HomeMy WebLinkAbout4.624B Original Contract (2)City of Port Angeles
Public Works & Utilities Dept.
Operations Office
1703 South B Street
Port Angeles WA 98362
Tel: 360-417-4541
Fax: 360-452-4972
LIMITED PUBLIC WORKS PROCESS
❑ Request for Quotation
® Contract
Contract Title: Sanitary Sewer Repair, Project Number: DW -08-008
THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES, WASHINGTON
("CITY") AND Craig Baar excavating LLC ("CONTRACTOR").
1. WORK BY CONTRACTOR
The Contractor shall perform the work as described in Attachment "A" (Attachment "A" may include Contractor's
Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents)
which is attached hereto and by this reference is incorporated herein.
2. TERM OF CONTRACT
All work under this Contract is to be completed as indicated (check one):
❑ All work under this Contract is to be completed by this date:
All work under this Contract is to be completed 30 days from the Notice to Proceed. No work is
to be performed prior to written Notice to Proceed by the City.
The performance period under this Contract commences calendar days after contract
award and ends calendar days after contract award.
3. PAYMENT
A. The City shall pay the Contractor for the work performed under this contract (check one):
Time and material, not to exceed: $
Time and actual expenses incurred, not to exceed: $
Unit prices set forth in the Contractor's bid or quote, not to exceed: $
Firm Fixed Price set forth in Contractor bid or quote in the amount of: $ 5,962.00
The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance.
with and as described in the Attachment "A".
The Contractor shall provide and bear the expense of all equipment, work and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in this contract and every part thereof; except as are mentioned in the
specifications to be furnished by the City of Port Angeles.
B. The Contractor shall maintain time and expense records, which may be requested by the City. The
contractor shall submit invoices to the City for payment for work performed. All invoices must reference the
City's contract number. Invoices shall be in a format acceptable to the City.
C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt of a
properly completed invoice.
D. All records and accounts pertaining to this Contract are to be kept available for inspections by
representatives of the City for a period of three (3) years after final payment. Copies shall be made available
to the City upon request.
Project DW -08-008 Page 1
Rev. 6/18/2008
E. If during the course of the Contact, the work rendered does not meet the requirements set forth in the
Contract, the Contractor shall correct or modify the required work to comply with the requirements of this
Contract. The City shall have the right to withhold payment for such work until it meets the requirements of
the Contract Documents.
4. RESPONSIBILITY OF CONTRACTOR
A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site
and shall comply with, all applicable provisions of federal, state and local regulations, ordinances and codes.
Contractor shall erect and properly maintain, at all times, as required by the conditions and progress of the
work, all necessary safeguards for the protection of workers and the public and shall post danger signs
warning against known or unusual hazards.
B. Correction of Defects. Contractor shall be responsible for correcting all defects in workmanship and/or
materials discovered within one year after acceptance of this work. When corrections of defects are made,
Contractor shall be responsible for correcting all defects in workmanship and/or materials in the corrected
work for one year after acceptance of the corrections by the City. The Contractor shall start work to
remedy such defects within seven (7) days of mailing notice of discovery thereof by City and shall complete
such work within a reasonable time. In emergencies where damage may result from delay or where loss of
service may result, such corrections may be made by the City, in which case the cost shall be borne by the
Contractor. In the event the Contractor does not accomplish corrections at the time specified, the work will
be otherwise accomplished and the cost of same shall be paid by the Contractor.
C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages including
consequential damages suffered by the City resulting from defects in the Contractors work including, but
not limited to, cost of materials and labor expended by the City in making emergency repairs and cost of
engineering, inspection and supervision by the City. The Contractor shall hold the City harmless from any
and all claims which may be made against the City as a result of any defective work and the Contractor
shall defend any such claims at its own expense. Where materials or procedures are not specified in the
Contract Document, the City will rely on the professional judgment of the Contractor to make appropriate
selections.
D, Nondiscrimination/Affirmative Action. Contractor agrees not to discriminate against any employee or
applicant for employment or any other persons in the performance of this Contract because of race, creed,
color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by
federal, state or local law or ordinance, except for a bona fide occupational qualification. Contractor agrees
to post in conspicuous places, available to employees and applicants for employment, notices to be
provided by Contractor setting forth the provisions of the nondiscrimination clause.
