UTILITY ADVISORY COMMITTEE
PUBLIC WORKS CONFERENCE ROOM
PORT ANGELES, WA 98362
APRIL 25, 2006
3:00 P.M.
AGENDA
I. CALL To ORDER
II. ROLL CALL
III. ApPROVAL OF MINUTES FOR APRIL 11,2006
IV. LATE ITEMS
V. STRATEGIC PLANNING SESSION
VI. DISCUSSION ITEMS - (IF TIME PERMITS)
A. STORMWATER UTILITY RATES
B. WASHINGTON DEPARTMENT OF FISH AND WILDLIFE USE OF CITY
FACILITIES
C. EXECUTIVE SESSION
D. REDUCING LANDFILL FEES FOR CLEANUP OF DERELICT BUILDINGS
VII. NEXT MEETING DATE - MAY 9, 2006
VIII. AD..JOURNMENT
N:\UAC\FINAL\042S06.wPD
UTILITY ADVISORY COMMITTEE
GUEST SIGN UP SHEET
PRINT NAME ORGANIZATION
..
~l~ ~v t-v- v~ riJ. ' \
G( ') ~"". B.
\ ,
.
N: \PWKS\LIGHT\ CONS \ CATE \ SIGNUP.wpd
r.
UTILITY ADVISORY COMMITTEE
Special Meeting
Port Angeles, Washington
April 11, 2006
b-;
L Call to Order:
Chairman Reed called the meeting to order at 2:00 p.m.
IL Roll Call:
Members Present:
Chairman Reed, Orville Campbell, Betsy Wharton, Grant Munro (2:04),
Karen Rogers
Members Absent:
None
Staff Present:
Mark Madsen, William Bloor, Glenn Cutler, Scott McLain, Gary
Kenworthy, Mike Puntinney, Larry Dunbar, Tom McCabe, Teresa Pierce,
Helen Freilich, Claudia Stromski, Bill McKenzie, Rick Hostetler, Cate
Rinehart
Others Present:
Brian Gawley - Daily News
Paul Lamoureux - Citizen
Leroy Sproat - Citizen
Jim Haguewood - One Group
IlL Approval of Minutes:
Chairman Reed asked if there were any corrections to the meeting minutes of February 28, 2006.
Mayor Rogers moved to approve the minutes. Councilmember Wharton seconded the motion,
which carried unanimously. Orville Campbell abstained due to absence at the meeting.
Chairman Reed asked if there were any corrections to the meeting minutes of March 14,2006.
Orville Campbell moved to approve the minutes. Councilman Munro seconded the motion, which
carried unanimously.
IV. Strategic Planning Session
Jim Haguewood, One Group Chairman, distributed a handout and exchanged ideas and opinions in
depth concerning visualizing what the community might be like in the future. Additional exchange was
made regarding values, principles, and issue strategies. It was noted that another special meeting was
scheduled for April25th to examine the concepts that have been gathered.
1
UTILITY ADVISORY COMMITTEE
April 11, 2006
Jl: Discussion Items:
A. Repair Of Track Assembly On Landfill D-7R Caterpillar Dozer
Bill McKenzie, Fleet Manager, explained that during a recent inspection by NC Machinery the track
assembly wear surfaces had been worn beyond allowable tolerances and needed to be fixed. There was a
brief discussion.
Councilman Munro moved to recommend City Council agree to repair the D-7R Caterpillar
bulldozer by NC Machinery. Mayor Rogers seconded the motion, which carried unanimously.
B. Conservation Acquisition Agreement
Larry Dunbar, Power Resources Manager, advised that under the proposed agreement, the City could
provide $575,000 for energy conservation work in progress at Port Angeles Hardwoods, Nippon Paper
Industries USA, and K-Ply. It was noted that additional BP A funding for commercial and industrial
energy conservation projects could be available through September 30,2009 by entering into the
agreement. There was a brief discussion.
Councilmember Wharton moved to recommend City Council authorize the Public Works and
Utilities Director to enter into the Conservation Acquisition Agreement with the Bonneville Power
Administration. Orville Campbell seconded the motion, which carried unanimously.
