HomeMy WebLinkAboutAgenda Packet 03/13/2012Utility Advisory Committee
Council Chambers
Port Angeles, WA 98362
March 13, 2012 3:00 PM
AGENDA
I. Call To Order
II. Roll Call
III. Nomination and Election of Officers (Vice Chairman)
IV. Approval Of Minutes For February 14, 2012
V. Late Items
VI. Discussion Items:
A. Proposed 2012 Medic I Utility Ambulance Transport Rate Adjustments
B. Bonneville Power Administration Commercial Industrial Demand
Response Grant Amendment No. 1
C. Utility Discount Ordinance Amendments
D. Dry Creek Water Association Special Services Agreement No. 2
E. Proposed Electric Utility Time Of Use Rate Ordinance
VII. Information Only Items:
A. 2011 Consumer Confidence Water Quality Report
B. Shared Resource Conservation Manager Program Update (verbal report
only)
C. Bonneville Power Administration FY 2014 -2015 Electric Load Forecast
(verbal report only)
D. Bonneville Power Administration FY 2014 -2015 Initial Proposal for
Wholesale Tiered Rate Methodology (verbal report only)
E. Industrial Transmission Electric Rate Ordinance and Letter Agreement
Update (verbal report only)
F. Bonneville Power Administration Technology Innovation Funding
Opportunity Announcement
G. Advanced Metering Infrastructure System Phase I Status Report Update
H. Utility Advisory Committee Community Member Applicant
Recruitment (verbal report only)
I. Wireless Mobile Data System Update (verbal report only)
VIII. Executive Session
Potential Litigation: RCW 42.30.110(1)(i)
IX. Next Meeting Dates: April 10, 2012
X. Adjournment
N. \uac \final \031312
I. Call To Order
Mayor Cherie Kidd called the meeting to order at 3:00 p.m.
II. Roll Call
UAC Assigned
Councilmembers Present: Dan Di Guilio, Cherie Kidd, Sissi Bruch, PhD
Other Councilmembers
Present:
Other Councilmembers
Absent:
Utility Advisory
Committee Members
Present:
Utility Advisory
Committee Members
Absent:
Staff Present:
Others Present:
III. Nomination and Election of Officers (Chairman and Vice Chairman)
Sissi Bruch moved to nominate Councilmember Dan Di Guilio as chairman. A Vice Chairman was
not nominated or selected.
IV. Approval Of Minutes
Chairman Di Guilio asked if there were any corrections to the minutes of January 10, 2012.
Committee Member Dean Reed moved to approve the minutes. Paul Elliot seconded the motion,
which carried unanimously
V. Late Items:
None.
City Council Special Meeting/Utility Advisory Committee
Jack Pittis Conference Room
Port Angeles, WA 98362
February 14, 2012
3:00 p.m.
Max Mania, Patrick Downie
Brad Collins, Brooke Nelson
Dean Reed, Paul Elliott (3:02)
N/A
Kent Myers, Glenn Cutler, Bill Bloor, Larry Dunbar, Mike
Puntenney, Randall Brackett, Jim Harper, Phil Lusk, Terry Dahlquist,
Dan McKeen, Terry Gallagher, Linda Kheriaty, Sondya Wray, Helen
Freilich (3:58), Tom McCabe (3:58), Rick Hostetler (4:11)
Marilyn Harbaught Citizen
Tom Callis Peninsula Daily News
Craig Johnson CPI
Jennifer Garceleon Clallam County (3:58)
1
VI. Discussion Items:
A. Telecommunications Utility and Electric Fund Ordinance Amendments
Terry Gallagher, Chief of Police, advised the City has the legal authority to create a utility ordinance
for owning the telecommunications facilities and providing telecommunications services. A lengthy
discussion followed.
Dean Reed moved to recommend City Council to conduct a first reading of the proposed
telecommunications utility ordinance and electric fund ordinance amendment on February 21,
2012, and continue to March 6, 2012 for a second reading and adoption of the ordinances to
include amending edits to Chapter 3.24 to include a requirement for UAC and Council
approval to comingle funds between the electric and telecom utilities and also edit to the text in
section 3.24.020 to concern the terms for electric utility and electric light. Sissi Bruch seconded
the motion, which carried unanimously.
B. Wireless Mobile Data System On -Site Professional Service Options
Terry Gallagher, Chief of Police, discussed guidance needed for two options for local on -site support
with the wireless mobile data system professional services. There was a lengthy discussion.
The Utility Advisory Committee provided direction to staff to move forward with the least -cost
option.
C. Wireless Mobile Data System Pole Attachment Agreements
Larry Dunbar, Deputy Director of Power Systems discussed the recently awarded agreement of the
city owned wireless mobile data system. Wireless access points are needed on some utility poles
owned by Clallam County Public Utility District No. 1. The need for a pole attachment agreement
was discussed.
Paul Elliot moved to recommend City Council authorize the Public Works and Utilities
Director to sign an agreement with the Clallam County Public Utility District No. 1 for pole
attachments, and to make minor modifications to the documents, if necessary. Cherie Kidd
seconded the motion, which carried unanimously.
D. Landfill Methane Outreach Program Memorandum of Understanding
Phil Lusk, Power Resources Manager, reviewed the U.S. Environmental Protection Agency's
Landfill Methane Outreach Program and discussed how it is a voluntary assistance program to help
reduce methane emissions from landfills. Becoming a Community Partner with provide additional
exposure on the City's Landfill Gas Utilization Project request for proposals effort. A brief
discussion followed.
Sissi Bruch moved to recommend City Council authorize the City Manager to sign the Landfill
Methane Outreach Program Memorandum of Understanding for Community Partners, and to
make minor modifications to the agreement, as necessary. Paul Elliot seconded the motion,
which carried unanimously.
E. 2012 On -Call Electric Utility Engineering Professional Services Agreement
Terry Dahlquist, P.E., Electrical Engineering Manager, explained that TriAxis Engineering, Inc., has
been selected to provide on -call professional services for the City's Electric Utility. On -call technical
2
assistance to support the electric utility and design for the replacement of the transformer at A- Street
Substation will be provided. A brief discussion followed.
Dean Reed moved to recommend City Council to approve and authorize the City Manager to
sign the on -call professional services agreement with TriAxis Engineering, Inc., with two initial
project tasks, in an amount not to exceed $109,000, and to make minor modifications to the
agreement, if necessary. Paul Elliot seconded the motion, which carried unanimously.
F. Construction Engineering Combined Sewer Overflow Phase I Project WW02-
2008
Kathryn Neal, P.E., Engineering Manager, discussed the CSO Phase I Project design which is near
completion and preparations are underway to being construction. Brown and Caldwell's services are
required during the construction phase, which is estimated to last until January 2014. There was a
lengthy discussion.
Dean Reed moved to recommend City Council to authorize the City Manager to add this
planned program element to the CSO Professional Services Agreement with Brown and
Caldwell in an amount not to exceed $485,980, and to make minor modifications to the
agreement, as necessary. Paul Elliot seconded the motion, which carried unanimously.
G. Environmental Engineering During Construction Combined Sewer Overflow
Phase I Project WW08 -2008
Kathryn Neal, P.E., Engineering Manager, provided information on Farallon Consulting, LLC, and
their efforts regarding assistance with the former Rayonier site and CSO Phase I Project. The CSO
Phase I Project design in near completion and preparations are underway to being construction.
Farallon Consulting, LLC, services are required during the construction phase, which is estimated to
last until January 2014. There was a lengthy discussion.
Paul Elliot moved to recommend City Council to authorize the City Manager to sign
Amendment No. 5 to the Professional Services Agreement with Farallon Consulting in an
amount not to exceed $60,878, and to make minor modifications to the agreement, as necessary.
Dean Reed seconded the motion, with carried unanimously.
H. 2012 On -Call Construction Management Services Agreement
Kathryn Neal, P.E., Engineering Manager, explained that Vanir Construction Management, Inc., has
been selected to provide on -call construction management services for the Phase I CSO Project.
There was a lengthy discussion.
Sissi Bruch moved to recommend City Council to approve and authorize the City Manager to
sign the On -Call Professional Service Contract with Vanir Construction Management, Inc., in
the amount not to exceed $1,787,668, and to make minor modifications to the agreement, if
necessary. Dean Reed seconded the motion, with carried unanimously.
I. Operation of Sewer Agreement between the City of Port Angeles and the Lower
Elwha Klallam Tribe
Glenn Cutler, P.E., Director of Public Works and Utilities, discussed the Lower Elwha Tribe's
desires to commence sending sewage to the City treatment plant per the City and Tribe 2007
Wastewater Agreement. Construction work has been accomplished and two temporary easements are
3
required before the Tribe may commence operations. A long discussion followed.
Dean Reed moved to recommend the City Council to approve and authorize the City Manager
to sign the Operation of Sewer Agreement between the City of Port Angeles and the Lower
Elwha Klallam Tribe and make minor modifications to the agreement, if necessary. Cherie
Kidd seconded the motion and Sissi Bruch abstained from voting.
J. Advanced Metering Infrastructure System Agreement Amendment No. 1
Larry Dunbar, Deputy Director of Power Systems reminded that City Council has approved the
Advanced Metering Infrastructure System Agreement with Mueller systems. Phase I has taken longer
than planned to complete, and an amendment to the payment schedule is recommended. There will
be no changes to the total project cost being proposed. A brief discussion followed.
Sissi Bruch moved to recommend the City Council to authorize the City Manager to sign
Amendment No. 1 to the Advanced Metering Infrastructure System Agreement with Mueller
Systems, and to make minor modifications to the agreement, if necessary. Dean Reed seconded
the motion, which carried unanimously.
D. Information Only Items:
A. Draft Clallam County Hazardous Waste Management Plan
Information only. No action taken.
B. Bonneville Power Administration FY2014 -2015 Electric Load Forecast (Verbal
report only)
Item moved to March meeting.
C. Bonneville Power Administration FY 2014 -2015 Initial Proposal for Wholesale
Tiered Rate Methodology (Verbal report only)
Item moved to March meeting
D. Industrial Transmission Electrical Rate Ordinance and Letter Agreement
Update (Verbal report only)
Item moved to March meeting
VIII. Selection of Regular Meeting Location
Mayor Cherie Kidd moved to UAC meetings to the council chambers. Sissi Bruch seconded the
motion, which carried unanimously.
IX. Next Meeting Dates: March 13, 2012
X. Adjournment: 5:35 p.m.
Cherie Kidd, Mayor Sondya Wray, Administrative Specialist
4
RTANGELES
W A S H I N G T O N U.S.A.
UTILITY ADVISORY COMMITTEE
March 13, 2012
Date:
To: Utility Advisory Committee
From: Dan McKeen, Fire Chief
Subject: Proposed 2012 Medic I Utility Ambulance Transport Rate Adjustments
Summary: Based on an audit of our current ambulance transport rates comparing our rates
against Medicare allowables and against the areas prevailing transport rates the Fire
Department proposes to adjust its Medic I transport rates and charges in 2012 by the following:
Basic life support (BLS) from $450 to $500
Advanced life support (ALS -1) from $600 to $650
Advanced life support (ALS -2) from $650 to $725
Paramedic intercept service charge from $600 to $650
Advanced life support, no transport from $600 to $650
Mileage from $13 to $14 per mile
The proposed fee adjustments and new service charge will not affect City residents or an
employee of a business within the City, as they are not billed beyond their private insurance
coverage.
