HomeMy WebLinkAboutAgenda Packet 10/11/2005 UTILITY ADVISORY COI~IMITTEE
PUBLIC WORKS CONFERENCE ROOI'4
PORT ANGELES~ WA gB362
DmTOBER 1 1 ~ 2OD5
3-'nO
.AGENDA
I. CALL To ORDER
II. ROLL CALL
III. APPROVAL OF I~IINUTEB F'OR AUGUST C~
APPROVAL E-IF MINUTES F'OR SEPTEMBER ~ -~ 2FII"I5
IV. LATE I TEIVlS
V. DISCUSSION
A. DEPARTI',4ENT OF ECDLOBY FISCAL YEAR 2OI-t'7 FUNDING CYCLE
APPLICATION
a. c~TORMWATER PHASE '-~ RULES (VERBAL)
I~.. NORTHWEST COALITION F'OR AFFORDABLE POWER
VI. NEXT MEETING DATE - NOVEMBER B~ 2hr-ts
VII. AD~.IOURNMENT
UTILITY ADVISORY COMMITTEE
Port Angeles, Washington
August 9, 2005
I. Call to Order:
Chairman Rogers called the meeting to order at 3:00 p.m.
II. Roll Call:
Members Present: Chairman Rogers, Allen Bentley, Mayor Headrick, Dean Reed,
Councilmember Erickson (Out 3:40 - Back 4:04)
Members Absent: None
StaffPresent: Michael Quinn (4:40), William Bloor, Glenn Cutler, Scott McLain, Gary
Kenworthy, Larry Dunbar, Tom McCabe, Helen Freilich, Steve Sperr
(4:00), Cate Rinehart.
Others Present: Brian Gawley - Daily News
Paul Lamoureux - Citizen
Angle Sanchez - HDR Engineering Incorporated
Shawn Koom - HDR Engineering Incorporated
III. Approval of Minutes:
Chairman Rogers asked if there were any corrections to the meeting minutes of June 14, 2005. A
minor spelling error was noted. Dean Reed moved to approve the minutes. Couneflmember
Erickson seconded the motion, which carried unanimously.
IV. Discussion Items:
A. Household Hazardous Waste Collection Event
Helen Freilich, Waste Reduction Specialist, pointed out that the City was again being asked to participate
in the event sponsored by the Clallam County Environmental Health and the Depzahiient of Ecology.
Grant funding pays 75% of the total costs of the event which costs approximately $62,000. There was a
brief discussion.
Dean Reed moved to recommend City Council authorize the Mayor to sign the 2005 agreement
with Clallam County to provide a maximum of $6,000 toward the cost of the Household
Hazardous Waste Collection Event. Allen Bentley seconded the motion, which carried
unanimously.
UTILITY ADVISORY COMMITTEE
August 9, 2005
B. Electric Rate Adjustments
Lan'y Dunbar, Power Resources Manager, introduced Angie Sanchez and Shawn Koom of HDR
Engineering Incorporated. Ms. Sanchez distributed a handout and gave a presentation based on that
information. Retail rate adjustments are needed due to a draw down of reserves, increased labor
expenses, rebuilding operating, inflation of expenses and increased debt service. Based upon the 3.9%
BPA tentative increase notification as of August 1st the worst case scenario is a 9.5% adjustment. Final
figures should be announced the 1st of September. A discussion followed.
Mayor Headrick moved to recommend City Council proceed with a public hearing on the rate
study and proposed rate adjustments. Allen Bentley seconded the motion, which carried
unanimously.
C. Solid Waste Rate Adjustment - Pre Closure
Larry Dunbar, Power Resources Manager, indicated that staff had reviewed the need for a rate increase
for 2006 and proposed an adjustment of 5.0%. This increase will help cover the cost of capital projects
and rate mitigation. There was a brief discussion.
Councilmember Erickson moved to recommend a public hearing be set September 6th to discuss
solid waste increases. Allen Bentley seconded the motion, which carried unanimously.
D. Amendment No. 1 To The Consultant Agreement With Parametrix, Contract #05-06
Gary Kenworthy, City Engineer, reviewed the information contained in the packet, responded to
questions, and provided clarification. He noted it was necessary to amend the agreement for design
changes and added work. There was a brief discussion
Dean Reed moved to recommend City Council authorize the Mayor sign Amendment No. 1 to the
Consultant Agreement with Parametrix, in the amount not to exceed $130,000 for a revised total
contrct amount not to exceed $599,529. Mayor Headrick seconded the motion, which carried
unanimously.
