HomeMy WebLinkAboutAgenda Packet 12/09/2008
Utility Advisory Committee
Public Works Conference Room
Port Angeles, W A 98362
December 9, 2008
3:00 P.M.
AGENDA
I. Call To Order
II. Roll Call
III. Approval Of Minutes For November 10, 2008
IV. Late Items
V. Discussion Items
A. Corrosion Control Report (Oral Report)
B. Ordinance Revisions Required For Stormwater NPDES Compliance
C. CFL Markdown Promotion Agreement Amendment
D. Electric Utility Cost Of Service Study Consultant Agreement
E. Green Motors Initiative Agreement
F. Morse Creek License Amendment Update
G. BPA Demand Response Pilot Program
VI.
Next Meeting Date:
January 13, 2009
VI. Adjournment
N:\UAC\FINAL\120908
Utility Advisory Committee
Special Meeting
Public Works Conference Room
Port Angeles, W A 98362
November 10, 2008
3:00 p.m.
D.94J:',.
I. Call To Order
Chairman Reed called the meeting to order at 3 :00 p.m.
II. Roll Call
Members Present:
Chairman Reed, Betsy Wharton, Orville Campbell (3:35), Don
Perry, Dan Di Guilio, Elizabeth Butler
Members Absent:
Karen Rogers
Staff Present:
Bill Bloor, Glenn Cutler, Ken Dubuc, Mike Puntenney, Larry
Dunbar, Steve Sperr, Kathryn Neal, Phil Lusk, Cate Rinehart
Others Present:
Terry Mundorf - Western Public Agencies Group
III. Approval of Minutes:
Chairman Reed asked if there were any corrections to the minutes of October 14, 2008.
Councilman Di Guilio moved to approve the minutes. Councilman Perry seconded the motion,
which carried unanimously.
IV.
Late Items
None
V. Discussion Items:
A. Proposed Medic 1 Utility Rate Adjustments
Ken Dubuc, Fire Marshal, explained that the Medic 1 program is supported through an enterprise
fund using transport charges, monthly utility charges, and a General Fund contribution. A rate
adjustment of 6% was proposed by staff. Elizabeth Butler, who serves on the committee for
Medic I utility issues, supported staffs recommendation. A discussion followed.
Councilman Perry moved to recommend City Council proceed with the proposed rate
adjustments for the Medic 1 Utility. Councilmember Wharton seconded the motion, which
carried unanimously.
B. Draft 2008 Comprehensive Water System Plan (WSP)
UTILITY ADVISORY COMMITTEE
November 10, 2008
Kathryn Neal, Engineering Manager, noted that the City was required to update the WSP every
six years and the most recent was approved in 2002. A summary ofthe issues since the 2002
WSP was reviewed. Staff advised that the draft WSP would be available on the Internet. There
was a brief discussion.
Information only. No action taken.
C. Port Angeles Water Treatment Plant Computerized Maintenance Management
System
Michael Puntenney, Deputy Director of Operations, advised that the City had signed a transfer
agreement with the National Park Service and a computerized system will be procured to manage
maintenance activities. A discussion followed
Information only. No action taken.
D. Bonneville Power Administration Power Sales Agreement
Larry Dunbar, Deputy Director of Power Systems, gave a presentation reviewing the power sales
contract and tiered rate methodology and explained the Tier 1 greenhouse gas emission averages.
Therewas a lengthy discussion.
Councilmember Wharton moved to recommend City Council 1) make a determination that
the power resources comply with the State greenhouse gas emissions standard, 2) authorize
the City Manager make minor modifications to the agreement, if necessary, and 3)
authorize the Mayor to accept the agreement. Orville Campbell seconded the motion,
which carried unanimously.
E. Energy Independence Security Act Of 2007 Consideration
Phil Lusk, Power Resources Manager, identified standards the City must consider which
included an investment in a qualified "Smart Grid" system, providing grid information to electric
customers, consider conducting integrated resource planning, and rate design modifications that
promote energy efficiency. A discussion followed.
Councilmember Wharton moved to recommend City Council 1) commence consideration of
the standards, 2) set public hearing dates of November 17, 2009 and December 15, 2009 to
consider the standards, and 3) make a determination on the standards no later than
December 19,2009. Councilman Perry seconded the motion, which carried unanimously.
