HomeMy WebLinkAboutAgenda Packet 05/11/2010VI. Information Only Items:
VIII. Adjournment
N: \UAC \FINAL \051110
UTILITY ADVISORY COMMITTEE
Jack Pittis Conference Room
Port Angeles, WA 98362
May 11,2010
3:00 p.m.
I. Call To Order
II. Roll Call
III. Approval Of Minutes For April 13, 2010
IV. Late Items
V. Discussion Items:
A. Wireless Mobile Data System Grant Application
B. Solid Waste Management and Recycling Laws
C. Electric Utility Safety Equipment Purchase
D. Conservation Program Annual Report
E. Conservation Loan Guarantee Agreement
F. Advanced Metering Infrastructure System Project Update
G. Federal Communications Commission National Broadband Plan
H. Morse Creek License Amendment Update
I. Benefit Dump Day
VII. Next Meeting Date: June 8, 2010
I. Call To Order
Chairman Di Guilio called the meeting to order at 3:00 p.m.
II. Roll Call
Councilmembers Present:
Councilmembers Absent:
Utility Advisory
Committee Members
Present:
Utility Advisory
Committee Members
Absent:
Staff Present:
Others Present:
III. Approval Of Minutes
City Council Special Meeting/Utility Advisory Committee
Jack Pittis Conference Room
Port Angeles, WA 98362
April 13, 2010
3:00 p.m.
Mayor Di Guilio, Brooke Nelson, Cherie Kidd, Max Mania (Left at
4:07)
Brad Collins, Pat Downie, Don Perry
Paul Elliott
Dean Reed
Kent Myers (Arrived at 3:54), Bill Bloor, Glenn Cutler, Larry
Dunbar, Steve Sperr, Phil Lusk, Terry Dahlquist, Cate Rinehart
Harold Norlund Nippon Paper Industries USA Co., Ltd
Scott McCollough National Park Service
Chairman Di Guilio asked if there were any corrections to the minutes of March 9, 2010.
Councilmember Kidd moved to approve the minutes. Councilmember Nelson seconded the
motion, which carried unanimously.
IV. Late Items None
V. Discussion Items
A. Nippon Paper Industries USA Co., Ltd Cogeneration Memorandum Of Intent
Larry Dunbar, Deputy Director of Power Systems, observed that Nippon had offered the City a
non binding Memorandum of Intent to indicate its interest in purchasing a portion of the output
of a cogeneration project that is under consideration. Harold Norlund of Nippon explained in
detail the use of a wood -fired boiler to generate renewable energy. There was a brief discussion.
Councilmember Kidd moved to recommend City Council authorize the City Manager to
sign a non binding Memorandum of Intent with Nipon Paper Industries USA Co., Ltd.,
and to make minor modifications to the Memorandum of Intent, if necessary.
Councilmember Nelson seconded the motion, which carried unanimously. Paul Elliott
abstained.
B. College Substation Switch Replacement
Terry Dahlquist, Electrical Engineering Manager, advised that a 69 KV switch on the
transmission system that was not included in the capital projects for 2010 needed to be replaced
due to advanced deterioration of the switch and supporting structure. There was a brief
discussion.
Councilmember Nelson moved to recommend City Council add a capital project for
College Substation Switch Replacement, Project CL06 -2010, to the Capital Facilities Plan,
and approve advertisement of the work upon completion of the design. Paul Elliott
seconded the motion, which carried unanimously.
C. Lower Elwha Klallam Tribe (LEKT) /City Of Port Angeles (City) Wastewater
Agreement
Glenn Cutler, Director of Public Works and Utilities, gave a brief history noting that construction
of a storage facility for the LEKT sewer project was cost prohibitive and that the National Park
Service desires that the City construct a storm water system on First Street between Lincoln and
Valley Streets. A discussion followed.
Councilmember Nelson moved to forward the Cooperative Agreement Amendment #1,
Wastewater Agreement Amendment #1, and the draft Task Agreement 17 to the City
Council with a favorable recommendation. Councilmember Kidd seconded the motion,
which carried unanimously.
D. Retail Tiered Rate Methodology Study
Phil Lusk, Power Resources Manager, reported that the City had issued an invitation to qualified
consultants to submit a proposal to perform services necessary to complete a retail Tiered Rate
Methodology Study for the City's electric utility. There was a lengthy discussion.
Paul Elliott moved to recommend City Council authorize the Mayor to approve a
consulting services agreement with EES Consulting to complete a Retail Tiered Rate
Methodology Study in an amount not to exceed $24,500. Councilmember Nelson seconded
the motion, which carried unanimously.
E. Simple Steps, Smart Savings Promotion Services Agreement
Phil Lusk, Power Resources Manager, acknowledged that the City had been offered a new
Agreement to deliver energy efficient compact fluorescent lamps and showerheads to its electric
utility customers with reimbursement under the Bonneville Power Administration's energy
conservation program. A discussion followed.
Councilmember Nelson moved to recommend City Council authorize the City Manager to
make minor modifications to the Agreement if necessary, for the Mayor to sign the
Agreement and also to authorize the Director of Public Works and Utilities to sign any
amendments to the Simple Steps, Smart Savings Promotion Services Agreement.
Councilmember Kidd seconded the motion, which carried unanimously.
VI. Information Only Items
F. Low Snowpack/Wholesale Power Rates
Information only. No discussion or action taken.
G. Benefit Dump Day
Information only. No discussion or action taken.
H. Refrigerator Freezer Collection Event
Information only. No discussion or action taken.
I. Washington State Cash For Appliances Program
Information only. No discussion or action taken.
J. Conservation Loan Guaranty Agreement Termination
Information only. No discussion or action taken.
K. City Response To Google Fiber For Communities Request For Information
Information only. No discussion or action taken.
L. Western Public Agencies Group Direct Load Control Assessment
Information only. No discussion or action taken.
M. Advanced Metering Infrastructure Project Communications Plan
Information only. No discussion or action taken.
VII. Next Meeting Date: May 11, 2010
VIII. Adjournment: 4:40 p.m.
Dan Di Guilio, Mayor Janessa Hurd, City Clerk
Dan Di Guilio, Chair Cate Rinehart, Admin. Spec. II
Utility Advisory Committee
N. \UAC\Final \april 13meet wpd
Date:
From:
N \UAC\Final\BTOP Grant Application doc
PORTANGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
May 11, 2010
To: Utility Advisory Committee
Glenn A. Cutler, P.E., Director of Public Works and Utilities
Terry Gallagher, Police Chief
Dan McKeen, Fire Chief
Subject: Wireless Mobile Data System Grant Application
Summary: At the direction of City Council, our staff and our outside consultant, Columbia
Telecommunications Corporation, prepared a federal Broadband Technology Opportunities
Program grant application for a wireless mobile data system within the City of Port Angeles.
During grant application development, we discovered that the Northwest Open Access Network®
(NoaNet) was on a parallel path. The City was allowed to partner with them on their application.
If the grant application is successful, a due diligence process will be initiated in the next few
months. If the application passes due diligence, a grant would likely be offered this summer or fall.
Recommendation: For information only, no action requested.
Background /Analysis: On March 17, 2009, City Council approved an agreement with
Columbia Telecommunications Corporation (CTC) to assess the City's network, including the
Police and Fire Departments' wireless mobile data needs. On July 21, 2009, City Council
authorized CTC to prepare a design, cost estimate, business plan, and grant application for a
wireless mobile data system under the American Recovery and Reinvestment Act (ARRA). The
City's cost share under the grant was anticipated to be 20% at that time.
The U.S. Congress has appropriated $4.7 billion to establish a Broadband Technology
Opportunities Program (BTOP) under ARRA for awards to eligible entities to develop and expand
broadband services to rural and underserved areas and improve access to broadband by public
safety agencies. Based on CTC's advice to staff the City did not pursue a grant under the first of
the two rounds of BTOP funding. The rules governing the first round did not directly apply to the
City's needs and it was felt that it would be better to wait for another opportunity. On February 2,
2010, City Council confirmed that CTC should proceed with a grant application for a public safety
wireless mobile data system in the second round of BTOP funding. CTC and staff felt the second
round opportunity was a more effective opportunity to compete for a grant award. The grant
application was available on February 16, 2010, and included a March 26, 2010 grant submission
deadline. Under the rules for the second round of BTOP funding the City's cost share would be
30
Wireless Mobile Data System Grant Application
May 11, 2010
Page 2
During the week of February 15, 2010, CTC and staff exchanged information with prospective
stakeholders including: the City of Sequim, Clallam County, Wave Broadband, TefNet, Capacity
Provisioning, Inc., Fire Districts 2 -4, Clallam County Public Utility District, Housing Authority,
Lower Elwha Klallam Tribe, Peninsula College, Port Angeles School District, Olympic Medical
Center, Port Angeles Downtown Association, Port Angeles Regional Chamber of Commerce,
Sequim School District, and the Port of Port Angeles. The purpose of the exchange was to inform
and educate prospective stakeholders leading into a grant application strategy. During meetings
with the Clallam County Public Utility District and TefNet it became apparent that they, through
the Northwest Open Access Network® (NoaNet), were pursuing first and second round grants
under BTOP.
During the following week, further discussion of NoaNet's successful first round grant application
revealed that the City's opportunities under the second cycle would be limited. Prior to then the
City was pursuing collaboration with other public safety organizations that would benefit from a
wireless data network along the 101 corridor. At that time it also became apparent that the City's
odds of success under the second round would significantly improve if NoaNet would allow the
City to be a sub grantee. The Clallam County Public Utility District and NoaNet allowed the City
to be a sub grantee under their application in exchange for engagement in more discussion
intended to produce a mutually beneficial agreement to allow expanded Clallam County Public
Utility District fiber optics within the City.
