HomeMy WebLinkAboutAgenda Packet 09/27/2006
~ORTANGELES
WAS H I N G TON. U. s. A.
CITY COUNCIL SPECIAL MEETING
I.
CALL TO ORDER - SPECIAL MEETING:
II. ROLL CALL:
Members Present:
Mayor Rogers
Deputy Mayor Williams
Councilmember Braun
Councilmember Headrick
Councilmember Munro
Councilmember Petersen
Councilmember Wharton
Staff Present:
Manager Madsen
Attorney Bloor
Clerk Upton
G. Cutler
D. McKeen
T. Riepe
Y. Ziomkowski
~
,/
'"
\/'"
September 27, 2006
4a5. n.Yr\.,
I
~ Staff Present:
~
III. PLEDGE OF ALLEGIANCE:
Led by: dill) 1\11~ QfY\t~D.A, ~.+?fh.Jt~Q. ^-
~ORTAN'GELES
CITY COUNCIL SPECIAL MEETING
Attendance Roster
WAS H I N G TON. U, 5, A-
DATE OF MEETING: September 27. 2006
LOCATION: City Council Chambers
DATE:
To:
FROM:
SUBJECT:
~. ,or "R"!7T'i~' y .N' 'G'" E.,'t. E.."S
" ~: : 'f < "1':'''' ( ;_h ~
.... ! ..... .'.'..' .... /.m mm', ; . .. ... I ...........' ..' ..' ... .
WAS H I N G TON, U. S. A.
CITY COUNCIL MEMO
September 27, 2006
CITY COUNCIL
GLENN A. CUTLER, DIRECTOR OF PUBLIC WORKS & UTILITIES I>CA..V
Service Agreement for Network Integration Transmission Service with BP A
Summarv: The City's electrical transmission service agreement with the Bonneville Power
Administration is expiring on September 30, 2006. The attached service agreement utilizes the
City's reservation priority rights under the current Open Access Transmission Tariff (OA TT).
This will give Port Angeles transmission rights over the BP A system for the next 30 years.
Recommendation: Authorize the Mayor to sign the Service Agreement for Network
Integration Transmission Service with the Bonneville Power Administration.
Background / Analysis: At the City Council meeting on July 18, 2006, the Council approved the
City's application for electric transmission service from the Bonneville Power Administration.
The current agreement will expire on September 30, 2006.
BPA adopted their Open Access Transmission Tariff (OATT) in 1998. This tariff defines the
terms and conditions for Point-to-Point (PTP) and Network Integration Transmission (NT)
services. This tariff was adopted by BP A after the Federal Energy Regulatory Commission
(FERC) issued order 888 prescribing pro-forma, open access tariffs by all transmission providers
to insure a level playing field for competitive power markets.
This Transmission Service agreement is not a negotiated agreement, but rather implements the
terms and conditions available under the tariff. The City, in its application for transmission
service, exercised our Reservation Priority rights for Existing Firm Service Customers, pursuant to
section 2.2 of the tariff. If this priority right should ever be removed from the tariff, the City
would be required to compete with other transmission users for use of the transmission system.
Selection of a 30 year term for this agreement will preserve our transmission rights for the
maximum term allowed under the tariff.
N:\CCOUNCIL\FINAL\BPA Transmission Service Agreement.doc
Service Agreement for NT Service
September 27, 2006
Page 2
The Transmission Service Agreement defines the technical issues involved in the tariff and the
City's application for service, including the following:
. Term (October 1,2006 through September 30,2036)
. The City's network resources (BPA power contract and Morse Creek hydroelectric power)
. Points of receipt on the system (Federal Columbia River Power System- FCRPS)
. ControlAuea(BPA)
. Points of Delivery (City of P A 69 kV and Nippon 069 kV)
. Transmission charges (NT -06 rate or its successor rate)
. Ancillary Service Charges (services provided by BP A transmission under ACS-06 rate or
its successor rate)
o Scheduling, system control, and dispatch
o Reactive supply and voltage control
o Regulation and frequency response
o Energy imbalance
o Operating reserves (spinning and supplemental)
It is recommended that the City Council authorize the Mayor to sign the Service Agreement for
Network Integration Transmission Service with the Bonneville Power Administration.