F. Morse Creek License Amendment
Phil Lusk, Power Resources Manager, advised that the City was required to have a new Clean
Water Act 401 Certification issued by the Washington State Department of Ecology as a
UTILITY ADVISORY COMMITTEE
November 10, 2008
component of its Federal Energy Regulatory Commission license amendment to use new
minimum instream flows at the Morse Creek Hydroelectric Project. A draft order had been
provided on October 31, 2008 which must be acted on by the Department of Ecology no later
than December 23,2008. There was a brief discussion.
Information only. No action taken.
G. Capital Facilities Plan And Transportation Improvement Program Amendment
Larry Dunbar, Deputy Director of Power Systems, requested adding four additional projects to
the City's 2008-2014 Capital Facilities Plan which would include Conservation Voltage
Reduction and three West UGA basin sewer extensions. A discussion followed.
Councilman Di Guilio moved to recommend City Council 1) set a public hearing on
December 2, 2008, and 2) pass a resolution that amends the 2008-2014 Capital Facilities
Plan and Transportation Improvement Program to include four additional projects.
Councilmember Wharton seconded the motion, which carried unanimously.
H. Low4ncome Weatherization
Phil Lusk, Power Resources Manager, gave a brief report on the utility discount program noting
that some audits have been completed to determine if any energy conservation improvements are
needed. There wasm.brief discussion.
Information only. No action taken.
I. Energy Northwest Quarterly Report
Larry Dunbar, Deputy Director of Power Systems, shared that he attended a board meeting and
that the City had been added to the Energy Northwest membership list. Committee reports were
given, a role in energy conservation was considered, and it was noted that City participation in
two wind projects was solicited. There was a brief discussion.
Information only. No action taken.
VI. Next Meeting Date:
December 9,2008
VII. Adjournment:
The meeting was adjourned at 4:48 p.m.
Chairman Reed
Cate Rinehart, Admin Spec II
Date:
To:
From:
Subject:
~ORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
December 9, 2008
Utility Advisory Committee
Terri Partch, P.E., Stormwater Program Manager
Ordinance Revisions Required for Stormwater NPDES Compliance
Summary: Staff will provide a brief presentation summarizing the Stormwater National Pollutant
Discharge Elimination System Phase 2 Permit requirements for 2009, including the development
of three ordinances that must be approved and adopted by August 15,2009.
Recommendation: For information only, no action requested.
Background/Analysis: Staff will provide a brief presentation summarizing stormwater
National Pollutant Discharge Elimination System (NPDES) Phase 2 Permit requirements for 2009,
including the development of three programs that must be approved and adopted by ordinance no
later than August 15, 2009. The proposed programs address the following:
1. Pollutant discharge into the stormwater system
. Prohibit pollutants from being discharged into the City's stormwater system.
. Illicit discharge detection and elimination.
2. Construction site runoff
. Further control and regulate construction site stormwater planning, permitting, plan review,
inspection and enforcement.
3. Private stormwater facilities
. Permit and regulate maintenance and operation of private stormwater facilities, including
detention/retention ponds and filters.
In general, all of the programs will include formal adoption of technical manuals by ordinance,
updated procedures and policies, formal documentation of actions taken, and staff training. Staff
will return to the Utility Advisory Committee in the Spring of 2009 with the proposed ordinances
for further consideration.
