HomeMy WebLinkAboutAgenda Packet 05/11/2004 UTILITY ADVISORY P-OHI~ITTEE
PUBLIC WORK5 ['~-ONFER£NCE ROOM
MAY 1 I, 2004
3:00 ~.M.
AGENDA
II, ~OLL CALL
III. APPROVAL O~ ~INUT~S ~OR APRIL ] 3~ ~004
IV. LAT~
V. DISCUSSION ITEM5
A, SOLID WAST~ TRANS~R STATION SIZING
B. SOUO WAST~ INT$~LOCAL AGR~MSNT
C. I-N~T S~RVIC~ AGReemeNT A~ND~NT
D. TRANSMISSION ABR$~M~NT R~VISlON
VI. ~X~OUTIV~
VII, SST SPECIAL ~TING OAT~
N~XT ~GULAR ~TING 0AT~ - ~UN~ B~ ~004
VIII. ADOOURNM~NT
UTILITY ADVISORY COMMITTEE
Port Angeles, Washington
April 13, 2004
I. Call to Order:
Chairman Rogers called the meeting to order at 3:00 p.m.
IL Roll Call:
Members Present: Chairman Rogers, Mayor Headrick, Councilmember Erickson, Dean Reed,
Allen Bentley
Members Absent: None
Staff Present: Glenn Cutler, Scott McLain, Gary Kenworthy, JeffYoung, Bill Beverford,
Annette Owens, Steve Sperr, Cate Rinehart
Others Present: Brian Gawley - Daily News
III. Approval of Minutes:
Chairman Rogers asked if there were any additions or corrections to the meeting minutes of
March 9, 2004. Allen Bentley moved to approve the minutes. Dean Reed seconded the motion,
which carried unanimously. Chairman Rogers abstained due to absence.
IV. Discussion Items
A. Water Leak Detection Results
Bill Bcverford, Watcr/Wastcwatcr Collection Division Superintendent, noted the City had utilized leak
detection companies for the past fourteen years to detect water leaks in the distribution system. The
th
survey this year occurred between March 15 and March 19th and surveyed approximately 25 miles of
lines. Three leaks were found within our distribution system and two leaks were found on the customer
side. All detected leaks have been repaired. There was a brief discussion.
No action taken. Information only.
B. ~Vater Quality Report
Bill Beverford, Water/Wastewater Collection Division Superintendent, reviewed the annual report
required by the Washington State Department of Health which contains information on the potential
contaminants present in the water supply that customers receive. The report will be delivered to water
customers with the May utility billing statement, a public announcement will be placed in the local
newspaper, and information posted on the City web site. It was noted that some verbage in the report
was required by the Environmental Protection Agency. There was a brief discussion.
No action taken. Information only.
C. Acquisition Of Rayonier Tank And Property
Steve Sperr, Engineering Manager, pointed out the possibility of purchasing the 5.3 million gallon tank
on Rayonier property and using it for combined sewer flow storage without having to move it. Staff
proposed directing Brown and Caldwell complete a physical inspection of the tank, discussing the
possible pumhase with the Real Estate Committee, and completing a "due diligence" investigation of the
site to confirm the ability to use it as intended. A discussion followed.
Dean Reed moved to recommend City staff investigate the viability of purchasing the 5.3 million
tank and land on which it sits from Rayonier. Mayor Headrick seconded the motion, which
carried unanimously.
D. Solid ff~aste Transfer Statiort/Interlocal Agreement Update
Glenn Cutler, Director of Public Works and Utilities, indicated a meeting with the County on the
interlocal agreement resulted in only minor item changes. Requests For Proposals is in the final
development stage and a special UAC meeting would probably be called for sometime in May. There
was a brief discussion.
No action taken. Information only.
E. Morse Creek Update
Scott McLain, Deputy Director for Power Systems, reported that minor problems to the plant had been
repaired and the plant will begin generating when minimum stream flows are available. The biological
assessment has been done and would be submitted to FERC in approximately one month. Mr. McLain
advised that a local logger had requested removing approximately twelve maple trees from the property.
Tree removal, if done, will be conducted through the Small Works Roster. There was a brief discussinn.
No action taken. Information only.
F. Electronic Packet Distribution
Glenn Cutler, Director of Public Works and Utilities, requested consideration of electronic distribution
rather than pony express to cut down on excessive employee time. Members expressed interest in this
technique and directed staff use this means for the next meeting.
2
UTILITY ADVISORY COMMITTEE
April 13, 2004
V. Late Items: None
VI. Next meeting: May 11, 2004
VII. Adjournment: The meeting was adjourned at 3:45p. m.
Chairman Rogers Cate Rinehart, Administrative
Assistant
4/14/04
N:~PWKS\LIGHTxCONS\CATEXapr 13meet.wpd
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: May 11, 2004
TO: UTILITY ADVISORY COMMITTEE
FROM: Tom McCabe, Solid Waste Superintendent
Larry Dunbar, Power Resources Manager
SUBJECT: Transfer Station Facility Minimum Size
~ummary: A request for proposal is being prepared that will solicit Contractors to design and
;onstruct a transfer station due to closure of the landfill. To ensure that comparable proposals arc
;eceived, the minimum size of the transfer station needs to be specified by the City.