CTC proceeded with their engineering evaluation and aggregate system -level design for a wireless
mobile data system within the City and the Lower Elwha Kallam Tribe. A total of 240 wireless
access points are anticipated, including 44 interconnections to the fiber optic network within the
City. Equipment necessary for vehicles was also included in the sub -grant for the City (Police,
Fire, And Public Works and Utilities Departments), Fire Districts 2 and 3, Clallam County Sheriff,
and the Lower Elwha Klallam Tribe. The total estimated capital cost of the proposed project is
$3.7 million with a 30% City match of $1.1 million (prior investments and in -kind contributions
allowed). CTC also prepared a business case evaluation which anticipated outsourcing services for
operation and maintenance of the wireless network. The business case also envisioned that excess
network capability could be used by a vendor to provide Internet access services to the public. It
was anticipated that outsourcing such services would lower the City's ongoing costs. The City's
sub -grant under NoaNet's grant application included letters of support from the City, Lower Elwha
Klallam Tribe, Fire District 3, and Capacity Provisioning, Inc. A letter to our legislators and
representatives was recently sent to inform them about this noteworthy and desperately needed
project.
A total of 355 applications requesting $8.4 billion in funding were received by the National
Telecommunications Infrastructure Administration (NTIA) under the second round of BTOP.
There is $2.35 billion in funding available in the second round. NoaNet's grant application was
the only "highly recommended" comprehensive community infrastructure project for the state of
Washington (see attachment). NoaNet's grant application (including the City's sub grant) is in the
due diligence process. If the application passes due diligence, a grant would likely be offered this
summer or fall.
Attachments: Port Angeles Citywide Broadband Wireless Project Overview
Letter from Governor Gregoire to NTIA dated May 3, 2010
Port Angeles Citywide Broadband Wireless Project Overview
The City of Port Angeles Broadband Wireless project will provide integrated
communications and interoperability among all local public safety entities. It will be
interconnected to an existing fiber optic backbone to City, county, and other public safety
entities, City utility facilities, City government departments, and commercial Wi -Fi
subscribers. This project will allow the City to leverage a range of in -place public and
private broadband assets and initiatives to deliver essential communications services to
first responders in the field and the public at large.
On the top of the City's list of priorities is the public safety community's need to
deliver interoperable high- bandwidth mobile data communications to first
responders in the field, allowing them to access critical and time sensitive
information on site. The proposed high capacity broadband wireless network will
provide public safety staff in the field with full and timely access to state, federal,
and GIS databases, and will allow EMS responders to access medical databases
and support on -site telemetry of patient status.
A citywide wireless broadband footprint will provide a timely and cost effective
mechanism to interconnect, monitor, and control all of the many distributed
elements of the City's complex electrical, water, storm water, and wastewater
facilities. In addition to providing backbone control, the density of coverage will
allow cost effective future deployment of Smart Grid technology throughout the
City. The addition of wireless PC devices to utility and other City vehicles
associated with permitting and building and electrical site inspections will
improve staff efficiency by allowing managers to send work orders directly to
staff in the field. Maintenance staff will also have full on -line access to design
documents and maps in the field, reducing the need for in- office support and trips
back to the shop.
A commercial "open access" multi provider wireless access system will be
deployed as a public private partnership with local ISPs. The project goal is to
provide a cost effective network open to all parties. The City and its local ISP
partner will put into place subscriber rates that will be attractive to a wide range
of commercial, residential, and public sector users. A subsidized service program
will be established to provide a "basic broadband lifeline" service to residents
who are unable to subscribe due to economic hardship.
City Profile
The City Port Angeles is the county seat of Clallam County, Washington. Port Angeles
has a population of 18,982 residents' occupying 8,053 housing units in a 10.7- square-
mile area. While the City is a major center of commerce in northwestern Washington and
has a substantial downtown retail district, for purposes of the BTOP grant definition, Port
Angeles falls within a rural classification.
1 U.S. Census, 2008 estimate
Port Angeles Project Overview
Page 2
Port Angeles plays host to an international port-of- entry, and the regular ferry service that
connects the region to Victoria and Vancouver, British Columbia is a primary gateway
for tourists entering Canada. The City also counts a community college and a regional
hospital among its anchor institutions.
In addition to its economic development needs, Port Angeles is statistically under
policed; the Washington State average is 2.07 officers per thousand residents, but Port
Angeles has only 1.74 officers per thousand residents. The police department has
established innovative programs to address this need by placing resource officers in
schools and the downtown district.
Network Architecture
The wireless network addition to the existing broadband infrastructure will leverage the
power grid /street light infrastructure owned and operated by the Public Works and
Utilities Department. Multi -band, broadband mesh wireless access points (WAP) will be
installed and powered on existing lighting standards. The WAPs are to be mounded on
the lighting standards at a height of 25 feet to provided high capacity coverage in both
consumer and public safety wireless bands.
The density of access devices is dependant on the desired coverage requirements and
subscriber demand requirements. High- capacity areas, such as Route 101 through the
City, will require an access unit density of 30 to 35 units per square mile, or in route
terms, five to seven units per linear mile. The design targets a maximum of two mesh
access points linked wirelessly to any fiber access point in the high- density and high
traffic areas of the City.
Figure I provides an overview of coverage and details of the locations of available
lighting standards for mounting the WAPs. The coverage target for the City, with the
exception of the area delineated in yellow, is 90 percent area coverage.
2 This map is maintained in a GIS database.
Port Angeles Project Overview
Page 3
Figure I Map of Potential Wireless Access Coverage and Exclusion Areas
City of Port Angeles Utility Poles Traffic Lights
*.1441,
I
Fen
Met w x irna
qT. aau.
The design focuses on providing mobile coverage to over 80 percent of the City's 10.7
square miles for a total service area of eight square miles. It will provide service along
most or all of the public roads. A secondary or reduced service should be available in the
unpopulated areas and on the airport land and runways.
The City currently has 32 high -speed broadband access points being served via fiber
optics (buildings, utility SCADA, cameras, and similar facilities) that are to be connected
to the wireless access devices for backhaul. These sites are listed in Appendix A. They
are distributed throughout the City and can be immediately pressed into service to
support the wireless network. To enhance the network and provide adequate capacity for
the additional broadband traffic, the City will be upgrading the network interface
equipment at City Hall and six other key sites. Figure II provides an overview of the
existing fiber access points that will be used for backhaul.
Port Angeles Project Overview
Page 4
Figure II Location of Existing Broadband Network Access Points
Legend
fa Existing Fiber Optic Sites
alID
POMO
In order to implement the wireless system, the City will add fiber optic network access
points at strategic locations which will allow for direct broadband access for the WAP
and also support other municipal applications such as enhanced utility management
functions, advanced metering infrastructure (AMI) /automatic meter reading (AMR) for
residential and commercial customers, street lights, traffic signals, and other facilities.
These sites are listed in Appendix A. Figure III is a map illustrating the locations of the
planned new fiber optic network access point sites (red) along with the existing access
sites (green). Figure IV illustrates three addition wireless access points that are to be
installed outside the city of Port Angeles for interagency coordination between the Lower
Elwha Police Department and the Port Angeles PD.
Port Angeles Project Overview
Page 5
Figure III Location of Citywide Broadband Network Access Points
Legend
Future Fiber Optic Sites to be Activated
Existing Fiber Optic Sites
wha Broadband Network Access Points
IV Location of Lower El
Figure I Locat>lo u :a,::�� ,3
Y.CtL Fits Zi
7.C.s N:MS Pfi'F Pd
Port A WA
Lew CIS PD
49:3 5 Cry CrcF' P
Pert Aeg4 Wn
7563
Existing Broadband Services
Telephone and cable broadband services are availa b e city i throu
ugh Qwest
t DSL
service and Wave Broadband cable modems. provides
Port Angeles Project Overview
Page 6
carriers provide nearly 100 percent coverage in the occupied land areas of the City, but
none of these service providers are able to provide the high -speed mobile data service
required by the public safety agencies.
Proposed Mobile Broadband Service
The system at time of activation will provide wireless service to public safety and other
government users at a minimum data rate of 10 Mbps. The initial implementation is
planned to support the following vehicle deployment:
Agency 1 Vehicles
Port Angeles Police 1 33
Port Angeles Fire 1 22
Fire District #2 1 7
Fire District #3 1 15
Clallam County Sheriff 7
Lower Elwha PD 5
Port Angeles Utility 30
Total: 119
Proposed Wi -Fi Broadband Service
The commercial Wi -Fi service is to be operated by a private operator. The business plan
calls for a penetration of 10 percent of the residences passed. The marketing plan focuses
on lower- income and mobile users. Capacity Provisioning Inc. (CPI) has submitted a
letter of interest. The estimated income per subscriber per month to the City from the
operator is estimated at $10.
Capital Budget
This project is to be substantially completed in a period of 24 months after the notice to
proceed. The total capital budget for the project is $3,655,765, with a total of $1,096,729
(30- percent of the total project budget) to be covered by local cash matching funds.
P.S. 6
Laurel St.
Port Angeles Project Overview
Page 7
Appendix A High -Speed Broadband
Name
City Hall
Fire Station
Ranney Well
Jones St.
Peabody Hts
P.S. 11
P.S. 7
P.S. 10
P.S. 3
P.S. 8
P.S. 4
P.S. 2
P.S. 5
P.S. 9
Fairmount PS
Washington St.
College
Valley St.
A St.
F St.
I St.
Transfer Station
Corp Yard
WWTP
E St.
Senior Center
William Shore Pool
Parks Mntc
Cemetery Chapel
1 Marine Terminal
Type
Bldg
Bldg
Well
Reservoir
Reservoir
Pump
station
Pump
station
Pump
station
Pump
station
Pump
station
Pump
station
Pump
station
Pump
station
Pump
station
Pump
station
1 Substation
Pump
station
Substation
Substation
Substation
Substation
Substation
Substation
Complex
Bldg
Complex
Reservoir
Bldg
Bldg
Bldg
Bldg
Pier
Access Points
Address
321 E 5th St.
102 E 5th St.
Elwha River
1200 E 9th St.
600 Viewcrest
10 Eclipse Industrial
Pkwy
W 19th St.
1829.5 W 12 St.
Marine Hill
H St. 14
313 Marine Dr.
1/2 Alley Cherry
219 E 2nd St.
Del Guzzi Dr.