E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work
or services required by the Contractor under this Contract, shall be considered employees of the Contractor
only and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf
of said employees, while so engaged, and all claims made by a third party as consequence of any negligent
act or omission on the part of the Contractor's employees, while so engaged on any of the work or services
provided or rendered herein, shall not be the obligation of the City.
5. COMPLIANCE WITH LAWS
The Contractor shall comply with all federal, state and local laws and regulations applicable to the
work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of
a material provision of this Contract and shall be grounds for cancellation, termination or suspension of the
Contract by the City, in whole or in part, and may result in ineligibility for further work for the City.
6. TERMINATION OF CONTRACT
A. This Contract shall terminate upon satisfactory completion of the work described in Attachment "A"
and final payment by the City.
Project DW -08-008
Page 2 Rev. 6/18/2008
B. The City may terminate the Contract and take possession of the premises anu all materials thereon
and finish the work by whatever methods it may deem expedient, by giving 10 days written notice to the
Contractor, upon the occurrence of any one or more of the events hereafter specified.
1. The Contractor makes a general assignment for the benefit of its creditors.
2. A receiver is appointed as a result of the insolvency of the Contractor.
3. The Contractor persistently or repeatedly refuses or fails to complete the work required herein.
4. Contractor fails to make prompt payment to subcontractors for material or labor.
5. Contractor persistently disregards federal, state or local regulations and ordinances.
6. Contractor persistently disregards instructions of the Contract Administrator, or otherwise
substantially violates the terms of this Contract.
7. The City determines that sufficient operating funds are not available to fund completion of the work
contracted for.
C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any
further amounts due under this Contract until the work specified in Attachment "A" is satisfactorily
completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount
to be paid under this Contract exceeds the expense incurred by the City in finishing the work, and all
damages sustained by the City or which may be sustained by reason of such refusal, neglect, failure or
discontinuance of employment, such excess shall be paid by the City to the Contractor. If the City's
expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally
liable therefore to the City and shall pay such difference to the City. Such expense and damages shall
include all legal costs incurred by the City to protect the rights and interests of the City under the Contract,
provided such legal costs shall be reasonable.
7. OWNERSHIP OF DOCUMENTS
A. On payment to the Contractor by the City of all compensation due under this Contract, all finished or
unfinished documents and material prepared by the Contractor with funds paid by the City under this
Contract shall become the property of the City and shall be forwarded to the City upon its request.
B. Any records, reports, information, data or other documents or materials given to or prepared or
assembled by the Contractor under this Contract will be kept confidential and shall not be made available to
any individual or organization by the Contractor without prior written approval of the City or by court order.
8. CLAIMS
Any claim against the City for damages, expenses, costs or extras arising out of the performance of this
Contract must be made in writing to the City within thirty days after the discovery of such damage, expense
or foss, and in no event later than the time of approval by the City for final payment. Contractor, upon
making application for final payment, shall be deemed to have waived its right to claim for any other
damages for which application has not been made, unless such claim for final payment includes notice of
additional claim and fully describes such claim.
9. GENERAL ADMINISTRATION AND MANAGEMENT
The Director of the Public Works and Utilities Department or his/her designee shall have primary responsibility for
the City under this Contract and shall oversee and approve all work to be performed, coordinate communications,
and review and approve all invoices, under this Contract.
Project DW -08-008
Page 3 Rev. 6/18/2008
10. HOLD HARMLESS
A. The Contractor shall protect, defend, indemnify and save harmless the City, its officers, employees and
agents from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting
from the negligent acts or omissions of the Contractor. The Contractor agrees that its obligations under this
subparagraph extend to any claim, demand, and/or cause of action brought by, or on behalf of, any of its
employees or agents. For this purpose, the Contractor, by mutual negotiation, hereby waives, as respects the
City only, any immunity that would otherwise be available against such claims under the industrial insurance
provision of Title 51 RCW. In the event the City obtains any judgment or award, and/or incurs any cost arising
therefrom including attorneys' fees to enforce the provisions of this article, all such fees, expenses, and costs
shall be recoverable form the Contractor.
B. The City shall protect, defend, indemnify and save harmless the Contractor, its officers, employees and
agents from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting
from the negligent acts or omissions of the City. The City agrees that its obligations under this subparagraph
extend to any claim, demand, and/or cause of action brought by, or on behalf of, any of its employees or
agents. For this purpose, the City, by mutual negotiation, hereby waives, as respects the Contractor only, any
immunity that would otherwise be available against such claims under the industrial insurance provision of Title
51 RCW. In the event the Contractor obtains any judgment or award, and/or incurs any cost arising therefrom
including attorneys' fees to enforce the provisions of this article, all such fees, expenses, and costs shall be
recoverable form the City.