Recommendation: Forward a favorable recommendation to City Council to proceed with a
public hearing to adjust the transport and mileage charges for the Medic I Utility.
Background /Analysis: As part of the 2012 budget process, the Fire Department requested that
Systems Design Northwest, LLC, conduct an audit of our current ambulance transport rates.
Specifically, the Fire Department wanted our current ambulance transport rates compared against
Medicare allowables and against the areas prevailing transport rates. Based upon the audit,
Systems Design Northwest recommended that the City increase its BLS ambulance transport rate
from $450 to $500, its ALS -1 transport rate from $600 to $650, its ALS -2 transport rate from
$650 to $725, its paramedic service charge from $600 to $650, its ALS no transport charge from
$600 to $650, and its mileage rate from $13 to $14.
The Fire Department concurs with System Design Northwest's recommendation and proposes to
adjust the transport rates starting April 23, 2012.
Proposed Medic 1 Ambulance Transport Rate Adjustments
March 13, 2012
Page 2
Because the majority of the ambulance transport bills are paid based upon a fee schedule, raising
our rates will not necessarily provide a corresponding increase in revenue. Medicare our
primary payer will pay based upon their allowables, regardless of our rates.
The comparative rate information for local area ambulance transport rates is provided in the table
below.
Agency
Bremerton
Central Kitsap
Jefferson Co. #5
Joyce
Port Ludlow
Port Townsend
Poulsbo
Olympic Ambulance
Quilcene
AVERAGE
Port Angeles current
Port Angeles proposed
Basic Life
Support (BLS)
$425
$550
$500
$450
$460
$500
$450
$650
$600
$509
$450
$500
Advanced Life Advanced Life
Support (ALS -1) Support (ALS -2)
$550
$700
$700
$805
$600
$600
$600
$900
$700
$684
$600
$650
$550
$800
$700
$805
$785
$700
$650
$900
$800
$743
$650
$725
Per Mile
Charge
$10
$15
$15
$10
$14
$15
$11
$22
$15
$14
$13
$14
The recommended rate adjustments will not affect City residents or employees of a business
within the City as they are not billed beyond their governmental or private insurance coverage. In
addition, protection against financial hardship for non residents is provided. Non resident
charges may be waived or reduced in accordance with an income -based discount chart that is
based upon federal poverty guidelines for Washington State.
The proposed City Council public hearing is April 3, 2012 for a presentation of the proposed
transport and mileage charges and to allow public input to the process after the presentation.
Staff will return to the Utility Advisory Committee on April 10, 2012 requesting a
recommendation to City Council to adopt the proposed rate ordinance. The public hearing
would be continued to April 17, 2012 at which time the public hearing will be closed.
FOLLOWS:
Legal Draft 03.05.12
3.70.095 Fire Department Fees Medic I.
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington, revising
Chapter 3.70 of the Port Angeles Municipal Code relating to
Medic I Charges.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS
Section 1. Ordinance 3143, as amended, and Chapter 3.70 of the Port Angeles
Municipal Code are hereby amended by amending Section 3.70.095 PAMC to read as follows:
The following rates are established for ambulance services performed by the City's
Medic I Program:
A. Medic I transports that involve advanced life support (ALS) services requiring
either the administration of at least three different medications or the provision of a least one
ALS procedure as identified as ALS -2 in Medicare's current ambulance fee schedule.
1. Base charge.....$650.00 725.00
2. Disposable equipment charge $33.00
3. Mileage, per mile .....$100 14.00
B. Medic I transports that involve advanced life support services not covered by
section A. above:
1. Base charge .....$600.00 650.00
2. Disposable equipment charge $33.00
3. Mileage, per mile .....$13.00 14.00
C. Medic I transports that involve only basic life support services:
1. Base charge .....$459:90 500.00
2. Disposable equipment charge $33.00
3. Mileage, per mile .....$13.00 14.00
D. Paramedic intercept service charge $600.00 650.00
E. Advanced life support services, no transport.....$600.00 650.00
Section 2- Severabilitv. If any provisions of this Ordinance or its applications to any
person or circumstances is held to be invalid, the remainder of the Ordinance or application
of the provisions of the Ordinance to other persons or circumstances is not affected.
Section 3 Corrections. The City Clerk and the codifiers of this ordinance are
authorized to make necessary corrections to this ordinance including, but not limited to, the
correction of the scrivener's /clerical errors, references, ordinance numbering, section
subsection numbers and any references thereto.
Section 4 Effective Date. This ordinance, being an exercise of a power specifically
delegated to the City legislative body, is not subject to referendum. This ordinance shall take
effect five days after its publication by summary.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said
Council held on the
day of 2012.
-2-
Cherie, Kidd, Mayor
ATTEST:
Janessa Hurd, City Clerk
APPROVED AS TO FORM:
William E. Bloor, City Attorney
PUBLISHED:
By Summary
G \LEGAL\a ORDINANCES &RESOLUTIONS \ORDINANCES 2012 \08 Medic 1 rates 03 05 12.rtf
P
R T
NG I.L S
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: March 13, 2012
To: Utility Advisory Committee
From: Phil Lusk, Power Resources Manager
Subject: Bonneville Power Administration Commercial Industrial Demand Response Grant
Amendment No. 1
Summary: The City is participating in a Commercial and Industrial Demand Response Pilot
Project with the financial support of the Bonneville Power Administration. Due to an addition to
the scope of work, amendment No. 1 to the current agreement is necessary.
Recommendation: Forward a favorable recommendation to City Council to authorize the
City Manager to sign Amendment No. 1 to the Industrial Demand Response Pilot Project
Agreement with the Bonneville Power Administration, and make minor modifications to the
agreement, if necessary.
Background /Analysis: In February 2011, the City entered into an agreement with the
Bonneville Power Administration (BPA) to participate in a Commercial and Industrial (C &I)
Demand Response (DR) Pilot Project. Staff has recruited eight C &I customers to participate in the
pilot project. Seven of the eight participants have entered into agreements with the City to
participate in the pilot project including the North Olympic Library, Housing Authority, Olympic
Medical Center, Port Angeles Hardwood, the Landing Mall, Clallam County Courthouse, the
Water Treatment Plant, and City Hall. Amendment No. 1 incorporates a supplement to the project
to expand the scope of work for the eighth participant, Nippon Paper Industries USA, Co., LTD
(NPI).
In late 2010 and early 2011, the BPA, NPI and the City engaged in two distinct streams of work
associated with developing strategies that may benefit all parties. One of those work streams, led
by members of BPA's cross agency DR team, explored NPI's ability to manipulate production
sensitive equipment to provide, through the City, a significant DR resource, as well as an energy
load building resource that could assist BPA in its efforts to integrate wind power on the regional
electrical grid.
In March 2011, NPI, the City, and the BPA, agreed to work together to integrate both work
streams under the C &I DR Pilot Project, thus leveraging the technology infrastructure being used
by that project.
N \UAC Final \BPA C &1 DR Grant Amendment No 1 doc
BPA Commercial and Industrial Demand Response Grant Amendment No.1
March 13, 2012
Page 2
As now memorialized, the supplement incorporates a change of project scope to test Nippon's
ability to provide multiple capacity products to the BPA in the future, including:
Product 1: Voluntary reduction of non production related electrical loads with a day -ahead notice;
Product 2: Voluntary reduction of production related electrical loads with a 10- minute notice;
Product 3: Voluntary reduction of production related electrical loads with a day -ahead notice; and
Product 4: Voluntary increase of production related electrical loads with a 10- minute notice.
There is no financial impact to the City for the added proof of concept. All other direct cost
increases, if any, will be funded by the BPA and/or NPI. Any project efforts beyond the current
proof of concept, such as the potential future costs and revenues associated with voluntary load
reductions or increases, will require an additional amendment to the Agreement as well as an
agreement between the City and NPI.
Staff requests that the Utility Advisory Committee forward a favorable recommendation to City
Council to authorize the City Manager to sign Amendment No.1 to the Commercial and Industrial
Demand Response Pilot Project Agreement with the Bonneville Power Administration, and make
minor modifications to the agreement, if necessary.
P ORI A NGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: March 13, 2011
To: Utility Advisory Committee
From: Rick Hostetler, Customer Services Manager
Phil Lusk, Power Resources Manager
Subject: Utility Discount Ordinance Amendments
Summary: The City provides discounts to qualified low- income senior and low- income disabled
citizens receiving utility services. The enabling ordinance was created in 1980, and was last
updated in 1992.
Recommendation: Provide guidance to staff on what amendments to the utility discount
ordinance, if any, should be prepared for consideration by the Utility Advisory Committee at
a future meeting.
Background /Analysis: At the direction of the Utility Advisory Committee, staff has
discussed and provided information on the attached utility discount ordinance on December 14,
2010, March 8, 2011, and December 13, 2011. Providing utility discounts is discretionary and is
not mandated by State or federal law. At the last meeting staff was directed to seek guidance on
specific elements of the ordinance. Staff will request guidance at today's meeting on what
amendments to the utility discount ordinance, if any, should be prepared for consideration by the
Utility Advisory Committee at a future meeting.
The City provides discounts to qualified low- income senior and low- income disabled citizens
receiving electric, water, wastewater, and solid waste collection utility services. Last year a total
of roughly 340 customers receive monthly discounts for utility services, which results in a total
annual subsidy by all other ratepayers of about $116,000 ($50,000 or 0.25% rate impact for
electric, $28,000 or 0.70% rate impact for water, $19,000 or 0.32% rate impact for wastewater,
$8,000 or 0.27% rate impact for solid waste collection, $8,000 or 0.80% rate impact for
stormwater, and $3,000 or 0.30% rate impact for medic I).
While it is important that discounts continue to qualifying low income citizens, it is in the best
interest of all ratepayers to consider updating the utility discounts ordinance. The utility discount
ordinance was last revised in 1992 and the income guidelines are still in use and have not been
updated to reflect changes in the actual poverty levels experienced in our community. The current
income guidelines are not adjusted for household size. Given the current outdated low income
guidelines, staff anticipates that the current customers receiving discounts are economically
vulnerable.
N. \UAC \Final \Utility Discount Ordinance Amendment.doc
Utility Discount Ordinance Amendments
March 13, 2012
Page 2
Staff recommends the use of either state or federal poverty guidelines including adjustments for
household size, as they are adjusted from time to time. Doing so would simplify staff
responsibilities, and it would also make the City's income guidelines in -line with other local area
agencies that provide services to low- income citizens. However, a change to the income
guidelines could also increase enrollment in discounts from the current 340 customers to as many
as 4,000 customers. Any expansion to the enrollment could have impacts on staff depending on
how the overall process is handled.