E. Amendment No. 1 To The Consultant Agreement With Brown And Caldwell, Contract
#05.04
Steve Sperr, Engineering Manager, stated the amendment to the agreement was needed to fund the
development of the Combined Sewer Overflow Reduction Plan into a Sewer Facility Plant to make it
easier to apply for and receive loans and grants. There was a brief discussion.
2
UTILITY ADVISORY COMMITTEE
August 9, 2005
Allen Bentley moved to recommend City Council amend the Agreement for Professional Services
with Brown and Caldwell, Inc., and authorize the Mayor to sign Amendment No. 1 in the amount
of $54,700, for a total contract amount not to exceed $214,700. Councilmember Erickson
seconded the motion, which carried unanimously.
F. Amendment No. 3 To The Consultant Agreement With CH2M Hill, Contract #04-11
Steve Sperr, Engineering Manager, explained construction support services related to the construction of
utility extensions to the newly annexed area were needed as well as an adjustment cost for the facility
design. A discussion followed
Mayor Iteadrick moved to recommend City Council authorize the Mayor sign Amendment No. 3
to the Consultant Agreement with CIt2M Hill, in the amount of $92,588, for a total contract
amount not to exceed $997,091. Dean Reed seconded the motion, which carried unanimously.
G. Annexation Update
Glenn Cutler, Director of Public Works and Utilities, summarized the bid process and request for
proposals. A preconstmction meeting has been set for August 11th, completion of the electrical by the
end of October, and completion of water/sewer by mid November.
No action taken. Information only.
V. Adjourn To Executive Session - 4:42p. m.
Return to regular session - 5:25 p.m.
yrlI. Next meeting date: July 12, 2005
Fill. AdJournment: The meeting was adjourned at 5:25 p.m.
Chairman Rogers Cate Rinehart, Administrative Specialist
UTILITY ADVISORY COMMITTEE
Port Angeles, Washington
September 13, 2005
L Call to Order:
Cha'n-man Rogers called the meeting to order at 3:00 p.m.
II. Roll Call:
Members Present: Chairman Rogers, Allen Bentley, Mayor Hcadrick, Dean Reed,
Members Absent: Councilmember Erickson
StaffPresent: Michael Quinn (3:23), William Bloor, Gary Kenworthy, Steve Sperr, Larry
Dunbar, Tom McCabe, Cate Rinehart.
Others Present: Paul Lamoureux - Citizen
IIL Approval of Minutes:
No action was needed on the June 14, 2005 minutes that were accidently included in the packet,
which had been previously approved at the August 9, 2005 meeting. The August 9, 2005 and
September 13, 2005 minutes will be addressed at the October 11, 2005 meeting.
IV. Late Items: Stage 3 Water Shortage
Discussion Items:
.4. Agreed Order With The Department Of Health
Steve Sperr, Engineering Manager, noted that negotiations had been made to formally address the
installation of a surface water treatment plant for the City, aa well aa the need for corrosion control
treatment aa a result ofpaat exceedances of the copper action level. Changes have been made for the
delivery date of thc Water Treatment Plant conztr~ction documents from February 28, 2005 to November
30, 2005 and the cons~'uctiun completion date from December 31, 2007 to August 30, 2008. There was
a brief discussion.
Dean Reed moved to recommend City Council approve the terms of the Agreed order and
authorize the Public Works and Utilities Director to sign thc Agreed Order and negotiate minor
modifications to it. Allen Bentley seconded the motion, which carried unanimously.
UTILITY ADVISORY COMMITTEE
September 13, 2005
B. Electric Rate Adjustments
Larry Dunbar, Power Resources Manager, distributed a handout, reviewed the information contained in
the packet, responded to questions, and provided clarification. There was a brief discussion. Staffwas
directed to reword the memo to Council showing the original proposed increase was not going to be as
large.
Allen Bentley moved lo recommend City Couuell consider adoption of the proposed retail rates on
September :20, :2005 now that the Bonneville Power Adminlstrafiou had finalized their wholesale
power rate adjustment. Wording would include 6.5% increase in lieu of the original 9.5%
increase. Mayor Iteadrlek seconded the motion, which carried unanimously.
C. Electric And Solid Waste Rate Surveys
Larry Dunbar, Power Resources Manager, distributed a handout and reviewed the information. It was
noted that the proposed rates were well within the average rates of the region and the Puget Sound area.
A discussion followed.
No action taken; Information only.
VI. Late Item: Stage 3 Water Shortage
Gary Kenworthy, City Engineer, indicated that the Elwha flows were low and that staffwould most likely
recommend that Council proceed to the next level. It was explained that this stage is a voluntary
restriction requesting citizens water their lawns every other day.
No action taken. Information only.