11. INSURANCE
The Contractor shall maintain insurance as set forth in Attachment B.
12. PREVAILING WAGE
This Contract is subject to the requirements of Chapter 39.12 RCW, and as it may be amended, relating to
prevailing wages. On Public Works projects, funded in part or in whole with Federal funds, Federal wages laws
and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED IN THE
PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF WAGE
as determined by the Industrial Statistician of the Department of Labor and Industries for the State of
Washington. The schedule of prevailing wage rates for this Contract is made a part of this contract as though
fully set forth herein.
Prior to making any payment under this Contract, the City must receive an approved copy of the "Statement
of Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industries.
It is the Contractor's responsibility to obtain and file the "Statement of Intent to pay Prevailing Wage". The
Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that
prevailing wages have been paid by the Contractor and all subcontractors. Following the final acceptance
of services rendered, Contractor shall submit an "Affidavit of Wages Paid".
For a contract award or an on-call contract work order under $2,500, and in accordance with RCW 39.12.040(2),
the contractor or subcontractor is authorized to submit a combined Statement Of Intent To Pay Prevailing Wages
& Affidavit Of Wages directly to the City of Port Angeles at final invoicing. Submission shall be made on the form
developed by the Washington State Department of Labor and Industries and available from the City of Port
Angeles Public Works and Utilities Department.
In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or occupation
and such dispute cannot be adjusted by the parties in interest, including labor and management representatives,
the matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his
decision shall be final, conclusive, and binding on all parties involved in the dispute.
13. INTERPRETATION AND VENUE
This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The
venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington.
Project DW -08-008
Page 4 Rev. 5/18/2008
14. BRANDS OR EQUAL
When a special "brand or equal" is named it shall be construed solely for the purpose of indicating the standards
of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered,
provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid
containing a brand which is not of equal quality, performance, or use specified must be represented as an
alternate and not as an equal, and failure to do so shall be sufficient reason to disregard the bid.
15. INSPECTION AND REJECTION
All goods, services, work, or materials purchased herein are subject inspection and to approval by the City. Any
rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications
of this order, whether held by the City or returned, will be at Contractor's risk and expense.
16. SUBLETTING OR ASSIGNING OF CONTRACTS
Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from
this Contract without the express prior written consent of the other.
17. INDEPENDENT CONTRACTOR
The Contractor is and shall be at all times during the term of this Contract an independent contractor and not
an employee of the City.
18. EXTENT OF CONTRACT/MODIFICATION
This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract
between the parties hereto and supersedes all prior negotiations, representations, or agreements, either
written or oral. This contract may be amended, modified or added to only by written instrument properly
signed by both parties hereto.
This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract
between the parties hereto and supersedes all prior negotiations, representations, or agreements, either
written or oral. This contract may be amended, modified or added to only by written instrument properly
signed by both parties hereto.
1.9. SUBCONTRACTOR RESPONSIBILITY
The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require
each of its subcontractors to include substantially the same language of this section in each of their subcontracts,
adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to
all subcontractors regardless of tier.
At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors
meets the following bidder responsibility criteria:
- At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter 18.27
RCW;
- Have a current state unified business identifier number;
- If applicable, have:
1) Industrial insurance coverage for the subcontractor's employees working in Washington as required in
Title 51 RCW;
2) An employment security department number as required in Tile 50 RCW; and
3) A state excise tax registration number as required in Tile 82 RCW;
4) An electrical contractor license, if required by Chapter 19.28 RCW;
5) An elevator contract license, if required by Chapter 70.87 RCW.
- Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3).
Project DW -08-008 Page 5
Rev. 6/18/2008
TN WITNESS WHEREOF, the parties have executed this Contract as of % 1 �( Zoo W , not
CONTRACTOR
By:
P-�
Printed Name: 6,.r;yig f
Title: G W ,ief
Address: )444 To ,15A; 0ht rhe itrAct
City: pO7.) An
Tax ID#: (DOZ goo 698
Phone Number: 36 0 - 6419
City of Port Angeles
Operations Office
Public Works and Utilities Department
360-417-4541
CITY OF PORT NGELES
By:
Printed Name: 1
c,
t 1
Purchase Order #: 1 03
ATTACHMENT "A"
WORK BY CONTRACTOR
The contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the project
described below. Unless otherwise provided for in the Statement of Work, the Contractor will be responsible for
obtaining and paying for any and all permits required for this work.