933 Church St.
1 110E 14th St.
4400 S C St.
224 S Washington
1306 E Park St.
206 S Valley St.
1616 S A St.
1604 S F St.
1538 W 7th St.
3501 W 18
1703 S B St.
1509 Columbia
1022 S E St.
328 E 7th St.
1901 W 4th St.
3127 W 18th St.
2700 S Milwaukee Dr.
2007 S 0 St.
Broadband 1
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
1 Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Port Angeles Project Overview
Page 8
Name Type Address 1 Broadband
P.A.H.S.
Scrivner PS
CSO P.S. 1
Wolverton Park
Lower Elwha PD PD
Fire Station 22 Fire
Lower E1wha Tower tower
Bldg 304 E Park Ave. Future
Pump
station 300 E Scrivner Future
Utility 5th St. N St. Future
Park 825 W 11th St. Future
Signal Laurel St. and Front St. Future
Signal 8th and Race St Future
Signal 8th St. and Cherry St. Future
Signal Ennis St. and First St. Future
Golf Corse Rd. and
Signal SR101 Future
Bldg 201 W 1st St. Future
N Olympic Youth Center
Charles R. Wilson Park 1 Park Future
Marine Dr. E St. 1 St Light 1 Marine Dr. E St. Future
rGe`: 83'lt'
May 3, 2010
Dear Mr. Strickling:
Mr. Lawrence E. Strickling
Assistant Secretary for Communications and Information
National Telecommunications and Information Administration (NTIA)
U.S. Department of Commerce
Herbert C. Hoover Building (HCHB)
1401 Constitution Avenue N.W.
Washington, D.C. 20230
Thank you for inviting Washington State to comment on the broadband stimulus applications
submitted to NTIA for the second wave of broadband funding. I am pleased to submit to you my
recommendations for Washington.
In our review, we applied the objectives of the Broadband Technology Opportunities Program
(BTOP); the rules for the second wave of BTOP funding issued by the United States Department
of Commerce's National Telecommunications and Information Administration (NTIA); and the
recommendations described in the Governor's Broadband Advisory Council (GBAC) Report, as
guidelines.
Your state consultation letter requests that states differentiate their recommendations into two
categories: recommended and highly recommended. Your letter also suggested it would be
helpful to NTIA if comments were provided about why these particular applications serve our
state's best interests. We have done both, as I wish to make every effort to advocate on behalf of
these worthy applicants.
Mr. Lawrence E. Strickling
Page 2
May 3, 2010
Highly Recommended Proposals
The following proposals not only met the federal program objectives and Washington's
broadband priorities, but also stood out as being the most valuable to the state and the most likely
to be successfully executed:
Northwest Open Access Network, State of Washington Broadband Consortium,
Comprehensive Community Infrastructure proposal requesting a grant of
$55,280,797. (Easygrants ID: 5376)
This is the highest ranked proposal and meets all seven of the BTOP
Comprehensive Community Infrastructure criteria. The proposal would
complement the network newly funded by the first wave grant to NoaNet by
extending the ,NoaNet network to support additional middle mile and last mile
builds to unserved and underserved areas in the south central, southeast, and
northeast parts of the state. Many of these areas have challenging terrains where
broadband infrastructure would likely not otherwise be built. These are areas that
are economically depressed with income levels well below and unemployment
well above the state averages. When completed, the network will reach 283
anchor institutions and over 55 economically depressed communities. The project
will create a valuable platform for private investment in last mile infrastructure,
thereby helping create a level playing field between urban and rural areas of the
state. The project will enhance public safety and ensure high capacity access to
every community college in Washington. The application also receives my
strongest endorsement because it is proposed by an entity that has an existing
track record of successful deployment and expertise; involves a public- private
partnership; was developed in consultation with numerous public and private
stakeholders; and is coordinated with meritorious projects proposed by other
applicants.
Puget Sound Center Foundation for Teaching, Learning, and Technology,
Stimulating Broadband Enabled Economic Growth in Underserved Washington
Communities, Public Computer Center proposal requesting grant of S4,169,734.
(Easygrants ID: 5209)
This proposal will expand the capacity of 37 public computing centers and
establish five new public computing centers in areas of the state with limited
technology access, low adoption rates and low income and vulnerable
populations. The proposal employs a proven access, training, and content model.
Mr. Lawrence E. Stickling
Page 3
May 3,2010
Puget Sound Center Foundation for Teaching, Learning, and Technology,
Communities Connect Network, Sustainable Broadband Adoption proposal
requesting grant of $2,045,458. (Easygrants ID: 6321.)
Washington State Superintendent of Public Instruction, Regional Broadband
Education Project PCC, Public Computer Center proposal requesting grant of
$5,231,723. (Easygrants ID: 5158)
Washington State Superintendent of Public Instruction, Regional Broadband
Education Project SBA, Sustainable Broadband Adoption proposal requesting
grant of $3,524,059. (Easygrants ID: 5212)
Recommended Proposals
This project creates state and local partnerships for training and support services
that expand broadband adoption in more than 40 of Washington's most
impoverished communities. It is highly recommended because it is well thought
out and complements and enhances a respected, existing anti poverty program. It
also complements the applicant's PCC proposal (Easygrants ID: 5209) and will
result in a specialized open- content curriculum that can be made available to other
economically vulnerable communities in Washington. The project is specifically
designed to address all of the stated BTOP purposes.
This project dovetails with the CCI proposal submitted by NoaNet and will
provide a valuable public computing center in an area with high unemployment
and a lack of economic opportunity. The area is largely agricultural with a large
Hispanic population that displays a low adoption rate for broadband services. The
large disparity in incomes within this area masks severe poverty and a significant
need to improve the educational base. The proposal will provide the facilities for
broadband access for the general public and the vulnerable populations in this
challenged area.
This proposal is also coordinated with and integral to the success of the NoaNet
CC1 proposal and the applicant's PCC proposal (Easygrants ID: 5158). As with
the PCC proposal, this SBA proposal will provide broadband education and
awareness in an area that has large vulnerable populations and is severely
challenged economically.
The following proposals are recommended because they meet the federal program's objectives
and criteria and Washington's broadband priorities as described in my GBAC report:
Grays Harbor Public Development Authority "GHPDA" CCI Middle Mile
Project, Comprehensive Community Infrastructure proposal requesting grant of
$16,700,000. (Easygrants ID: 6156)
Mr. Lawrence E. Strickling
Page 4
May 3, 2010
Sincerely,
Christine O. Gregoire
Governor
This proposal was recommended in the first round of BTOP funding but was
eliminated because of a technical flaw in the application. It is recommended
again because it will bring valuable middle -mile infrastructure to an area that is
trying to make a difficult transition from a timber -based economy and is still
economically depressed. It is also a long distance from other economic centers.
The project proposed would meet federal objectives and criteria, enhance public
safety, and provide a valuable platform for private investment in last -mile
facilities. The infrastructure proposed will connect with the NoaNet network and
through it be able to reach the Internet and other areas of the state.
Port of Allyn, Computer Center North Mason, Public Computer Center proposal
requesting grant of $20,000. (Easygrants ID: 7070)
This is a modest request that would set up a computer center to provide broadband
access to support distance learning programs in an underserved rural part of the
Olympic Peninsula with high unemployment and low incomes. The primary
focus will be on non- English speaking, minority and low income populations.
I appreciate the opportunity to assist you in determining which of the proposals that best match
Washington State's interests are ones NTIA should give priority in selecting projects for funding.
If you have any questions, please contact my Broadband Policy and Program Manager, Angela
Wu at (360) 902 -2983 or an zela.wu(idis.wa.szov. Thank you again for taking into consideration
our state's best interests.
P 0RT A NGE LES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: May 11, 2009
To: Utility Advisory Committee
From: Tom McCabe, Solid Waste Superintendent
Subject: Solid Waste Management and Recycling Laws
Summary: The Washington State Department of Ecology has been holding workshops and is
accepting public comments until May 19, 2010 on the state's solid waste management and
recycling laws. The goal of this effort is to increase recycling and reduce the amount of waste
going to transfer stations and landfills.
Recommendation: For information only, no action requested.
Background /Analysis: The Washington state solid waste and hazardous waste management
plan, called "Beyond Waste" began in 2004 and set a goal to reduce most waste and toxic
substances in the next 30 years. The State legislature has established priorities for sold waste
management. They start with waste reduction, then recycling, and as a last resort waste disposal.
Today the current statewide recycling rate is 45 while the goal set in 1995 was 50 The
current recycling rate across the entire county is 22% and last year the Transfer Station Utility
received a total of 7,329 tons of recyclable materials.
The Washington State Department of Ecology (DOE) has been holding workshops on the State's
solid waste management and recycling laws. They are trying to identify what's problematic with
current solid waste laws and what should be improved. The goal of this effort is to increase
recycling and reduce the amount of waste going to transfer stations and landfills. The final
workshops will be held on May 12, 2010 in Seattle at the King Street Center from 1 -4 pm and 6-
9 pm. The Solid Waste Division will be sending a representative to attend this workshop.
Additional information about updating solid waste laws, background, and issues is available on
the Internet at httn /www.ecv.wa.aov /nroarams /swfa /7095/. The DOE is accepting public
comments until May 19, 2010. Staff does not plan to share any comments at this time.
N. \UAC\Final \Solid Waste Management and Recycling Laws.doc
J
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: May 11, 2010
To: Utility Advisory Committee
From: Terry Dahlquist, Electrical Engineering Manager
Subject: Electric Utility Safety Equipment Purchase
Summary: State and Federal work rules require the Electric Utility to provide equipment and
clothing necessary to protect personnel from arc flash incidents. Such failures can occur when
disconnecting breakers in electric substations.
Recommendation: Forward a favorable recommendation to City Council to purchase a
remotely operated breaker racking system to protect personnel during substation
maintenance.
Background /Analysis: When a fault occurs on an energized high voltage circuit, it can create
what is called an "arc flash." A high current at the fault location heats the metal and surrounding
air so much and so quickly that a pressure wave of heat and light radiates in all directions. An arc
flash is essentially an explosion. The severity of the explosion depends upon the amount of energy
available. The most hazardous locations on the electric utility system are at the electric substations
where the total energy available is very high.