VII. Next meeting date: October 11, 2005
VIII. Adjournment: The meeting was adjourned at 3:46 p.m.
Chairman Rogers Cate Rinehart, Administrative Specialist H
2
I RTANGELES
W A $ H ~ N G T O N, U. $, A,
UTILITY ADVISORY COMMITTEE MEMO
DATE: October 11, 2005
To: UTILITY ADVISORY COMMITTEE
FROM: Stephen Sperr, P.E.
SUBJECT: Department of Ecology Fiscal Year 2007 Funding Cycle Application
Summary: The City has committed to completing a number of Combined Sewer Overflow
(CSO) projects in the coming years. While the schedule to complete all these projects is still
being negotiated with the Department of Ecology (DOE), an application for grant and/or loan
funding through DOE is due October 31, 2005 for the Fiscal Year 2007 Funding Cycle.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Mayor to sign the Fiscal Year 2007 Funding Cycle Application certification, in an amount
not to exceed $600,000. In addition, ff a grant or loan is approved, authorize the Mayor to
execute the agreement.
Background/Analysis: The City is currently negotiating an updated CSO Plan for the
completion of a number of projects that will reduce CSO events in the future. The next
construction project to be completed under the CSO Plan, regardless of the required date of
completion, is the installation of a gravity sewer main from the north end of Francis Street to the
City's Wastewater Treatment Plant. This project is estimated to cost a total of approximately
$2,900,000 in 2005 dollars. The design portion of this project is currently being estimated at
$500,000, though this figure is being reviewed.
The DOE, under its Water Quality Program, administers the following three financial assistance
programs:
Centennial Fund (grants & loans)
The grants under this program go mainly to hardship communities. There was, in the FY2005
funding cycle, $2.6 million in so-called Legislative Provisos, where specific projects were
earmarked for grant funding by the State Legislature. There is no guarantee there will be any in
the FY2007 funding cycle.
PW 0101_06 [Revised 07/24/03]
Section 319 (grants)
This programs provides grants to non-point activities, not construction projects.
State Revolving Fund (loans)
This is the program that funds most of the construction projects that fall above the minimtun
scoring level for a funding cycle's ranking process.
The Fiscal Year 2007 Funding Cycle has a unified application form that is required to be filled
out by the applicant. The details of this application will be outlined by City staff at the UAC
meeting. The important thing to emphasize is that the DOE structures its grant and loan funding
programs such that construction dollars are not available until the design is complete. Because
of this, we are moving forward with requesting funding for the design portion of the Francis
Street Sewer Project.
In order to submit the application an authorized representative of the City must sign the
application. We are recommending to the UAC that they forward a favorable recommendation
to the City Council as stated in the recommendation above.
A separate funding program administered by the Washington State Public Works Board, called
the Public Works Trust Fund (PWTF), has a separate funding cycle and application process. The
City plans to submit an application for a PWTF loan in the spring of 2006 for construction
dollars to cover the rest of the Francis Street Sewer Project costs.
FY2007 Application
pOR?ANGELES
W A S H I N G T O N, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
DATE: October 11, 2005
TO: UTILITY ADVISORY COMMITTEE
FROM: Scott McLain, Deputy Director for Power Systems
SUBJECT: Northwest Coalition for Affordable Power
Summary: A broad based group of utilities, government agencies, industrial and commercial
customers, and other organizations have formed a coalition to put pressure on the Bonneville
Power Administrator to propose a wholesale power rate for the next rate period (October 2006 to
September 2009) that is more in line with rates in effect prior to the "energy crisis" of 2001.
Recommendation: Discuss the purpose and approach of the coalition. Consider
recommending a resolution in support of the coalition.
Background/Analysis: About two months ago, some of the larger utilities in the Western Public
Agencies Group (WPAG) began an effort to pressure BPA into setting the level of its wholesale
rates in the next rate case at a level that would help preserve the economy of the Northwest. The
rate levels that have been in effect since the "energy crisis" in 2001 have had a huge effect on the
economy of the Northwest. Now that the "crisis" is behind us, the Northwest needs to have
electric rates that will allow business and industry, along with residential customers, to recover
financially and form a stronger economy.
Wholesale power rates prior to 2001 were about $23 mWh. Rates during the "crisis" ranged up
to $35 per mWh, and current rates are about $30 per mWh. The coalition is proposing a rate of
$27 per mWh for the next rate case (Oct. 2006 to Sept. 2009). BPA's initial numbers are being
proposed at a rate of $34 to $39 per mWh with much of the increase relating to risk. Rates this
high will continue to depress the vitality of the Northwest economy.