General Scope: Excavate, repair sanitary sewer line and restore area.
Location: City of Port Angeles, Public Works & Utilities, Corporation Yard, 1703 S. B. St., Port Angeles, WA.
98363.
Site Point of Contact: Ernie Klimek, Superintendent, 417-4855.
Work Hours: The contractor will be allowed to work at the Public Works & Utilities Corp Yard from 7:00 A.M. to
3:30 P.M., Monday through Saturday. Work outside of these hours may be requested from and is at the
discretion of the Water Superintendent.
Work Requirements:
1. All work and materials shall be in accordance with the current edition of the Washington State
Department of Transportation's Standard Specifications for Road, Bridge, and Municipal Construction
(English Units), referred to herein as the Standard Specifications.
2. Replace approximately twenty (20') of collapsed 8" concrete sanitary sewer mainline pipe, in the 17/18
alley West of 'A' Street. This location is inside the City Corporation Yard. The sewer mainline is collapsed
Project DW -08-008
Page 6 Rev. 6/18/2008
from approximately fifteen (15') west of the down stream manhole (Wahl_ of "A" Street), to approximately
thirty-five (35') west of same manhole. Sanitary sewer is approximately 12' deep. Replacement pipe
shall be PVC, ASTM D3034, SDR 35 or ASTM F789 with joints and rubber gaskets conforming to ASTM
D3212 and ASTM F477, and shall be connected to existing concrete pipe using rubber°transition couplings
with stainless steel bands.
3. Contractor is responsible for all necessary work in placing all pipe, joint restraints, fittings, bedding,
backfill, restoration and clean-up.
4. Pipeline bedding shall be imported 3/4" minus sand and/or gravel mix, 6 inches below pipe to 6 inches
above pipe. Compact all fill material in accordance with Standard Specifications. Restore surface to
smooth rough graded finish.
5. All existing live sanitary sewers shall be kept in service at all times. Provisions shall be made by the
Contractor for sewer flow bypass, if necessary, while repairs are made to the sanitary sewer main.
6. Contractor shall be responsible for all utility locates. Contractor is responsible for disposal of removed
damaged pipe and debris.
7. The following additional requirements are to comply with RCW 39.04.180
a.) Excavation on this contract will exceed a depth of four feet. This contract requires adequate
safety systems for the trench excavation that meet the requirements of the Washington
Industrial Safety and Health Act, Chapter 49.17 RCW. In advance of any excavation, the
Contractor shall provide in writing a description of the safety systems to be used for the trench
excavation.
b.) The costs of trench safety systems shall not be considered as incidental to any other contract
item and any attempt to include the trench safety systems as an incidental cost is prohibited.
Project DW -08-008
Page 7 Rev. 6/18/2008
f
ray
aeV �ssew.i i�`?”
.va�r: b°t.�t :. N�Ic%
Project DW -08-008
Page 8 Rev. 6/18/2008
City of Port Angeles
Operations Office
Public Works and Utilities Department
360-417-4541
ATTACHMENT B
INSURANCE
Insurance Requirements:
The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to
persons or damage to property which may arise from or in connection with the performance of the work
hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the
Contractor to maintain the insurance as required shall constitute a material breach of contract upon which the
City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate the
Contract or at its discretion, procure or renew such insurance and pay any and all premiums in connection
therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City,
off set against funds due the Contractor from the City.
1. Minimum Scope of Insurance
The Contractor shall obtain insurance of the types described below:
a. Automobile Liability insurance covering all owned, non -owned, hired and leased vehicles. Coverage
shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing
equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability
coverage.
b. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall
cover liability arising from premises, operations, stop gap liability, independent contractors, products -
completed operations, personal injury and advertising injury, and liability assumed under an insured
contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per
Project Endorsement ISO form CG 25 03 11 85. There shall be no endorsement or modification of
the Commercial General Liability insurance for liability arising from explosion, collapse or
underground property damage. The City shall be named as an insured under the Contractor's
Commercial General Liability insurance policy with respect to the work performed for the City using
ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured -Completed Operations
endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage.
c. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of
Washington.