Each substation has several high voltage breakers that occasionally need to be removed for
operation or maintenance. The act of physically removing the breaker is called "racking out" the
breaker, and it exposes personnel to a potential arc flash if some mechanical failure occurs during
the process. The amount of energy available at a substation would make an arc flash fatal to
anyone near the breaker. This safety deficiency was identified in both a job hazard analysis and
from employee inputs which indicated that should an arc flash occur during the racking procedure,
that the employee that tripped the breaker would almost certainly die or that if they survived, the
injuries would be so catastrophic that their lives would be irreparably changed.
Light Operations proposes to purchase a "Remote Racking System" manufactured by CBS ARC
Safe, at an estimated cost of $25,000. This device allows breaker racking to be performed
remotely. The operator stands safely outside of the hazard area during the actual
disconnecting/connecting process when a failure would be most likely. This purchase was not
included in the 2010 budget, but will be paid for by deferring other planned expenses so the total
budget does not increase.
It is requested that the UAC forward a favorable recommendation to City Council to purchase a
remotely operated breaker racking system to protect personnel during substation maintenance.
N: \UAC\Final \Electric Utility Safety Equipment Purchase doc
P ORT A N GELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: May 11, 2010
To: Utility Advisory Committee
From: Bob Kajfasz, Commercial Energy Analyst
Subject: Conservation Program Annual Report
Summary: During the last year, the City finalized its participation in the Bonneville Power
Administration's 2006 -2009 Conservation Rate Credit program and initiated the successor 2010-
2011 Conservation Rate Credit program. Staff will present last year's achievements, summarize
the currently available rebates, and share the progress made on the options to use available
program funding.
Recommendation: For information only, no action requested.
Background /Analysis: On April 17, 2001, City Council authorized the Public Works and
Utilities Director to implement a conservation program that qualifies for the Bonneville Power
Administration's (BPA) Conservation Rate Credit (CRC) program. The BPA provides a monthly
discount of $0.005 /kWh on wholesale power purchases that the City uses to provide rebates for
qualified conservation measures.
Any unspent credits must be returned to BPA at the end of the CRC program period. The City has
implemented a conservation program consistent with the requirements of the CRC and offers
rebates to each electric utility customer rate class. Participating in the CRC program lowers the
City's wholesale power costs, funds rebates to customers to invest in conservation improvements,
and benefits the local economy. The following table summarizes the CRC program achievements
from April 1, 2009 through March 31, 2010.
Rate Class kWh/Yr Total Cost Rebate
Industrial 87,920 $67,634 $50,044
Commercial 172,560 64,998 25,220
Residential Low Income 139,269 160,179 145,784
Residential 2,566,091 1,220,251 296,377
Northwest Energy Efficiency Alliance Contribution 2.815.852 121,000 121.000
Total 5,781,692 $1,634,062 $638,425
N \UAC\Final \Conservation Program Annual Report doc
Conservation Program Annual Report
May 11, 2010
Page 2
The following table summarizes the currently available rebates
Improvements
Wall insulation
Attic insulation
Floor insulation
Air sealing
Heat pump
Duct Sealing
Windows
Electric water heater
Dishwasher
Clothes washer
Refrigerator or Freezer
Refrigerator or Freezer
Recycling
Compact fluorescent lamps
Lighting fixture
New Construction
Lighting fixture
New Construction
Energy Smart Grocer
Process Improvements
Residential
Up to $0.60 /SF
Up to $0.80 /SF
Up to $0.75/SF
$0.08 /SF
$300 $2,000
$400 $500
$6.00 /SF
$25 or $50
$25
$50
$25
$100
$1.75 each
>5 watt)
$10 /fixture
$10 /fixture
$500 $1,000
NW ENERGY STAR
N/A
Commercial
Up to $0.25/SF
Up to $0.45/SF
Up to $0.45/SF
N/A
Custom Project
N/A
N/A
N/A
N/A
$75 -$180
$100 -$700
N/A
$3 each
>5 to 45 watt)
$12 each
>45 watt)
$20 $200 /fixture
$10 $50 /fixture
$0.50 /SF floor area
Energy Smart
Office Design
$10 $170
Custom Project
All improvements must meet City material installation specifications to qualify for a rebate.
Industrial
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$3 each
>5 to 45 watt)
$12 each
>45 watt)
$20 $200 /fixture
$10 $50 /fixture
Custom
Project
N/A
Custom Project
All improvements with the exception of residential appliances and residential lighting require advance written
approval from a City representative.
Residential appliances, residential lighting, and commercial clothes washers must be listed as qualified ENERGY
STAR models at time of purchase to qualify for a rebate.
Commercial refrigerators /freezers must be as listed on the Consortium for Energy Efficiency's Tier 1 and 2 Qualified
Refrigerators and Freezers list to qualify for a rebate.
Date:
To:
From:
Subject:
P
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
May 11, 2010
Utility Advisory Committee
Phil Lusk, Power Resources Manager
Conservation Loan Guarantee Agreement
Summary: On March 25, 2010 staff received a letter from First Federal Savings and Loan
providing a notice of termination of that agreement, effective May 24, 2010. A new agreement has
been offered for the City's consideration.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Mayor to sign the Conservation Loan Guarantee Agreement with First Federal Savings and
Loan.
Background /Analysis: The City and First Federal Savings and Loan Association of Port
Angeles (First Federal) entered into an agreement in 1998 to assist residential customers in the
financing of energy and water conservation improvements. In 2008, the agreement was expanded
to include the City's commercial customers. As part of the expanded agreement, the City provided
First Federal a guaranty to pay the principal balance of any loan defaults in exchange for a more
favorable interest rate. There have been no loan defaults requiring City payment.
On April 13, 2010, the Utility Advisory Committee was informed that First Federal provided a
notice of agreement termination, effective May 24, 2010. Since then First Federal has offered a
new agreement for the City's consideration. The primary differences between the current and
proposed agreements are summarized below.
Current Agreement
Fixed interest rate
10 -year repayment term
2.0% margin
Indexed on current federal discount rate
N \UAC \Final \Conservation Loan Guarantee Agreement doc
Proposed Agreement
Adjustable interest rate
20 -year repayment term
2.5% margin
Indexed on 1 -year London Interbank Offered
Rate (LIBOR)
Conservation Loan Guarantee Agreement
May 11, 2010
Page 2
An estimate of the monthly payment is summarized below which are based on the current and
proposed conservation loan guarantee agreements.
Principal borrowed
Interest rate
Margin
Monthly payment
Current Agreement
10 -Year Term
$5,000
0.750
2.000%
$47.71
'Federal Discount Rate as of April 26, 2010.
1 -year London Interbank Offered Rate as of April 26, 2010.
Attachment: Proposed Loan Guarantee Agreement with First Federal
Proposed Agreement
10 -Year Term 1 20 -Year Term
$5,000 $5,000
0.979 1 0.979
2.500% 1 2.500%
$49.56 1 $29.13
1 1. Aareement this contract
CONSERVATION LOAN GUARANTEE AGREEMENT
This Conservation Loan Guarantee Agreement is made this day of 2010, by
and between First Federal (hereinafter referred to as "Lender and the City of Port Angeles
(hereinafter referred to as "City
1. Definitions
1.2. City Customer an owner of an existing residential structure or owner and /or tenant of a
commercial structure who has an active account for utility services with the City
1 3 Citv Representative an officer, agent, or individual, of the City duly authorized to
execute or amend the terms of this Agreement
1 4 Eliaible Measures cost effective improvements which conserve energy or water utility
services, meet the City's specifications, and are available through the City's energy or
water conservation program
1 5 Loan Fees costs associated with preparing, underwriting, and closing a loan as
determined by the Lender
1 6 Loan Guarantee an agreement by the City to pay to Lender the remaining unpaid
balance on an existing loan upon default by the City Customer
1.7. Residential Structure one (1) to four (4) unit stick built single family dwellings, or
manufactured homes not older than fifteen (15) years at the time of application and that
are deeded to land
1.8. Unpaid Balance the remaining principal balance of the loan, accrued interest to date of
payment by the City, and late fees.
2. Scone of the Aareement
2 1 In consideration of the City's Loan Guarantee the Lender will extend financing, as
outlined in this Agreement, to credit worthy City Customers for Eligible Measures as
defined by the City's energy and water conversation program.
2 2. All Lender loan approvals shall be conditional to the receipt of the City's Loan
Guarantee
Page 1 of 7
Created on 04/18/2010 2 52 00 PM
3. General Procedures
3.1 Loan Application
i
3 1 1 The Lender shall supply to the City Customer, and provide assistance in
completing, the loan application
3.1.2.The Lender shall determine the credit worthiness of each City Customer in
accordance with Lender's generally accepted standards and current underwriting
guidelines
3 1.3.The Lender will disclose all loan fees and charges to each City Customer.
3.1 3 1. The City Customer shall pay all Loan Fees charged by the Lender for
processing the application.
3132 Loan Fees may be paid in cash or included in the loan amount
3.2. Loan Guarantee
3 2.1 Upon conditional loan approval the Lender shall make a written request to the City
for the Loan Guarantee
3.2.2.The City shall approve or deny the Lender's Loan Guarantee request in writing
323 The Loan Guarantee shall be approved in writing, in the form attached hereto as
Exhibit 1, by an authorized City Representative.
3.3 Loan Disbursement
3.3.1.The City shall be responsible for all inspections and certifying the project has been
completed in accordance with Eligible Measures
332 Upon written notice from the City that the project has passed the City inspection the
Lender shall disburse all funds as per the loan agreement with the City Customer.
34 Security
3 4 1.The Lender shall secure loans made to owners of Residential Structures in a
manner consistent with home improvement loans made outside of this Agreement.