The purpose of the coalition is to form an integrated grassroots advocacy and media relations in
support ora targeted federal lobbying effort. The organization is stressing that this will not be a
campaign to '~oash" BPA or the delegation. The focus will be on the utility customers in the
Northwest and consequences of the economy, jobs, and competitiveness if rates are not reduced
in the next rate case.
The campaign is being coordinated by McBee Strategic consulting, along with APCO
Worldwide and will be an effort throughout Washington, Oregon, Idaho, and Montana. They
will also manage the federal component out of Washington D.C.
N:\UAC~Original~NW coalition for Affordable Power.doc
UAC Memo- Northwest Coalition for Affordable Power
October 11, 2005
Page 2
The focus of the campaign will be to present the facts concerning the costs and risks for the
Bonneville Power Administration. Based on the data that has been made available by BPA, a
target rate of $27 per mWh is a realistic and achievable objective.
On the 27th of September, the City of Port Angeles electric utility became a member of the
coalition, prior to the letter that was sent to the delegation (attached). After discussion at UAC,
the City may consider joining the organization not only as the electric utility, but as the City of
Port Angeles municipality as well. Many of the organizations within the City may also be
contacted to join the organization.
Attachments: Delegation letter
Participating entities
N:\UACSOriginal\NW coalition for Affordable Power.doc
Dear Pacific Northwest Delegation member:
We, the'members of the Northwest Coalition for Affordable Power, would like to thank
you for your leadership on electricity issues and your commitment to low-cost electricity
in the Northwest. As we enter the Bonneville Power Administration's (BPA) FY2007-
2009 rate case, we believe that in order to ensure a rate reduction and a stable economy,
your continued oversight and leadership is critical to success.
The energy crisis in California and throughout the West had a negative and dramatic
effect on BPA's historic ability to offer low cost power. As a result, BPA raised its
wholesale rates by approximately 50% during the past five years. With the energy crisis
behind us, we believe lower rates now are possible and that it is well within BPA's ability
to present scenarios that detail a wholesale power rate of $27 per megawatt hour,
inclusive of risk, as part of the FY2007-2009 rate case.
In February, BPA embarked on a "Power Function Review" (PFR) process to determine
agency program costs for the FY2007-2009 rate case. Throughout the PFR, many BPA
customers have identified cost savings and creative new approaches to BPA's budget that
were not included by the agency. In fact, at the conclusion of the PFR process, BPA
recognized that many customers had commented that BPA's cost reductions were not
enough. They stated that, "BPA is also not satisfied that these costs are as low as they can
reasonably be while still meeting its mission requirements." BPA promised "to seek
further reductions before submitting its FY2007-2009 final power rate proposal." The
agency further pledged that it "will seek comment early next year on these further cost
changes, prior to incorporating them in the final power rate proposal." As a result,
uncertainly over program costs remain.
While the PFR process provided some visibility into the elements that make up BPA's
program costs, we believe the continued examination of costs and risks promised by BPA
would best be accomplished by having BPA present scenarios that details a $27 per
megawatt hour rate to the region that would provide for the necessary regional debate on
our collective priorities. Further, we believe the region would be best served by having
BPA's revenue requirement and line item costs, which are currently not included,
detailed as part of the rate case similar to other utilities in the region. We believe that all
program costs must continue to be examined throughout the rate case in order to
maximize cost savings for the next rate period. If program costs and risk are considered
together throughout the fall, a wholesale rate of $27 per megawatt hour is achievable. A
$27 per megawatt hour represents an approximate 10% reduction from the FY2006 rate
recently announced by BPA.
The Coalition believes that only BPA can effectively present these scenarios due to the
lack of visibility into line item budget numbers. However, we are committed to
continuing to work with BPA to identify potential savings as many have done throughout
the process thus far.
We are commilted to the continued success of BPA and believe that BPA is a unique and
powerful economic driver for the entire region. However, as detailed above, we believe
that BPA's rate process can be more transparent and credible, which ultimately will lead
to lower rates for the region. Therefore, we ask your support in requesting that BPA take
the following three actions:
1. Prepare scenarios that provide for a $27 per megawatt hour inclusive of risk in
the coming rate case for regional discussion.
2. Include the revenue requirement as part of the FY2007-2009 rate case, and
3. Provide the region line item budget information on program costs that allow
for transparency and review by BPA customers.
There are few factors that have a larger impact on our regional competitiveness than
power rates. Moving beyond the record prices of the energy crisis and ensuring that the
rate case is the most effective process possible will help ensure economic stability.
Thank you for your consideration of our request and we look forward to working with
you and BPA over the coming months.