An element of the discount ordinance is that in addition to meeting the income guidelines there is a
requirement to be either sixty -two years of age or older, or a disabled citizen. Another element of
the ordinance is there are four different discount levels ranging from 5% to 30% based on income
guidelines. The current discounts apply to both base charges and consumption charges and it is
common practice that discounts are only applied to base charges. As part of the last Electric
Utility rate adjustment, City Council increased the discount so that customers participating in
utility discounts would not see any cost increase in 2012. If the income guidelines are revised
resulting in increased enrollment in discounts, the total annual subsidy will also increase. Should
these elements of the utility discount ordinance be maintained?
Another consideration is should the ordinance be amended to revert back to the 1980 ordinance
that only provided discounts for the electric utility? Discounts paid from the Electric Utility fund
qualify for a 50% credit on state taxes, which would reduce the overall subsidy provided by all
other ratepayers to fund utility discounts.
And a further consideration is how much should all other ratepayers subsidize discount customers
each year? Specifically, should annual funding for discounts be more, the same or less than the
current subsidy? As part of this consideration City Council may want to consider the funding level
for discounts as part of its annual budget process. A specific not to exceed subsidy budget
approved by City Council will increase transparency, and limit the impact on all other ratepayers.
Attachment: Utility discount ordinance
Municode Page 1 of 2
Port Angeles, Washington, Code of Ordinances Title 13 PUBLIC UTILITIES CHAPTER 13.20
UTILITY DISCOUNT FOR LOW- INCOME SENIOR CITIZENS AND DISABLED CITIZENS
CHAPTER 13.20 UTILITY DISCOUNT FOR LOW- INCOME SENIOR CITIZENS AND
DISABLED CITIZENS
13 20 010 Purpose and findino s.
13.20 020 Definitions
13 20 030 Utility discount.
13 20.040 Information to be made available
13 20 050 Qualifications for utility discount
13 20 060 Application for discount
13 20 070 Calculation of discount.
13 20 080 Penalty for false information
13.20.010 Purpose and findings.
The City Council of the City of Port Angeles finds that it is appropriate for the City of Port Angeles to provide a
discount against utility charges to low income elderly and disabled residents of the City. The Council further
finds that this discount should be accompanied by energy conservation programs.
(Ord. 2663 1 (part), 4/1/1992)
13.20.020 Definitions.
A. "Utility discount" means a discount granted pursuant to the terms of this chapter to a low income senior
citizen or a low income disabled citizen„ the amount of which is applied against outstanding obligations
of the citizen to the City of Port Angeles for utility services.
B. "Low- income senior citizen" means a person who:
1. Resides within the City of Port Angeles,
2. Is 62 years of age or older,
3. Receives utility services from the City of Port Angeles,
4. Is the head of a household;
5. Has a total income, including that of his or her spouse or co- tenant, which does not exceed the
amount specified in RCW 84.36.381(5)(b), as now or hereafter amended.
C. "Low-income disabled citizen" means a person who:
1. Resides within the City of Port Angeles;
2. Receives utility services from the City of Port Angeles;
3. Is the head of a household;
4. Qualifies for special parking privileges under RCW 46.16.381(1) through (f), or a blind person as
defined in RCW 74.18.020, and whose income, including that of his or her spouse or co- tenant,
does not exceed the amount specified in RCW 70.164.020(4), or a person who qualifies for
supplemental social security benefits due to a disability.
(Ord 2663 1 (part), 4/1/1992)
13.20.030 Utility discount.
There is authorized a utility discount for each calendar year commencing January 1, 1992, which discount
shall be applied to the monthly utility bills of qualified low- income senior citizens and low- income disabled
citizens, in accordance with the terms of this chapter.
(Ord. 2663 1 (part), 4/1/1992)
13.20.040 Information to be made available.
The City's Customer Service Manager shall maintain at all times the following information which shall be
current and applicable to current applications for, and awards of, utility discounts under the terms of this
chapter
http: /library.municode. com/print. aspx ?clientlD =15090 &HTMRequest= http %3 a %2f%2flib... 3/8/2012
Municode
A. A list of all Federal, State or local energy related programs which are available to provide fiscal
assistance to low- income senior and disabled citizens, for which certification of application must
be made by an applicant;
B. A list of all conservation or consumption reduction programs of the City for which an applicant for
a utility discount must agree to apply, and the requirements for each such program;
C. Current application forms.
(Ord. 2663 1 (part), 4/1/1992)
13.20.050 Qualifications for utility discount.
13.20.060 Application for discount.
A. Applications for utility discounts shall be obtained from and filed with the City's Customer Service
Manager.
B. Submission of an application for a utility discount shall constitute a verification by the applicant that all
information provided in such application is true and correct to the best of the applicant's knowledge.
(Ord 2663 1 (part), 4/1/1992)
13.20.070 Calculation of discount.
Calculation of the amount of the utility discount for eligible low- income senior or disabled citizens shall be in
accordance with the following procedure:
A. The amount available shall be a percentage of the monthly utility bill. The percentage shall be
based on the citizen's annual income in accordance with the following:
1. $0 00— $7,999 00 annual income 30% discount
2. $8,000.00— $11,500.00 annual income 20% discount
3. $11,501.00— $17,500.00 annual income 10% discount
4. $17,501.00— $21,000.00 annual income 5% discount
B. The amount of discount to be received by any individual shall be reduced by the amount which
the total subsidy, including grants from other (e.g., Federal) sources, exceeds the customer's
utility bill.
(Ord 2994 7/31/1998, Ord 2663 1 (part), 4/1/1992)
Page 2 of 2
A. Each recipient of a utility discount must meet the following criteria
1. Be a low- income senior or disabled citizen, as defined in section 13 20 020
2. Certify that he or she has completed an application for and has either received or been denied,
aid for all Federal, State, or local utility- related programs available to provide fiscal assistance to
low- income senior or disabled citizens;
3. Agree to participate in available conservation or consumption reduction programs of the City.
4. Agree to participate in the City's average payment program.
B. Failure of the applicant to participate in an available conservation or consumption reduction program,
after receipt of a utility discount, shall constitute a basis for denial by the City of participation in the utility
discount program during the ensuing years.
(Ord. 2687 1, 4/19/1992, Ord. 2663 1 (part), 4/1/1992)
13.20.080 Penalty for false information.
The wilful provision to the City of false information in an application for utility discount shall forfeit the low
income senior or disabled citizen's eligibility for future credits Additionally, the low- income senior or disabled
citizen shall be required to repay the amount of any utility discount received based upon such false information.
(Ord 2663 1 (part), 4/1/1992)
http: /library.municode. com/print. aspx ?clientlD =15090 &HTMRequest= http %3 a %2f%2flib... 3/8/2012
IORTANGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: March 13, 2012
To: Utility Advisory Committee
From: Glenn A. Cutler, P.E., Director of Public Works Utilities
Subject: Dry Creek Water Association Special Service Agreement No. 2
Summary: In May 2005, the City entered into an Interagency Water Facilities Agreement with the
Dry Creek Water Association. The Agreement contemplated transfer of customers as service areas
change during annexations, and the need for Special Service Agreements to address water service by
one agency in another agency's service area. This resulted in the negotiation and approval of the
Special Service Agreement No.1 in December 2009. A second Special Service Agreement has been
negotiated to address water customers in a section of the western portion of the City currently served
by the Dry Creek Water Association and not included in the first agreement.
Recommendation: Forward a favorable recommendation to Council to approve and authorize
the City Manager to sign Special Service Agreement No. 2 with the Dry Creek Water
Association, and to make minor modifications to the agreement, if necessary.
Background Analysis: In 2005, the City annexed a portion of the Western Urban Growth Area to
support economic growth. In May 2005, the City entered into an Interagency Water Facilities
Agreement (IWFA) with the Dry Creek Water Association (DCWA). The IWFA addresses service
area boundaries, sales of facilities, and new development. It also outlines the terms to enter into
Special Service Agreements (SSA) that address water service to existing DCWA customers that are
inside the City.
In December 2009, the City and DCWA entered into SSA No. 1. SSA No.1 was negotiated over a four
year period. SSA No. 1 covers water service to customers in areas annexed in 2005 along and south of
US 101 as follows:
1. Existing DCWA water customers in the annexed area and located between Eclipse
Industrial Parkway and Cameron Road to the west.
2. Now former DCWA water customers in the annexed area and located between Eclipse
Industrial Parkway and Gakin Road to the east.
Staff met with the City Attorney to discuss SSA No. 2 following initial reviews. SSA No. 2 is
modeled after SSA No. 1, and encompasses 19 customers north of Edgewood Drive and east of Lower
Elwha Road. On January 3, 2012, SSA No. 2 was approved by the DCWA Board of Trustees.
March 13, 2012 UAC
Re: DCWA Special Services Agreement No. 2
Page 2
The cost to execute the agreement is approximately $8,300.00. The final cost will reflect actual
billings accumulated associated with special service terms at the time of the transfer to the City of the
customers shown in Exhibit C -1 and Exhibit D -1.
It is recommended that a favorable recommendation be forwarded to the City Council to approve and
authorize the City Manager to sign a Special Service Agreement No. 2 with the Dry Creek Water
Association, and to authorize the City Manager to make minor modifications to the agreement, if
necessary.
Attachments: Special Service Agreement #2
Exhibit D -1 for IWFA
N• \UAC \Final \Dry Creek Water Association Special Services Agreement #2 doc
March 13, 2012 UAC
Re DCWA Special Services Agreement No 2
Page 3
SPECIAL SERVICE AGREEMENT #2 BETWEEN
CITY OF PORT ANGELES
AND
DRY CREEK WATER ASSOCIATION. INC.
This special service agreement is made and entered into this March 2012, by and between Dry
Creek Water Association, Inc. (hereinafter called the Association) and City of Port Angeles
(hereinafter called the City).
WHEREAS, on May 3, 2005, the Association and City signed an Interagency Water Facilities
Agreement, which may hereafter be called the IWFA; and
WHEREAS, the Association and City desire to enter into this Agreement to address provision of
potable water to current customers of the Association located within the City limits; and
WHEREAS, the Association and City desire to enter into this Agreement to address the sale to the City
of certain Association facilities located within the City limits; and,
WHEREAS, the Association and City entered into a similar agreement on December 1, 2009, titled
Special Services Agreement #1; and,
NOW, THEREFORE IT IS AGREED between the parties hereto as follows:
1. Incorporation:
a. The IWFA is incorporated herein by this reference.
2. Special Service To Be Provided By The Association:
a. Pursuant to the IWFA, the City requested a special service agreement with the
Association for properties inside the city limits, north of Lauridsen Blvd Edgewood
Drive, and east of Lower Elwha Road, which may hereafter be referred to as "the special
service area."
b. This special service agreement specifies the conditions and charges for service
pursuant to Exhibit "C" of the IWFA.
c. The parties agree that the special service area qualifies for a special service agreement
under the conditions stated in the IWFA.
d. The water customers within the special service area shown in Exhibit "D -1" of the
IWFA are and shall be customers of the City's water utility. The Association agrees to
provide and be responsible for potable water service to and as required by the City's
water customers within the special service area shown in Exhibit "C -1." As consideration
for the special service to be provided by the Association pursuant to this agreement, the
City shall pay the Association compensation as provided in Section 6 below.