C Solid Waste Rates
Larry Dunbar, Power Resources Manager, and Tom McCabe, Solid Waste Superintendent, distributed
information regarding the issue. A presentation was given based upon that information which included
the topics of public hearing comments, recommended changes based on the public hearing, other
recommended changes, and staff comments. There was a lengthy discussion. Staffwas given guidance
on proposed solid waste rates and ordinance amendments.
No action taken. Information only.
D. Landfill Storm water Project 05-18, Change Orders
Gary Kenworthy, City Engineer, gave a short overview of the project updating the committee on the
various changes that have been done and needed corrective measures.
No action taken. Information only.
2
i-m-
UTILITY ADVISORY COMMITTEE
April 11, 2006
E. Storm water Utility Rates
F. Reducing Landfill Fees For Clean Up Of Derelict Buildings
G. Washington Department Of Fish And Wildlife Use Of City Facilities
All deferred to the April 25th meeting.
VI.
Special Meeting:
Next meeting date:
April 25, 2006 - 3 p.m.
May 9,2006
VIL
Adjournment:
The meeting was adjourned at 5:44 p.m.
Chairman Reed
Cate Rinehart, Administrative Specialist II
N:\PWKS\LIGHT\CONS\CA TE\041 I06meet.wpd
3
FORT,NlGBLBS
WAS H I N G TON, U. S. A.
UTILITY ADVISORY COMMITTEE MEMO
DATE:
April 25, 2006
To:
UTILITY ADVISORY COMMITTEE
,
FROM:
Gary W. Kenworthy P .E., Deputy Director of Public Works/City Engineer
SUBJECT:
Stormwater Utility Rates
Summary: It has been three years since formation of the Stormwater Utility and direction is
needed in development of programs and funding.
Recommendation: Discuss Stormwater Utili
ram and Fundin 0 tions.
Background/Analysis: The Stormwater Utility was created (Ordinance 3151) in 2003. During
the discussions regarding the Stormwater Utility it was noted that the rates would be reevaluated
in three years, our normal utility review period. The current monthly Stormwater Utility Rates
are $3.00 per month ($36 Annually) for single-family and duplex property and $3.00 per 4,000
square feet unit of impervious area, with a ten unit/$30.00 cap ($360 Annually), for
commercial/multiple property. These fees are collected by the County along with property taxes
and in 2005 generated revenues of$357,000 (1490 commercial properties, $124,500, 35%; 6510
residential properties, $232,500, 65%). It was directed by City Council that the funds for the
Stormwater Utility be utilized primarily for Capital Improvement Projects to reduce flooding and
Combined Sewer Overflow (CSO) impacts along with endangered species act (ESA) training for
staff. The charges for services (County processing fees (1 %), utility taxes (8%), training, "-
assessments, professional services) reduce the projected annual funds available for capital
projects, in 2006 dollars, to approximately $310,000. This is the same value noted in the 2003
Council Memo for the Stormwater Utility formation.
The major stormwater project completed using Stormwater Utility funds since the establishment
was the Crown Park Stormwater Improvements CSO reduction project completed in 2005. This
year the Lincoln Street Storm Drain (4th to 7th) CSO reduction project, Aerial Mapping, Catch
Basin Improvements, and Valley Creek Erosion Control are the scheduled projects. The projects
for 2007 have not been selected. A matrix of proposed projects prepared in 2003 for the
formation ofthe Stormwater Utility is attached along with the proposed 2006-20012 Capital
Facilities Project (CFP) list for Stormwater.
1-- .
Stormwater Utility Rates
April!!, 2006
Page 2
DOE will decide on the looming specter ofNPDES Municipal Stormwater Phase II this year.
The City of Port Angeles is currently included as a Phase II community. Ifwe are not successful
in being excluded this will result in the need for additional staff to implement, inspect, monitor,
and report in accordance with the DOE requirements which will include all those in the
Stormwater Management Manual for Western Washington. This unfunded mandate will be a
significant impact to the City and developers. Weare currently reviewing the final draft ofthe
Phase II permits and will be providing comments to DOE prior the May 19,2006 deadline.