3 4 2.The Lender shall secure loans made to business owners and /or tenants of
commercial structures in a manner consistent with Residential Commercial
Underwriting Guidelines as defined in this Agreement unless otherwise specifically
approved by a City Representative in writing
3.4.3.AlI loan documents will specifically provide that the secured interest may be
transferred and /or assigned to the City
Page 2 of 7
Created on 04/20/2010
3.5. Loan Default
3 5 1.The City Customer shall be considered in default if the customer has failed to make
payments to Lender on the loan for a period greater than ninety (90) days
3.5 2 The Lender shall make commercially reasonable efforts to collect.
3 5 3.Upon loan default the Lender shall make a written request to the City which shall
include evidence of the Lender's reasonable efforts to collect and the amount of the
remaining Unpaid Balance of the loan
3.5.4.The Lender shall supply proof that it has not allowed the security to be subordinated
unless otherwise specifically approved by an authorized City Representative in
writing.
3 5 5.The Lender will deliver, endorse, and negotiate without recourse, any and all notes
and documents to the City and transfer the security that it has associated with the
loan to the City within thirty (30) days of payment of the remaining Unpaid Balance
by the City to the Lender
3 6. Upon written request the Lender shall provide reports to the City specifying the
remaining principal balance of each loan on which a Loan Guarantee has been issued
under this Agreement
4. Loan Characteristics
4.1 Loan payments made to loans under this Agreement by the City Customer shall be
monthly principal and interest payments.
4 2 The loan term shall be no more than two hundred forty (240) months for owners of
residential structures and no more than sixty (60) months for owners or tenants of
commercial structures unless otherwise approved by a City Representative in writing.
4 3 The loans guaranteed under this agreement shall be a variable rate loan hereinafter
referred to as a 1/1 ARM.
4 3 1 The note rate shall be published weekly and made available in the Lender's
ratesheet
4 3 2 The Index shall be the twelve (12) month, or one (1) year LIBOR (London Interbank
Offered Rate) as published by the Wall Street Journal
4 3.3 The Margin shall be 2 500%
4.3.4.The Floor Rate shall be 2 500
4 3.5 The interest rate is subject to adjust annually
4.3.6.Interest rate adjustments shall be calculated by adding the current Index plus the
Margin and rounding up to the nearest 125
4.3.7.The first initial adjustment shall not result in an interest rate that is 2.000% higher or
lower than the note rate, nor be lower than the Floor Rate of 2 500%
Page 3 of 7
Created on 04/20/2010
4.3.8.AII subsequent periodic adjustments shall not exceed 2 000% higher or lower than
the interest rate from the previous period, nor result in a rate lower than the Floor
Rate of 2 500%
4 3 9 No interest rate adjustment shall result in a rate higher than 5 000% above the note
rate or fall below the Floor Rate of 2 500%
5. Residential Underwritina Guidelines
5.1. All loans made to residential City Customers shall be underwntten to the Lender's
standard Residential Underwriting Guidelines which shall include but not be limited to;
5.1.1.The Lender determining the credit worthiness of each City Customer in accordance
with Lender's standard Residential Underwriting Guidelines
5 1.2 The credit score, loan to value, debt to income, delinquency profile, and lien
position, must be in accordance with the Lender's home improvement loan
requirements.
5.1 3.No mortgage payments greater than thirty (30) days past due within the previous
twelve (12) months prior to application date.
5 1 4 No outstanding judgments.
5 1 5 Divorce proceedings must be final.
5 1 6 Title insurance (limited liability) will be required on loan amounts of $15,000 and
higher.
6. Commercial Underwritina Guidelines
6.1. All loans made to commercial City Customers shall be underwritten to the Lender's
standard Commercial Underwriting Guidelines which shall include but not be limited to,
6.1 1.Lender shall determine the credit worthiness of each City Customer in accordance
with Lender's standard Underwriting Guidelines.
6 1 2 No mortgage or lease payments greater than thirty (30) days past due within the
last year
6 1 3.Cash flow and /or debt coverage ratio in accordance with the Lender's commercial
loan requirements
6.1 4.No outstanding judgments
6.1.5 All legal owners shall be a party to the loan
6.1 6.Loan term shall not exceed the remaining lease term.
6.1 7.Title insurance (limited liability) will be required on loan amounts of $15,000 and
higher
Page 4of7
Created on 04/20/2010
7. Termination
7.1. Either party may terminate this agreement with a thirty (30) day written notice
7 2 The Lender and the City shall be obligated to perform under the terms of this agreement
on all loan applications and Loan Guarantees made on or before the date termination
becomes effective
8. Notices
8.1. Each Lender Loan Guarantee request and each City Loan Guarantee approval shall be
in writing and shall be considered received by either party when;
8 1.1. personally delivered
8.1 2 three (3) days following deposit in the United States mail when mailed postage
prepaid by certified or registered mail
8.1.3 received via facsimile
8 1 4 sent by courier service and providing evidence of delivery
8 2 All Lender Loan Guarantee requests and other notices to the City shall be directed to:
Director of Public Works and Utilities
City Hall
321 East Fifth Street
P O. Box 1150
Port Angeles, WA 98362
or to such officer as designated by the Director of Public Works and Utilities
8 3 All City Loan Guarantee approvals and other notices to the Lender shall be directed to
Director of Credit Administration
P.O. Box 351
Port Angeles, WA 98362
or to such officers designated by the Lender
Page 5 of 7
Created on 04/20/2010
AGREED TO BETWEEN THE PARTIES:
First Federal City of Port Angeles
Date Date
Page 6 of 7
Created on 04/20/2010
Exhibit 1
Conservation Loan Guarantee
The City of Port Angeles (hereinafter referred to as the "City acknowledges and agrees to
guarantee the loan referenced here per the terms of the Conservation Loan Guarantee
Agreement between First Federal (hereinafter referred to as "Lender and the City
City Customer Name
City Customer Address
Total Amount Financed:
Loan Application Number.
City Representative Name
City Representative Signature
Date
Page 7 of 7
Created on 04/20/2010
PORTANGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: May 11, 2010
To: Utility Advisory Committee
From: Larry Dunbar, Deputy Director of Power Systems
Subject: Advanced Metering Infrastructure System Project Update
Summary: Several activities are underway in support of the Advanced Metering Infrastructure
System project. Based on the interest of Utility Advisory Committee members a presentation will
be available at today's meeting that further describes the AMI System and how the various
activities are inter related.
Recommendation: For information only, no action requested.
Background /Analysis: As part of the 2010 City Budget an Advanced Metering
Infrastructure (AMI) System was approved for the electric, water and wastewater utilities. Several
activities are underway in support of the AMI System.
The AMI System Request for Proposals (RFP) was issued on May 10, 2010. The
Communications Plan RFP was also issued on May 10, 2010. A grant application was submitted
to the Bonneville Power Administration (BPA) on April 19, 2010 for a Demand Response (DR)
project that would be integrated into the AMI System. And a consulting agreement for the Retail
Tiered Rate Methodology (TRM) Study was approved by City Council on January 19, 2010. The
AMI System RFP, the DR grant application, and the Retail TRM Study were prepared by EES
Consulting.
Based on the interest of Utility Advisory Committee members a presentation will be available at
today's meeting that further describes the AMI System and how the various activities are inter-
related.
N. \UAC \Final \AMI System Project Update doc
Utility Advisory Committee
PORT k
Advanced Metering
Infrastructure System
May 11, 2010
Agenda
1 Acknowledgements
2 Brief Background
3 AMI System Description
4 Smart Grid and Demand Response
5 Retail Tiered Rate Methodology Study
6 Communications Plan
7 AMI System Project Schedule
Rick Hostetler
Jim Harper
Phil Lusk
Bob Williams
Lisa Hainstock
Ernie Klimek
Trent Peppard
Terry Dahlquist
Staff Team
Brooke Nelson
Glenn Cutler
Yvonne Ziomkoski
Dennis Dickson
Kathyellen Haney
Linda Kheriaty
Tracy Rooks
Teresa Pierce
Other Acknowledgements
Kevin Smit, EES Consulting
Kelly Tarp, EES Consulting
Laurel Black, Laurel Black Design
Dave D'Avanzo, Lane Electric Coop
We've used the acronym AMR and AMI
for years... but, what does it really
stand for?
It simply stands for...
Automated Advanced
Meter Metering
Reading Infrastructure
100%
90%--
80%.-
70%
60
50%
40%•-
30%
20%
10%-•
Current Metering Synopsis
10,500+ electric meters installed
8,300+ water meters installed
Additional backup meters in warehouse
95 electro- mechanical
Require manual reads using hand -held computer
High metering losses due to aged infrastructure
Contribute to water distribution system losses
Electric Water Meter Inventory
0%. iIliII11I;I;t
1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
Meter Installation Year
-0.35
0.60-
-0.85
-1.10
-1.35
Electric Meter Error
-1.60
48 54 58 62 66
Purchase Year
Water Meter Error
70 meters tested
38% are pre -1987
18.2% error
19% are post- 1987/pre -1992
3.7% error
43% are post -1992
0.6% error
17 %failed
40% tested non compliance
Weighted average —7.9% error
70 84 93
SOURCE Uttmetncs Autovation 2005 Conference, and based on testing conducted by Entergy Corporation, Little Rock, Arkansas
An AMI System Provides Benefits...
AMI Pilot Project
Initiated by Finance
Mesh radio in service since November 2006
Elster 900 MHz RF two -way network
60 Electric REX® meters ($100 each)
2 Water meters with EnergyAxis® water module ($190)
1 A3 ALPHA® meter collector ($800)
Business Case Evaluations
An AMI system can:
improve cash flow to the utilities by...
increasing accuracy of our meter readings, which can
enhance our revenues
reducing the number of estimates and misreads
providing accurate consumption and demand readings
reducing or eliminating potential theft of service, meter
tampering issues, and bad debt
reduce operating expenses associated with reading meters..
reducing or eliminating final and rereads by personnel
providing the ability for remote connects and disconnects
provide better service to our customers by...
eliminating long and short reading periods
being able to address billing and usage concerns more
accurately
fewer home and yard intrusions
An AMI System Provides
Benefits...
