HomeMy WebLinkAboutAgenda Packet 03/12/2002 PUBLIC WORKS CONFERENCE ROOM
PORt ANGELES, WA cJB362
MARCH 12, 2FIE}:~
3:on P.M.
AGENDA
I. 0all TO ORDER
II. ROLL P-ALL
III. APPROVAL OF MINUTEB fOR FEBRUARY 12, 20n2
IV, DISCUSSION ITEMS
A. NORTHLAND P. ABLE - INFORMAL NEGOTIATIONS PROGRESS (PETE
{~RIGORIEFF ~ VERBAL)
B. WATER [~UALITY REPORT - INFO rINLY
C, BENEFIT DUMP DAY
D0 MINIMUM LANDFILL RATE
E. REPORT E]N SAP TRIAL (VERBAL)
f, WWTP (NPDES) PERMIT
I~. AMENDMENT TO E:H2M HILL AGREEMENT
H. I-:-ONSERVATIDN PROGRAM STATUS REPORT
I, CITY AUTHORIZED RETAILER ASREEMENT
d. LANDFILL BLUFF EROSION (VERBAL)
K. RATE STUDY F~R WATER/WASTEWATER UTILITY
v. NEXT MEETING APRIL cJ~ 2002
VI. ADUOURNMENT
UTILITY ADVISORY COMMITTEE
Port Angeles, Washington
February 12, 2002
I. Call to Order:
Chairman Bentley called the meeting to order at 3:00 p.m.
IL Roll Call:
Members Present: Chairman Bentley, Councilman Campbell, Councilmember Erickson,
Councilmember Rogers
Mexnbers Absent: Dean Reed
Staff Present: Michael Quinn, Craig Knutson, Brad Collins, Ken Ridout, Scott McLain,
Gary Kenworthy, Larry Dunbar, Tom McCabe, JeffYoung, Cate Rinehart
Others Present: Brian Gawley - Peninsula Daily News
Pete Grigorieff- Northland Cable TV
Jack Dyste - Northland Cable TV
Bob Jensen - Capacity Provisioning
Richard Li - Metropolitan Communications
III. Approval of Minutes:
Chairman Bentley asked if there were any additions or corrections to the meeting minutes of
January 7, 2002. None were given. Councilman Campbell moved to approve the minutes.
Councilmember Erickson seconded the motion, which carried unanimously. Chairman Bentley
asked if there were any additions or corrections to the meeting minutes of January 22, 2002. None
were given. Councilmember Erickson moved to approve the minutes. Councilmember Rogers
seconded the motion, which carried unanimously.
IV. Discussion Items:
A. Cable Television Franchise Renewal
Larry Dunbar, Power Resources Manager, stated that several meetings had been held which have
resulted in positive discussions. An unpublished federal district court opinion had been discovered by
Northland's legal counsel which would allow a delay in the formal decision. A short discussion
followed.
Councilmember Erickson moved to recommend City Council authorize the informal cable
franchise renewal negotiation to continue through May of 2002 based on the Cable Operator's
waiver dated February 6, 2002. Councilman Campbell seconded the motion, which carried
unanimously.
UTILITY ADVISORY COMMITTEE
February 12, 2002
B. Proposed Amendment to Utility Advisory Committee By-Laws
Craig Knutson, City Attorney, noted a written request by Councilmember Erickson had been received
asking that the regular meeting date be changed from the Monday after the first Tuesday to the second
Tuesday of each month.
Councilman Campbell moved to approve the change in by-laws. Councilmember Rogers seconded
the motion, which carried unanimously.
C. Minimum Fee at Port Angeles Landfill
Tom McCabe, Solid Waste Superintendent, reviewed the background for the new members indicating
the increase was needed due to increased labor created by self-haul vehicles. A short discussion
followed.
Councilmember Rogers moved to recommend City Council amend Chapter 13.56.020A to increase
the minimum rate at the Port Angeles Landfill from $2.00 to $7.00, effective Monday, April 1,
2002. Councilman Campbell seconded the motion, which carried unanimously.
D. Wastewater Treatment Plant Operating System and Software upgrade
Jeff Young, Wastewater Treatment Plant Superintendent, pointed out that upgrading the existing
software and hardware would allow staff to add new equipment and solve some existing problems.
Different software packages had been investigated but it had been determined using the existing S&B
Inc. software was in the City's best interest. During a brief discussion some concern was raised
regarding cost. Staff pointed out the upgrade would keep the software consistent and would alleviate the
need to constantly request a new line of code.
Councilman Campbell moved to recommend City Council approve the purchase of operating
software and associated hardware for the City's Wastewater Treatment Plant, and authorize the
City Manager to sign a contract to complete the work for a price not to exceed $68,700, not
including tax. Councilmember Erickson seconded the motion, which carried unanimously.
E. Processing and Application of City of Forks Biosolids
Jeff Young, Wastewater Treatment Plant Superintendent, explained the City of Forks is overloaded with
approximately fifteen tons of biosolids and has requested the City process them. This would not
adversely affect the processing, storing or land application. A brief discussion followed.
Councilman Campbell moved to recommend City Council enter into an inter-local agreement with
the City of Forks to receive up to 200,000 gallons of biosolids at fifteen cents ($0.15) a gallon.
Councilmember Erickson seconded the motion, which carried unanimously.
2
UTILITY ADVISORY COMMITTEE
February 12, 2002
F. Acceptance of Septage from Clallam County Haulers
Jeff Young, Wastewater Treatment Plant Superintendent, announced that the Lakeside Corporation had
approached the City requesting one of their Septage Acceptance Plants be set up to use as a local test
model for a period of approximately two weeks. During the demonstration period haulers will be
charged eleven cents a gallon to treat their wastes and permit fees will be waived. A brief discussion
followed.
Councilmember Rogers moved to recommend issuing Industrial Wastewater Acceptance and
Septic Hauler permits to septic pumpers within Clallam County for the period from February 20,
2002 to March 6, 2002 and to waive permit fees for this demonstration project and charge for
septage disposal and treatment at our current rate of eleven cents ($0.11) per gallon. Councilman
Campbell seconded the motion, which carried unanimously.
G. Proposed Code to form Storm and Surface Water Utility
Gary Kenworthy, Deputy Director of Engineering Services, stressed the need to form a Storm and
Surface Water Utility to fund mandated storm water management requirements. Activities required by
the National Pollution Discharge Elimination System were reviewed and key elements of the code were
explained. A lengthy discussion followed. Staff was directed to emphasize mandated requirements
when explaining the reason for pursuing the fund.
Councilman Campbell moved to approve Public Works and Utilities proceed with development of
the Storm and Surface Water Utility based on the proposed code addition. Councilmember
Erickson seconded the motion, which carried unanimously.
H. Power Supply Update
Scott McLain, Deputy Director of Power Systems, summarized the power supply situation and the cost
recovery adjustment clauses in effect until 2006. He indicated staff would know the load based CRAC
for the next six months on February 14th. It was explained that Staff would not recommend changes to
retail rates if the adjustments to the CRAC's are small.. There was a brief discussion.