N:\UAC\Final\Ordinance Revisions for Stormwater NPDES.doc
{>JcQ:f~ P\';'WJ:,~n~
CJ rcJlfjsJfj C;~ F~ e/l sl CJfJ S P ~Cj ulr~cJ '[CJr
StCJr[[j'HsJt8r j JP D ~ S PhsJS8 j j
GCJffJ fjJlsjfJ C;~
,,"/'
~ !F@mrll ~@mmo ~o~o
Outline
· NPDES Permit effective February 16, 2007
· Stormwater Management Program Overview
(SWMP)
· Three ordinances are required to be in place by
August 15, 2009
1
Stormwater Management Program
(SWMP)
1. Public Education & Outreach
2. Public Involvement and Participation
3. ~~~~_cnt[J)j~~~~lIrg)e lE~nmnll'Da1~n<o>1l'D ,:'
",tr< ' , ',.' " ,
~. [J)~v~~(Q)[p)m~ll'D~ ~(UJIl'D(Q)~ <C(Q)Il'D~lr(Q)~
5. (Q)[p)~rl'~~D(Q)Il'D$ ~ ~~nll'D~~Il'D~IJ'i}@~
Co" ~.,_
~ '" _ 'IJ
Illicit Discharge Detection and Elimination
(IDDE) Program
a. Mapping
lb. (Q)If'<dInll'D~ll'D@ce IPIf'~V~Il'D~DIl'D~ m~@~~/Dm@D~
<dID$lCihlallf'~~$ ~(Q) ~ihl~ ~~(Q)lf'mWal~~1f' $w~~~m
~. 1P1f'(Q)~If'~m 1R~<q!l!.nDIf'~m~Il'D~$ ~(Q) ~l!.nIPIP(Q)~ ~ihl~
(Q) rr-<dIDIl'D @l!l'D c,~.,
'cP' "'..,
d. Public Education "-
e. Program Evaluation and Assessment / Annual
Report
q. ~fr~W Ulr~DIJ'i)DITIl~ 1R@~MUlr@m@lTIlfr~
~ -.0 "'0
(~,
2
lODE Ordinance
The ordinance must prohibit the following
discharges unless certain conditions are met:
· Waterline and fire hydrant flushing
· Lawn vyatering .'~ '_'-'
//.'-~wi~~ing pool water discharges' ""~,
· Street and sidewalk wash water, water us~d to control -..
dust and external building wash down water
· Other non stormwater discharges
lODE Program Requirements to Support the
Ordinance
· Adopt "l/licit Discharge Detection and
Elimination: A Guidance Manual for Program
Development and Technical Assessments,
"Center for Watershed Protection, October
2004
· Develop procedures, handbooks and forms for
City field crews to help characterize, trace and
remove sources of illicit discharge
· Train City field crews to identify and remove
illicit discharges
3
Runoff Control
from
New Development, Redevelopment, and Public
and Private Construction Sites
aI. Oll"tdIull1alll1ce to reduce pollutants in runoff from any site
disturbance 1 acre or greater
b. New !P>ell"mD~~Dll1g, !P>~alll1lRsvDew, ~m~iPleC~Dcm alll1td1
IEll1ff<<?ll"~emell1~ !P>ll"ocess ~o SVJiPliPloo:t~lh~j()ll"tdIDll1alll1ce
/ c~'''/Keep Records 6f Inspections and Enforcement Actions
d. Make available DOE Permit forms, Le. NOI forms "
~. ~~~if(f 'f1f~ijlTilDlTil~ ~@~(!J]DIr@IM1@lTil~~ '" Implement a training
program for all staff responsible for permitting, plan
review, construstion site inspections and enforcement
Construction Site Runoff Ordinance
The ordinance must include:
II The minimum requirements, technical thresholds and
definitions in Appendix 1 of the Permit.
II A site planning process, BMP selection and design
criteria that will protect water quality to the Maximum
Extent Practicable (MEP) Option: AdQpt 2005 DOE
/ _ ~.-:;pStormwater manual or develop an equivalent manual
/.. II Give the City the legal authority to inspect private-
stormwater facilities
II Provisions which allow Low Impact Development (LID)
techniques- complete
· Evaluate and aClopt enforcement measures
( .,. z.,
4
New Permitting, Plan Review, Inspection and
Enforcement Process
Permitting must include the following elements:
· Require and review a stormwater pollution prevention
plan (SWPPP). Option: limited waiver option
· Inspect sites with a high potential for erosion before
clearing and grading
· Inspect sites during construction and upon completion
of construction to verify proper installation of BMPs
· Keep records of the inspection program. Achieve 95%
of all scheduled inspections.
· Develop an enforcement strategy.