3. Sale of Facilities: Not Applicable (No customers are to be physically
N: \UAC \Final \Dry Creek Water Association Special Services Agreement #2.doc
March 13, 2012 UAC
Re DCWA Special Services Agreement No 2
Page 4
4. Term:
disconnected from DCWAI.
a. This agreement shall become effective on this day of March 2012. It shall remain in
effect until terminated as provided below.
5. Duration and Termination of Agreement:
a. This agreement shall continue in force and effect until terminated in accordance with the
following procedures:
The Association may terminate this agreement at any time upon receiving the
consent of the City. After March 2017, the City may terminate this agreement at any
time by giving the Association at least sixty (60) days notice prior to termination;
additionally, after March 2017, the Association may terminate this agreement upon
one hundred eighty (180) days written notice to the City when, in the reasonable opinion
of the Association, the preconditions set forth in Section 11 of the IWFA are no longer
applicable to this agreement. In the event, at the expiration of the notice period, the City
shall proceed to implement service in the manner and subject to the time frame as
depicted in Section 6 of the IWFA.
6. Payment for Water to Special Service Area:
a. From and after the effective date of this agreement, the City shall pay to the
Association, a monthly amount to be calculated in accordance with the Exhibit "C
which is attached hereto and incorporated herein by reference. The parties agree that the
Association is entitled to payment from the City of the 20% surcharge as depicted in
Exhibit "C" for the period included in billings beginning with May 2005 through
December 2011, together with interest on the surcharge due at the rate of 7.45% per
annum from the date of each original billing to the date paid. The Association shall
recalculate past due 20% surcharges, plus applicable interest thereon, and submit an
invoice to the City therefore within ten (10) days of the effective date of this agreement.
The balance due shall be paid on or before April 30, 2012. The time period May 2005
through December 2011 is included in this agreement for reimbursement from the City to
the Association as Exhibit "C -1
7. Changes to Agreement:
a. Changes in the terms and conditions of this special service agreement may be made
at any time upon the mutual consent of both parties. Either party desiring a change shall
given the other party written notice. The notice shall contain the desired changes and
with a full explanation of the reasons for the changes. If, the parties hereto cannot
mutually agree to the proposed changes, the agreement shall remain unchanged.
8. Hold Harmless: Not Applicable
N: \UAC \Final \Dry Creek Water Association Special Services Agreement #2 doc
March 13, 2012 UAC
Re: DCWA Special Services Agreement No. 2
Page 5
9. Arbitration:
a. The parties agree that any dispute with regard to the interpretation or enforcement
of this agreement shall be resolved by binding arbitration conducted pursuant to the
arbitration statutes of the State of Washington in effect at the time of the dispute. The
arbitration award may be filed with the Clallam County Superior Court and enforced in
that venue
In the event of litigation regarding the enforcement or interpretation of this agreement,
the party who substantially prevails in such litigation shall be entitled, in addition to any
other relief, to an award of reasonable attorney fees incurred in such proceedings.
10. Authority:
a. Each party warrants that the undersigned representative has full and complete
legal authority to sign for it and to commit it to the performance of the agreement set
forth herein.
11. Priority:
a. This agreement is intended to implement provisions of the IWFA, and the parties
have not intended to create any conflict between the terms of this agreement and the
IWFA. However, in the event of any conflict between the terms of this agreement, the
IWFA shall control.
WITNESS WHEREOF, the parties hereto have caused the SPECIAL SERVICE AGREEMENT to be
duly signed and executed in two counterparts as of the day and year first above written.
ATTEST: ATTEST:
James Critchfield, President of the Board Kent Myers, City Manager
Dry Creek Water Association, Inc. City of Port Angeles
APPROVED AS TO FORM: ATTEST:
William Bloor, Attorney
City of Port Angeles
N• \UAC \Final \Dry Creek Water Association Special Services Agreement #2.doc
Janessa Hurd
City Clerk
City of Port Angeles
March 13, 2012 UAC
Re: DCWA Special Services Agreement No. 2
Page 6
Randy Alderson
Randy Alderson
AA &W Self Storage LLC
Port of Port Angeles
Port of Port Angeles
Port of Port Angeles
Port of Port Angeles
Port of Port Angeles
Jerry Payne
Mary Payne
Dan Morrison Partners
Sabrina Hamm
Tim Gillespie
Lake Beavers
Cheryl Richmond
Port of Port Angeles
Port of Port Angeles
Port of Port Angeles
Port of Port Angeles
EXHIBIT "A"
PROPERTY OWNERS
1935 Edgewood Drive
1935 Edgewood Drive
1929 W. Duval Place
Edgewood Drive (Office)
1520 S. Critchfield Road
Critchfield Road
Model Airplane Club
1512 S. Critchfield Road
1512 S. Critchfield Road
1509 S. Critchfield Road
Critchfield Road
2917 W. Edgewood Drive
382 Lower Elwha Road
1607 Lower Elwha Road
3230 Saddle Club Road
3210 Saddle Club Road
Lower Elwha Road
Gardner Property
Lower Elwha Road
Bopp Property
Lower Elwha Road
Taylor Property
Lower Elwha Road
Rush Property
N: \UAC \Final\Dry Creek Water Association Special Services Agreement #2 doc
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Commercial Service (3/4
Commercial Service (3/4
Commercial Service (3/4
Commercial Service (3/4
Commercial Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
Residential Service (3/4
March 13, 2012 UAC
Re: DCWA Special Services Agreement No. 2
Page 7
1. Definitions:
EXHIBIT "C"
SPECIAL SERVICE TERMS
Customers served under this special service agreement are the customers of the City of Port Angeles,
receiving water service by agreement from Dry Creek Water Association.
"Special service water rate Dry Creek Water Association will charge the established
Association customer rate (residential or commercial, as the case may be) plus twenty percent
(20
2. Facility Costs Associated with Special Service Agreements:
All costs of new or improved facilities in order to provide water pursuant to this special service
agreement shall be borne by the City. These costs shall include but not be limited to the cost of
providing meters and disconnect between the facilities of the two parties when applicable.
Payment of costs by the City shall be made within forty -five (45) days of invoice by the
Association upon completion of the project.
The Association as owner of the existing facilities shall be responsible for maintenance of the
existing facilities.
3. Special Service Charges:
The Association shall provide monthly statements to the City of the total metered consumption
of all customers included in this special service agreement. Special service conditions and
charges for this service will be as follows:
3/4 Residential Service: $25.00 Monthly Base Rate
0 -499 cubic feet $.005 per cubic feet
500 -999 cubic feet $.010 per cubic feet
1000 -1499 cubic feet $.015 per cubic feet
1500 -1999 cubic feet $.020 per cubic feet
2000+ cubic feet $.025 per cubic feet
Plus 20% Total Billing.
3/4 Commercial Service: $28.00 Monthly Base Rate up to 1,000 cubic feet
0 -499 cubic feet $.005 per cubic feet
500 -999 cubic feet $.010 per cubic feet
$38.00 Monthly Base Rate from 1001 to 1999 cubic feet
N: \UAC \Final \Dry Creek Water Association Special Services Agreement #2.doc
March 13, 2012 UAC
Re: DCWA Special Services Agreement No. 2
Page 8
1000 -1499 cubic feet $.015 per cubic feet
1500 -1999 cubic feet $.020 per cubic feet
$48.00 Monthly Base Rate from 2000 cubic feet and over
2000 -over cubic feet $.025 per cubic feet
Plus 20% Total Billing
If a rate change happens by the membership of the Association before the termination of this
agreement, Dry Creek Water Association will submit a change agreement request to this special
service agreement.
N. \UAC \Final \Dry Creek Water Association Special Services Agreement #2.doc
March 13, 2012 UAC
Re. DCWA Special Services Agreement No. 2
Page 9
Payment for Water to Special Service Area:
EXHIBIT "C -1"
SPECIAL SERVICE TERMS
From and after the effective date of this agreement, the City shall pay to the Association, a monthly
amount to be calculated in accordance with Exhibit "C which is attached hereto and incorporated
herein by reference. The calculations below include monthly billings from May 2005 through
December 2011.
Customer #1 (Randy Alderson 1935 Edgewood Drive)
2005 -2011 billings $2,943.54 x 20% surcharge $588.71
Customer #2 (Randy Alderson 1935 Edgewood Drive)
2005 -2011 billings $1,821.80 x 20% surcharge $364.36
Customer #3 (AA &W Self Storage, LLC 1929 W. Duval Place)
2005 -2011 billings $3,483.25 x 20% surcharge $696.65
Customer #4 (Port of Port Angeles Edgewood Drive (Office)
2005 -2011 billings $1,932.79 x 20% surcharge $386.56
Customer #5 (Port of Port Angeles —1520 S. Critchfield Road)
2005 -2011 billings $1,947.49 x 20% surcharge $389.50
Customer #6 (Port of Port Angeles Critchfield Road Model Airplane Club)
2005 -2011 billings $1,962.35 x 20% surcharge $392.47
Customer #7 (Port of Port Angeles 1512 S. Critchfield Road)
2005 -2011 billings $1,797.05 x 20% surcharge $359.41
Customer #8 (Port of Port Angeles 1512 S. Critchfield Road)
2005 -2011 billings $1,960.78 x 20% surcharge $392.16
Customer #9 (Jerry Payne 1509 S. Critchfield Road)
2005 -2011 billings $2,588.98 x 20% surcharge $517.80
Customer #10 (Mary Payne Critchfield Road)
2005 -2011 billings $1,817.79 x 20% surcharge $363.56
Customer #11 (Dan Morrison Partners 2917 W. Edgewood Drive)
2005 -2011 billings $2,681.17 x 20% surcharge $536.23
N: \UAC\Final \Dry Creek Water Association Special Services Agreement #2.doc
March 13, 2012 UAC
Re: DCWA Special Services Agreement No 2
Page 10
Customer #12 (Sabrina Hamm 382 Lower Elwha Road)
2005 -2011 billings $2,437.12 x 20% surcharge $487.42
Customer #13 (Tim Gillespie 1607 Lower Elwha Road)
2005 -2011 billings $2,550.03 x 20% surcharge $510.01
Customer #14 (Lake Beavers 3230 Saddle Club Road)
2005 -2011 billings $1,877.37 x 20% surcharge $375.47
Customer #15 (Cheryl Richmond 3210 Saddle Club Road)
2005 -2011 billings $2,224.31 x 20% surcharge $444.86
Customer #16 (Port of Port Angeles Lower Elwha Road Gardner Property)
2005 -2011 billings $1,795.25 x 20% surcharge $359.05
Customer #17 (Port of Port Angeles Lower Elwha Road Bopp Property)
2005 -2011 billings $1,795.25 x 20% surcharge $359.05
Customer #18 (Port of Port Angeles Lower Elwha Road Taylor Property)
2005 -2011 billings $1,795.25 x 20% surcharge $359.05
Customer #19 (Port of Port Angeles Lower Elwha Road Rush Property)
2005 -2011 billings $1,795.25 x 20% surcharge $359.05
Total Due: $8,241.37
N: \UAC \Final \Dry Creek Water Association Special Services Agreement #2 doc
P
RT NGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: March 13, 2012
To: Utility Advisory Committee
From: Larry Dunbar, Deputy Director of Power Systems
Subject: Proposed Electric Utility Time of Use Rate Ordinance
Summary: On January 17, 2007, City Council approved a voluntary time of use rate. On
December 14, 2010, City Council approved the Advanced Metering Infrastructure System
Agreement with Mueller Systems that incorporated a time of use rate in accordance with the Retail
Tiered Rate Methodology Study. On November 1, 2011, City Council directed staff to develop
time of use rates as soon as it is technically feasible to do so.