No action taken. Information only.
I. Morse Creek Flow Agreement with Agencies
Scott McLain, Deputy Director of Power Systems, advised that to reactivate the Morse Creek
Hydroelectric Project minimum flow levels needed to be addressed to protect listed fish species.
Meetings with several agencies have taken place and a tentative agreement has been reached on flow
levels.
A short discussion followed.
Councilmember Erickson moved to recommend City Council approve the revised minimum flow
levels for Morse Creek and direct staff to initiate action to revise the FERC license to the new
3
UTILITY ADVISORY COMMITTEE
February 12, 2002
minimum flow levels. Councilmember Rogers seconded the motion, which carried unanimously.
J. Kleinschmidt Agreement Change Order
Scott McLain, Deputy Director of Power Systems, pointed out that an agreement had been made with
Kleinschmidt Associates to perform an evaluation of the sale price of the Morse Creek Hydroelectric
Project. Additional work has now been requested to evaluate the appropriate level for the lease cost and
to re-evaluate both the sale price and lease cost under the proposed new minimum flow restrictions.
There was a brief discussion.
Councilmember Erickson moved to recommend City Council approve a change order with
Klainschmidt Associates to revise the total compensation to an amount not to exceed $17,000.
Councilman Campbell seconded the motion, which carried unanimously.
K. Western Public Agencies Group (WPAG) Agreements for 2002
Scott McLain, Deputy Director of Power Systems, explained that the City had been a member of the
Western Public Agencies Group for a number of years. This group is comprised of twenty-one public
utilities and is responsible for addressing expected regional issues. The law firm of Marsh Mundorf
Pratt and Sullivan, and EES Consulting are the two primary consultants to WPAG. Total budget
allocations are divided among the utilities based on number of customers, KWH sales, and utility
investment. A short discussion followed.
Councilman Campbell moved to recommend City Council authorize the Director of Public Works
and Utilities to sign agreements with Marsh Mundorf Pratt and Sullivan, and EES Consulting for
WPAG services during the year 2002 for an amount not to exceed $12,000. Councilmember
Erickson seconded the motion, which carried unanimously.
L. Fuel Cell Demonstration Project
Scott McLain, Deputy Director of Power Systems, indicated the Clallam County Public Utility District
was committed to purchasing and operating a 3 KW fuel cell which was being partially funded by the
Bonneville Power Administration. The PUD had inquired if the City would like to participate.
Operating costs would be in excess ten cents per KWH with capital costs of $27,000 plus installation.
Participation is not recommended. It was noted that the City should not be party to funding research and
development projects.
No action taken. Information only.
M. Rayonier Leachate Report
Revenue chart for 2001
No action taken. Information only.
4
UTILITY ADVISORY COMMITTEE
February 12, 2002
V. Late Items: None
VII. Next Meeting:
The next meeting will be March 12, 2002. At 3:00 p.m.
VIII. Adjournment:
The meeting adjourned at 5:40 p.m.
Allen Bentley, Chairman Cate Rinehart, Administrative
Assistant
2/15/02
N:~PWKS\LIGHTxCONS\CATE~feb 12meet.wpd
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
TO: UTILITY ADVISORY COMMITTEE
FROM: Doyle W. McGinley, Superintendent Water/Wastewater Collection
SUBJECT: Water Quality Report (2001)
Summary: The Washington State Department of Health requires that every water system provide
an annual Water Quality Report to its customers. The report is to contain information on the
potential contaminants present in the water supply that customers receive. The attached Water
Quality Report for the Port Angeles Water Supply has been prepared for distribution to the City's
water customers.
Recommendation: Approve the attached Water Quality Report for presentation to the Cit
Council and distribution to water customers of the City.
Background / Analysis: In 1996 Congress passed amendments to the Safe Drinking Water Act
that included a mandate for the Environmental Protection Agency [EPA] to require community
water systems to provide each of its customers with a "Consumer Confidence Report [CCR]"
every 12 months. Last years report, using 2000 data was delivered to all City of Port Angeles
water customers via the US Mail, along with a public information announcement. This year's
report will be included in customers utility bills prior to July 1 st.
The attached Water Quality Report, based on calendar year 2001 data, has been developed in
accordance with the EPA/CCR regulations. The regulations require information on the quality of
the water delivered by the system and characterization of any risks from exposure to any
contaminants in the drinking water in an accurate and understandable manner. The report is
intended to communicate to customers the quality of their water in terms they can understand.
Many of the topics covered are required and some of the actual language used is mandatory. The
City is also required to provide information to wholesale customers by April 1st. Testing
information will be forwarded to the Clallam County Public Utility District.
Attachment: Water Quality Report
N:\UAC~FinaI~2002 ccr uac.wpd
WASHINGTON, U.S.A.
PUBLIC WORKS & UTILITIES DEPARTMENT
Water Quality Report - 2001 Data
(As required by WSDOH)
Dear Water Customer:
The City of Port Angeles is pleased to provide you with our annual Water Quality Report. The
purpose of this report is to tell our customers about the high quality of their water and their water
system. We aggressively safeguard our Elwha River and well supplies, which enables us to always
provide our customers with a reliable and safe water supply. This report is a summary of the quality
of water provided in 2001. It is a record reflecting the hard work by our employees to bring you water
that satisfies all of the requirements of the Safe Drinking Water Act. The report includes details about
where your water comes from, its quality and how it compares to stringent standards set by regulatory
agencies. We believe that customers who are well informed are able to make better decisions about
~heir drinking water supply.
WATER SYSTEM INFORMATION
Source of the City's Water: The source for the City of Port Angeles Water System is a Ranney
Collector (well) located on the east bank of the Elwha River at mile post 1.9 in Section 3, T 30 N, R 7
W. The system identification number is 68550M.
The river flows northward from the high peaks of the Olympic Mountains in the heart of the Olympic
Peninsula to the Strait of Juan de Fuca. The source of the fiver and most of the land through which it
flows is contained within the boundaries of the Olympic National Park.
The Rauney collector has been classified as groundwater under the influence (GWI) of surface water.
This designation requires the City to meet the requirements of the Surface Water Treatment Rule
(SWTR). The City evaluated regulatory compliance options available under the SWTR including
filtration and complying with criteria to avoid filtration. The City and the Washington State
Department of Health have negotiated an agreement that could effectively meet the filtration
avoidance requirement.
Water from the Ranney Collector is tested following the guidelines established by the Washington
State Department of Health to detect potential contaminants that.could reasonably be expected to be
found in drinking water. As water travels over the surface of the land or through the ground, it
dissolves naturally occurring minerals and, in some cases radioactive material, and can pick up
substances resulting fi.om the presence of animals or from human activity. Because most of the land
through which the Elwha River flows are inside the Olympic National Park, there is limited
opportunity for human contamination of the water. Contaminants that might be expected in untreated
water include: biological contaminants, such as viruses and bacteria; inorganic contaminants, such as
salts and metals; pesticides and herbicides; organic chemicals from industrial or petroleum use, and
radioactive materials.