Operation and Maintenance
Ordinance
for Private Stormwater Facilities
The ordinance must:
· Clearly identify the party responsible for maintenance
· Property owner
" ,. Gity maintenance crew
· Developer impact fee (maintenance contracted by City)
, ""
1/'-"
· Require regular inspection to DOE standards
· Establish enforcement procedures
5
Operation and Maintenance
Program Requirements
for Public Stormwater Facilities
· Establish maintenance standards by adopting
Chapter 4, Volume 5 of the DOE Manual
· Develop a program to annually inspect all
stormwater treatment and flow control facilities
· Develop a program to spot check all flow control
facilities after major ( 3.3 inches of rainfall in 24
hours) storms
· Document the City's inspection and maintenance
program
Operation and Maintenance
Program Requirements
for Public Stormwater Facilities
· Establish and implement practices to reduce
stormwater impacts from all City maintenance
operations
· Establish and implement practices to reduce
pollutants from all City owned or maintained lands
· Train City employees on how their job impacts
stormwater quality and how to select BMPs to
reduce or eliminate impacts
· Develop SWPPPs for all City owned maintenance
or industrial yards-complete
6
Coordination
between
Engineering and DeED
DEVELOPMENT OF STANDARDS AND
ORDINANCES
- ~-
,;,f'P , "'~"
/'
2008 ClEO Grant
· Site coverage/stormwater Comp Plan
changes -- done
Incentives for density, affordable housing
and less stormwater runoff
· Amend Urban Services Standards and
Guidelines - in progress
For improved streetscapes, Low Impact
Development, and multi. modal transportation
connectivity
7
Changes to
Urban Services Standards
· Chapter 3, Transportation
· Chapter 5, Stormwater
· Chapter 6, Clearing, Grading, Filling and
Drainage
· New chapter on Urban Forestry
Timeline
· Update Standards, February 28
· Consult with Clallam County, March 15
· Planning Commission review, March 25
· Draft PAMC Title 11, 13, 15 amendments
· Planning Commission and City Council
Public Hearings, June 3
· PAMC Amended, June 15
8
Date:
To:
From:
Subject:
FORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
December 9, 2008
Utility Advisory Committee
Philip Lusk, Power Resources Manager
CFL Markdown Promotion Agreement Amendment
Summary: The City was offered an amendment to extend the term of the "Change a Light,
Change the World" compact fluorescent lamp Markdown Promotion Agreement with Portland
Energy Conservation, Inc. All City expenses under the Agreement are eligible for reimbursement
under the Bonneville Power Administration's Conservation Rate Credit program.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Public Works and Utilities Director to sign the amendment and any subsequent amendments
to the CFL Markdown Promotion Agreement.
Background/Analysis: Since 2007, the City has participated in the "Change a Light, Change
the World" Compact Fluorescent Lamp (CFL) Markdown Promotion operated by Portland Energy
Conservation, Inc. (PECI).
City payments to PECI are used to markdown CFL prices at local retailers, which will ultimately
reduce the cost of CFLs purchased by Port Angeles electric utility customers. City utility
customers purchased an estimated 20,000 CFLs through the period ending September 30, 2008.
PECI recently offered the City an amendment to the existing agreement to extend its term through
September 30,2009.
The extended term is anticipated to result in additional City payment of up to $30,000 to PECL
All City expenses under the proposed amendment are eligible for reimbursement under the
Bonneville Power Administration's Conservation Rate Credit program.
Staff requests that the Utility Advisory Committee forward a favorable recommendation to City
Council to authorize the Public Works and Utilities Director to sign the amendment and any
subsequent amendments to the CFL Markdown Promotion Agreement.
The City Attorney reviewed the proposed amendment.
N:\UAC\final\CFL Markdown Promotion Agreement Amendment
nO"' R"T': A IN'G' "E' 'L" E" 'S"
.i=::: ():;'J..i:t I r; I'; i ! I', )
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
Date:
December 9,2008
To:
Utility Advisory Committee
From:
Phil Lusk, Power Resources Manager
Subject:
Electric Utility Cost of Service Study Consultant Agreement
Summary: Every three years a consultant is retained to assess and evaluate the cost of services
and rates for each City utility. The study for the electric utility study is scheduled for completion
in 2009, and staff recommends that FCS Group be used to perform the proposed scope of work.
Recommendation: Forward a favorable recommendation to City Council to 1) authorize the
City Manager to make minor modifications to the agreement, and 2) authorize the Mayor to
sign an amendment to the agreement with FCS Group for financial services in an additional
amount not to exceed $40,000 for the electric utility cost of service study.
Background/Analysis: Every three years, a consultant has traditionally been retained to
independently assess and evaluate the City utility services, including such topics as cash reserve
requirements, cost-of-service, and rate structures. The City's electric utility is due to be evaluated,
with the result of that study anticipated to be available in June 2009.