Our Stormwater residential monthly rates are low in comparison to similar Cities in western
Washington as shown in the following table:
City Monthly Residential Rate System Development Charge
Port Angeles $3.00 None
Anacortes $3.00 $1,126.00
Blaine $4.00 $200.00
Bainbridge $5.00 None
Shelton $5.00 None
Mount Vernon $6.00 None
Port Townsend $6.00 None
Gig Harbor $7.00 None
Friday Harbor $7.00 $286.00
Edmonds $7.00 $428.00
Poulsbo $8.00 None
The rates and system development charges shown in the table above are based on A WC 2004
Survey. The A WC survey is updated every two years and the 2006 survey will be available this
coming August.
It is clear that with NPDES Phase II additional administration, engineering and planning staff
will be needed. Initially one FTE position ($100,000) will be required. Over the next 6 years the
2007-20012 CFP has identified $8,000,000 in projects to be completed. These equate to
approximately $1,350,000 per year. Our current rate distributions generate approximately
$120,000 of revenue for each dollar collected. To fully fund the annual $1,350,000 would require
a rate of $11.25 per month. This $8.25 increase is not a reality and priorities within the staffing
and CFP program will need adjustments. In addition we may need to review the commercial
(35%) and residential (65%) contributions to the overall revenues. Based on impervious areas for
commercial (52%) and residential (48%) an adjustment may be needed to be more equitable.
Currently monthly contributions from contiguous commercial properties are capped at 10
equivalent residential units (ERU) or $30.00. Adjusting or removing the cap limits and/or
modifying the ERU impervious area from 4000 s.f. are alternate methods to bring the
commercial and residential rates to equity. Removing the cap would provide an estimated
additional 2600 ERUs or $90,000 in annual revenues at the current $3.00 ERU rate. Reducing
the ERU areas from 4,000 s.f. to 3,500 s.f. would not increase the residential revenues but would
N:\UAC\Final\stormwater rates 2006.doc
Stormwater Utility Rates
April 11, 2006
Page 3
raise the commercial revenues by $142,200 with cap or $390,000 without cap at the current
$3.00 ERU rate. These options are shown in the following table:
Alternates Residential Commercial Total
1. No change (Current) $232,500, 65% $124,500,35% $357,000, 100%
2. Remove ERU cap $232,500, 52% 214,500,48% 447,000, 100%
3. Reduce ERU to 3500 s.f. $232,500, 47% 266,700,53% 499,200, 100%
with ERU cap
4. Reduce ERU to 3500 s.f. $232,500, 36% 414,500,64% 647,000, 100%
without ERU cap
Impervious areas 48% 52% 100%
These proposals are for opening the discussion with the UAC on Stormwater Utility Rate
adjustments need to meet the CFP program as well as pending NPDES Phase II unfuIl,ded
requirements. At minimum, a stormwater engineer/manager position is desired to meet current
stormwater design, construction management, consultant management, pursuit of funding
opportunities, and monitoring of DOE and other agency pending programs and impacts.
N:\UAC\Final\stormwater rates 2006.doc
DATE:
To:
FROM:
SUBJECT:
~RTNGELES
WAS H I N G TON, U. S. A.
UTILITY ADVISORY COMMITTEE MEMO
April 25, 2006
UTILITY ADVISORY COMMITTEE
Scott McLain, Deputy Director for Po~er Systems
Washington Department ofFish and Wildlife use of City Facilities
Summary: The Washington Department ofFish and Wildlife (WDFW) would like to utilize
City property for fish pens during the demolition of the Elwha River dams.
Recommendation: Consider the concept proposed by the WDFW and whether staff should
work toward a formal agreement for allowing WDFW to utilize City property to raise
Elwha Chinook salmon durin~ demolition of the Elwha dams.
Background/Analysis: The Washington Department ofFish and Wildlife (WDFW),is
developing a strategy to preserve the Elwha River Chinook salmon during the demolition of the
Elwha River dams. This strategy includes rearing Elwha fall Chinook in Morse Creek until
about 2014, at which time the fish would be reintroduced in the Elwha River.
To accomplish the rearing and releasing of fish into Morse Creek, WDFW is proposing the
installation of several fish rearing pens and associated equipment on City property near the
Morse Creek Hydroelectric generation facility. This site would allow the WDFW to utilize
water from the Morse Creek diversion pipeline to feed water the pens. This water use would
preclude the use of that water for generating power, for which the City would need to be
compensated.