2. Minimum Amounts of Insurance
The Contractor shall maintain the following insurance limits:
a. Automobile Liability insurance with a minimum combined single limit for bodily injury and property
damage of $1,000,000 per accident.
b. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each
occurrence, $2,000,000 general aggregate and a $2,000,000 products -completed operations
aggregate limit.
3. Other Insurance Provisions
Project DW -08008
Page 9 Rev. 6/18/2008
The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile
Liability and Commercial General Liability insurance.
a. The Contractor's insurance coverage shall be primary insurance as respect to the City. Any
insurance, self-insurance, or insurance pool coverage maintained by the City shall be in excess of the
Contractor's insurance and shall not contribute with it.
b. The Contractor's insurance shall not be cancelled or reduced as to coverage by either party, except
after forty-five (45) days prior written notice by certified mail, return receipt requested, has been
given to the City.
4. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VI.
5. Verification of Coverage
The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements,
including but not necessarily limited to the additional insured endorsement, evidencing the Automobile
Liability and Commercial General Liability insurance of the Contractor before commencement of the work.
Before any exposure to loss may occur, the Contractor shall file with the City a copy of the Builders Risk
insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements
related to this project.
6. Contractor's Insurance For Other Losses
The Contractor shall assume full responsibility for all Toss or damage from any cause whatsoever to any tools,
Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the
Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures,
scaffolding and protective fences.
7. Waiver of Subrogation
The Contractor and the City waive all rights against each other, any of their Subcontractors, Subcontractors,
agents and employees, each of the other, for damages caused by fire or other perils to the extent covered by
Builders Risk insurance or other property insurance obtain pursuant to the Insurance Requirements Section of
this Contract or other property insurance applicable to the work. The policies shall provide such waivers by
endorsement or otherwise.
City of Port Angeles
Project DW -08-008 Page 10
Rev. 6/18/2008
QUOTATION FORM
Sanitary Sewer Repair
DW -08-008
The bidder hereby bids the following amounts for all work (including labor, equipment, time
and materials) required to perform the work in the Statement of Work and this package.
1, Price Quote:
All work other than Trench Safety Systems
Trench Safety Systems
Subtotal:
Sales Tax (8.4%)
Total Bid:
$ 5, 3 0-D
$ t�o cd
$ 5a e)
i
$ 4W-
2. The bidder hereby acknowledges that it has received Addenda No(s).
(Enter "N/A" if none were issued), to this Request for Quotation package.
3. The name of the bidder submitting this bid and its business phone number and address, to which
address all communications concerned with this bid and with the contract shall be sent, are listed
below. Any written notices required by the terms of an awarded contract shall be served or mailed to
the following address:
Contractor Information:
1. Company Name: ie4. +7 6 act,,-- &c• e a.•a ti�l�y�
2. Address: 1444 .J t� -u ri s h + ' [_ r, e Q o tA.
3. City, State, Zip Code: 4e) ri A tl j h 1 C t ge939
4. Phone Number: j ‘,„6 -640-081s
5. Contractor Registration Number:
6. USI Number:
7. WA State Industrial Insurance Account Number: 044 ci 3
8: WA State Employment Security Dept Number:
9. State Excise Tax Registration Number: 66Z Boo 668
66 2a74j o6)
G 661 Big
The bidder represents that it is qualified and possesses sufficient skills and the necessary capabilities
to perform the services set forth in this Contract.
Signed by
Title
Printed Name:
Date
0 L
Project: DW -08" 008 Page 2
Rev, 6/18/2008
P.O. #: 012031
DATE: 07/11/08
INVOICE TO:
City of Port Angeles
'ATTN: ACCOUNTS PAYABLE
PO BOX 1150
PORT ANGELES, WA 98362
TO: CRAIG SAAR EXCAVATING, LLC
1444 TOWNSHIP LINE RD
PORT ANGELES, WA 98362
VENDOR #
27477
REQ. NO.
11876
SHIP TO:
City of Port Angeles
BUILDING 1
1703 S 'B' ST
PORT ANGELES, WA 98363
REQUISITIONED BY F.O.B.
LUCY HANLEY
SHIP VIA:
FREIGHT TERMS
NET
QUANTITYUOM ITEM NO. AND DESCRIPTION UNIT CO EXTENDED
1.00EA DW -08-008 - CORP YARD 5500.00 5500.00
SANITARY SEWER REPAIR
SUB -TOTAL 5500.00
TAX 8.4 462.00
TOTAL 5962.00
AUTHORIZED BY
State of Washington
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public Works Contracts
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits.