N:\CCOUNCIL\FINAL\BPA Transmission Service Agreement.doc
Service Agreement No. 06TX-12443
SERVICE AGREEMENT
for
NETWORK INTEGRATION
TRANSMISSION SERVICE
executed by the
UNITED STATES OF AMERICA
DEPARTMENT.OF ENERGY
acting by and through the
BONNEVILLE POWER ADMINISTRATION
and
THE CITY OF PORT ANGELES
.1. This Service Agr~ement, dated as of ' is entered into by
and between the Bonneville Power Administration Transmission Business Line
(Transmission Provider) and the City of Port Angeles (Transmission Customer).
2. The Transmission Customer has been determined by the Transmission Provider. to
have a Completed Application for Network Integration Transmission Service under
the Transmission Provider's Open Access Transmission'Tariff(Tariff).
3. . The. Transmission Customer has provided to the Transmission Provider a deposit,
unless such deposit has been waived by the Transmission Provider, for Transmission
Service in accordance with the'provisions of Section 29.2 of the Tariff.
4. Service under this agreement shall commence on the later of (1) the requested
Service Commencement Date, or (2) the date on which construction of any Direct
Assignment Facilities andlor Network Upgrades are completed. Service under this
agreement shall terminate on such date as mutually agreed upon by the parties.
This Service Agreement No. 06TX-12443 supersedes the Network Integration .
Service Agreement No. 96MS-96090. .
5. The Transmission Provider agrees to provide and the Transmission Customer agrees
to pay for Network Integration Transmission Service' in accordance with the
provisions of Part III of the Tariff and this Service Agreem.ent.
6. Any notice -Or request made to or by either Party regarding this Service Agreement
shall be made to the representative of the other Party as indicated in Exhibit 'B.
7. The Tariff, Exhibit A (Specifications for Network Integration Transmission Service),
Exhibit B (Notices), and Exhibit C (Network Operating Agreement) are incorporated
herein and made a part hereof. Capitalized terms not defined in this agreement are
defined in the Tariff.
8. This Service Agreement shan be-interpreted, construed, and enforced in accordance
with Federal law.
9. This Service Agreement shall inure to the benefit of and be binding upon the Parties
. and their respective successors.
. .10. The Transmission Customer and the Transmission Provider .agree that provisions of
Section 3201(i) of Public Law 104-134 (Bonneville Power Administration
Refinancing Act) are incorporated in their entirety and hereby made a part of this
Service Agreement.
IN WITNESS WHEREOF, the Parties have caused this Service Agreement to be executed
by tbeirrespective authorized officials.
Date:
UNITEDSTATESOFAMEIDCA
Department of Energy
Bonneville Power Administration
By. -:lk~m~'
Name: Thomas M. Noguchi
(Print I Type)
Senior
Title: Transmission Account Executive
Date: 09) 2- c/z. ,,, D 0
I
THE CITY OF PORT ANGELES
By:
Name:
(Print/Type)
Title:
W:TMC\ CT\Porl Angeles \ Contracts (FinaD\1244S.doc
Service Agreement No. 06TX-12443
The City of Porl Angeles
2
r--
I
EXHIBIT A
SPECIFICATIONS FOR
NETWORK INTEGRATION TRANSMISSION SERVICE
TABLE 1
REQUEST FOR TRANSMISSION SERVICES
The OASIS Assignment Reference Number (ARet) is:. 1470701
1. TERM OF TRANSACTION
Service Commencement Date: at 0000 hours' on October 1, 2006.
Termination Date: at 0000 hours on October 1,2036.