Recommendation: Forward a favorable recommendation to City Council to proceed with a
public hearing on time of use rates for the Electric Utility.
Background /Analysis: On January 17, 2007, City Council approved a voluntary Time of
Use (TOU) rate for the Electric Utility, which was required in accordance with Section 1252 of the
Energy Policy Act of 2005. The Act required all electric utilities in the United States to offer
smart metering and time -based rates to their customers no later than February 8, 2007.
In anticipation of the Bonneville Power Administration wholesale power Tiered Rate Methodology
(TRM), on April 20, 2010, City Council approved a consulting services agreement with EES
Consulting to complete a retail TRM study. The retail TRM study was an ideal time to
independently assess and evaluate retail rate design options for each Electric Utility customer rate
class.
At the completion of the retail TRM study, the City Council selected the TOU rate option for all
customer rate classes. The City Council decision to proceed with TOU rates was incorporated into
the Advanced Metering Infrastructure (AMI) System Agreement that was approved by City
Council on December 22, 2010. TOU rates align the relationship between wholesale power rates
and retail rates, and provide customers the price signals that reflect the cost of power and energy at
the time it is consumed. The AMI System and TOU rates also give customers the opportunity to
manage their electric power costs, and an incentive to conserve electric energy use by shifting use
to lower priced periods. The proposed TOU rates were designed to generate the same amount of
revenues in 2012 as the current uniform rates. There is no anticipated impact for the average
customer by adopting the proposed TOU rates.
N \UAC \Final \Electric Utility Time of Use Rate Ordinance.doc
Proposed Electric Utility Time of Use Rate Ordinance
March 13, 2012
Page 2
On November 1, 2011, at the conclusion of last year's Electric Utility rate study, City Council
stated that it intended to discontinue the current uniform rates and establish TOU rates as soon as
staff determined it was technically feasible to do so. The staff has determined that implementation
of TOU rates will now be technically feasible upon completion of the AMI System, which is
anticipated by the end of this year. Staff plans to implement a customer education program on
TOU rates prior to the completion of the AMI System.
A summary of the proposed residential TOU energy rates is below for the winter and summer
seasons. The proposed TOU periods include: "heavy" from 6:00:00 AM to 1:59:59 PM Monday
through Friday, "medium" from 2:00:00 PM to 9:59:59 PM Monday through Friday; and "light"
for all other hours and North American Electric Reliability Corporation holidays. A demand
response monthly credit of $10.00 is also proposed if customers choose to participate in the
voluntary peak power project. There are no proposed changes to the current $15.75 monthly base
charge.
Description
Current Uniform Rate
I Proposed TOU Winter Rate
Percent Difference from current
Uniform to proposed TOU
Percent Difference from Heavy
TOU period
Description
Current Uniform Rate
Proposed TOU Summer Rate
Percent Difference from current
Uniform to proposed TOU
Percent Difference from Heavy
TOU period
1
1
$0.06700 per kWh I $0.05800 per kWh I $0.05000 per kWh
10.7%
N/A
$0.06930 per kWh I $0.05990 per kWh I $0.04520 per kWh
14.6%
N/A
Winter Time of Use Periods Rates
Heavy 1 Medium I Light
$0.06050 per kWh regardless of when consumed
-4.1% -17.4%
-13.4% -25.4%
Summer Time of Use Periods Rates
Heavy I Medium I Light
$0.06050 per kWh regardless of when consumed
-1.0% -25.3%
-13.6% -34.8%
The proposed City Council public hearing is April 3, 2012 for a presentation of the TOU rates and
to allow public input to the process after the presentation. Staff will return to the Utility Advisory
Committee on April 10, 2012 requesting a recommendation to City Council to adopt the TOU rate
ordinance. The public hearing would be continued to April 17, 2012 at which time the public
hearing will be closed.
Attachment: Proposed time of use electric rate ordinance
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington, relating to
electricity services and charges making changes to Chapter 13.12 of
Title 13 of the Port Angeles Municipal Code.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN
AS FOLLOWS:
Section 1. Ordinances 2054 as amended, and Title 13 of the Port Angeles
Municipal Code Chapter 13.12 is amended to read as follows:
CHAPTER 13.12 ELECTRICITY SERVICES AND CHARGES
13.12.010 General provisions applicable to all services.
13.12.015 Time of use electric rate
13.12.020 Uniform electric rate.
13.12.021 Point of delivery.
13.12.025 Rate Class assignment.
13.12.030 Schedule R -03- Residential service.
13.12.031 Schedule R -03- Residential service time of use rate.
13.12.040 Schedule GS -03- General service.
13.12.0401.Schedule GS -03- General service time of use rate.
13.12.041 Schedule GD- 03- General service demand.
13.12.0411.Schedule GD- 03- General service demand time of use rate.
13.12.042 Schedule NP- 03- Nonprofit tax deductible.
13.12.0421. Schedule NP- 03- Nonprofit tax deductible time of use rate.
13.12.043 Schedule GD- 04- General service demand -primary metered.
13.12.044 Schedule GD- 04- General service demand primary metered time of use
rate.
13.12.060 Schedule PS- 03- Primary service.
13.12.061 Schedule PS -03 -Primary service time of use rate.
13.12.071 Schedule IT- 03- Industrial transmission.
13.12.072 Schedule L- 03- Lighting.
13.12.073 Schedule MW- 03- Municipal water pumping.
13.12.074 New or expanded loads.
13.12.075 Schedule MW- 03- Municipal water pumping time of use rate.
13.12.080 Contract sales and purchases.
13.12.100 Electrical work permits and fees.
13.12.110 Contract and administration charge.
13.12.015 Time of use electric rate.
After City Council formally accents the Advanced Metering Infrastructure System. the monthly
rate for electricity consumed shall he in accordance with Sections 13.12.031. 13.12.0401,
13.12.0411.. 13.12.0421.. 13.12.044, 13.12.061. and 13.12.075. The monthly rate includes all
applicable taxes.
13.12.020 Uniform Eelectric rate.
Before the City Council formally accents the Advanced Metering Infrastructure System. Tthe
monthly rate for electricity consumed shall be in accordance with sections 13.12.030
13.12.040. 13.12.041. 13.12.042. 13.12.043. 13.12.060. through 13.12.073, and the demand
response credits in accordance with Sections 13.12.031.D. 13.12.0401.E. and 13.12.0421.D.
The monthly rate includes all applicable taxes.
13.12.031 Schedule R- 03- Residential service time of use rate.
A. Applicability.
This schedule applies throughout the City for domestic uses in single family residences,
individual apartments or farms. Separately metered services incidental to single family
residential and farm service may be served under this schedule
B. Character of Service.
Sixty cycle. alternating current, 120/240 volts nominal. single phase service will be furnished
under this schedule_ supplied through a single meter and one_noint of delivery.
C. Time of Use Rate:
1. Base charge $15.75 per month.
2. Monthly energy charge between September 1 and May 31 $0.06700 per kWh during
heavy load hours $0.05800 per kWh during medium load hours. and $0.05000 per kW h during
light load hours.
3. Monthly energy charge between June 1 and August 31 $0.06930 per kWh during_heavv
load hours, $0.0599 Der kWh during medium load hours. and $0.04520 Per kWh during light
load hours.
-2-
4. Heavy load hours are all hours from 6:00:00 a.m. to 1:59:59 n.m. Monday through
Saturday. Medium load hours are all hours from 2:00:00 n.m. to 9:59:59 p.m. Monday
through Saturday. Light load hours are all other hours Monday through Saturday_ all day
Sunday. and all day on North American Electric Reliability Corporation specified holidays.
Pacific Prevailing Time annlies (Pacific Standard Time or Pacific Daylight Time as
aplicablel_
D. Demand Response Credits.
Devices controlled by the City during demand events_ providing the customerhas_not disabled
the controls or opted out of participation. shall receive a credit as follows:
1. Water heater load control switch S10.00 credit per month.
2. Smart_thermostat or home area network $10.00 credit per month.
3. Water heater load control switch and smart thermostat $10.00 credit ner month.
4. Thermal storage system $10.00 credit ner month.
13.12.0401. Schedule GS -03 General service time of use rate.
A. Applicability. This schedule applies to all accounts not covered by other rate schedules with
the following tunes of service:
1. 120/208 or 120/240 volts. single or three phase. service Hanel of 400 amps or smaller.
2. 240/480 or 277/480 volts. three phase_ service Hanel of 200 amp s or smaller
3. Municipal traffic signal and street lights.
4. Municipal emergency management systems_
5. Cable television system and other communications systems. single phase power supplies in
accordance with Section 10.2 of Ordinance no. 3116.
B. Character of Service. Sixty cycle. alternating current at such phase and voltage as
the City may have available will he furnished under this schedule. applied through a single
meter and one point of delivery.
C. Time of Use Rate:
1. Base Charge
a. Single phase 821.50 ner month
b. Three phase $53.75 ner month
c. Municipal traffic signal $179.00 per month
d. Municipal street light $128.90 per month
e. Municipal emergency management system $27.20 ner month
2. Monthly Energy Charge between September 1 and May 31 $0.06800 kWh during heavy load
hours. $0.05800 ner kWh during medium load hours. and $0.05000 per kWh during light load
-3-
hours.
3. Monthly Energy Charge between June 1 and August 31 $0.07040 ner kWh during heavy load
hours. $0.0599 ner kWh during medium load hours. and $0.04520 ner kWh during light load
hours.
4. Heavy load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M.. Monday through
Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P -M.. Monday
through Saturday. Light load hours are all other hours Monday through Saturday. all day
Sunday, and all day on North American Electric Reliability Corporation holidays.
Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time_ as
applicable)_
5. The base charges for municipal traffic signals and street lights includes maintenance of
existing luminaries and controls by the Public Works and Utilities Department.
6. The municipal emergency management system base charge shall apply to systems with a
normal operating load of 150 watts or less. which shall not be reauired to be metered.
D. Municipal Streets Lights. The electric utility rates for municipal street lighting shall recover
the cost of providing service. In different areas of the City. the Department shall meter
representative 150 and 200 watt street lights. Each light so metered shall be charged a base
charge. The monthly energy charge shall be determined by multiplying the number of street
light fixtures. times the monthly consumption determined by the metered lights.