An AMI system can also
be used for technical purposes like
load balancing, line phasing, loss evaluations
designing or engineering new loads
cost of service studies
provide critical customer information such as.
outage or "loss of power" notification
Consumption and demand use for billing concerns
water service leak
allow the City to...
comply with federal and state mandates
enhance rate payer equity
more promptly respond to customer inquiries
An AMI System Provides
Benefits...
Can include...
Security alarm services
Distribution automation and peak load management
Demand response
Water heaters
Home area networks
Hybrid electric vehicles
AMI System Components
DIstnbubon
System S
Water Main
Substation Control Egwpment
AMI Meter
Electric Service
To Home
AMI System
v I une_1 r.1
.AMI Meter
Customer Information
System
SCADA Systems
Substations...
Along with our typical substation equipment (transformers, regulators,
breakers, switches, etc.) the following is needed for an AMI system:
Likely Interconnection point of AMI System
meter data collection points and the fiber
optic network.
Distribution systems...
In addition to our basic distribution equipment (poles, wires, transformers,
switches, water mains, etc.), the following is needed for an AMI system:
AMI Meters replaces the existing mechanical or
electronic meters so data can be collected and
transmitted for the water and electric utilities.
Distnbution
System
Water Main
The AMI System hardware and
software reside will be integrated
into our customer information
system and supervisory control
and data acquisition (SCADA)
systems.
Distribution automation devices voltage
optimization, distribution relay operation, metering
wholesale points of delivery
Communications from substations to AMI meters
Radio Frequency fixed base
Radio Frequency mesh
Powerline carrier
AMI Meter.
Electric Sern,ce 0 v I l Ina I all r "1
To Home
AMI System
AMI Meter
Internal System Components...
While we have some of the necessary hardware and software systems,
there are some additional requirements:
Customer Information
System
SCADA Systems
DistnbutI
System
When you add all the
components together...
AMI System
Water Main
AMI Meter
Electnc Service
To Home
L.
Ina 1
AMI Meter
Customer Information
System
SCADA Systems
...you have a fully operational AMI system!
What is Meant by "Smart Grid
Smart Grid is a system that uses various technologies to enhance power delivery and
use through intelligent two -way communication.
The Bonneville Power Administration generation and transmission services, the City's
electrical distribution utility, suppliers, and customers are all part of the future Smart
Grid.
With increased communication and information, the future Smart Grid can monitor
activities in real time, exchange data about supply and demand and adjust power use
to changing load requirements.
The future Smart Grid will empower customers to choose to control their energy
usage.
What is Meant by "Demand Response
Changes in electric usage by customers from their normal consumption patterns in
response to changes in the price of electricity over time, or to incentive payments
designed to induce lower electricity use at times of high wholesale power rates or
when the d{stnbut{on system reliability is jeopardized.
There are three basic demand response techniques.
Load shedding or load curtailment that simply shuts off a device during peak
events, typically fewer than 10 times per year
Load shifting, a more sophisticated technique that moves loads away from
heavy load hours and distribution system peaks, sometimes by preheating or
precooling, other times by delaying an activity (clothes dryers, dishwashers, etc
Load shaping, which constantly fine -tunes the distnbution system consumption
and demand in real time to resemble BPA's system load shape.
Demand Response Technologies
6 B °q
DIGITAL THERMOSTAT
THERMAL STORAGE
Residential
H2O HEATER
PLUG -IN HYBRID
SMART APPLIANCES
1
Retail Tiered Rate Methodology Study
Bonneville Power Administration Wholesale Tiered Rate
Methodology begins October 1, 2011
Develop alternatives to allocate power costs to customer rate
classes
Developing retail tiered rate methodology options:
Selected rate design needed for AMI System
Selected rate design will be included in 2011 rate study
-New retail rate design in effect January 2012
Communications Plan
Internal and external communications needs
AMI System, Retail Tiered Rate Methodology Study, BPA Demand
Response Project
Communications Plan includes:
-Survey of at least 3 other utilities
Minimum levels of public involvement and information
Vitally needed prior, during, and after AMI System installation
Summary of AMI System Project
Phase
RFP
Procurement
AMI Project
Implementation
Plan
AMI System
Deployment
Phase I
AMI System
Deployment
Phase II
Development of AMI System Request for Proposals
Management of the RFP process
Facilitate decision making process for final vendor
selection
Development of project implementation plan
Consult on AMI technical implementation issues
Provide periodic management progress reports
1,000 electric and water meters remote disconnects
Communications system
Demand response equipment
Information technology equipment and meter data
management system
System acceptance test
Remaining electric and water meters
Distribution automation
System acceptance test
Training
AMI System Schedule
Event Completion Date
RFP Issue Date May 10, 2010
Vendor Registration, Non Disclosure Agreement, and Pre- May 21, 2010
Proposal Conference
Deadline for Questions City Site Surveys July 2, 2010
Proposal Submission Deadline August 6, 2010
City Proposal Review August 20, 2010
Vendor Demonstrations, Interviews, Field Trips September 3, 2010
AMI System Agreement Negotiation September 10, 2010
Utility Advisory Committee Consideration September 14, 2010
City Council Contract Award September 21, 2010
AM1 System Schedule Continued
Event Completion Date
City Council Retail Rate Design Approval September 21, 2010
Successful Vendor Implementation Plan, Certificate Of October 15, 2010
Insurance, Performance Bond
City Council Commun;cations Plan Approval October 19, 2010
City Approval of Vendor Implementation Plan And Issues October 29, 2010
Phase I Notice To Proceed
Vendor Phase I Construction Complete December 31, 2010
Phase I System Acceptance Testing (SAT) January 28, 2011
City Issues Phase II Notice To Proceed Apnl 1, 2011
City Approval of Phase I SAT May 6, 2011
Vendor Phase II Construction Complete June 30, 2011
Phase II System Acceptance Testing (SAT) July 29, 2011
Vendor As -Builts August 12, 2011
City Approval of Phase II SAT and As -Builts August 26, 2011
AM1 System Fully Complete and Operational September 1, 2011
Utility Billing Successfully Completed (3 Consecutive Months) December 1, 2011
AMI System Agreement Term Concludes December 31, 2011
Questions?
17ORTANGELES
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: May 11, 2010
To: Utility Advisory Committee
From: Larry Dunbar, Deputy Director of Power Systems
Subject: Federal Communications Commission National Broadband Plan
Summary: The Federal Communications Commission recently released a National Broadband
Plan that is anticipated to be used as a guide to the nation in the years ahead. Based on the interest
of Utility Advisory Committee members a short video will be available at today's meeting that
summarizes the plan.
Recommendation: For information only, no action requested.
Background /Analysis: The Federal Communications Commission (FCC) started the process
of creating a National Broadband Plan in April 2009 and the final plan was recently released. It is
anticipated that the plan will be a guide to the nation in the years ahead. Based on the interest of
Utility Advisory Committee members a short video will be available at today's meeting that
summarizes the plan. The plan's goals are summarized below and a copy of the executive
summary is attached. Goals 4- 6 and are directly related to current and planned City activities.
1. At least 100 million U.S. homes should have affordable access to actual download
speeds of at least 100 megabits per second and actual upload speeds of at least 50
megabits per second.
2. The United States should lead the world in mobile innovation, with the fastest and
most extensive wireless networks of any nation.
3. Every American should have affordable access to robust broadband service, and the
means and skills to subscribe if they so choose.
4. Every community should have affordable access to at least 1 gigabit per second
broadband service to anchor institutions such as schools, hospitals and government
buildings.
5. To ensure the safety of Americans, every first responder should have access to a
nationwide public safety wireless network.
6. To ensure that America leads in the clean energy economy, every American should be
able to use broadband to track and manage their real -time energy consumption.
Attachment: Federal Communications Commission National Broadband Plan Executive Summary
N \UAC\Final\FCC National Broadband Plan doc
f
Broadband is the great infrastructure challenge of the early
21st century.
Like electricity a century ago, broadband is a foundation
for economic growth, job creation, global competitiveness and
a better way of life. It is enabling entire new industries and
unlocking vast new possibilities for existing ones. It is changing
how we educate children, deliver health care, manage energy,
ensure public safety, engage government, and access, organize
and disseminate knowledge.
Fueled primarily by private sector investment and innova-
tion, the American broadband ecosystem has evolved rapidly.
The number of Americans who have broadband at home has
grown from eight million in 2000 to nearly 200 million last
year. Increasingly capable fixed and mobile networks allow
Americans to access a growing number of valuable applications
through innovative devices.
But broadband in America is not all it needs to be.
Approximately 100 million Americans do not have broadband
at home. Broadband enabled health information technology
(IT) can improve care and lower costs by hundreds of billions
of dollars in the coming decades, yet the United States is behind
many advanced countries in the adoption of such technology.
Broadband can provide teachers with tools that allow students
to learn the same course material in half the time, but there is a
dearth of easily accessible digital educational content required
for such opportunities. A broadband enabled Smart Grid could
increase energy independence and efficiency, but much of the data
required to capture these benefits are inaccessible to consumers,
businesses and entrepreneurs. And nearly a decade after 9/11, our
first responders still lack a nationwide public safety mobile broad-
band communications network, even though such a network could
improve emergency response and homeland security
Fulfilling the Congressional Mandate
In early 2009, Congress directed the Federal Communications
Commission (FCC) to develop a National Broadband Plan to
ensure every American has "access to broadband capability."
Congress also required that this plan include a detailed strategy
for achieving affordability and maximizing use of broadband to
advance "consumer welfare, civic participation, public safety and
homeland security, community development, health care deliv-
ery, energy independence and efficiency, education, employee
training, private sector investment, entrepreneurial activity, job
creation and economic growth, and other national purposes."
EXECUTIVE SUMMARY
AMERICA'S PLAN EXECUTIVE SUMMARY
Broadband networks only create value to consumers and
businesses when they are used in conjunction with broadband
capable devices to deliver useful applications and content. To
fulfill Congress's mandate, the plan seeks to ensure that the entire
broadband ecosystem networks, devices, content and applica-
tions—is healthy. It makes recommendations to the FCC, the
Executive Branch, Congress and state and local governments.