Recommendation: Provide direction to Staff on the minimum size of the transfer station.
Background: A request for proposal (RFP) is being prepared for "Transfer Station Development
and Solid Waste Management Services". Development ora transfer station is a key component
of the RFP and the size o£the transfer station will significantly effect the City's cost.
Analysis: The "2001 Long-l~ange Plan for Solid Waste Management" identified the need for a
new transfer station. The transfer station concept plan was an approximate 10,000 square foot
facility including 2 stalls for commercial haulers and 6 stalls for self-haulers (residential and
commercial) with an estimated cost range of $3,000,000 to $3,400,000.
Based on industry-standard design methods, Parametrix confirmed the transfer station concept plan
would meet current needs. However, over the life of the new facility and anticipated growth rates
in solid waste, an 8-stall facility will not be adequate. Ifa facility was constructed to meet projected
growth for the next 20-years, it would need to be 3 times larger.
A recent Load Forecast prepared by Sta£festimated that annual tons and tickets will increase by 3.0%
and 2.5% per year respectively. Over the next 20-years tons and tickets would increase by 80% and
65% respectively. Modifications to the transfer station over time and changes to City policy could
expand the capacity o£the transfer station to delay City investments. An increase to the minimum
fee, an increase to waiting time at the scale shack, and increasing operating hours are examples of
changes to City policy that could help expand the capacity of the facility at a low cost.
Following a presentation by Parametrix and Staff, the Utility Advisory Committee will be requested
to provide guidance on thc minimum size of the transfer station to be included in the RFP.
N:\UAC~ORJGINAL\INETAGREEMENTAMENDMENT2 WPD
WASHINGTON, U.S.A.
UTILITY aDVISORY (;OMMITTfi:: Mi=MO
DATE: May 11, 2004
TO: UTILITY ADVISORY COMMITTEE
FROM: Lan'y Dunbar, Power Resources Manager
SUBJECT: Institutional Network Services Agreement Amendments
:ummary: In cooperation with Capacity Provisioning, Inc., staff negotiated an amendment to
he Institutional Network Services Agreement for marketing services to promote awareness and
:onnections to the institutional network in support of the City's economic development goals.
Recommendation: Forward a favorable recommendation to the City Council to approve the
~roposed amendments to the Institutional Network Services Agreement.
Background: On August 20, 2002, the City Council approved the Institutional Network (I-Net)
fast-track including the I-Net Services Agreement with Capacity Provisioning, Inc. (C.P.I.). On
December 31, 2002, the City and C.P.I. entered into amendment one to the I-Net Services
Agreement. On December 2, 2003, the City and C.P.I. entered into amendment two to the I-Net
Services Agreement.
Analysis: As part of the 2004 budget, the City Council approved a $10,000 expense for
promotion of the I-Net. The proposed amendment includes C.P.I. development of an annual
marketing strategy that will detail the marketing activities, and a implementation and cost
schedule. The goal of the marketing strategy will be to increase customer awareness of the I-Net,
advance the City's economic development strategies, and to annually increase connections to the
I-Net by 5%. The 2004 marketing strategy will provide an emphasis on recruitment activities.
Each annual marketing strategy must be approved by the City Manager prior to implementation.
All media advertisements will be approved by the City Manager prior to placement. The cost of
the marketing strategy will be equally shared between the City and C.P.I.
The Economic Development Director supports the recommendations included in this report. The
City Attorney has reviewed the amendment.
N \UA~O RIGIN AL\IN ETAG RE EMENTAMENDM ENT2 WPD
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: May 11, 2004
TO: UTILITY ADVISORY COMMITTEE
FaOM: Scott McLain, Deputy Director for Power Systems
SUBJECT: Revision to Bonneville Power Administration Transmission Contract
Summary: Some minor housekeeping changes need to be made to Exhibit C of the electric
transmission contract between the City and The Bonneville Power Administration. These
changes will bring the contract up to date on the current configuration of the system and power
supply contract status.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Director of Public Works and Utilities to sign Revision No. 2, Exhibit C of the Bonneville
Power Administration Transmission Contract.
Background/Analysis: Several changes need to be made in exhibit C to our BPA transmission
agreement. This exhibit specifies points of delivery and the various power supply projects or
contracts that are delivered to Port Angeles.
Specific changes to this exhibit include removal of the Pacific Rim Landfill Project, removal of
the market purchase from LG&E, and removes the mid-Columbia point of delivery for LG&E
and the Rayonier point of delivery (this point of delivery becomes another Port Angeles point of
delivery). This revision also renames the Daishowa point of delivery to Nippon.