At this time, the WDFW is looking for general agreement on the concept, and that the City
would work toward a formal agreement at a later time.
The letter outlining the WDFW proposal is attached, and provides more detail of the concept
they would like the City to consider.
Attachment: WDFW proposal
PW 0101_06 [Revised 07/24/03]
I. _
.'
State of Washington
Department of Fish and Wildlife
Mailing Address: 600 Capitol Way N . Olympia WA 98501-1091 . (360) 902-2200; TDD (360) 902-2207
Main Office Location: Natural Resources Building. 1111 Washington Street SE . Olympia WA
March 23,2006
RECE\VEO
, Mr. Glenn A. Cutler, P.E.
Director of Public Works and Utilities
City of Port Angeles
321 E. Fifth Street
Post Office Box 1150
Port Angeles, WA 98362-0217
MAR 2 7 2006
Of POR1 f:\.NGELES
C\1'lPt!BUC WORKS
RE: Morse Creek Hydropower site
Dear Mr. Cutler:
In December 2005, Mr. Scott McLain, Deputy Director of Public Works for the city of Port
Angeles escorted Department ofFish and Wildlife (WDFW) employees to several locations
including city-owned sites such as the Morse Creek hydropower plant. We explored the concept
of building a temporary Elwha River Chinook fish rearing station near this plant as part of a
strategy to maintain survival ofthis stock when the Elwha River's dams are removed. Mr.
McLain was receptive to this concept and suggested I make a more formal proposal to you.
In order to continue planning for the implementation of this critical project, and prior to
expending any funds, the Department needs to meet with the city to discuss the feasibility of the
project. 1 am optimistic that the outcome ofthis meeting would give us both a clear agreement
on project design, intent, expectations, and any constraints for the WDFW. Prior to this meeting
I hope the city will be ableto provide a written response agreeing to the concepts provided
below, pending a formal agreement after negotiation of details, in the coming months.
The WDFW, the National Park Service, the city and others are partners in the restoration of the
Elwha River. One ofWDFW's goals is to maintain the existence of the Elwha River Fall
Chinook stock if the removal of the dams makes the environment unsuitable. for spawning and
rearing of this critical stock. Installation of a site to reat, acclimate, and release Elwha Chinook
yearlings is part of the strategy to preserve the genetic integrity of this stock. At the yearling
life-stage, the Chinook would be transported to proposed ponds at the city's hydropower site on
Morse Creek. There they would be reared for a few months and released in early May. Having
been reared in Morse Creek water, they will return as adults to Morse Creek rather than the
Elwha River. There, their eggs will be harvested and the cycle will begin again. Once the river
environment is conducive to spawning, these yearlings will be reared and released at the Elwha
River facility to re-establish the stock, and the rearing ponds at the hydropower site will no
longer be required. We expect the rearing ponds at the hydropower site to be usedthrough 2014.
I . :
Mr. Glenn A. Cutler
March 23, 2006
Page2
At this conceptual stage, we anticipate the proposed project would consist ofthe following
elements:
. Use of approximately 4.5 cubic feet per second (CFS) of Port Angeles' water in the
months of January through early May of each year. WDFW proposes to tap the waterline
using the existing 8" blind flange on the penstock supplying the hydropower station.
From there, an underground pipeline would lead to the rearing pond site immediately
downstream of the parking area, We understand that using of this water for rearing fish
rather than power generation, will be a cost to the city. WDFW is anxious to discuss this
Issue.
. Four or five above ground fiberglass or vinyl fishponds for rearing the Chinook. The
ponds will be 8 to 10 feet wide x 80 to 100 feet long x 4-1/2 feet tall, and brown in color.
These ponds will have water supplied by the pipeline and will drain by pipe to a ditch-
like channel draining to the creek. Obviously, the precise location of the ponds has not
yet been determined. They could be located very close to the existing road or a bit
further downstream at a flat area very near the creek.
The fish waste in the ponds would be removed while the ponds are in use in accordance
with a governing National Pollutant Discharge Elimination System permit. A small,
approximately 10' x 20' x 4' structure may be necessary for this.
The area in which the ponds are sited will receive compacted gravel surfacing.