321 EAST FIFTH STREET · p. O. BOX 1150 · PORT ANGELES, WA 98362-O217
PHONE: 360-417-4805 · FAX: 360-417-4542 · TT¥: 360-417-4645
E-Mall: PU BWOR KS@Cl. PO RT-aN GELES.Wa. US
In order to ensure that tap water is safe to drink, the Environmental Protection Agency (EPA)
prescribes regulations which limit the amount of certain contaminants in water provided to the public
water systems. Food and Drug Administration (FDA) regulations establish limits for contaminants in
bottled water which must provide the same protection for public health.
WATER QUALITY TESTING OCCURS DAILY BY CERTIFIED PERSONNEL
Drinking water, including bottled water, may reasonably be expected to contain at least small amounts
of some contaminants. The presence of contaminants does not necessarily indicate that water poses a
health risk. More information about contaminants and potential health effects can be obtained by
calling the Environmental Protection Agency's Safe Drinking Water Hotline (800-426-4791).
Some people may be more vulnerable to contaminants in drinking water than the general population.
Immuno-compromised persons such as persons with cancer undergoing chemotherapy, persons who
have undergone organ transplants, people with H1V/AIDS or other immune system disorders, some
elderly, and infants can be particularly at risk from infections. These people should seek advice about
drinking water from their health care providers. EPA/CDC guidelines on appropriate means to lessen
the risk of infection by cryptosporidium and other microbial contaminants are available from the Safe
Drinking Water Hotline 800-426-4791.
Disinfection in the City's water supply is accomplished by dosing the water with chlorine at the
Ranney Collector on the Elwha River and at the City's five reservoirs. The chlorine concentration is
monitored daily and is maintained at a minimum of .20 mg/l throughout the system. In the year 2001,
city water quality personnel collected more than 300 water samples throughout the water distribution
system. None of the samples tested positive for coliform bacteria presence.
The City receives a number of calls each year about fluoridation. The City does not induce fluoride
into the public water system. Fluoride is a natural substance found in varying degrees in almost all
water supply. Fluoride was not detected in the last sampling period.
MONITORING WAIVERS, BILATERAL COMPLIANCE AGREEMENTS (BCA)
The City was granted, by the Washington State Department of Health, a waiver through December
2001 for the sampling and testing for synthetic organic chemicals (herbicides, general pesticides).
Previous background test results indicated that these substances are not present in this source.
The City water system operates under two BCA's with Washington State Department of Health.
Docket # 7207 - Covering of Uncovered Finished Water Supply Reservoirs and Installation of
Corrosion Control.
Docket # 00-02-014 Groundwater Under the Influence of Surface Water.
Details for both of the BCA's are available upon request from the City of Port Angeles Water System
Superintendent at 360-417-4855.
2
TABLE OF CONTAMINANTS
FOUND IN SOURCE WATER
CONTAMINANT Detected Compllance Level LevelACti°n SOURCE
None detected
MONITORING FOR NON-HEALTH
RELATED COMPOUNDS
INORGANICS Detected Compliance Level MCL SOURCE
MCLG
Conductivity 95 not set 700 a
(umhos/cm)
Hardness (mg/l)* 42 not set not set b
Magnesium (rog/I)* 1.6 not set not set c
Calcium (rog/I)* 14 not set not set
*testing is required, no state action level
Table Notes:
a. MHOS instrument to measure ION changes in water
b. Measure of materials shown above
c. Occurs in surface water. Used to measure hardness of water
Calcium and magnesium are naturally occurring minerals in groundwater. These minerals are measured
to determine water hardness. Hardness interferes with the sudsing of soap. The scale of hardness is: 0-75
mg/I = soft; 76-150 mg/l = moderately hard; 151-300 mg/1 = hard. [AWWA standard]
DEFINITIONS:
Action level [AL] The concentration ora contaminant which, if exceeded, triggers a treatment or other
requirement which a water system must follow.
Maximum Contaminant Level [MCL] The highest level of a contaminant that is allowed in drinking
water. MCLs are set as close to the MCLGs as feasible using the best available treaanent technology.
The contaminant is measured in milligrams per liter (mg/L).
Maximum Contaminant Level Goal [MCLG] The level of a contaminant in drinking water below
which there is no known or expected risk to health. MCLGs allow for a margin of safety. The
contaminant is measured in milligrams per liter (mg/L).
Milligrams per liter ling/II or parts per million [ppm] Metric measurement of concentration of a
contaminant or material. [one part per million and one mg/l = I penny in 10,000 dollars]
Micro mhos per centimeter Jumbos/cml Measure of ions in water.
3
WATER CONSERVATION TIPS
Water conservation measures are an important first step in protecting our water supply. Such
measures not only save the supply of our water, but can also cut the cost of water treatment. Here are
a few suggestions:
Conservation measures you can use inside your home:
~ Fix leaking faucets, pipes, toilets, etc.
~ Install water saving devices in faucets, toilets and appliances. Replace old fixtures with new ones.
This will reduce water consumption by nearly one-half.
~ Wash only full loads of laundry.
~ Do not use the toilet for trash disposal.
~ Take shorter showers. Do not let the water run while shaving, washing, brushing teeth, or
cleaning fruits and vegetables.
~ Soak dishes before washing. Run the dishwasher only when full.
You can conserve outdoors as well:
~ Water the lawn and garden in the early morning or evening.
~* Use mulch around plants and shrubs.
~ Repair leaks in faucets and hoses. Use water-saving nozzles.
~ Use water from a bucket to wash your car. Save the hose for rinsing.
For more information:
Thc City of Port Angeles City Council meets at 6:00pm on the 1 st and 3rd Tuesday of each month at City
Hall, 321 E. 5~h Street. Information about the City's utilities may be found on the web site: www.ci.port-
angeles.wa.us. If you have questions, the City of Por~ Angeles Water System Superintendent may be
reached at 360-417-4855.
Repor~ Date: March 1, 2002
4
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
TO: UTILITY ADVISORY COMMITTEE
FROM: Tom McCabe, Solid Waste Superintendent
Dale Miller, Recycling Coordinator
SUBJECT: Benefit Dump Day
Summary: The City of Port Angeles sponsors an annual Free Dump Day for all Clallam County
residents. The 2001 event was modified to limit the size of vehicles, trailers, and amount of materials.
Staff diverted the majority of the refuse to the recycling area to conserve valuable landfill space and to
assure that the current cell will not reach its capacity before December 2006.
Recommendation: Forward a favorable recommendation to the City Council to approve the
annual Free Dump Day at the City's Landfill on April 21, 2002.
Background / Analysis: Clean-Up Days, Free Dump Days, or Recycle Days are common events for
rural communities. The City of Port Angeles Solid Waste Division sponsors an annual Free Dump Day
for all Clallam County residents. Currently residents may haul all non-hazardous waste to the Landfill
Site for free on the designated Free Dump Day. All landfill fees are waived for this event. Residents are
requested to donate cash or food items to benefit the Port Angeles Food Bank. In 2001, the benefit to the
Food Bank was $2853.26 in cash donations and 6240 pounds of food.