2. NETWORK RESOURCES
(a) Generation Owned by the Transmission Customer
Capacity Capacity Designated
Resource .(MW) as Network Resource 'Control Area
Morse Creek 0.465 MW 0.465 MW BPAl
(b) Power Purchased by the Transmission customer
i... Source ' Capa~ity . 'Control Area
(Contract No.) .' (MW) (Delivered From)
BPA PBLl
(Contract No. 00PB-12054 Net Requirements BPA
10/01101-10/01111)
(c) Total Network Resources equals 2(a) + 2(b)
. 3. POINT(S) OF RECEIPT
Federal Generation Point(s) of Receipt
Location: FCRPS;'
Voltage: varies by facility;
Metering: scheduled quantity;
Transmission Demand: net ,requirements;
Delivering Party: BP A;
1 Bonneville Power Administration (BPA).
1 Power Business Line (.PBL).
06TX.12443, The City of Port Angeles
Exhibit A, Table 1
Specifications for Network Integration Transmission Service
Page 10f5
Effective at 0000 houn;
on October 1, 2006
Control Area: BPA;
Exceptions: none.
4. POINT(S) OF DELIVERY
(a) Description of Network Points of Delivery
(1) Nippon 69 kV Point of Delivery
Location: the point in the Transmission Provider's PoIt Angeles
Substation, where the 69 kV facilities of the Transmission Provider
. and the Transmission Customer are connected;
Voltage: 69 kV;
Mete~~in: t'he Transmission Provider's Port Angeles S~b~tation in
the 69 kV CiTC.Ll~t o~~r which such electric pow~r flows;
(2) Po~t Angel~s 69 kV Point of Delivery
"', ....,
'., Location: the point the Transmission Provider's Port Angeles
Substation, wherei'the 69 kV facilities of the Transmission Provider.
and the Transmission Customer are connected;
Voltage: 69 kV;
Metering:
(A) in the Transmission Provider's Port Angeles Substation in the
69 kV circuits over which such electric power flows;
(B) in the Transmission Customer's Morse Creek Hydroele~tric
Generation Plant in the 0.48 kV circuit over which such' electric
. power flows;
Metering Loss Adjustment: the Transmission Provider will adjust
for losses between the Transmission Customer's Point of Delivery and
point of metering. Such adjustments shall be specified in wntten
correspondence between the Transmission Provider and the
Transmission Customer;
Exception: revenue meters at metering point (B) are owned by the
Transmission Customer. ..
(b) Description of Transfer Points of Delivery
Not applicable. See Section 4(a) of this Table 1.
06TX-12443, The City of Port Angeles
Exhibit A, Table 1
Specifications for Network Integration Transmission Service
Page 2 of5
Effective at 0000 hours
on October I, 2006
5. NETWORK LOAD
The Application provides the Transmission Customer's initial annual load and
resoUrce information. Annual load and resource information updates shall be
submitted to the Transmission Provider at the address specified in Exhibit B, by
September 30 of each year, unless otherwise agreed to by the Transmission Provider
and the Transmission Customer.
. 6. DESIGNATION OF PARTY(IES) SUBJECT TO RECIPROCAL SERVICE
OBLIGATION
The City of Port Angeles
7. NAMES OF ANY INTERVENING SYSTEMS PROVIDING TRANSMISSION
SERVICE
None.
. .
8. DECLARED CUSTOMER-SERVED LOAD
(a) Declared Customer,..Served Load (CSL) is the monthly amount in megawatts
of the Transmission Customer's Network Load that the Transmission
Customer elects not to serve under this Service Agreement. . .
(b) Where a Transmission .Customer's Network Load is served pursuant to a
transmission agreement between the Transmission Provider and a third. .
party, in orderfor such load to qualify as a declared CSL, such transmission
agreement must be for Firm Transmission Service of at least one month to
the Transmission Customer's system and must include a point of delivery at
the Transmission Customer's system. The amount of such load, which will be
treated as a declared CSL, is limited to the demand amounts at the point of
delivery set forth in such transmission agreement.
(c) Identify for all CSL: Not Applicable.
9. OTHER PROVISIONS SPECIFIC TO TInS SERVICE AGREEMENT
Not Applicable..
