these negotiations as appropriate. 3. The Port will assist City in development or negotiation of an agreement for the public/private construction of a conference center if assistance is requested by City. 4. The Port will assist the developer in applications for City permits and will refer developer to appropriate City staff for assistance in the permit process. 5. Port will work with developer to prepare necessary environmental assessment or other documentation necessary to meet SEPA requirements. This MOU may be terminated by either party upon days notice and may be modified at any time by written agreement of the parties. CITY OF PORT ANGELES PORT OF PORT ANGELES ATTEST: ITEM FOR CONSIDERATION BY THE BOARD OF PORT COMMISSIONERS WORK SESSION Janua~ 25,1999 SUBJECT: RAYONIER - HIGHEST AND BEST USE STUDY BACKGROUND: In mid-1998 Rayonier hired RCA/Huitt-Zollars, a Seattle real estate planning firm, to conduct a land use study of its Port Angeles pulp mill site. In late December Rayonier circulated copies of the study to interested parties in Port Angeles. The study discusses the pros and cons of various land use possibilities for the site and recommends a mixed use land use plan which includes light industrial, commercial, residential and recreational (open space) uses for the 80 acre site. The study includes a discussion of economic and demographic trends, and market opportunities (lodging, retail, commercial and industrial). The study indicates that housing stock has increased at slightly less than 500 units per year since 1993. The study also indicated an expected population growth in the Port Angeles urban growth area of roughly 2,400 people and 1,400 people in the City between 1990 and 2010 (120 people in the urban growth area and 70 people in the City per year). The study indicates that this growth implies new housing development within the existing] City boundaries of 60 - 74 single family units and 15 - 19 multi-family units per year. It concludes that there is a positive market opportunity to develop housing at the mill site. There seems to be some problem with this analysis. If the growth projection for the City is for an additional 70 people per year and an average family unit is probably 3+ people, then the total new residential units per year in the City would be in the range of 23+ not 93 (74 single family and 19 multi-family) as the study suggests. The analysis of lodging opportunities indicates that development of additional lodging facilities in Port Angeles would be difficult in the near-term because lodging revenues have not increased markedly in the past decade, sales are seasonal which cause RAYSTY.DOC difficulty in covering fixed and variable costs, and the Double Tree Inn which is west of the Rayonier site offers better access to downtown Port Angeles. Relative to retail sales, the study indicates that there has not been a "real increase in retail sales" countywide since 1991. The study estimates that there is a "baseline demand for 2.5 million square feet of new retail space on approximately 150 acres of land." It further states that the Rayonier site is not well-located for most retail because of its relatively poor access and visibility. It concludes that the site opportunities "are more generally limited to restaurant and/or miscellaneous retail stores." Opportunities for industrial development are discussed regarding areas of construction, food and kindred products, apparel mills, printing and publishing, fabricated metal products and industrial equipment/machinery, miscellaneous manufacturers, under- developed manufacturing sectors (furniture, chemical, plastic products, scientific instruments, etc.), transportation/communications/utilities, wholesale and water- dependent uses. Under the fabricated metal section, the report states "...These are relatively undeveloped heavy industrial sub-sectors in Clallam County. It is unlikely that firms in this sector could pay the premium required for view space at the Rayonier mill site." This statement signifies a lack of understanding of real estate values relative to industrial property. Industrial property does not generally generate a premium value because the property has a view. If this was the case, the Port's waterfront industrial properties should generate higher values than non-waterfront industrial land or should have comparable values to downtown commercial land values. This is not the case. In the under-developed manufacturing section, the report indicates that there are no firms in Clallam County that manufacture scientific instruments. However, the do no list AM Systems in Carlsborg anywhere in the report. As you are aware, AM Systems manufactures medical diagnostic equipment and is one of the target sectors of the Port's and EDC's marketing plans. In addition, the report does not seem to cover other high- tech industries that are located in Clallam County many of whom are members of the local Science Technology Manufacturing Association. In addition, the report completely ignores the recreational equipment manufacturer industry. Mervin Manufacturing which employees 40_+ people and the new Pacific Bay (fishing rods) are not mentioned in the report. This is another industry targeted in recent years by the Port and EDC. In the water-dependent uses analysis, the report indicates that Clallam County has a relatively well developed marine repair and service industry. It also discusses firms located in Central Puget Sound who may need to relocate due to infrastructure, adjacent land use conflicts and land cost issues. While the report paints a good market picture for this industry it concludes that "Noise (especially at night) and lighting may negatively impact commercial and residential uses." However, there are no residential or commercial uses currently on site. One can only conclude that the report is discussing its ultimate mixed use plan which suggests that those uses should be placed on site. Two pages later, the report questions whether passenger activities would be appropriate at a site "mainly used by heavy industry." This seems contradictory to the earlier conclusion. ANALYSIS: The site is currently zoned for heavy industrial use. It has access to the industrial water line and it is accessible via Ennis street. The Ennis street entrance to the site traverses a few blocks of residential property before it becomes a private entrance/truck route into the mill site. The site has a large industrial pier and substantial waterfront access. The site has utilities available although some new lines may need to be laid in on site once a master plan is developed. The site has excellent access and infrastructure, and is situated well below and removed from the existing residential located on the bluff above the site. There appear to be numerous problems with the math and analysis within the Rayonier study. These problems and contradictions create serious questions regarding the conclusions drawn in the report. Of most concern is the proposed mixed use plan which allocates significant land to residential and commercial use. The report indicates that the residential sites will have views, but it is hard to visualize any views from the single family lots created in the former parking lot for the mill. The major issue with residential use on this site is its severe impacts on the ability to utilize the remaining industrial land. The site which is currently zoned for heavy industrial under the proposed plan would be primarily residential and commercial with a small amount of "light industrial." remaining. One of the first meetings of the Port Angeles Works committee was a brainstorming session relative to economic development within Port Angeles. One of the conclusions reached by that committee was that there should be "no net loss of industrial property." The plan proposed by Rayonier is completely contrary to this concept. In addition, the study virtually ignores the potential for marine trades, recreational equipement manufacturing and high-tech growth in Clallam County. There are no other industrial waterfront sites available in Clallam County. If this site is allowed to be converted or its industrial use compromised by introducing adjacent non-compatible uses then its use as a waterfront industrial site will be forever eliminated and the expansion of the marine trades industry in Port Angeles will be stifled. RAYSTY.DOC A mixed use development with heavy industry such as marine trades and rother manufacturing uses with buffer development of high-tech office and light manufacturing space would provide protection for the true industrial nature of this site. To allow for any other non-compatible uses would be significantly detrimental to the long-term economic development potential within Clallam County. ENVIRONMENTAL IMPACT: None. FISCAL IMPACT: None. RECOMMENDED ACTION: No action in Work Session. Discuss and provide direction to staff. RAYSTY.DOC