For the 2001 event staff was directed by the UAC to impose vehicle size restrictions, increase recycling,
and provide inspection of loads prior to unloading.
· Vehicle size is limited to 3/4 ton pick-ups or cars with trailers ( 4' x 8' ). One load per household,
with a limit on tires, refrigerators, freezers, and other appliances of four each.
For the first time in the event's history, the Benefit Dump Day will be assisted by a $7,500 grant from the
Department of Ecology (The city will match $2,500). The money from this grant will pay for any cost
associated with recycling activities at the event. Other costs of this event are included in the tipping fee
paid by all users of the landfill.
Planned Changes for 2002:
· Change start time of the event from 10:00 A.M. to 9:00 A.M. Closure time will be at 3:00 P.M.
as usual.
· Additional man power for rotation of breaks.
· Increase traffic control devices, such as more cones at the site, and signs to prevent blocking of
intersections and driveways along 18* street.
Dump Day
Page 2
Costs for the 2001 event:
TABLE 1
Expenditure Event Day Post Event Cost
Wages $ 4667.64 $ 608.64 $ 5276.28
Equipment $ 410.00 $ 238.00 $ 648.00
Tip Fee's 423.45 tons $ 32,520.98*
City of Sequim 22.46 tons $1414.98'
Crushed Rock 120 yds. $1440.00
Advertising Daily News $ 387.75
Lost revenues from tonnage fee's not charged. (Tip Fee's 423.45 x $76.80 = $32,520.98)
(City of Sequim 22.46 x $63.00 = $1,414.98)
Demographic of Users:
TABLE 2
Agency 2001 Vehicles 2001 Tons Tip Fees
Port Angeles 629 186.19 $14,299.40
City of Sequim 147 44.91 $ 3449.09
Forks 13 3.19 $ 245.00
East County 348 105.80 $ 8125.44
West County 254 83.3 $ 6402.05
Total 1391 423.39 $32,520.98
Wages & Donated Services:
TABLE 3
Agency Regular Hrs. O.T. Hrs. Other Cost
Waste Management* 8 8 Truck hours $ 662.5
Clallam County* * 10.75 $ 310.03
Solid Waste Division 16 80 $ 2983.75
Port Angeles Food Bank*** 96 0
Street Division 37 $1214.50
Water Division 15.5 $ 469.39
Totals 112 148.50 8 $ 4667.64
· Waste Management paid wages for employee.
· *Clallam County paid for expense for employee.
· **Port Angeles Food Bank donated 12 volunteers at no cost.
N:\UAC~FinaI\UAC Dump Day 2002.wpd
WASHINGTON, U.S.A.
UTILITY ADVISORY {;OMMITTfl= Mi=MO
DATE: March 12, 2002
To: UTILITY ADVISORY COMMITTEE
FROM: Tom McCabe, Solid Waste Superintendent
SUBJECT: Minimum Fee Port Angeles Landfill
Summary: The minimum fee increase proposal for the Port Angeles Landfill has been sent back by the
City Council to the UAC for additional review. Staff was requested to perform additional data gathering
on the self-haul users. Concern was expressed about the impact on user groups, if there would be a
change in revenues, and if there would be any effect on the landfill closure in 2006.
Recommendation: Return to City Council with a recommendation to amend Chapter 13.56.020A
to increase the minimum rate at the Port Angeles Landfill from $2.00 to $7.00 effective May 1,
2002.
Background / Analysis: The City Council has directed that the requested increase in minimum fees for
the Port Angeles Landfill be returned to the UAC for further review and analysis. The City Council
expressed concern that the increase will become a significant financial burden to the City residents
considering the fact that they are now required to subscribe to solid waste collection services. Also,
several questions were asked by a citizen at the Council meeting.
Staff has reviewed the transactions for City and County self-haulers for the period of Jnne 2001 to
December 200I and analyzed the fees they were required to pay at the landfill. The results indicate that
on those dates sampled 18% were City self-haulers and 82% were County self- haulers. 48% paid less
than $5 per load, 18% paid between $5 and $7 per load and 34% paid more than $7 per load. The
attached table is a tabulation of the survey data.
Additional questions/issues raised at the City Council meeting:
Why a recommendation to change the minimum fee?
Self-haulers at the landfill have increased by 17% since 1998 and the trend is continuing. The more
material placed in the drop boxes require more frequent dumping into the cell. The tonnage of material
from the Blue Mountain transfer station continues to decrease in part because the tipping fees are less at
the City landfill. There are also indications that the fee at Blue Mountain transfer station may increase in
the near future. When material is placed in the cell by commercial haulers, it has had some initial
compaction reducing the amount of time that City crews must spend to compact the material. Reducing
the numbers of self-haulers will reduce congestion at the drop off landing area and the scales.
Will the increase generate additional revenue?
The minimum landfill fee increase is anticipated to be revenue neutral. If the trend continues, it will be
necessary to hire additional personnel at the landfill, potentially leading to increases in the tipping fee
charged.
Who will be affected?
The users that will be affected are the city/county residential, commercial yard waste, and small
commercial businesses. They represent 96% of the total users coming to the landfill. Residential yard
waste is free. The current rate for commercial yard waste is $20.00 a ton.
Self Haul Users 2001 Users Tons
City Residential 9,997 1,607
County Residential 44,906 4,678
City Commercial 5,158 7,267
County Commercial 7,844 3,672
City Yard Waste 8,276 264
County Yard Waste 5,336 832
* Commercial Yard Waste 1,195 401
* City & County combined.
Will the increase impact recycling?
The City is promoting increased recycling efforts by City residents and landfill users. The increase in the
minimum fee at the landfill is not expected to affect recycling efforts by self-haulers.
Will the increase have an impact on the transition to an export system in 2006?
The design ora transfer station is based on annual tonnage, amount of users, and future growth
projections along with thc amount of traffic per day. A higher minimum fee should reduce the amount of
traffic, which will reduce facility size and labor requirements.
The previous memos to the UAC are attached for background information.
The UAC is also encouraged to discuss a possible minimum fee increase from $2.00 to $5.00 with a step
to $7.00 starting in 2003 or 2004.