On public works projects, workers' wage and benefit rates must add to not less than this total, A brief description
of overtime calculation requirements is provided on the Benefit Code Key.
CLALLAM COUNTY
Effective 03-02-08
www**w*****************wwwww**ww*************ww*w*w***************wwww******wwwwwwwww******************w**
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL $36.24 1H 50
BOILERMAKERS
JOURNEY LEVEL $50.33 1C 5N
BRICK AND MARBLE MASONS
JOURNEY LEVEL $43.75 1M 5A
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL $14.67 1
CARPENTERS
ACOUSTICAL WORKER $43.91 1M 50
BRIDGE, DOCK AND WARF CARPENTERS $43.75 1M 5D
CARPENTER $43.75 1M 5D
CREOSOTED MATERIAL $43.85 1M 5D
DRYWALL APPLICATOR $43,79 1M 5D
FLOOR FINISHER $43.75 1M 5D
FLOOR LAYER $43.75 1M 5D
FLOOR SANDER $43,75 1M 5D
MILLWRIGHT AND MACHINE ERECTORS $44,75 1M 5D
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING $43.95 1M 5D
SAWFILER $43.75 1M 5D
SHINGLER $43.75 1M 50
STATIONARY POWER SAW OPERATOR $43,75 1M 50
STATIONARY WOODWORKING TOOLS $43,75 1M 50
CEMENT MASONS
JOURNEY LEVEL $36,24 1H 5D
DIVERS & TENDERS
DIVER $85.75 1M 5D 8A
DIVER TENDER $44.22 1M 5D
DREDGE WORKERS
ASSISTANT ENGINEER $44,59 1T 5D 8L
ASSISTANT MATE (DECKHAND) $44,09 1T 5D BL
BOATMEN $44,59 1T 5D 8L
ENGINEER WELDER $44.64 1T 5D 8L
LEVERMAN, HYDRAULIC $46.21 1T 5D 8L
MAINTENANCE $44.08 1T 5D 8L
MATES $44.59 1T 5D 8L
OILER $44.21 1T 50 8L
DRYWALL TAPERS
JOURNEY LEVEL $43.59 1E 5P
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL $9.37 1
Page 1
CLALLAM COUNTY
Effective 03-02-08
wwwwwww*www****w**********w*******************w*******www*****w*w****************www********w**********w**
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
ELECTRICIANS - INSIDE
CABLE SPLICER $55.05 1E 5A
CABLE SPLICER (TUNNEL) $58.86 1E 5A
CERTIFIED WELDER $53.16 1E 5A
CERTIFIED WELDER (TUNNEL) $57.15 1E 5A
CONSTRUCTION STOCK PERSON $28.83 1E 5A
JOURNEY LEVEL $51.25 1E 5A
JOURNEY LEVEL (TUNNEL) $55.05 1E 5A
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN $15.37 2A 6C
JOURNEY LEVEL $14.69 2A 6C
ELECTRICIANS - POWERLINE CONSTRUCTION
CABLE SPLICER $56.53 4A 5A
CERTIFIED LINE WELDER $51.64 4A 5A
GROUNDPERSON $37.15 4A 5A
HEAD GROUNDPERSON $39.19 4A 5A
HEAVY LINE EQUIPMENT OPERATOR $51.64 4A 5A
JACKHAMMER OPERATOR $39,19 4A 5A
JOURNEY LEVEL LINEPERSON $51.64 4A 5A
LINE EQUIPMENT OPERATOR $43.83 4A 5A
POLE SPRAYER $51.64 4A 5A
POWDERPERSON $39.19 4A 5A
ELECTRONIC TECHNICIANS
ELECTRONIC TECHNICIANS JOURNEY LEVEL $12.07 1
ELEVATOR CONSTRUCTORS
MECHANIC $60.85 4A 6Q
MECHANIC IN CHARGE $66.25 4A SQ
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS $13.50 1
FENCE ERECTORS
FENCE ERECTOR $13.80 1
FENCE LABORER $11.60 1
FLAGGERS
JOURNEY LEVEL $31.01 1H 5D
GLAZIERS
JOURNEY LEVEL $43.76 1H 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC $46.59 1S 5J
HEATING EQUIPMENT MECHANICS
MECHANIC $16.00 1