In 2007, as part of the consultant, selection process for the recently completed utility rate studies,
staff conducted a formal request for proposal process. A total of fourteen consultant inquiries were
received and three consultants submitted proposals including EES Consulting, FCS Group, and
MuniFinancial. The City's prior utility financial consultant, HDR/EES chose not to submit a
proposal because of an anticipated conflict of interest. Staff determined that FCS Group submitted
the most responsive proposal and negotiated a scope of work and budget for the project. The
duration of the executed FCS agreement is through the period ending January 31,2010, which will
allow the City to use this firm for the 2009 electric utility cost of service study.
Table 1 outlines the key tasks for the proposed amendment to the existing Agreement. The
funding source for the electric utility cost of service study is from the approved 2009 electric
utility budget. Staff recommends that the Utility Advisory Committee forward a favorable
recommendation to City Council to authorize the Director of the Mayor to sign an amendment to
the Agreement with FCS Group in an amount not to exceed $40,000 for the recommended scope of
work.
N:\UAC\Final\Electric Utility COSA.doc
Amendment to Consultant Agreement for Electric Utility Cost of Service Study
December 9,2008
Page 2
Table 1- Summary of 2009 Electric Utility Cost of Service Study Scope of Work
TASKS
8) Data Collection
9) Fiscal Policy Evaluation
10) Capital Funding Plan
11) Multi-Year Operating Forecast (Revenue Requirement)
12) Cost of Service
13) Rate Design
14) Recommended Optional Tasks
A. Pole attachment fees as delineated under RCW 54.04.045 and 47 CFR 99
1.1401-1.1408
B. Electrical work permit and inspection fees
C. Line extension fees.
15) Optional Tasks Not Recommended
D. Wholesale generation costs using Tiered Rates Methodology.
E. Rate Design based on Tiered Rates Methodology.
Staff recommends tasks 8-13 and optional tasks 14(A-C) are included in the approved scope of
work.
~.
~ORTAN ELES
CITY OF
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
Date:
December 9,2008
To:
Utility Advisory Committee
From:
Phil Lusk, Power Resources Manager
Subject:
Green Motors Initiative Agreement
Summary: The Bonneville Power Administration is proposing that the City join its Green Motors
Initiative, whose purpose is to support an industry trade group of qualified motor service centers
providing re-winds of energy efficient motors to maintain energy efficiency.
Recommendation: Forward a favorable recommendation to City Council to 1) authorize the
City Manager to make minor modifications to the agreement, and 2) to authorize the Public
Works and Utilities Director to sign the Green Motors Initiative Agreement and any
subsequent amendments to the Agreement.
Background/Analysis: The Bonneville Power Administration (BPA) is proposing that the
City join its Green Motors Initiative (GMI), whose purpose is to support an industry trade group of
qualified motor service centers providing re-winds of energy efficient motors to maintain energy
efficiency. The trade group, called the Green Motor Practice Group (GMPG), provides an
incentive of $2.00 per horsepower (HP) to qualified service centers that re-wind energy efficient
motors to their original nominal operating efficiency. Service centers will provide an instant
rebate of at least $1.00 per HP on the customer's invoice. Qualified motors are 15-5000 HP
NEMA Premium or equivalent.
The Green Motors Initiative is a direct acquisition offering, which is a mechanism where the BP A,
with the consent of a participating utility, contracts directly with a third party such as the GMPG to
implement energy efficiency activities within a participating utility's service area. A utility
participates by signing the consent agreement with the BP A. In 2001, the City participated in a
similar program called the VendingMiser program.
BP A will attribute all energy savings to the City, and a 75% conservation adjustment credit will
count towards the City's upcoming High Water Mark. All incentives will be paid by the BP A and
the City will not have to budget or spend any of its Conservation Rate Credit funds.
Staff requests that the Utility Advisory Committee forward a favorable recommendation to the
City Council to approve the Agreement and authorize the Director of the Public Works and
Utilities Department to sign the Green Motors Initiative Agreement and any subsequent
amendments to the Agreement.
N:\UAC\Final\Green Motors Initiative Agreement.doc
~.......i.........O... R. .T.. ..'J1;.................. N.G.. ..EiL' E.. is"'
I ....~ r~):j 'I / i' 1 .: :'ii i,i,' ..~
: .'
, .,
i '."'''''''' ~ . .",..... ..;
WAS H I N G T'O N, U. S. A.