Attached: Revised random survey
N:\UAC~FinalWlinimumFeeLandfill,wpd
Survey Landfill Self Haul Residential Customers ( 2001 )
City Self Haulers County Self Haulers
Date Day Self < $5 >$5 <$7 > $7 Self < $5 >$5 <$7 > $7
Haul Haul
06/06 Wed. 39 18 9 12 96 43 23 30
06/16 Sat. 51 14 8 29 269 121 45 103
07/07 Sat. 78 28 11 39 252 105 44 103
07/13 Fri. 34 18 9 7 179 77 36 66
07/17 Tue. 28 20 7 1 129 70 21 38
07/30 Mon. 29 ] 6 $ 5 190 99 22 69
08/01 Wed. 37 16 7 14 131 74 26 31
08/10 Fri. 30 19 I l0 186 ]08 28 50
08/15 Wed. 25 8 8 9 136 82 16 38
08/21 Tue. 39 11 9 19 183 104 22 57
08/30 Fri. 38 16 8 14 134 75 20 39
09/05 Wed. 31 15 2 14 155 80 32 43
09/13 Thur. 26 6 9 11 120 73 14 33
09/18 Tue. 24 10 2 12 128 75 17 36
09/29 Sat. 66 15 17 34 311 138 49 124
City Self Haulers City Self Haulers
Date Day Self ~ $5 >$5 <$7 > $7 Self :~ $5 >$5 <$7 > $7
Haul Haul
10/03 Wed. 32 10 6 16 132 62 20 50
10/09 Tue. 37 17 8 12 I17 63 24 30
10/19 Fri. 27 8 8 11 122 61 23 38
10/27 Sat. 39 9 10 20 230 I01 37 92
11/02 Fri. 26 9 5 12 132 67 22 43
11/06 Tue. 23 11 5 7 124 53 22 49
11/17 Sat. 55 18 8 29 308 143 58 107
11/26 Mom 24 8 7 9 170 83 35 52
12/03 Mom 36 16 6 14 133 68 21 44
12/07 Fri. 22 13 3 6 123 69 13 41
12/11 Tue. 33 16 4 13 104 58 19 27
12/15 Sat. 37 11 5 21 247 125 45 77
12/19 Wed. 22 10 4 8 152 55 19 78
12/21 Fri. 21 8 6 7 152 92 24 36
12/26 Wed. 40 18 10 12 195 116 36 43
Total 929 365 185 379 4,294 2,152 709 1,433
% 18% , 7% 4% 7% 82% 41% 14% 27%
N:\UAC~Fina]\minimumch ar2_A.wpd
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
To: UTILITY ADVISORY COMMITTEE
FROM: Jeff Young, WWTP Superintendent
RE: WWTP National Pollutant Discharge Elimination System (NPDES) Permit
Summary: The Washington Department of Ecology (DOE) has reviewed our application to
renew the NPDES permit and has returned a draft permit. As part of the permit process they will
publish a notice in the local newspaper for interested parties to review the draft permit and make
comments.
Recommendation: Information only.
Background/Analysis: The Washington Department of Ecology has completed processing our
NPDES permit application including a request for reductions in testing. A draft permit has been
reviewed by City staff to identify any factual errors prior to the draft being released for public
comment. The next step in the permit process will be a 30-day formal public comment period.
This was to begin on March 6, 2002, but DOE is behind schedule and the actual start date is
anticipated to begin within the next 30 days. Staff may also submit comments during this 30-day
period. Thirty days after the public comment period ends, DOE will prepare the final permit,
including a responsiveness summary to all comments received.
N:\UACWinal\uacnpde s3 - 12A.wlxl
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
TO: UTILITY AnVlSORY COMMITTEE
FROM: Stephen Sperr, Utility Engineer
SUBJECT: Amendment to Consultant Agreement with CH2M Hill for Water System Services
Summary: CH2M Hill, Inc. was selected in August 2000 to continue to provide engineering
services for projects involving the City's water system. The scope and budget of this Agreement
needs to be amended to reflect actual costs for completed tasks, additional costs for ongoing
tasks, the addition of a new task, and the extension of the time of performance. This Amendment
to the Agreement will change the not-to-exceed amount from $660,072 to $710,072, an increase
of $50,000.
Recommendation: City Council authorize the Mayor to sign an Amendment to the
Agreement for Professional Services with CH2M Hill, Inc.
Background / Analysis: On August 30, 2000, the City signed an Agreement for
Professional Services with CH2M Hill to provide engineering support services for the following
projects (tasks):
1. Elwha Dam Removal - The planned removal of two dams on the Elwha River and the
impact on the City's domestic and industrial water supplies.
2. GWI Compliance Assistance - Meeting the requirements of a Bilateral Compliance
Agreement with the Department of Health (DOH) addressing the City's water source
being designated a groundwater under the influence of surface water (GW1).
3. Black Diamond Improvements - The design of a cover, chlorination facilities, and other
items for the City's Black Diamond Reservoir.
4. Peabody Heights Reservoir Cover - The design of a floating cover and drainage facilities
for this Reservoir.
5. Water System Plan Update - Updating the City's Water System Plan for approval by the
DOH.
6. Other Services as Directed.
Task Nos. 1 and 2 are ongoing projects that will last at least for the duration of this Agreement.
Task Nos. 3 and 5 are almost complete and Task 4 is scheduled for completion by early 2003.
There is a need to amend the Agreement to reflect the current status of the tasks, including the
budgets for each task and new subtasks for Task No. 2.
In addition, the predesign for a new High Zone Reservoir, to be funded jointly by the City's
Water Utility and Clallam County PUD#1 (currently being negotiated), will be added to the
Amendment to CH2M Hilt Contract
Page 2 of 2
March 12, 2002
Agreement. There is a need to move forward on the design of this reservoir to meet storage
shortfalls identified in both the City and PUD's Water System Plans.
The following is a table summarizing the budgets and funding sources for the key tasks in the
original and amended Agreement:
TASK OmGINAL REVISED FUNDING SOURCE(S)
BUDGET BUDGET
1. Elwha Dam Removal Mitigation $59,889 $59,889 Federal Government~
2. GWI Compliance Assistance $80,408 $139,398 Water Utility2
3. Black Diamond Improvements $160,101 $126,934 PWTF & DWSRF loans3
4. Peabody Heights Reservoir Cover $84,581 $109,815 PWTF loan3
5. Water System Plan Update $230,763 $115,648 Water Utilitiy4
6. Other Services as Directed $44,330 $105,455 Water Utility~
a. UGA Annexation
b. Large industrial water users
c. Morse Cr. Hydro
d. Surge tank specifications
e. Future services as directed
7. New 2.5 MG High Zone Reservoir n/a $52,933 Water Utility~
Total $660,072 $710,072
~ Reimbursement of costs to be provided Der 1999 Congressional Appropriations
Bill.
2 Funded by the Water Utility. Some work items in this task may be deleted based
upon ongoing negotiations with National Park Service on federal funding of water
mitigation facilities related to Elwha Dam Removal Project.
3 _ A Public Works Trust Fund Loan (1% interest) and Drinking Water State
Revolving Fund Loan (5 % interest) were obtained to cover the City's reservoirs
per a Bilateral Compliance Agreement with the Washington State Department of
Health (DOH).
4 $100,000 budgeted in 2000 and in 2001 respectively from water rates. If
additional funds are needed, they will come from the Water Utility reserves.
s Directed services will be funded by the Water Utility.
6 Water Utility will fund predesign; the rest of the project funding to be negotiated.
A copy of Amendment No. I to the Agreement is attached. For further information on task and
cost breakdowns, see the attached Amended Scope of Work and Exhibits. The duration of the
Agreement will be extended from December 31, 2002 to August 31, 2003, and is based on the
completion of all tasks.
N:\UACXFinaI\CH2M Amendment.wpd
Exhibit A1
Scope of Work
CH2M HILL (Consultant) agrees to furrdsh the City of Port Angeles (City) the following
services, as described herein, which are hereby amended to the existing Agreement for
Professional Services, dated August 30, 2000 (Agreement). Except as modified herein, the
original Agreement and Scope of Work (Exhibit A) shall remain in effect.