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL $36.75 1H 5D
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC $15.65 1
INDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL $9.24 1
INLAND BOATMEN
CAPTAIN $59.22 1
COOK $34.81 1
DECKHAND $34.52 1
ENGINEER/DECKHAND $58.62 1
MATE, LAUNCH OPERATOR $50.20 1
Page 2
CLALLAM COUNTY
Effective 03-02-08
*ww*w******w*wwww**********w****www*************wwww*ww***w*w*******w*www**w**w************www*w*****w****
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY
REMOTE CONTROL
CLEANER OPERATOR, FOAMER OPERATOR $9,73 1
GROUT TRUCK OPERATOR $11.48 1
HEAD OPERATOR $12.78 1
TECHNICIAN $B.07 1
TV TRUCK OPERATOR $10.53 1
INSULATION APPLICATORS
JOURNEY LEVEL $20.50 1
IRONWORKERS
JOURNEY LEVEL $47,92 10 5A
LABORERS
ASPHALT RAKER $36.75 1H 5D
BALLAST REGULATOR MACHINE $36.24 1H 5D
BATCH WEIGHMAN $31.01 1H 50
BRUSH CUTTER $36.24 1H 5D
BRUSH HOG FEEDER $36.24 1H 5D
BURNERS $36.24 1H 50
CARPENTER TENDER $36.24 1H 50
CASSION WORKER $37.20 1H 5D
CEMENT DUMPER/PAVING $36.75 1H 50
CEMENT FINISHER TENDER $36.24 1H 50
CHANGE -HOUSE MAN OR DRY SHACKMAN $36.24 1H 5D
CHIPPING GUN (OVER 30 LBS) $36.75 1H 5D
CHIPPING GUN (UNDER 30 LBS) $36.24 1H 50
CHOKER SETTER $36.24 1H 5D
CHUCK TENDER $36.24 1H 5D
CLEAN-UP LABORER $36.24 1H 5D
CONCRETE DUMPER/CHUTE OPERATOR $36.75 1H 5D
CONCRETE FORM STRIPPER $36.24 1H 513
CONCRETE SAW OPERATOR $36,75 1H 5D
CRUSHER FEEDER $31.01 1H 50
CURING LABORER $3624 1H 5D
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) $36.24 1H 5D
DITCH DIGGER $36.24 1H 5D
DIVER $37.20 1H 5D
DRILL OPERATOR (HYDRAULIC, DIAMOND) $36,75 1H 50
DRILL OPERATOR, AIRTRAC $37.20 1H 5D
DUMPMAN $36.24 1H 5D
EPDXY TECHNICIAN $36.24 1H 5D
EROSION CONTROL WORKER $36.24 1H 5D
FALLER/BUCKER, CHAIN SAW $36.75 1H 5D
FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning; NOT $28,45 1H 5D
construction debris cleanup)
FINE GRADERS $36.24 1H 5D
FIRE WATCH $31.01 1H 5D
FORM SETTER $36.24 1H 50
GABION BASKET BUILDER $36.24 1H 5D
GENERAL LABORER $36.24 1H 5D
GRADE CHECKER & TRANSIT PERSON $36.75 1H 5D
GRINDERS $36.24 1H 5D
GROUT MACHINE TENDER $36.24 1H 5D
Page 3
CLALLAM COUNTY
Effective 03-02-08
********************www, *******neve**x******* ***w*wee****** *****,eve**********w*****www*****v *******www******
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
GUARDRAIL ERECTOR $36.24 1H 5D
HAZARDOUS WASTE WORKER LEVEL A $37.20 1H 5D
HAZARDOUS WASTE WORKER LEVEL B $36.75 1H 5D
HAZARDOUS WASTE WORKER LEVEL C $36,24 1H 5D
HIGH SCALER $37.20 1H 5D
HOD CARRIERIMORTARMAN $36.75 1H 5D
JACKHAMMER $36.75 1H 5D
LASER BEAM OPERATOR $36.75 1H 5D
MANHOLE BUILDER-MUDMAN $36.75 1H 5D
MATERIAL YARDMAN $36.24 1H 50
MINER $37,20 1H 5D
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH $36.75 1H 5D
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE,
SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER $36.75 1H 5D
PILOT CAR $31.01 1H 5D