E. Demand Response Credits. Devices controlled by the City during demand events,
providing the customer has not disabled the controls or opted out of participation. shall receive
a credit as follows:
1. Water heater load control switch 510.00 credit ner month.
2. Smart thermostat or home area network $10.00 credit per month.
3. Water heater load control switch and smart thermostat $10.00 credit ner month.
4. Thermal storage system $10.00 credit per month.
13.12.0411. Schedule GD -03 General service demand time of use rat e.
A. Applicability. This schedule applies to all not covered by other rate schedules with the
following tunes of service:
1. 120/208 or 120/240 volts. single or three phase. service Hanel larger than 400 amps.
2. 240/480 or 277/480 volts. three phase service Hanel larger than 200 amps_
B. Character of Service. Sixty cycle. alternating current at such phase and voltage as the City
may have available will be furnished under this schedule. applied through a single meter and
one point of delivery
C. Time of Use Rate:
-4-
1. Base Char=
a. Single phase $42.95 ner month
b. Three phase $107.40 ner month
2. Monthly Energy Charge between September 1 and May 31 $0.04660 ner kWh during heavy
load hours. $0.04660 ner kWh during medium load hours. and $0.03750 ner kWh during light
load hours.
3. Monthly Energy Charge between June 1 and August 31 $0.04820 ner kWh during heavy
load hours. $0.04820 ner kWh during medium load hours, and $0.03390 ner kWh during. light
load hours.
4. Heavy load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M.. Monday through
Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M._ Monday
through Saturday. Light load hours are all other hours Monday through Saturday. all day
Sunday. and all day _on North American Electric Reliability Corporation specified holidays_
Pacific Prevailing Time applies (Pacific Standard Time or Pacific
Daylight T ime. as
applicable),
5. Billing Demand:
a. Billing demand for each month shall be based on the maximum hour of KVA (apparent
Hower) during Heavy Load Hours.
b. Monthly Demand Charge between September 1 and Mav 31 53.50 ner KVA for 95% of all
KVA and $9.80 ner KVA for 5% of all KVA..
c. Monthly Demand Charge between June 1 and August 31_53.50 ner KVA for 95% of all KVA,
and 59.06 ner KVA for 5% of all KVA.
13.12.0421. Schedule NP -03 Nonprofit tax deductible time of use rate.
A. Applicability. This schedule applies to all nonprofit tax deductible organizations.
B. Character of Service. Sixty cycle. alternating current at such phase and voltage as the City
may have available will be furnished under this schedule applied through a single meter and
one point of delivery.
C. Time of Use Rate.
1. Base Charge
a. Single phase $21.50 ner month
b. Three phase $53.75 ner month
2. Monthly Energy Charge between_Sentember 1 and May 31 $0.07110 ner kWh during heavy
load hours. $0.05770 per kWh during medium load hours, and 04970 ner kWh during light
load hours.
3. Monthly Energy Charge between June 1 and August 31 $0.07360 kWh during heavy load
hours. $0.05960 ner kWh during medium load hours. and $0.04490 ner kWh during light load
hours.
4. Heavy load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M.. Monday through
Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M.. Monday
through Saturday. Light load hours are all other hours Monday through Saturday_ all day
Sunday. and all day on North American Electric Reliability Cornoration specified holidays.
Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time_ as
applicable).
D. Demand Response Credits. Devices controlled by the City during demand events,
providing the customer has not disabled the controls or opted out of narticination. shall receive
a credit as follows:
1. Water heater load control switch $10.00 credit per month.
2. Smart thermostat or home area network $10.00 credit ner month.
3. Water heater load control switch and smart thermostat $10.00 credit ner month.
4. Thermal storage system 810.00 credit per month.
13.12.044 Schedule GD -04 General service demand prim ary metered time of use rate.
A. Applicability. This schedule applies to all accounts not covered by other rate schedules with
the following types of service:
1. 120/208 or 120/240 volts. single or three phase. service panel larger than 400 amps.
2. 240/480 or 277/480 volts three phase service Hanel larger than 200 am ps.
3. When electric current is measured at primary voltage and delivery to the customer is at
secondary voltage.
B. Character of Service._Sixty cycle. alternating current at such phase and voltage as the City
may have available will be furnished under this schedule. applied through a single meter and
one point of delivery.
C. Time of Use Rate:
1. Base Charge:
a. Single phase $42.95 ner month
b. Three phase $107.40 ner month
2. Monthly Energy Charge between September 1 and May 31 80.04590 ner kWh during heavy
load hours. $0.04590 per kWh during medium load hours. and $0.0 ner kWh during light
load hours.
3. Monthly Energy Charge between June 1 and August 31 $0.04740 ner kWh during heavy load
hours. $0.04740 ner kWh during medium load hours. and $0.03330 ner kWh during light load
hours. 4. Heavy load hours are all hours_from 6:00:00 A.M. to 1:59:59 P.M. Monday through
Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M.. Monday
through Saturday. Light load hours are all other hours Monday through Saturday. all day
-6-
Sunday. and all day on North American Electric Reliability Corporation specified holidays.
Pacific Prevailing Time annlies (Pacific Standard Time or Pacific Daylight Time, as
nlicablel.
5. Billing Demand:
a. Billing demand for each month shall be based on the maximum hour of KVA (apparent
power) during Heavy Load Hours.
b. Monthly Demand Charge between September 1 and May 31 _$3.45 per KVA for 95% of all
KVA and 59.80 per KVA for 5% of all KVA
c. Monthly Demand Charge between June 1 and August 31 $3.45 per KVA for 95% of all KVA
and $9.06 per KVA for 5% of all KVA.
13.12.061 Schedule PS -03 Primary service time of use rate.
A. Applicability. This schedule annlies to all accounts which own and overate a primary voltage_
distribution system with a connected load greater than 1.000 KVA.
B. Character of Service. Service to be furnished under this schedule is unregulated three phase
sixty cycle. alternating current at primary voltage. 12.5 KV nominal. Service under this
schedule shall be provided and metered at the noint(s) of interconnection of the distribution
facilities of the customer and the City.
C. Time of Use Rate:
1. Base Charge: 5286.35 per month
2. Monthly Energy Charge between September 1 and May 31 50.04100 ner kWh during heavy
load hours. $0.04100 ner kWh during medium load hours. and 50.03 ner kWh during light
load hours.
3. Monthly Energy Charge between June 1 and August 31 $0.04240 ner kWh during heavy load
hours. $0.04240 ner kWh during medium load hours. and $0.02980 ner kWh during light load
hours.
4. Heavy load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M.. Monday through
Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M.. Monday
through Saturday. Light load hours are all other hours Monday through Saturday. all day
Sunday. and all day on North American Electric Reliability Corporation specified holidays.
Pacific Prevailing Time annlies (Pacific Standard Time or Pacific Daylight Time. as
applicable).
5. Billing Demand:
a. Billing demand for each month shall be based on the maximum hour of KVA (apparent
power) during Heavy Load Hours.
b. Monthly Demand Charge between September 1 and May 31 $4.30 per KV Afo for 95% of all
KVA and 59.80 per KVA for 5% of all KVA.
-7-
c. Monthly Demand Charge between June 1 and A ugust 31 $4.30 ner KVA for 95% of all KVA
and 59.06 ner KVA for 5% of all KVA.
13.12.075 Schedule MW -03 Municipal water Humping time of use rate.
A. Annlicability. This schedule aDlies to municipal water Dumping facilities where the
connected load is greater than 500 KVA.
B. Restrictions. Timers approved by the Public Works and Utilities Department shall be
installed to prevent pumping during restricted hours as determined by the Public Works and
Utilities Department.
C. Character of Service. Service to be furnished under this schedule is three phase. sixty cycle.
alternating current at such phase and voltage as the City may have available will be furnished
under this schedule, applied through a single meter and one point of delivery.
D. Time of Use Rate:
1. Basic Charge: $286.35 per month
2. Monthly Energy Charge between September 1 and May 31 $0.06440 ner kWh during heavy
load hours. $0.06440 per kWh during medium load hours. and 50.03210 ner kWh during light
load hours.
3. Monthly Energy Charge between June 1 and August 31 $0.06650 ner kWh during heavy load
hours. $0.06650 ner kWh during medium load hours. and $0.02900 ner kWh during light load
hours.
4. Heavy load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M.. Monday through
Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M.. Monday
through Saturday. Light load hours are all other hours Monday through Saturday. all day
Sunday. and all day on North American Electric Reliability Corporation specified holidays.
Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time_ as
applicable)_
5. Billing Demand:
a. Billing demand for each month shall be based on the maximum hour of KVA (apparent
power) during Heavy Load Hours.
b. Monthly Demand Charge between September 1 and May 31 $3.65 ner KVA for 95% of all
KVA and $9.80 ner kW for 5% of all KVA.
c. Monthly Demand Charge between June 1 and August 31 $3.65 ner KVA for 95% of all KVA
and $9.06 per KVA for 5% of all KVA.
-8-
Section 2 Corrections. The City Clerk and the codifiers of this ordinance are
authorized to make necessary corrections to this ordinance including, but not limited to, the
correction of the scrivener's /clerical errors, references, ordinance numbering,
section/subsection numbers and any references thereto.
Section 3 Severabilitv. If any provisions of this Ordinance, or its application to
any person or circumstances, are held invalid, the remainder of the Ordinance, or application of
the provisions of the Ordinance to other persons or circumstances, is not affected.
Section 4 Effective Date. This Ordinance, being an exercise of a power
specifically delegated to the City legislative body, is not subject to referendum. This
ordinance shall take effect five (5) days after passage and publication of an approved summary
thereof consisting of the title.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said
Council held on the day of April, 2012.
ATTEST:
Janessa Hurd, City Clerk
PUBLISHED:
By Summary
2012
MAYOR, CHERIE KIDD
APPROVED AS TO FORM:
William E. Bloor, City Attorney
G. \LEGAL\a ORDINANCES &RESOLUTIONS \ORDINANCES 2012 \05 Electnc- TimeofUse Chapter 3.12. 02 22.12docx.docx
-9-
CITY OF
P ORT A NGELES
W A S H I N G T O N U, S. A.
UTILITY ADVISORY COMMITTEE MEMO
Date: March 13, 2012
To: Utility Advisory Committee
From: Ernie Klimek, Water Superintendent
Subject: 2011 Consumer Confidence Water Quality Report
Summary: The Washington State Department of Health requires that every water system
provide an annual Consumer Confidence Report to its customers. The report is to contain
information on the potential contaminants present in the water supply that customers receive.
The attached report for the Port Angeles Water Supply has been prepared for distribution to the
City's water customers.
Recommendation: For information only, no action requested.
Background /Analysis: Congress passed amendments to the Safe Drinking Water Act that
included a mandate from the Environmental Protection Agency (EPA) in 1996 requiring
community water systems to provide each of their customers with a "Consumer Confidence
Report" (CCR) every twelve months. This report, referencing 2011 calendar year data, will be
delivered to all City of Port Angeles water customers with the May /June utility billing
statements, along with a public information announcement in the local newspaper and posted on
the City's website. By law, this report must be distributed to our customers by July 1, 2012.
The attached CCR has been developed in accordance with the EPA CCR regulations by City
staff. The regulations require information on the quality of the water delivered by the system
and characterization of any risks from exposure to contaminants in the drinking water in an
accurate and understandable manner. Included in the report is the data for Water Use Efficiency
that is also required to be provided to our customers by July 1, 2012. The City is also providing
the content of the CCR to Clallam County Public Utility District No. 1 by April 1, 2012 for use
with their customers.