Summary
The revised scopes for Tasks 1 through 6 are described below and reflect any ongoing
and/or anticipated changes in the scope of each Task. Task 7, New High Zone Reservoir,
has been added to the Scope of Work and is also described below.
The amended budgets for Tasks 1 through 6 of the Agreement, as well as the budget for
Task 7, is presented in the attached Exhibit BI. These amended budgets reflect either the
expansion of services to be provided by Consultant for some tasks or the reduction of
services for other tasks. In the case of Task 1, no change to the scope or budget was made.
The increase in the total budget of the Agreement is due almost exclusively to the addition
of Task 7.
Task 1. Elwha Dam Removal Mitigation
No change in the original scope and budget for this task is proposed.
Task2. GWl Compliance Assistance
All of the originally-scoped subtasks for this task have been completed. The scope of
services presented herein for this task are additional to the original scope of services.
2.6 PALL Septra C8 Pilot Assistance
The scope of services presented in this subsectSon pertain to the ongoing pilot testing
assistance for the PALL Septra CB membrane cartridge filter. In general, this assistance
extends from the services that have recently been provided and that are currently being
provided, but not yet invoiced, through completion of the pilot testing and the subsequent
pilot test report. For the purpose of scoping and budgeting this subtask, the duration of
pilot testing is estimated to be 9 months (through November 2002) to ensure that the impact
of autumn water quality conditions are assessed. This subtask is numbered as 2.6 (subtasks
2.1 through 2.5 of the original scope were completed).
2.6.6 Test Report
Upon completion of the pilot testing, a report summarizing the testing shall be prepared
and submitted to the City for its review and subsequent submittal to DOH for its review
and approval. The test report shall summarize the results of the pilot testing, assess the
success (or lack thereo0 of the testing with respect to the objectives of the December 13, 2001
Alternative Filtration Testing Protocol Report, and provide recommendations for follow-up
actions to be taken toward compliance with the City's Bilateral Compliance Agreement with
DOH related to GWI compliance. The budget for this subtask is based on 80 hours of
Consultant's Corvallis treatment expert time for preparation of a report for review City staff
and subsequent review by DOH and 20 hours of to address DOH review comments.
Task 3. Black Diamond Improvements
All of the originally-scoped subtasks for this task have been completed except for the
preparation of record drawings, Subtask 3.7.5, from marked-up design drawings. City staff
completed the vast majority of the engineering services pertaining to construction. Thus,
substantial budget remains. Most of this remaining budget for this task has been transferred
to other tasks that have newly scoped subtasks. The budget remaining for this task is only
to cover the original Subtask 3.7.5, Record Drawings.
Task 4. Peabody Heights Floating Cover
In general, the services described herein for this task are additional to the services scoped in
the original Agreement. The scope and budget for the Task 4 services described in the
original Agreement remain in effect.
4.8 Bidding and Contract Documents
Consultant shall prepare Bidding and Contract Documents using City's standard formats.
The applicable sections of the Contract Document prepared for the Black Diamond
Reservoir Improvements project, which include all of Parts I and II and Part III through the
end of Division 1 of the CSI-formatted section), shall be used to prepare the Contract
Document for this task. Any updates in the City's standard bidding and contract document
forms shall be identified by City staff and provided to Consultant so that Consultant may
update the contract files prepared for the Black Diamond project.
City's standard construction contract format is acknowledged to be based on the latest City-
adopted version of the Washington State Department of Transportation (WSDOT) /
American Public Works Association (APWA) Standard Specifications (English unit version),
hereinafter referred to as the Standard Specifications. Consultant shall coordinate City's
standard Bidding and Contract Document formats with the technical specifications and
drawings of the work as part of Division 8 of the Standard Specifications in Construction
Standards institute (C_SI) format.
Task 6. Directed Services
Similar to the scope and budget for this task, as described in the original Agreement,
Consultant shaI1 provide technical assistance and other services to the City, related to the
City's water system or other utilities, at the specific direction of authorized City staff. No
such assistance or services shall be provided unless specifically directed by the City. The
purpose of this task is to facilitate timely response by Consultant to needs that are
unforeseen at this time. The budget for this task is essentially a contingency allowance that
includes labor and expenses.
In addition to the unforeseen needs that may arise, the following subtasks have already
been specifically defined under this task:
6.1 Ongoing / Completed Directed Services
Ongoing assistance with the Elwha Surge Tank and the Morse Creek Instream Flow Subtask
will be undertaken and completed as directed by City staff in conformance with available
budget.
6.1.1 Eastern UGA Annexation Assistance (Completed)
This subtask is completed. The budget for this subtask included in Exhibit B1 reflects
already-invoiced charges.
6.1.2 Pilot Testing Assistance (Completed)
This subtask is completed. The budget for this subtask included in Exhibit B1 reflects
already-invoiced charges.
6.1.3 Large Water Users Task (Completed)
This subtask is completed. The budget for this subtask included in Exhibit BI reflects
already-invoiced charges.
6.1.4 Morse Creek Assistance
This subtask is completed. The budget for this subtask included in Exhibit B1 reflects
already-invoiced charges. Both the City and Consultant acknowledge that additional
related work may be directed by City, which will be covered as part of the budget for
Subtask 6.2.
6.1.5 Surge Tank Specification and Shop Drawing Review
This subtask is ongoing. The budget for this subtask included in Exhibit B1 reflects already-
invoiced charges as well as additional budget to cover anticipated charges.
· Operational strategies for use of the Reservoir to meet the PUD's needs as well as
the City's
· The Reservoir's hydraulic elevation above most of the PUD's system gradient,
which will require pressure reduction
· The Reservoir's assumed siting at the same elevation as the existing 1-million
gallon high zone reservoir. It is assumed at this time that major reconfiguration
of the PUD and City systems to minimize current and future pumping costs
(both operational and capital) to both the City and PUD, which could result in
locating the Reservoir at a higher hydraulic gradient, will not be cost-effective.
This issue needs to be addressed to obtain concurrence from the City and PUD.
If additional analysis of this issue appears necessary, it will need to be scoped
and budgeted as a separate task.
· Reservoir site issues such as wetland mitigation, neighborhood concerns,
visibility issues, seasonal restrictions on construction, and other similar issues.
· Potential future development in the City within the high zone, in unincorporated
UGA within the high zone, and outside the unincorporated UGA that might
possibly connect to the high zone, thus, requiring service from the combined
high zone reservoirs
· P6tential "oversizing" of the Reservoir to meet City and PUD operational
strategies and optimize capital expenditure related to future storage needs
· Identification of project aspects that warrant combined funding participation by
the City and PUD as well as those project aspects that are applicable to either the
City or PUD (but not both). It is acknowledged that negotiation of these issues
between the City and PUD will likely be conducted without further input from
Consultant.
· Preliminary identification and discussion of cost-sharing criteria. Again, it is
acknowledged that negotiation of these issues between the City and PUD will
likely be conducted without further input from Consultant.