Utility Advisory Committee Memo
Date:
December 9,2008
To:
Utility Advisory Committee
From:
Phil Lusk, Power Resources Manager
Subject:
Morse Creek License Amendment Update
Summary: At Utility Advisory Committee's November meeting, a question was raised regarding
the power production impacts that could result from using the new minimum instream flows at the
Morse Creek Hydroelectric Project. A production impact model previously prepared during the
Agency negotiations was updated, which indicated that the Project's avoided power purchases are
practically identical.
Recommendation: For information only, no action requested.
Background/Analysis: As discussed at the November
meeting, the City is required to have a new Clean Water Act
401 Certification issued by the Washington State Department
of Ecology (DOE) as a component of its Federal Energy
Regulatory Commission license amendment for its Morse
Creek Hydroelectric Project (Project). This Certification will
stipulate the new minimum instream flows as shown in Table
1. At this meeting, a question was raised regarding the power
production impacts that could result from using the new
minimum instream flows at the Project.
A production impact model using an exceedence flow
methodology previously prepared during the Agency
negotiations was updated to include the power costs that the
Bonneville Power Administration charges the City. As the
Project operates on a net metering basis, the model indicated
that the Project's avoided costs would be annually decreased
from $73,921 to $73,747. This model estimated an increase in
avoided costs of $174, a rise of only 0.24%. Given the
accuracy of the model, this is a statistical "net-zero" impact to
the City.
N:\UAC\Final\Morse Creek License Amendment Update. doc
TABLE 1: Morse Creek Minimum
Instream Flow Rates in CFS
Month Current Proposed
January None 48
Feb 1-14 None 48
Feb 15-28 None 50
March None 50
April 85 55
May None 61
June None 61
July 1-15 None 61
July 16-31 None 50
August 1-15 90 50
August 16-31 90 58
September Operation Not Allowed
October 1-15 100 69
October 16-31 100 60
November 65 48
December None 48
tn
u.
U
Morse Creek Average Water Flow Rates
250
200
150
100
50
o
Jan
Feb
May
Oct
Mar
Apr
Jun
Sep
Nov
Dee
Jul
Aug
101966-76 USGS 11I2003-08 DOE OProposed Project Minimums I
~ORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
Date:
December 9,2008
To:
Utility Advisory Committee
From:
Larry Dunbar, Deputy Director of Power Systems
Subject:
BP A Demand Response Pilot Program
Summary: The Bonneville Power Administration recently announced the availability of a
demand response pilot program related to automatic meter reading, which was included in the
Electric Utility's 2008-2014 Capital Facilities Program. Staff participated in a teleconference and
completed a survey expressing interest in the pilot program.
Recommendation: For information only, no action requested.
Background/Analysis: The Bonneville Power Administration (BPA) recently announced the
availability of a new Demand Response Pilot Program related to automatic meter reading, which
was included in the Electric Utility's 2008-2014 Capital Facilities Program. Staff participated in a
teleconference and completed a survey expressing preliminary interest in the pilot program.
The future BP A power sales agreement includes a new tiered rates methodology, which will be in
effect beginning October 1, 2011, and creates a need for automatic meter reading and provides
opportunities to reduce wholesale generation purchases through a demand response program.
The Demand Response Pilot Program will launch in early 2009 with additional pilots conducted
through 2011. The City recently conducted an automatic meter reading pilot project and
participated in the GridWise and Non-Wires Solutions programs, which are related to the Demand
Response Pilot Program. The next step in the utility selection process includes preliminary
interviews in December with BP A making their final selection of utility participants in their pilot
program by January 15,2009.
A copy of BP A announcement of the Demand Response Pilot Program is attached for more
information.
Attachment: BP A seeks Demand Response Pilot Program Partners
N:\UAC\Final\BP A Demand Response Pilot Program.doc
BPA Energy Efficiency Announcement:
BPA seeks Demand Response pilot program partners
November 25, 2008
Bonneville Power Administration (BPA) is seeking partners for Demand Response (DR)
pilot programs. An Advanced Direct Load Control pilot program will launch in early 2009,
with additional pilots conducted through 2011. Utilities interested in learning more or
participating in the programs are asked to comolete a brief survey by Dee. 8, 2008.
Why Demand Response?