Attachment: 2011 Consumer Confidence Water Quality Report
Dear Water Customer
The City of Port Angeles is pleased to
provide you with our annual Consumer
Confidence Water Quality Report for 2011.
The purpose of this report is to share infor-
mation with you, our customers, about the
quality of your water and to convey a basic
knowledge of our water system. This re-
port is a summary of the quality of water
we provided to you in 2011, gives details
about where the water comes from, and
compares it to standards set by regulatory
agencies.
We continue to monitor the Elwha River
1 Restoration Project as dam removal has
1started and we are working closely with
State and Federal agencies as conditions
change, sometimes daily, all the while pro-
viding you with the quality of water you
have come to expect from us.
The year 2011 saw your water treatment
plant operators begin refining their skills
at Department of Health sponsored per-
formance based training classes. At this
training, which will continue in 2012, they
are learning to tune plant operations to
produce the highest quality drinking water
at the lowest possible costs.
Also in 2011, the Utility distribution crew
continued to remove older lines from ser-
vice and move customers to newer larger
lines as we work to improve the water
WHERE DOES OUR WATER'COME FRO
Source water for.the,,City of,Port.Ange-
-,les Water:System'is*Ranney Collector
Well (Source: S01),,located -40°the east
k
=bank °of` the''Elwha River. "Our Depart-
ment of Health system identification
nurnber'sa685;50M. The';Ranney Cola
lector "has' been classified as ground=
water =:under the influence (GWI) sur=
face This designation requires
The .City to meet the stricter require=;
<ments of;the Surface; Water: Treatment
;Rule_ :(SWTR) forr<_our,edrinking ;water
The. City of Port-Angeles isan full=com
.pliance with S WTR through: the ;`filtra
tion processes "provided bya:: Port "Anger:
'les, :Water Treatment (PAWTP),
constructe'd under the Elwha River
quality for our community. This same
crew is responsible for leak detection
and repair and their efforts can be re-
viewed on page 7 under the title "Water
Use Efficiency These effort will con-
tinue in 2012 with capital projects to re-
place our aging concrete cylinder trans-
mission mains, smaller distribution lines,
and perform needed maintenance at our
E Street reservoir location.
Once again, I'd like to thank you for
your support, and if you have any ques-
tions about this report or at anytime have
concerns about the quality of your drink-
ing water please visit our website at
www.cityofpa.us /pwWaterU.htm or con-
tact me by e-mail at eklimek @cityofpa.us
or phone 360.417.4855.
Thank you,
Ernie Klimek
Water Superintendent
Ecosystem end Fisheries :`Restore
tion Act: More .data on .Source We-. ter' is avaiiable through the, Source
;Weer Assessment Program (SWAP)
online st:v httb: /www.doh.wa.ssov/
e h p /dw /sw /assess m e nt, h t m
Inside this issue
Water Sampling Data
Water I nformatlon
Water Use Effictency
1
at We Test forin Yotar, prip}dng Water'°
In :2011, we conducted over 520ftests for contaminants:;
Four, hundred and fifty -six: of these, were routine Coliform:
isampiing, sample.. for Nitrate -N four (one -per quarter)
,samples each for total trihalpmethane (TTHM) haloacetic
acid: (HAA5); .and total organic carbon (TOC's),-H;tivelve,
monthly samples for fluoride; thirty samples ":for lead and
copper; -and four sarriples for' new construction, and investi
gat The results listed on page 5 are a summary oftliese
:teats as submitted, .to the DOH /Office :of Drinking Water and
theU.S. Environmental Protection Agency:
Thank yo
Larry Messinger
Water Treatment PI
0perator'3
WATER TREATMENT
Jason
Variance and Exemptions
In 2003 the City requested and was approved to reduce
monitoring of Disinfection /Disinfectant -By- Products by the
DOH by having met the sampling requirements agreed to
and being below the Maximum Contaminant Level (MCL)
for TTHM's, HAA(5)'s. and TOC's.
Exceedences
There were no exceedences to report for 2011
Additional Testing,
Complete Inorganic (IOC), Complete Synthetic Organic
(SOC) and Complete Volatile Organic (VOC) analysis.
Lead in Drinking Water
In Washington State, lead in drinking water comes primar-
ily from materials and components used in household
plumbing. The more time water has been sitting in pipes,
the more dissolved metals, such as lead, it may contain.
Elevated levels of lead can cause serious health problems
especially in pregnant women and young children.
To help reduce potential exposure to lead: For any drink-
ing water tap that has not been used for 6 hours or more,
flush water through the tap until the water is noticeably
colder before using for drinking or cooking. You can use
the flushed water for watering plants, washing dishes, or
general cleaning. Only use water from the cold tap for
drinking, cooking, and especially for making baby formula.
Hot water is likely to contain higher levels of lead. If you
are concerned about lead in your water, you may wish to
have your water tested. Information on lead in drinking
water is available from EPA's Safe Drinking Water Hotline
at 1.800.426.4791 or online at http://www.epa.gov/
Benjie Eric
Quinn
;The Water Treatment Section, of the Water, Utility has the, responsibility of treating,and testingyour d linking water Our goal is to
ensure that*meet ailregulatory agency s tandards, arid- ,retain your,confidence in:,us to provide you:with safe and reliable drink
ing-water every time -you turn on your, `ater: The section is :.composed of 5 employees ":They'have a combined total of over 90
years'of experience and serve. you with expertise and professionalism Continuing ducation is mandatory for our employees to
meet the high standards that you have come to expect :,Current certifications held by staff and issued by. the Washington State
Department of Health include. Manager, Water Distribution Specialist :WaterTreatment•Plant Operator;_ Cross
Connection Control Specialist;�and.Backflow Assembly Tester.:..
Page 2 201 CONSUMER CONFIDENCE WATER QUALITY REPORT
Thank you
Port Angeles Water Treatment Plant
Effluent Basin
Maturation Mixer
Ron Becker
Backflow Assembly Tester
Cross Connection Control Specialist
on CONSUME CONFIDENCE WATER QUALITY REPORT'
Process Area
Backflow Protection
To protect our customers from possible cross connection con-
tamination to the drinking water distribution system, the City of
Port Angeles aggressively inspects and requires testing of back
flow devices on an annual basis. In the year 2011 we evaluated
1102 sites with a total of 1691 potential hazards eliminated
with backflow devices. We surveyed 151 new sites and added
12 new locations requiring annual inspections and testing to
protect the drinking water system. If you have any questions in
regards to backflow requirements you may contact me at:
360.417.4886 or e-mail at rbecker @cityofpa.us
Chemical Storage
Port Angeles Water Treatment Plant
Page 3
Term
AL
D /DBP
HAA5
MCL
MCLG
MF /L
MRDL
MRDLG
Definition
Water Sampling Definitions
Action Level: The concentration of a contami-
nant which, if exceeded, triggers treatment or
other requirements that a water system must
follow.
Disinfectant /Disinfection By- Products
Haloacetic Acid
Maximum Contaminant Level: The highest level
of a contaminant that is allowed in drinking
water. MCLs are set as close to the MCLGs as
feasible using the best available treatment
technology.
Maximum Contaminant Level Goal: The level of
a contaminant in drinking water below which
there is no known or expected risk to health.
MCLGs allow for a margin of safety.
Million Fibers per Liter
Maximum Residual Disinfectant Level: The high-
est level of disinfectant allowed in drinking wa-
ter. There is convincing evidence that addition
of a disinfectant is necessary for control of mi-
crobial contaminants.
The level of a drinking water disinfectant below
which here is no known or expected risk to
health. MRDLGs do not reflect the benefit of the
use of disinfectants to control microbial con-
taminants.
ol
stuck
Term
ND
NE
pCi /L
Qom m g/j
SRL
TOC
TTHM
ug/L
Definition
Not Detected
Not Evaluated
Picocuries per Liter
Parts per million, or milligrams per liter
(mg/L)
State reporting Level
Total Organic Carbon
Total Trihalomethane
Micrograms per liter
Otte part per million (P Nf is�like
n eh in 16ntiles, one eco
s in 1 5!da s 3one'minute in 2 °y ears, o r one cai
in bumpeer to bumper tra veland=to San Francisco.
(S ce http /!www.nesc-wvu edu/ndwetart cleslo fa04 /q&a pd
Sampling Conducted
Nitrates at source —Elwha
Microbiological Contami-
nants
Monthly Samples (38) Plus
3 New Construction In-
vestigative
Total Organic Carbons
(TOC's)
Trihalomethane (TTHM)
Haloacetic Acid (HAAS)
Lead
Copper
Fluoride
Asbestos
Complete Volatile Organic
Compounds (VOC's)
Complete Inorganic Com-
pounds (IOC's)
Complete Synthetic Or-
ganic Compounds (SOC's)
2011 SUIVIE R Co n
Water Sampling Conducted
Sample Date
9/21/11
Monthly and
as Needed
1 Sample per
Quarter
1 Sample per
Quarter
1 Sample per
Quarter
9/11
9/11
Monthly
9/01/09
6/21/11
6/21/11
6/21/11
Unit MCL MCLG Detected Viola- Maior Sources
MRDL MRDLG Level tion
ppm
mg/L
N/A
ppm
mg/L
ug/L
ug/L
mg/L
mg/L
mg/L
MFL >10
um
ug/I
mg/I
10 SRL ND
0.1 mg/L
Contami- No Contami- LID
nant Pre- nant Pre-
sent sent
.51 AVG.
100 100
60 NE
AL
0.015
mg/L
AL
1.3 mg/L
4
Various
Various
SRL
0.002 mg/L
SRL
0.02 mg/L
2
SRL
0.132
SRL
0.5
Variable
ug/I Various Variable
0.065
0.004 NO
1.19 NO
.82 Avg. NO
lY!? NQ
ND NO
$elow ML NO
ND
Runoff, Septic,
Fertilizers
NO Naturally present in
the environment
NO Monthly sampling
required for reduced
monitoring of D /DBP
Avg. De- NO Byproduct of Chlorine
tected Disinfections Process
3.7
Avg. De- NO Byproduct of Chlorine
tected Disinfections Process
From specific plumb-
ing in certain year
homes
From specific plumb-
ing in certain year
homes
Chemical is regu-
lated by State
Naturally occurring.
Transmission mains
Fuels and solvents
that may enter
source water
Naturally occurring or
manmade non car-
bon compounds.
Copper, Lead, Iron,
etc.
NO Synthesized com-
pounds such as in-
secticides and pesti-
cides
Source water assessment and its
availability
Water from the Ranney Collector is
tested following the guidelines estab-
lished by the DOH to detect potential
contaminants that could reasonably be
expected to be found in drinking water.
Because most of the land through
which the Elwha River flows is inside the
Olympic National Park, there is limited
opportunity for human contamination
of the water. Contaminants that might
be expected in untreated water include:
biological contaminants, such as vi-
ruses and bacteria; inorganic contami-
nants, such as salts and metals; pesti-
cides and herbicides; organic chemicals
from industrial or petroleum use; and
radioactive materials.