· Impacts to Reservoir sizing, siting, or other related issues that may be related to
the potential acquisition of PUD's PA Composite system by the City that the City
is aware of.
· Whether or not an altitude valve is necessary or desired
· Other relevant topics to raised by workshop attendees
Consultant shall summarize the topics discussed and decisions made during the workshop
in a to 3 to 5 page memorandum, which will be submitted to the City for its review and
subsequent distribution to other attendees and stakeholders.
· Precast, cable-tensioned concrete conforming to AWWA Dl15-95
· Welded steel conforming to AWWA D100-96
The City select the method and materials of construction soon after completion of this
evaluation to facilitate completion of Predesign activities. Furthermore, this subtask will be
coordinated with the City's site-selection efforts and geotechnical exploration efforts to
ensure that the type of reservoir to be constructed is compatible with the Reservoir site
selected.
7.4 Reservoir Sizing
Gross sizing of the Reservoir was developed based on DOH criteria and available flow data.
Consultant shall further refine the needed capacity of the Reservoir based on criteria
developed during the preliminary workshop, the latest (2001 and 2002) flow data provided
by the City, and the results of the PUD's ongoing water system planning effort. Consultant
shall coordinate directly with PUD regarding obtaining information related to its storage
capacity needs.
7.5 Rechlorination Station and Potential Stagnancy
It is assumed at this time that rechlorination of flow out of the high zone reservoir will be
necessary to maintain a detectable residual in the flow delivered to the PUD's intertie and
within the City's high zone distribution system.
Consultant will qualitatively address this assumption with respect to the potential for
chlorine decay to undetectable levels as well as the potential for "water aging" that could
lead to taste and odor problems. Estimated residence times in the Reservoir at various flow
conditions will be developed.
Consultant will identify the issues related to the potential for stagnancy in the new
Reservoir. The importance of this stagnancy issue is somewhat dependent on the final
sizing of the reservoir and how it is connected to the high zone system. Several
configuration strategies are possible to address potential stagnancy. These strategies will be
identified, qualitatively assessed based on their cost and estimated effectiveness, and
reduced to a reconunended approach.
For the purpose of this Predesign Report, it will be assumed that the dimensions of the
rechlorination station will be the same as those for the Black Diamond facility. No details of
the facility will be developed.
7.6 Predesign Report Preparation
Upon completion of subtasks presented above for the Reservoir, a Predesign Report,
conforming to the requirements of WAC 246-290-110 shall be prepared by Consultant. The
Predesign Report will range in length, including tables and figures, from 10 to 20 pages.
The report will include the following:
A single meeting to be held in Port Angeles is budgeted to present and discuss the results of
this Predesign subtask. The timing of this meeting, to be attended by Consultant, will be as-
directed by City staff to support presentation of either the first or second drafts. The budget
for this effort is based on the attendance of ~:wo Consultant staff persons.
Exhibit B2
Summary of Amended Budget for Water System Assistance
Original New or Revised
Task Original Amount Budget Transferred Revised Budget
No. Task Description Budget Expended Remaining Budget Budget Remaining
I Elwha Dam Removal Mitigation $59,889 $31,674 $28,215 $0 $59,889 $28,215
2 GWI Compliance Assistance $80,408 $81,922 -$1,514 $58,990 $139,398 $58,990
3 Black Diamond Improvements $160,101 $122,234 $37,867 .$33,167 $126,934 $4,700
4 Peabody Heights F~oating Cover $84,581 $25,542 $59,039 $25,234 $109,815 $84,273
5 Water System Plan Update $230,763 $90,267 $140,496 -$115,115 $115,648 $25,381
6 Directed Services $44,330 $52,052 -$7,722 $61,125 $105,455 $51,889
7 New High Zone Reservoir $0 $0 $0 $52.933 $52.933 $52.933
Total $660,072 $403,691 $256,381 $50,000 $710,072 $306,381
Notes:
The exceedance associated with Task 2 was transferred to the "Revised Budget Remaining" column for Task 6, which
includes an infusion of $50,000 additional to the original Agreement.
13
AMENDMENT NO. 1 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN THE
THE CITY OF PORT ANGELES
AND
CH2M HILL, INC.
RELATING TO
THE CITY'S WATER SYSTEM
THIS AMENDMENT NO. 1 TO THE AGREEMENT is made and entered into this day
of ,2002, by and between THE CITY OF PORT ANGELES, a non-
charter code city of the State of Washington, (hereinafter called the "CITY") and CH2M Hill,
Inc., a Florida Corporation (hereinafter called the "CONSULTANT").
WHEREAS, the CITY entered in to an AGREEMENT with the CONSULTANT on August 30,
2000, and
WHEREAS, the CITY desires to amend the AGREEMENT to revise the Scope of Work,
Budget, and Time of Performance,
NOW, THEREFORE, in consideration of the above representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the
parties hereto agree as follows:
I REVISED SCOPE OF WORK
The revised scope of professional services to be performed and the results to be achieved by
the CONSULTANT shall be as detailed in the attached Exhibit A1 and shall include all
services and material necessary to accomplish the work.
II TIME OF PERFORMANCE
The work shall be completed by August 31,2003.
III MAXIMUM COMPENSATION
The CONSULTANT'S total compensation and reimbursement under the original Agreement
and Amendment No. 1 to the Agreement, including labor, direct non-salary reimbursable costs
and outside services, shall not exceed the total and subtotals for the tasks as set forth in the
attached Exhibits B1 and B2.
IV SIGNATURES
Except as modified in this Amendment No. 1 to the Agreement, the original Agreement and its
Exhibits shall remain in effect.
In WITNESS THEREOF, the parties hereto have executed this Amendment No. 1 to the
Agreement as of the day and year first written above.
CITY OF PORT ANGELES:
MAYOR
CONSULTANT:
TITLE:
APPROVED AS TO FORM:
CRAIG KNUTSON, CITY ATTORNEY
ATTEST:
BECKY UPTON, CITY CLERK
N:\PROJECTS~20-17\CONTRACT~CONTRACT.WPD
W A S H I N G T O N, U. S. A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
To: UTILITY ADVISORY COMMITTEE
FROM: Bob Kaj fasz, Commercial Energy Analyst
SUBJECT: Conservation Program Status Report
Summary: The City has been offering various conservation programs for its electric utility customers
since June, 2001. The programs have been well received by our customers and has resulted in a saving o:
almost halfa million kWh per year. A status report will be presented on the City's energy conservation
programs from June 2001 through February 2002.
Recommendation: No action requested.
Background/Analysis: On April 12, 2001 the City Council authorized the Director of Public Works to
implement a conservation program that qualifies for the Bonneville Power Administration (BPA)
Conservation and Renewables Discount (C&RD). The Conservation program has been in operation since
June 1,2001 and offers electric utility customers rebates for energy efficient building improvements,
appliances and lighting.
Below is a summary of the program achievements during the last nine months. The programs have met
our expectations in providing energy savings to our customers and utilizing CR&D funding within the
community. A summary of the rebates available for energy conservation measures is attached.