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: May 11, 2004
TO: UTILITY ADVISORY COMMITTEE
FROM: Glenn A. Cutler, Director of Public Works and Utilities
SUBJECT: Combined Sewer Overflow Directed Actions by Department of Ecology
Summary: The Department of Ecology has directed the City to implement specific combined
sewer overflow (CSO) control measures. This action is due to the City not making satisfactory
progress in its efforts to control CSOs.
Recommendation: Discuss the issue and provide feedback to the staff on the proposed actions.
Background/Analysis: The U. S. Environmental Protection Agency (EPA) requested that the
Washington State Department of Ecology (DOE) nominate a City that was required to initiate
actions addressing combined sewer overflows for an oversight review. DOE nominated the City
of Port Angeles. The EPA conducted the review in October 2003. The EPA and DOE identified
deficiencies per RCW 90.48, Water Pollution Control of the City's sewage collection and
treatment system. The EPA inspection results were presented to the Utility Advisory Committee
(UAC) at its February 10, 2004 meeting, along with a discussion of pending CSO requirements
to meet National Pollutant Discharge Elimination System (NPDES) permit requirements.
Based upon the EPA review, DOE determined that the City was not making satisfactory progress
on its efforts to implement CSO controls. Therefore, the DOE has directed that the City
implement various actions. The attached table outlines the issues, actions and time frames for
implementing the actions.
Prior to receipt of the DOE directive, staff and Brown & Caldwell, our wastewater-engineering
consultant, met with DOE to discuss the inspection, corrective actions that had been
implemented, and planned corrective measures. This meeting, and the corrective actions taken by
staff, more than likely resulted in DOE not issuing a monetary fine.
A significant effort will be required to ensure all action items are completed on or before the
required dates.
The information is provided for information and discussion.
N:\UAC\DepDir~Administrative Order.wpd
Utility Advisory
Committee
Transfer Station Facility Minimum
Size?
May 11, 2004
Tom McCabe, Solid Waste
Superintendent
Larry Dunbar, Power Resources
Manager
Presentation Agenda
1. Background
A. RFP Project Status
B. Current Facility
2. Transfer Station Minimum Size?
A. Industry-Standard Sizing Method
B, Transfer Station Size - No Waiting
3. City Policy Considerations
A, Transfer Station Size - Peak Hour Waiting
B, Adjust Minimum Fee
C. Adjust Operating Hours
4. Staff Recommendations
RFP Project Status
- Final Draft Document
- Stakeholder Comments
- Special UAC Meeting
- City Council
Transfer Station Minimum Size?
- Specified In The RFP
- Easily Expandable Facility
- Ensure Adequate Size
- Comparable Proposals
Current 8 Self-Haul Stall Facility
Industry-Standard Sizing Method
Load Forecast
Peak Hour Design
Unloading Rates
Transfer Station Size - No Waiting
Load Forecast - Tickets
Peak Hour Design
~oI i.....-- L~. __ ~,-'
~/ '- --'~ ""' : ~.~- '"'t-.,
Transfer Station Size - No Waiting
.
Current Facility 8 Landfill N/A
Current Need 10 2 $ 535,000
(12,600 SF Facility) $ 0.88 Per Ton
2016 Forecast 12 2 $ 596,000
(14,000 SF Facility) $ 0.96 Per Ton
2026 Forecast 15 3 $ 749,000
(18,000 SF Facility) $1.23 Per Ton
~Estimated cost for transfer station construction only.
2Amortized over 20 years & 5% APR.
City Policy Considerations
Goal: Extend Capacity Of Transfer Station
At The Least Cost
A Transfer Station Size - Waiting Time
B. Adjust Minimum Tip Fee
C. Adjust Operating Hours & Conditions
Transfer Station Size - 20 Minute Wait
2016 Forecast 10 2 ($ 61,000)
(13,500 SF Facility)(12) (2) ($ 0.08) PerTon
2026 Forecast 10 2 ($ 214,000)
(15,000 SF Facility)(15) (3) ($ 0.35) Per Ton
~Estimated savings for transfer station construction only.
2Amortized over 20 years & 5% APR.
Prior Minimum Tip Fee Adjustment
· From $2 to $7 May 2002
· Previous Adjustment Effected 17% Tickets
· 1% Ticket Reduction Per $ Increase
Prior Adjustment To Minimum Tip Fee
Adjust Minimum Tip Fee
· Current Minimum Fee
Fee = Greater of $7 or Tonnage X $ Rate/Ton
· Future Adjustment Would Effect 49% Tickets
· $10 Minimum Fee May Reduce Tickets 10%
(53 X 59%/'~ 7% = 10% or 5,200 Tickets)
Future Adjustment To Minimum Tip Fee
Adjust Operating Hours & Conditions
Increased Operating Hours Monday-Saturday
Open Sunday
Time Of Day
Operating Cost Impacts
Recommendations
A. Specify a 10 self-haul and 2 commercial-haul
stall Transfer Station in the RFP, resulting in a
reasonably oversized facility through year 2016
and up to a 20-minute delay in year 2026 (peak
hour only).
B. Consider adjustments to the minimum tip fee
and operating hours prior to expansion of the
new Transfer Station.