Whv are there contaminants in drinking
water?
Drinking water, including bottled water,
may reasonably be expected to contain
at least small amounts of some con-
taminants. The presence of contami-
nants does not necessarily indicate that
water poses a health risk. More infor-
mation about contaminants and poten-
tial health effects can be obtained by
calling the EPA's Safe Drinking Water
Hotline (800.426.4791). This informa-
tion can also he accessed at the EPA's
website: httn: /www.eoa.gov/
safewater /hotline /index.html. The
source of drinking water (both tap and
bottled water) include rivers, lakes,
streams, ponds, reservoirs, springs, and
wells. As water travels over the surface
of the land or through the ground, it
dissolves naturally occurring minerals
and, in some cases, radioactive mate-
rial, and can pick up substances result-
ing from the presence of animals or
from human activity.
Contaminants that may be present in
source water include:
A) Microbial contaminants, such as vi-
ruses and bacteria, that may come
from sewage treatment plants, septic
systems, agricultural livestock opera-
tions, and wildlife;
B) Inorganic contaminants, such as
salts and metals, which can be natu-
rally occurring or result from urban
Page 6
WATER INFORMATION
Lake Angeles
stormwater runoff, industrial, or domes-
tic wastewater discharges, oil and gas
production, mining or farming;
C) Pesticides and herbicides, which may
come from a variety of sources such as
agriculture, urban stormwater runoff,
and residential uses;
D) Organic chemical contaminants, in-
cluding synthetic and volatile organic
chemicals, are by- products of industrial
processes and petroleum production,
which can also come from gas stations,
urban stormwater runoff, and septic
systems;
E) Radioactive contaminants, which can
be naturally occurring or be the result of
oil and gas production and mining ac-
tivities.
In order to ensure that tap water is safe to
drink, the Department of Health and EPA
prescribes regulations that limit the
amount of certain contaminants in the
water provided by public water systems.
The Food and Drug Administration (FDA)
and the Washington Department of Agri-
culture regulations establish limits for
contaminants in bottled water that must
provide the same protection for public
health.
vaoilfgONSV1VIER CONFIDENCE
Special Precautions
Some people may be more vulnerable
to contaminants in drinking water than
the general population. Immuno-
compromised persons such as persons
with cancer undergoing chemotherapy,
persons who have undergone organ
transplants, people with HIV /AIDS or
other immune system disorders, some
elderly, and infants can be particularly
at risk from infections. These people
should seek advice about drinking wa-
ter from their health care providers.
EPA /Centers for Disease Control (CDC)
guidelines on appropriate means to
lessen the risk of infection by crypto-
sporidium and other microbial con-
taminants are available from the Safe
Drinking Water Hotline
(800.426.4791).
Wild Flowers in Grand Valley
ATERQUAI ITrREPORT
Water Conservation/ Water Use Efficiency
:Water conservation measures are an ii`hportant first step in protecting our.; supply Such measures. not only save the;
supply of our water `but,can also cut the cost of water treatment Here: are a few, suggestions e
a
INSiDETHE HOUSE\" MEASURES YQU"CAN USE INSIDE YOUR p, HOME:
Fix leaking faucets :pipes, toilets, etc.
e- mail :conservation@cityofpa.us
email eklirriek@cityofpa,us:
http /jwww.cityofpa.us /pwCoriserv: htm
2) :Install water saving devices in faucet toilets, and.appliances:, Replace
r..
3 Wesh'only full Joads of, laundry.
4) Do not.use the_toiletfor trash. disposal.
5)Soak dishes before washing and run the dishwasher only when
OU:Ir$:16E4HE HQUSE:
Dennis`„Edgington, „I
z;. Water' tistribution :Lead- worker
'.Water Distribution`Manager 2
e CONSUMER CONFIDENCE WATER QUALITY REPORT'
1) Water the lawn and:garden..in_the early rr brnrng or =:evening and; use mulch around plants' and shrubs.
2) Repair leaks in faucets and -hoses ::;;Use,water- saving, nozzles: g”
3), Use water from a bucket to wash your vehicle. Save therthose.for rinsin
FQR NIQRE IP FORMATt N :PLEASE CGtNTACT:.
Bob Kajfasz, 360.41:7:4713 =tFriergy"and WaterCorise
Ernie Klimek ;360:417:4855 Water. Superintendent'
city of Port -Angeles Conservation Webpage:
WATER USE EFFICIENCY
Under the provisions of the Water Use P are requ report to >you annually by MY 15tour progress. in
reducing�water losses and to share information about our Water Use Efficiency Plan.
"LEAKAGE INFORMATION'-
For the -12 month redortiiir4 neriod:from January 2011 thru. becembe'r 2011.
,.Total production from.the Sourcein Million Gallons:
Total Authorized coriaumptioi i n`Million- Gallons:
Unaccounted;for Distribution System Water in Million.Gallons
Distribution'Syst rn Losses es a Percentage:
Summary for 2011
yin 2034 alined a`distribution l oss=of 1 6 This lowers our 3 -yr. loss average (Jan, 2009: Dec 2011) t6:16 front a high
,O121.%at the art the reporting cycle: We achieved this' reduction. by calibrating• Meters, tracking unaccounted usage
,g; fire.consum ption), aggressive leak ,repair (within 24 to 48 hours from reporting); and through:the use of
kadetecting and correlating:equiprrient
'reading and infrastructure Project ('AMR /AMI)
wes started 011s We .have "startedl replacing: theUtilitys ag=
ingand ietera with new ,accurate and°automatically;read
ablerneteiS >.continuingtoward ourefforts,to reduce our
water =to 'inaccuracies. These ,efforts wiil'continue into
ur customers used 23 Million4gallons less water,
ti °ince 2007 vkie°l aue' per•capita con
:om 129ga1 /capita /day to 109ga1 /capita /day.
Fr,leak•education fairs and in class-
ase history through utility billing, end offered'
cOnservation vices andrrebates to customers through our
ms:
Page 7
PQRTANG &LES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: March 13, 2012
To: Utility Advisory Committee
From: Phil Lusk, Power Resources Manager
Subject: Bonneville Power Administration Technology Innovation Funding Opportunity
Announcement
Summary: The Bonneville Power Administration recently released the Technology Innovation
Funding Opportunity Announcement for commercially available demand response technologies.
Staff is in the process of obtaining consulting services to assist in preparing the City's proposal.
Recommendation: For information only, no action requested.
Background /Analysis: The Bonneville Power Administration (BPA) recently released the
Fiscal Year 2013 Technology Innovation (TI) Funding Opportunity Announcement (FOA) for
commercially available demand response technologies. BPA is interested in using demand
response to increase loads during high wind/high water events, decreasing loads during peak
generation or transmission events, shifting loads, and non -wires solution to transmission
constraints.
BPA has approximately $4.5 -6.0 million in funding available to support regional projects. BPA
anticipates each project will be between $50,000 and $750,000 and staff is planning to submit a
grant application in an amount up to $300,000. There is a minimum 50% cost share requirement
and grants are considered and awarded using a competitive process.
The FOA includes the following milestones and deadlines:
1. Registration for the pre application conference March 19, 2012
2. Pre application conference March 22, 2012
3. Submission of a concept paper and a statement of qualifications April 4, 2012
4. BPA invitation to selected applicants to submit complete grant application April 11, 2012
5. Submission of complete grant application by selected applicants May 16, 2012
Staff is in the process of obtaining consulting services to assist in preparing the City's proposal,
which are anticipated to be less than $25,000. All consulting fees and the grant match would be
paid from the Conservation Fund. Staff will return to the Utility Advisory Committee and City
Council if a grant is offered.
N. \UAC \Final \BPA Technology Innovation Opportunity Announcement doc
P
RT s NGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: March 13, 2012
To: Utility Advisory Committee
From: Larry Dunbar, Deputy Director of Power Systems
Subject: Advanced Metering Infrastructure System Phase I Report Update
Summary: On December 14, 2010, City Council approved the Advanced Metering Infrastructure
System Agreement with Mueller Systems. An amendment to the percentages used to calculate
City payments and shifting some Phase II scope of work into Phase I was made last month. The
City and Mueller Systems have taken longer than planned to complete Phase I. The scope of work
is taking longer to complete due to the integration of the AMI System with the City's utility billing
system, installation of demand response equipment, and overall quality assurance.
Recommendation: For information only, no action requested.
Background /Analysis: The City and Mueller Systems entered into an agreement to provide
the Advanced Metering Infrastructure (AMI) System on December 22, 2010. On September 20,
2011, staff provided a Phase I report that summarized what went well, what did not go as expected,
outstanding Phase I scope of work to be completed, and changes including shifting scope of work
from Phase II to an expanded Phase I to incorporate lessons learned. The purpose of Phase I was
to perform a trial of the Implementation Plan, then make adjustments based on lessons learned
prior to proceeding with Phase II.
On February 21, 2012, City Council approved an amendment to the AMI System Agreement to
change the percentages used to calculate City payments and shifting some Phase II scope of work
into Phase I. Although staff has been verbally updating the Utility Advisory Committee each
month on the project, staff is providing a Phase I Report Update to ensure the Utility Advisory
Committee and City Council are informed on the status of the project.
Phase I included approximately 1,000 electric meter and 1,000 water meter installations, 11
communications collectors, 50 demand response (DR) installations, and the software integration.
The main outstanding scope of work at this time is the integration of the AMI System with the
City's utility billing system, installation of demand response equipment, and overall quality
assurance have taken longer than anticipated. Until this work is completed, City acceptance testing
cannot be completed for Phase I and the remaining scope of work will be delayed.
N: \UAC \Final \AMI System Phase I Report Update.doc
Advanced Metering Infrastructure System Phase I Report Update
March 13, 2012
Page 2
The original Phase I scope of work will be completed then undergo System Acceptance Testing
(SAT). City approval of the SAT is required prior to proceeding with the shifted Phase II scope of
work and remainder of Phase II.
The shifted Phase II scope of work into Phase I will be implemented to test Implementation Plan
revisions prior to Phase II launch. The expanded Phase I will include installation of another 1,000
electric meters and 1,000 water meters. Staff will provide another report to the Utility Advisory
Committee at the conclusion of the expanded Phase I. If the expanded Phase I is successful, staff
plans to promptly proceed with Phase II.
Based on the unanticipated delays the schedule to complete the Phase I SAT is anticipated to be no
earlier than May 2012 (estimated) and the earliest that the expanded Phase I scope of work is
anticipated to commence is June 2012 (estimated). The completion of Phase II is anticipated to be
by the end of 2012 (estimated). The dates once finalized will be included in the revised
Implementation Plan.
The project management teams (City and Mueller Systems) are continuing to work closely
together to revise the Implementation Plan. Mueller Systems has appointed a Program Manager
and we anticipate increased efficiency and performance during the remainder of the project.
In summary, the Phase I component of the AMI system project has not been completed and there
have been a few unanticipated delays to the project. Prior to proceeding with the expanded Phase 1
and original Phase II scope of work, a revised Implementation Plan will need to be approved by
the City Manager. Staff will share the revised schedules with utility customers once finalized