The Plan
Government can influence the broadband ecosystem in four ways:
1. Design policies to ensure robust competition and, as a
result maximize consumer welfare, innovation and
investment.
2. Ensure efficient allocation and management of assets
government controls or influences, such as spectrum, poles,
and rights -of -way, to encourage network upgrades and com-
petitive entry
3. Reform current universal service mechanisms to support
deployment of broadband and voice in high -cost areas; and
ensure that low income Americans can afford broadband;
and in addition, support efforts to boost adoption and
utilization.
4. Reform laws, policies, standards and incentives to maxi-
mize the benefits of broadband in sectors government influ-
ences significantly, such as public education, health care
and government operations.
1. Establishing competition policies. Policymakers, including
the FCC, have a broad set of tools to protect and encour-
age competition in the markets that make up the broadband
ecosystem: network services, devices, applications and content.
The plan contains multiple recommendations that will foster
competition across the ecosystem. They include the following:
Collect, analyze, benchmark and publish detailed,
market -by- market information on broadband pric-
ing and competition, which will likely have direct impact
on competitive behavior (e.g., through benchmarking of
pricing across geographic markets). This will also enable
the FCC and other agencies to apply appropriate remedies
when competition is lacking in specific geographies or
market segments.
Develop disclosure requirements for broadband service
providers to ensure consumers have the pricing and perfor-
mance information they need to choose the best broadband
FEDERAL C()MAIUN1C.fIONS CO%1'Nltitil(IN 1 NATIONAL RROAUR 1NI) PLAN XI
AMERICA'S PLAN EXECUTIVE SUMMARY
offers in the market. Increased transparency will incent
service providers to compete for customers on the basis of
actual performance.
Undertake a comprehensive review of wholesale compe-
tition rules to help ensure competition in fixed and mobile
broadband services.
Free up and allocate additional spectrum for unlicensed
use, fostering ongoing innovation and competitive entry.
Update rules for wireless backhaul spectrum to increase
capacity in urban areas and range in rural areas.
Expedite action on data roaming to determine how best
to achieve wide, seamless and competitive coverage, en-
courage mobile broadband providers to construct and build
networks, and promote entry and competition.
Change rules to ensure a competitive and innovative
video set -top box market, to be consistent with Section
629 of the Telecommunications Act. The Act says that the
FCC should ensure that its rules achieve a competitive
market in video "navigation devices," or set -top boxes —the
devices consumers use to access much of the video they
watch today.
Clarify the Congressional mandate allowing state and
local entities to provide broadband in their commu-
nities and do so in ways that use public resources more
effectively.
Clarify the relationship between users and their online
profiles to enable continued innovation and competi-
tion in applications and ensure consumer privacy,
including the obligations of firms collecting personal
information to allow consumers to know what information
is being collected, consent to such collection, correct it if
necessary, and control disclosure of such personal informa-
tion to third parties.
2. Ensuring efficient allocation and use of government
owned and government- influenced assets. Government
establishes policies for the use of spectrum and oversees access
to poles, conduits, rooftops and rights -of -way, which are used
in the deployment of broadband networks. Government also
finances a large number of infrastructure projects. Ensuring
these assets and resources are allocated and managed effi-
ciently can encourage deployment of broadband infrastructure
and lower barriers to competitive entry. The plan contains a
number of recommendations to accomplish these goals. They
include the following:
Spectrum is a major input for providers of broadband
service. Currently, the FCC has only 50 megahertz in inven-
tory, just a fraction of the amount that will be necessary
to match growing demand. More efficient allocation and
assignment of spectrum will reduce deployment costs, drive
XII FFIDERAI. COMMUNICATIONS COMMISSION WIN 13R0ADRAND.UOV
investment and benefit consumers through better perfor-
mance and lower prices. The recommendations on spec-
trum policy include the following:
Make 500 megahertz of spectrum newly available
for broadband within 10 years, of which 300 megahertz
should be made available for mobile use within five
years.
Enable incentives and mechanisms to repurpose
spectrum to more flexible uses. Mechanisms include
incentive auctions, which allow auction proceeds to be
shared in an equitable manner with current licensees
as market demands change. These would benefit both
spectrum holders and the American public. The public
could benefit from additional spectrum for high -de-
mand uses and from new auction revenues. Incumbents,
meanwhile, could recognize a portion of the value of en-
abling new uses of spectrum. For examp] e, this would al-
low the FCC to share auction proceeds with broadcast-
ers who voluntarily agree to use technology to continue
traditional broadcast services with less spectrum.
Ensure greater transparency of spectrum allocation,
assignment and use through an FCC created spectrum
dashboard to foster an efficient secondary market.
Expand opportunities for innovative spectrum ac-
cess models by creating new avenues for opportunistic
and unlicensed use of spectrum and increasing research
into new spectrum technologies.
Infrastructure such as poles, conduits, rooftops and rights
of -way play an important role in the economics of broad-
band networks. Ensuring service providers can access these
resources efficiently and at fair prices can drive upgrades
and facilitate competitive entry. In addition, testbeds can
drive innovation of next- generation applications and, ulti-
mately, may promote infrastructure deployment. Recom-
mendations to optimize infrastructure use include:
Establish low and more uniform rental rates for ac-
cess to poles, and simplify and expedite the process for
service providers to attach facilities to poles.
Improve rights -of -way management for cost and
time savings, promote use of federal facilities for
broadband, expedite resolution of disputes and identify
and establish "best practices" guidelines for rights -of-
way policies and fee practices that are consistent with
broadband deployment.
Facilitate efficient new infrastructure construction,
including through "dig- once" policies that would make
federal financing of highway, road and bridge projects
contingent on states and localities allowing joint de-
ployment of broadband infrastructure.
+M Jr
Provide ultra- high -speed broadband connectivity to
select U.S. Department of Defense installations to
enable the development of next generation broadband
applications for military personnel and their families
living on base.
3. Creating incentives for universal availability and adop-
tion of broadband. Three elements must be in place to
ensure all Americans have the opportunity to reap the benefits
of broadband. All Americans should have access to broad-
band service with sufficient capabilities, all should be able
to afford broadband and all should have the opportunity to
develop digital literacy skills to take advantage of broadband.
Recommendations to promote universal broadband deploy-
ment and adoption include the following:
Ensure universal access to broadband network services.
Create the Connect America Fund (CAF) to support
the provision of affordable broadband and voice with
at least 4 Mbps actual download speeds and shift up to
$15.5 billion over the next decade from the existing Uni-
versal Service Fund (USF) program to support broad-
band. If Congress wishes to accelerate the deployment
of broadband to unserved areas and otherwise smooth
the transition of the Fund, it could make available
public funds of a few billion dollars per year over two to
three years.
Create a Mobility Fund to provide targeted fund-
ing to ensure no states are lagging significantly behind
the national average for 3G wireless coverage. Such 3G
coverage is widely expected to be the basis for the future
footprint of 4G mobile broadband networks.
Transition the "legacy" High -Cost component of the
USF over the next 10 years and shift all resources to the
new funds. The $4.6 billion per year High Cost compo-
nent of the USF was designed to support primarily voice
services. It will be replaced over time by the CAF.
Reform intercarrier compensation, which provides
implicit subsidies to telephone companies by elimi-
nating per- minute charges over the next 10 years and
enabling adequate cost recovery through the CAF.
Design the new Connect America Fund and Mobility
Fund in a tax efficient manner to minimize the size
of the broadband availability gap and thereby reduce
contributions borne by consumers.
Broaden the USF contribution base to ensure USF
remains sustainable over time.
Create mechanisms to ensure affordability to low -in-
come Americans,
AMERICA'S PLAN EXECI Ci1E SUMMARY
Expand the Lifeline and Link -Up programs by allowing
subsidies provided to low income Americans to be used
for broadband.
Consider licensing a block of spectrum with a condi-
tion to offer free or low -cost service that would create
affordable alternatives for consumers, reducing the
burden on USF.
Ensure every American has the opportunity to become
digitally literate.
Launch a National Digital Literacy Corps to organize
and train youth and adults to teach digital literacy skills
and enable private sector programs addressed at break-
ing adoption barriers.
4. Updating policies, setting standards and aligning in-
centives to maximize use for national priorities. Federal,
Tribal, state and local governments play an important role
in many sectors of our economy. Government is the largest
health care payor in the country, operates the public education
system, regulates many aspects of the energy industry, provides
multiple services to its citizens and has primary responsibility
for homeland security. The plan includes recommendations
designed to unleash increased use, private sector investment
and innovation in these areas. They include the following:
Health care. Broadband can help improve the quality and
lower the cost of health care through health IT and improved
data capture and use, which will enable clearer understand-
ing of the most effective treatments and processes. To
achieve these objectives, the plan has recommendations that
will:
Help ensure health care providers have access to afford-
able broadband by transforming the FCC's Rural Health
Care Program.
Create incentives for adoption by expanding reimburse-
ment for e -care.
Remove barriers to e-care by modernizing regulations
like device approval, credentialing, privileging and
licensing.
Drive innovative applications and advanced analytics
by ensuring patients have control over their health data
and ensuring interoperability of data.
Education. Broadband can enable improvements in public
education through e- learning and online content, which can
provide more personalized learning opportunities for stu-
dents. Broadband can also facilitate the flow of information,
helping teachers, parents, schools and other organizations to
make better decisions tied to each student's needs and abili-
ties. To those ends, the plan includes recommendations to:
FEDERAL CONIMtNJCATIONS COMMISS[ON NATION-\E. HROADBANI) PLAN XIII
AMERICA'S PLAN EXECUTIVE SUMMARY
Improve the connectivity to schools and libraries by up-
grading the FCC's E -Rate program to increase flexibility,
improve program efficiency and foster innovation by pro-
moting the most promising solutions and funding wireless
connectivity to learning devices that go home with students.
Accelerate online learning by enabling the creation of
digital content and learning systems, removing regula-
tory barriers and promoting digital literacy.