Sincerely,
Northwest Coalition for Affordable Power
$27( 'o7
The right BPA rate for our economy
Northwest Coalition for Affordable Power
Coalition Members
The Northwest Coalition for Affordable Power is a broad-based alliance consisting of cities,
school districts, businesses, chambers, utility districts and a host of others. Our Coalition is
committed to securing fair power rates for Northwest electricity customers from the Bonneville
Power Administration, which provides nearly half the electricity used in the Northwest.
Our common goal is to urge BPA to set a $27 per megawatt hour rate target
- The right BPA rate for our economy
Utilities:
Benton REA Prosser, WA
Benton PUD Kennewick, WA
Canby Utility Canby, OR
City of Port Angeles Electric Utility Port Angeles, WA
Clallam County PUD No. 1 Port Angeles, WA
Ellensburg City Light Ellensburg, WA
Franklin County PUD Pasco, WA
Grays Harbor County PUD Aberdeen, WA
Lakeview Light & Power Lakewood, WA
Mason County PUD No. 1 Shelton, WA
Nespelem Valley Electric Cooperative Nespclem, WA
Pacific County PUD No. 2 Raymond, WA
Snohomish County PUD Everett, WA
Tanner Electric Cooperative North Bend, WA
Local Governments:
City of Ellensburg Ellensburg, WA
City of Forks Forks, WA
City of Sequim Sequim, WA
City of Westport Westport, WA
Franklin County Pasco, WA
Grays Harbor County Montesano, WA
Prosser Public Hospital District Prosser, WA
Organizations:
Association of Washington School Principals Olympia, WA
Columbia-Snake River Irrigators Association Kennewick, WA
Greater Pasco Chamber of Commerce Pasco, WA
Makah Museum Neah Bay, WA
Skagit Valley Hospital Mount Vernon, WA
Washington State Grange Olympia, WA
10-04-05
Washington State School Directors Association Olympia, WA
Publle Agencies:
Housing Authority of the City of Pasco and Franklin County Pasco, WA
Kennewick School District Kennewick, WA
Quillayute Valley School District Forks, WA
Sequim School District Sequim, WA
Companies:
AgriNorthwest Pasco, WA
Allen Logging Co Forks, WA
Archways, Inc. Seattle, WA
Aqua Quip Seattle, WA
Auto Machine & Supply Canby, OR
Balcom and Moe, Inc Pasco, WA
Bellevue Office Furniture Bellevue, WA
Canby Disposal Co Canby, OR
Centennial Home Inspections Woodinville, WA
CFO2GO Bothell, WA
Clallam Bay Grocery Clallam Bay, WA
DialPro Northwest Edmonds, WA
Emerald City Light, Inc. Renton, WA
Forest Hill Veterinary Hospital Auburn, WA
Forks Prairie Mart, Inc. Forks, WA
Forks Sand & Gravel Forks, WA
Forever Resorts Port Angeles, WA
Four Seasons Cleaners Seattle, WA
Freedoc LLC Snoqualmie, WA
GM Nameplate Seattle, WA
Green Creek Wood Products, LLC Port Angeles, WA
Hangfire Seattle, WA
Heartland Payment Systems Seattle, WA
Henry's Restaurant Richland, WA
High Tide Seafoods Port Angeles, WA
Hoquiam License & Transportation Agencies Aberdeen, WA
Interfor Pacific Port Angeles, WA
JV Northwest, Inc. Canby, OR
Kettel's 76 Sequ'ma, WA
Kimberly-Clark Worldwide, Inc. Everett, WA
Kvichak Marine Seattle, WA
Lakeside Industries Port Angeles, WA
Lampson Intemational Kennewick, WA
Laurier Enterprise/McDonalds Restaurant Kirkland, WA
Legacy Senior Living LLC Sequim, WA
Lierman Bus Service Comell, WA
McDonald Employment Services Seattle, WA
Northwest Reps Seattle, WA
PQ Corporation Canby, OR
Paratex Pest Control Seattle, WA
0-04-05
Personnel Management Services, Inc Kirkland, WA
The Plastiform Company Renton, WA
Portac Inc Beaver, WA
Reiban & Rosen Ine Seattle, WA
Rite-Aid Corporation Camp Hill, PA
Russ Dean Ford and Family RV Pasco, WA
S & S Hospitality, Inc. Kennewick, WA
Seattle Office Furniture Seattle, WA
Sherwood Assisted Living Sequim, WA
Time Equipment Company Bellevue, WA
Tri-Cities Motor Sales Pasco, WA
Veca Electric Seattle, WA
Washbums General Mdse Inc. Neah Bay, WA
Washington Alarm, Inc Seattle, WA
Washington Fruit & Produce yakima, WA
Wilder Auto Center Port Angeles, WA
10-04-05