10. SERVICE AGREEMENT CHARGES
Service under this Agreement will be subject to some combination of the
charges detailed in Tables 1 and 2 of this exhibit. .
(a) Transmission Charge
NT-06 Rate Schedule and UFI'-06 Rate Schedule or successor rate
schedules.
. (b) System Impact and/or Facilities Study Cbarge(s)
System Impact and/or Facilities Study Charges are not required at this
time for service under this Service Agreement. .
06TX.-12443, The City of Port Angeles
Exhibit A, Table 1
Specifications for Network Integration Transmission Service
Page 3 of5
Effective at 0000 hours
on October 1, 2006
11. DIRECT ASSIGNMENT AND USE-OF-FACILITIES CHARGES
Facilities Charges are not require4 at this time for the service under this Service
Agreement.
06TX-12443, The City of Port Angeles
ExhibitA. Table I"
Specifications for Network Integration Transmission Service
Page 4 ofS
Effective at 0000 hours
01). October 1, 2006
I .. -.----.--------.
I
TABLE 2 ,
ANCllXARYSER~CEdBARGES
This Table 2 is subject to the ACS-06 Rate Schedule or successor rate schedules.
Pr()vided By Contract No.
1. SCHEDULING, SYSTEM CONTROL AND Transmission 06TX-12443
DISPATCH Provider
2. REACTIVE SUPPLY AND VOLTAGE Transmission 06TX-12443
CONTROL Provider
3. REGULATION & FREQUENCY RESPONSE Transmission 06TX-12443
Provider
4. ENERGY IMBALANCE SER~CE Transmission 06TX-12443
Provider1
5. OPERATING RESERVE - SPINNING Transmission 06TX-12443
RESERVE Provider
6. OPERATING RESERVE - SUPPLEMENTAL Transmission 06TX-12443
RESERVE Provider
1 Energy Imbalance service is not applicable to BPA requirements customers.
06TX-12443, The City of Port Angeles
Exhibit A, Table 2
Specifications fOT Network Integration Transmission Service
Page 5 of5
Effective at 0000 hours
on October 1, 2006
..j
EXmBIT B
NOTICES
1. NOTICES RELATING TO PROVISIONS OF THE SERVICE AGREEMENT
Any notice or other communication related to this Service Agreement, other than
notices of an operating nature (Section 2 below), shall be in writing and shall be
deemed to have been'reeeived if delivered in person, by First Class mail, by telefax
or sent by.overnight delivery service.
If to the Transmission Customer:
If to the Transmission Provider:
City of Port Angeles ..
PO Box 1150
Port Angeles, W A 98362-0217
Phone: (360) 417-4703
Fax: . .(360) 417-4709
Attention: Transmission Account Executive
for City of Port Angeles - TMtI'PP-2
Phone: (360) 619-6009 .
Fax: (360) 619-6940
If by First Class Man: ..
Bonneville Power Admimstration
P.J>, Box 61409
Vancouver, WA 98666-1409
If by Overnight Delivery Service:
Bonneville Power Administration - TMlI'PP-2
7500 NE 415t Street - Suite 130 ..
Vancouver, W A 98662-7905
2. NOTICES OF AN OPERATING NATURE
. Any notice, request or demand of an operating nature by the Transmission Provider
or the Transmission Customer shall be made either orally or in writing by telefax or
sent by first class mail,
If to the Transmission Customer:
If to.the Transmission Provider:
City of Port. Angeles .
PO Box 1150
Port Angeles, WA 98362-0217
Phone: (360) 417-4703
Fax: (360) 417-4709
Bonneville Power Administration
5240 Trosper Street, SW
OlYIDpia,WA 98512
Phone: (360) 704-1651
3. SCHEDULING AGENT. Not applicable
W:TMC\CT\ Port Angeles \ Contracts <FinaJ)\ 12443.doc
06TX-12443, The City of Port Angeles
Exhibit B
Notices
Page lofl
Effective at 0000 hours
on October I, 2006