Personalize learning and improve decision- making by
fostering adoption of electronic educational records and
improving financial data transparency in education.
Energy and the environment. Broadband can play a major
role in the transition to a clean energy economy. Ameri-
ca can use these innovations to reduce carbon pollution,
improve our energy efficiency and lessen our dependence
on foreign oil. To achieve these objectives, the plan has
recommendations that will:
Modernize the electric grid with broadband, making it
more reliable and efficient.
Unleash energy innovation in homes and buildings by
making energy data readily accessible to consumers.
Improve the energy efficiency and environmental im-
pact of the ICT sector.
Economic opportunity. Broadband can expand access
to jobs and training, support entrepreneurship and small
business growth and strengthen community development
efforts. The plan includes recommendations to:
Support broadband choice and small businesses' use of
broadband services and applications to drive job cre-
ation, growth and productivity gains.
Expand opportunities for job training and placement
through an online platform.
Integrate broadband assessment and planning into eco-
nomic development efforts.
Government performance and civic engagement. Within
government, broadband can drive greater efficiency and
effectiveness in service delivery and internal operations. It
can also improve the quantity and quality of civic engage-
ment by providing a platform for meaningful engagement
with representatives and agencies. Through its own use of
broadband, government can support local efforts to deploy
broadband, particularly in unserved communities. To
achieve these goals, the plan includes recommendations to:
Allow state and local governments to purchase broad-
band from federal contracts such as Networx.
Improve government performance and operations
through cloud computing, cybersecurity, secure authen-
tication and online service delivery.
Increase civic engagement by making government more
open and transparent, creating a robust public media
XIV FEDE.rAI. COMMUNICATIONS COMMEISSL(N w'WW.HROADI \yn.cnv
ecosystem and modernizing the democratic process.
Public safety and homeland security. Broadband can bol-
ster efforts to improve public safety and homeland security
by allowing first responders to send and receive video and
data, by ensuring all Americans can access e mergency ser-
vices and improving the way Americans are notified about
emergencies. To achieve these objectives, the plan makes
recommendations to:
Support deployment of a nationwide, interoperable
public safety mobile broadband network, with fund-
ing of up to $6.5 billion in capital expenditures over 10
years, which could be reduced through cost efficiency
measures and other programs. Additional funding will
be required for operating expenses.
Promote innovation in the development and deploy-
ment of next- generation 911 and emergency alert
systems.
Promote cybersecurity and critical infrastructure sur-
vivability to increase user confidence, trust and adop-
tion of broadband communications.
Long -Term Goals
In addition to the recommendations above, the plan recom-
mends that the country adopt and track the following six goals
to serve as a compass over the next decade.
Goal No. 1: At least 100 million U.S. homes should have
affordable access to actual download speeds of at least 100
megabits per second and actual upload speeds of at least 50
megabits per second.
Goal No. 2: The United States should lead the world in
mobile innovation, with the fastest and most extensive
wireless networks of any nation.
Goal No. 3: Every American should have affordable ac-
cess to robust broadband service, and the means and skills
to subscribe if they so choose.
Goal No. 4: Every American community should have
affordable access to at least 1 gigabit per second broadband
service to anchor institutions such as schools, hospitals
and government buildings.
Goal No. 5: To ensure the safety of the American people,
every first responder should have access to a nationwide,
wireless, interoperable broadband public safety network.
Goal No. 6: To ensure that America leads in the clean
energy economy, every American should be able to use
broadband to track and manage their real -time energy
consumption.
Meeting these six goals will help achieve the Congressional
mandate of using broadband to achieve national purposes,
while improving the economics of deployment and adoption.
In particular, the first two goals will create the world's most
attractive market for broadband applications, devices and
infrastructure and ensure America has the infrastructure to at-
tract the leading communications and IT applications, devices
and technologies. The third goal, meanwhile, will ensure every
American has the opportunity to take advantage of the benefits
broadband offers, including improved health care, better edu-
cation, access to a greater number of economic opportunities
and greater civic participation.
Budget Impact of Plan
Given the plan's goal of freeing 500 megahertz of spectrum,
future wireless auctions mean the overall plan will be revenue
neutral, if not revenue positive. The vast majority of recom-
mendations do not require new government funding; rather,
they seek to drive improvements in government efficiency,
streamline processes and encourage private activity to promote
consumer welfare and national priorities. The funding requests
relate to public safety, deployment to unserved areas and
adoption efforts. If the spectrum auction recommendations are
implemented, the plan is likely to offset the potential costs.
AMERICA'S PLAN EXECUTIVE SUMMARY
Implementation
The plan is in beta, and always will be. Like the Internet itself, the
plan will always be changing— adjusting to new developments in
technologies and markets, reflecting new realities, and evolving to
realize the unforeseen opportunities of a particular time.
As such, implementation requires a long -term commitment
to measuring progress and adjusting programs and policies to
improve performance.
Half of the recommendations in this plan are offered to the
FCC. To begin implementation, the FCC will:
Quickly publish a timetable of proceedings to implement
plan recommendations within its authority.
Publish an evaluation of plan progress and effectiveness as
part of its annual 706 Advanced Services Inquiry.
Create a Broadband Data Depository as a public resource
for broadband information.
The remaining half of the recommendations are offered to
the Executive Branch, Congress and state and local govern-
ments. Policymakers alone, though, cannot ensure success.
Industry, non profits, and government together with the
American people, must now act and rise to our era's infrastruc-
ture challenge.
FEDERAL COMMUNICATIONS COMMISSION 1 NATIONAL, BROADBAND PLAN XV
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
Date: May 11, 2010
To: Utility Advisory Committee
From: Larry Dunbar, Deputy Director of Power Systems
Subject: Morse Creek License Amendment Update
Summary: The City's Morse Creek License will be amended this year to correct some
inconsistencies. As part of the process the Washington State Department of Ecology may allow
public comments. No other changes are anticipated.
Recommendation: For information only, no action requested.
Background /Analysis: On December 17, 2008, the City received a Clean Water Act 401
Certification issued by the Washington State Department of Ecology (DOE) as a component of its
Federal Energy Regulatory Commission (FERC) license amendment for its Morse Creek
Hydroelectric Project (Project). FERC approved the license shortly thereafter.
During the last year staff inquired to the DOE about some inconsistencies in the Clean Water Act
401 Certification, which are summarized below. No other changes are anticipated. The DOE is
planning to prepare and approve an amendment this year. As part of the process DOE may allow
public comments.
Summary of 401 Certification Inconsistencies
1. Under the month column in Table 1 under section 4 the "August 15 -31" should
be changed to "August 16 -31
2. The ramping rates table under section 4 under the season column has first
season of "February 16 to 15" which should be change to "February 16 to June
15
3. The annual water quality monitoring report as required in 3.0.17.e. will
removed.
N \UAC\Final\Morse Creek License Update doc
Date:
To:
From:
Subject:
ORT
W A S H I N G T O N U.S.A.
Utility Advisory Committee Memo
May 11, 2010
Utility Advisory Committee
Tom McCabe, Solid Waste Superintendent
Benefit Dump Day
Summary: Participants in the 2010 Benefit Dump Day donated $6,431 to the Port Angeles
Food Bank. The April 25th event had a total of 688 vehicles disposing of 229.39 tons. Of the total
tonnage, 33% was diverted to metal, tire, and yard waste recycling.
Recommendation: For information only, no action requested.
Background /Analysis: The Solid Waste Division sponsored Benefit Dump Day for all
Clallam County residents on April 25, 2010. The number of vehicles was up 25% from 2009. The
total tonnage was also up 18% from 2009. A waiting line developed at the gate before opening at
9:00 am, but was gone by 9:45 pm. Participation was steady all day.
A total of 43 staff and volunteers assisted with this 6 -hour event. City staff checked vehicle loads,
managed the metal pile, and weighed vehicles at the scales. A County staff person was stationed
at the used oil /antifreeze area. Police volunteers and a police officer helped with vehicle checking
and traffic control. The Food Bank staff collected donations. Waste Connection staff directed
traffic and helped unload vehicles at the Transfer Station.
The City of Sequim held a collection event on April 15 -17 at their Public Works Utility Yard.
Waste was accepted from City of Sequim residents only. The City of Sequim total brought to the
Transfer Station was 70.90 tons; 10.55 tons of metal was collected for recycling. Their event
raised $700 and approximately 1,000 pounds of canned food for the Sequim Food Bank.
Benefit Dump Day 2008 -2010
Year Vehicle Total Tons
Trips Received
2008 1 529
1 2009 1 550 1
2010 1 688
163.30
179.30
229.39
Transfer
Station Tons
93.78
129.36
152.85
Minimum donation increased from $5 to $10 in 2008
N \UAC\Final\Benefit Dump Day doc
Recycling Tons (metal, tires,
batteries yard waste)
69.22
49.95
76.54
Cash
Contribution
$5,619*
$5,480
$6,431
Benefit Dump Day
May 11, 2010
Page 2
Demographic of Users
Location
1 City of P.A.
Sequim
Forks
East County
West County
Totals
Waste Materials
2008
2009
2010
Event Costs 2010
Vehicles
2008 2009 2010
251 268 289
24 27 16
1
176 172 253
78 83 129
529 550 68 1
Average Load
Size
617 pounds
652 pounds 1
667 pounds 1
Refrigerators
(counted at scales)
186 units 1
95 units 1
79 units 1
Description
Employees (8 Public Works and Utilities staff)
Advertising Peninsula Daily News
Sani -Can Rental (2)
Freon Removal 79 units $20 /unit
Tire Recycling (367 tires) 8.55 tons $92.89/ton
Hauling and Disposal Fee 152.85 tons @$48.63/ton
Total
2008
78.47
6.70
56.85
21.28
163.30
Solid Waste Tons
2009 2010
89.22 92.18
10.16 4.87
0.08 1
52.10 89.40
27.82 42.86 1
179.30 229.39
Tires
(counted at scales) Batteries
7181 661
217 1 119 1
367 1 83 1
Cost 2010
$3,000
367
220
1,580
794
7,433
$13,394