Conservation Programs From June 1 2001 To Feb. 28z 2002
# JobsFLlnits Total Cost City Rebate kWh Savings~ C&RD
Heat Pump 19 $118,970.77 $22,530.00 140,951 $43,114.00
Window 76 $188,416.5~ $46,105.53 97,671 $47,325.81
Water Heater 96 $26,754.69 $4,380.00 25,37~ $5,649.59
Dishwasher 17 $11,402.50 $355.00 2,023 $412.76
Clothes Washer 93 $166,044.40 $12,000.00 51,418 $14,532.40
Attic Insulation 18 $18,803.66 $5,039.28 10,761 $5,380.56
Floor Insulation 1¢ $10,260.04 $1,463.70 2,927 $1,463.70
Wall Insulation 21 $31,420.71 $36,174.02 78,645 $45,351.95
Infiltration Control $611.33 $450.00 1,282 $533.10
Sub Total $572,684.66 $128,497.53 411 $163,763.87
Total $578,531.40 $133,314.23 438,048 $175,304.06
BPA projected annual energy savings in kWh
Purchase of Conservation Agreement Limited Standard Offer
Summary of Available Rebates
Available Single-Family Manufactured Multi-Family Small
Improvements Homes Homes Homes Commercial~
Up to $2,000 Up to $1,000 N/A Up to $0.60
(from electric (from electric per sq. ft.
Heat pump furnace) furnace) Retail Buildings
Up to $1,100 Up to $400 N/A Up to $0.45
(from zonal heat) (from zonal heat) per sq. ft.
Office Buildings
Wall insulation Up to $1.50 per sq. N/A Up to $1.50 per Up to $0.75 per sq.
ft. sq. ft. ft.
100% of actual cost 100% of actual cost
Air-sealing (if heat pump or wall (if heat pump is N/A N/A
winter special insulation is installed)
installed)
$5.00 per sq. ft. $4.00 per sq. ft. $4.00 per sq. ft. $3.50 per sq. ft.
Windows $10 per air inlet $10 per air inlet $10 per air inlet
Attic insulation $0.27 per sq. ft. $500 for attic and $0.27 per sq. ft. $1.80 per sq ft.
floor insulation
Floor insulation $0.15 per sq. ft. $0.16 per sq. ft. $1.00 per sq. ft.
ENERGY $6.00 each $6.00 each $6.00 each $6.00 each
STAR® labeled 15 to 26 watts 15 to 26 watts 15 to 26 watts 15 to 26 watts:
compact (limit of 12) (limit of 12) (limit of 12)
fluorescent
lamp
ENERGY $35.00 per fixture $35.00 per fixture $35.00 per fixture $15.00 -$200.00
STAR® labeled (limit of 12) (limit of 12) (limit of 12) per fixture:
lighting fixture
ENERGY $50. OOperfixture $50. OOperflxture $50. OOperfoctUre N/A
STAR® labeled (limit of 2) (limit of 2) (limit of 2)
torehiere lamp
ENERGY $150.00 $150.00 $150.00 N/A
STAR® labeled (Must have an (Must have an (Must have an
clothes washer electric water heater) electric water heater) electric water
heater)
An ENERGY $25.00 $25.00 $25. O0 N/A
STAR® labeled (Must have an (Must have an (Must have an
dish-washer electric water heater) electric water heater) electric water
heater)
Electric water Gallons Rebate
heater 30-64 $55.00 N/A
65-105 $60.00 N/A
Solar water $800 $800 $800 N/A
heater per 40 sq. ft. per 40 sq. ft. cOllector per 40 sq. ft.
collector collector
Photovoltaic $500 per kW $500 per kW $500 per kW N/A
· Must be an office or retail space 5,000 sq. ft. or less.
2 Purchase of Conservation Agreement Limited Standard Offer.
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
TO: UTILITY ADVISORY COMMITTEE
FROM: Larry Dunbar, Power Resources Manager
RE: City Authorized Retailer Agreement
~ummarv: Activities under the Bonneville Power Administration (BPA) ENERGY STAR®
abeled compact fluorescent lamp coupon rebate program ended December 31,2001. A City
~uthorized Retailer Agreement is proposed that would provide customers with a continuing and
:xpanded selection of energy efficient lighting alternatives.
Recommendation: Forward a recommendation to City Council to grant the Director of
Public Works and Utilities the authority to enter into City Authorized Retailer
~greements.
Background/Analysis: The BPA compact fluorescent lighting coupon program included
distribution of three utility billing inserts during calendar year 2001. As part of the program,
customers purchased and retailers, under agreement with BPA, redeemed 6,237 coupons.
There is a strong customer and local retailer interest in a continuing energy efficient lighting
program. Based on this interest and the conclusion of the coupon program, staff developed a
new program under the BPA Conservation and Renewables Discount (C&RD) program that
seeks to satisfy the following goals:
a. To have an expanded variety of styles and sizes of ENERGY STAR® labeled compact
fluorescent lamps (CFL) and torchiere floor lamps (TFL) available for retail sale locally.
b. To have a variety of styles of ENERGY STAR®labeled CFL fixtures and replacement
lamps available for retail sale locally.
c. To promote ENERGY STAR® labeled CFL fixtures in new residential construction.
It is recommended that the City form a business relationship with local retailers to promote the
sale of qualifying lighting products. Under the C&RD, the City is required to meet all BPA
program requirements necessitating an agreement with local retailers.
A City Authorized Retailer Agreement has been prepared in cooperation with local retailers that
have expressed a desire to participate in the City's future program. The Agreement includes
three retailer participation options and retailer and City responsibilities.
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: March 12, 2002
TO: UTILITY ADVISORY COMMITTEE
FROM: Scott McLain, Deputy Director for Power Systems
RE: Rate Study for Water/Wastewater Utility
Summary: The financial performance of each of the City's utilities is analyzed every three
years to determine the appropriate rate levels for the utility. The Water/Wastewater utility was
last evaluated in 1999 and the study needs to be updated this year for any necessary changes
starting in 2003.
Recommendation: Forward a recommendation to City Council authorizing the mayor to
sign an agreement with Economic and Engineering Services Inc. to perform a
comprehensive water and wastewater rate study with a total cost not to exceed $26,150.
Background/Analysis: All of the City's utilities are reviewed at least every three years to
evaluate their financial performance and to assure that the retail rates are appropriate over the
following three year period. The analysis normally covers the following five year period, with
retail rates established for the next three years.
A rate study is composed of three separate but related analyses. First is a revenue requirements
analysis, which reviews the projected revenues and expenses for the utility to determine the
overall level of rate adjustment needed. Second is a cost of service analysis, which allocates and
"fairly" distributes revenue requirements to the various customer classes. Last is a rate design
analysis, which takes the targeted level of revenue to collect from each class of service and
develops a rate to collect the fixed and variable charges in an equitable manner.
Economic and Engineering Services has been under agreement for several of the City's previous
studies and their performance has been very good in the past. It is expected that the study will be
complete by the end of August of this year. This year's rate analysis for each utility was
budgeted at $15,000, for a total of $30,000.