. A pad for a travel trailer for a person to live in at the site while fish are present. In
addition, a trailer or storage container will be used for feed and tool storage. Drinking
water will be suppliedby bottled water, toilet facility will be a Sanican provided by a
local company.
. Six foot tall chain link fencing will surround the fish facility and the site will be well-lit
in order to provide safety.
. Metered electrical power and telephone services are needed, but availability has yet to be
determined.
. A gravel road from the existing road to the actual pond site. This may be as short as 50
feet or as long as necessary to reach the flatter area nearer the creek.
. This development will require earthwork to accommodate these features. The work will
require cutting and removal of trees and stumps and limbing of other trees. Exposed soils
will receive seeding to control erosion and during construction proper sediment and
erosion control measures will be taken to avoid impacts to the stream.
. .
.
Mr. Glenn A. Cutler
March 23, 2006
Page 3
This work will require environmental permits. WDFW will apply for all necessary County, State
and Federal permits that may be necessary. In addition, as the design progresses we will submit
our design, including the pipe tap, electrical and telephone connections to the appropriate party
in the city for review of those features that may pertain to the operation or reliability of your
facility.
After the Chinook are once again established in the Elwha (expected to be in the year 20.14), the
ponds, fencing and trailers will be removed and the site restored and vacated by WDFW.
This project does not involve any work on the city's intake upstream.
The operation will require permission from the city for access to the site through the locked gate
on the existing road.
Based on this general outline, I hope you will be able to write areturn letter agreeing to the
concept, pending a formal agreement at a later date. Such a letter will give us reasonable
confidence in the viability ofthe project and we can start expending the necessary time and
funds. We hope to be able to negotiate the details of the facility's impacts and operation in a
timely manner.
If you have questions about the project or would like to discuss it with me, please feel free to
contact me at wan-elTW@dfw.wa.gov via e-mail or by phone at 360-249-1204.
~
Ron Warren,
Region 6 Fish Program Manager
cc: Sue Patnude
John Kerwin
Jo Wadsworth
Terry Legg
. Brian D. Winter, Ph.D.
Denis Popochock
Raymond Berg
Bill Freymond
DATE:
To:
FROM:
SUBJECT:
FORTANGELES
WAS H I N G TON, U. S. A.
UTILITY ADVISORY COMMITTEE MEMO
April 25, 2006
UTILITY ADVISORY COMMITTEE
Tom McCabe, Solid Waste Superintendent
LANDFILL DISPOSAL OF DERELICT BUILDINGS AND STRUCTURES
Summary: Staff has reviewed calculations for the remaining capacity anticipated at the landfill
upon its closure date of December 31,2006. The landfill will have some extra space available
that could be used for the disposal of derelict buildings and structures. The recommendation is
to accept 20,000 cubic yards of construction debris at a reduced rate from the normal tipping
fees.
Recommendation: Forward a favorable recommendation to City Council to allow up to a
maximum of 20,000 cubic yards of construction debris from derelict buildings and
structures to be sold at a reduced rate as set by the Director of Public Works and Utilities.
Background/Analysis: Based on a March 22,2006 capacity assessment of the remaining
volume in the Port Angeles Landfill, there will be some unused capacity at the landfill upon its
closure on December 31, 2006. At this time, staff anticipates that 20,000 cubic yards could be
devoted to construction debris from the demolition of derelict buildings and structures.
The 20,000 cubic yards devoted to this purpose would be sold on a first-come-first-serve basis at
a reduced rate set by the Director of Public Works and Utilities. The recently adopted Solid
Waste Ordinances give the Director of Public Works and Utilities the latitude to reduce the rates
for projects that "further the public health, safety, or welfare, enhances the environment, or is
otherwise in the public interest for parties of the interlocal agreement." At this time, it is
expected that this rate will be set approximately at a 50% reduction from the normal tipping fee.
The City will review all applications. All projects that are accepted must have their construction
debris disposed of by August 31, 2006. This date may be extended and the volume increased
dependent upon available space as the closure date approaches. In addition, the Public Works
and Utilities Department will advertise and encourage cleaning up these structures in order to
enhance the beautification of the community.
N:\UAC\Final\Landfill Disposal of Derelict Bldgs & Structures. doc