BPA forecasts a constrained capacity in the five-to-10 year planning horizon, which could
result in higher market prices. BPA has integrated a demand charge in the post-2011
rate structure as a price signal reflecting the projected value of capacity. Demand
Response is one tool utilities can use to mitigate this charge.
BPA has initiated a Resource Program to develop a plan, to be completed in September
2010, which uses a forecasting model to look at both supply-side and demand-side
options to meet the region's future load growth. The plan will identify BPA's least-cost,
least-risk portfolio of supply- and demand-side options for the 20-year planning horizon.
The Resource Program will evaluate Demand Response as one option to address the
projected capacity shortage.
Pilot Program Overview
Demand Response is a new initiative for most utilities in the region. BPA would like to
collaborate with selected utility customers in a series of pilot projects with substantial
engagement on the local level, including program design and verification, outreach to
customers and coordination with Trade Allies and other stakeholders.
The pilot projects will be conducted in multiple sectors. In addition to the Advanced
Direct Load Control pilot launching in early 2009, additional pilot programs under
consideration include Emergency/Capacity Market (large commercial/industrial),
Dynamic Energy Use and Wind Integration.
About the Survey
BPA is currently seeking utility partners for the Advanced Direct Load Control (DLC)
pilot. Utilities interested in participating in the 2009 Advanced DLC future DR pilots are
asked to complete a brief, 10-minute survey by Dec. 8, 2008. The responses to this
survey are for information-gathering purposes only and are considered non-binding. The
survey can be found at:
www.survevmonkeV.com/s.asox?sm=t2oPxaZ 2bWVI 2fDh2v 2bflT5Q 3d 3d
Contact Pam Sporborg (503-230-3170, oisoorborg@boa.qov) if you have difficulty
accessing the online tool. If you are unable to complete the survey by Dec. 8, please
contact Pam Sporborg by Dec. 5, 2008.
Selection Criteria
Because BPA expects utility partnership interest in the Advanced DLC pilot to exceed
current ability to staff and fund such projects the following selection criteria will be used
to identify pilot partners:
. Dedicated Staff. Utility partners must be able to contribute in-house staff for
local project management.
· Co-Funding. BPA expects utility partners to co-fund a portion of the project
costs. However, BPA recognizes that many utilities have already set their 2009
budgets; therefore, BPA will consider co-funding over a 2-year project
timeframe.
· Commitment to a 50% installation rate by July I, 2009, with 100%
installation by Sept. 30, 2009. BPA will conduct preliminary test events during
the 2010 winter heating season in January/February, gathering a full year of
data for FY 2010. This will require a significant utility partner commitment of
time and resources in winter/spring 2009 to recruit customers, train contractors
and install equipment.
. Advanced Metering Infrastructure (AMI) or Communications System.
Utility partners must have the ability to communicate with their customers in
hourly increments (at a minimum) through either a 2-way AMI system or other
communications medium (radio, wireless, etc). Technologies that allow
communication closer to real-time will be prioritized for selection as a pilot
participant.
· Geographic Diversity. If more than one utility is selected, BPA will implement
this pilot program in a variety of heating and cooling zones.
BPA will work collaboratively with the selected utility partner(s) to finalize program
design and identify appropriate technology vendors and installation contractors. BPA and
the utility partner will sign a Memorandum of Understanding detailing these decisions
and conditions.
Projected Timeline:
Dec. 4, 2008
Brown Bag Q&A. Noon. Contact your Energy Efficiency
Representative for additional information.
Survey of interest due
Preliminary interviews completed
Final selection of utility partners
Design phase
Advanced Direct Load Control pilot program
implementation phase begins
Dec. 8, 2008
Dec. 15, 2008
Jan. 15, 2009
Jan. 15-Mar. 1, 2009
Mar.1, 2009
For more information contact Pam Sporborg (503-230-3170, oisoorborq@boa.qov) or
your Energy Efficiency Representative:
Tom Hannon, 509-625-1360, tkhannon@lboa.gov
Margaret Lewis, 503-230-7552, mllewis@boa.qov
Lloyd Meyer, 503-230-7557, Icmever@lboa.gov
Rosalie Nourse, 509-625-1368, rnourse@lboa.qov
Melissa Podeszwa, 206-220-6772, mjpodeszwa@lboa.qov
Mark Ralston, 503-230-3175, mdralston@boa.qov
Boyd Wilson, 509-527-6217, bwilson@boa.qov
"