PIPE POT TENDER $36.75 1H 5D
PIPE RELINER (NOT INSERT TYPE) $36.75 1H 5D
PIPELAYER & CAULKER $36,75 1H 50
PIPELAYER & CAULKER (LEAD) $37.20 1H 50
PIPEWRAPPER $36,75 1H 50
POT TENDER $36.24 1H 50
POWDERMAN $37,20 11-I 5D
POWDERMAN HELPER $36.24 1H 5D
POWERJACKS $36.75 1H 5D
RAILROAD SPIKE PULLER (POWER) $36.75 1H 5D
RE-TIMBERMAN $37.20 1H 5D
RIPRAP MAN $36.24 1H 5D
RODDER $36.75 1H 5D
SCAFFOLD ERECTOR $36.24 1H 50
SCALE PERSON $36.24 1H 5D
SIGNALMAN $36.24 1H 50
SLOPER (OVER 20") $36.75 1H 50
SLOPER SPRAYMAN $36.24 1H 5D
SPREADER (CLARY POWER OR SIMILAR TYPES) $36.75 1H 50
SPREADER (CONCRETE) $36.75 1H 50
STAKE HOPPER $36.24 1H 5D
STOCKPILER $36.24 1H 50
TAMPER & SIMILAR ELECTRIC, AIR & GAS $36.75 1H 5D
TAMPER (MULTIPLE & SELF PROPELLED) $36.75 1H 5D
TOOLROOM MAN (AT JOB SITE) $36.24 1H 5D
TOPPER-TAILER $36.24 1H 5D
TRACK LABORER $36.24 1H 5D
TRACK LINER (POWER) $36.75 1H 5D
TRUCK SPOTTER $36.24 1H 50
TUGGER OPERATOR $36.75 1H 50
VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $36.24 1H 50
VIBRATOR $36.75 1H 5D
VINYLSEAMER $36,24 1H 5D
WELDER $36.24 1H 50
WELL -POINT LABORER $36.75 1H 5D
Page 4
CLALLAM COUNTY
Effective 03-02-08
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER $36.24 1H 5D
PIPE LAYER $36.75 1H 50
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS $12,89 1
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $12,89 1
LANDSCAPING OR PLANTING LABORERS $12,89 1
LATHERS
JOURNEY LEVEL $43.79 1M 50
METAL FABRICATION (IN SHOP)
FITTER/WELDER $15.16 1
LABORER $11.13 1
MACHINE OPERATOR $10.66 1
PAINTER $11.41 1
PAINTERS
JOURNEY LEVEL $33.94 2B 5A
PLASTERERS
JOURNEY LEVEL $25.83 1
PLAYGROUND & PARK EQUIPMENT INSTALLERS
JOURNEY LEVEL $8.07 1
PLUMBERS & PIPEFITTERS
JOURNEY LEVEL $57.34 1G 5A
POWER EQUIPMENT OPERATORS
ASSISTANT ENGINEERS $42.14 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $44.92 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $45.41 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH ATTACHMENTS) $45.96 1T 5D 8L
BACKHOES, (75 HP & UNDER) $44.50 1T 50 8L
BACKHOES, (OVER 75 HP) $44.92 1T 5D 8L
BARRIER MACHINE (ZIPPER) $44.92 1T 5D 8L
BATCH PLANT OPERATOR, CONCRETE $44.92 1T 5D 8L
BELT LOADERS (ELEVATING TYPE) $44.50 1T 5D BL
BOBCAT (SKID STEER) $42.14 1T 5D 8L
BROOMS $42.14 1T 5D BL
BUMP CUTTER $44.92 1T 5D 8L
CABLEWAYS $45A1 1T 5D 8L
CHIPPER $44.92 1T 5D 8L
COMPRESSORS $42.14 1T 5D 8L
CONCRETE FINISH MACHINE - LASER SCREED $42.14 1T 5D 8L
CONCRETE PUMPS $44.50 1T 5D 8L
CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $44.92 1T 50 8L
CONVEYORS $44.50 1T 5D 8L
CRANES, THRU 19 TONS, WITH ATTACHMENTS $44.50 1T 5D 8L
CRANES, 20- 44 TONS, WITH ATTACHMENTS $44.92 1T 5D 8L
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB $45.41 1T 5D 8L
WITH ATACHMENTS)
CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $45.96 1T 5D 8L
WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $46.53 1T 5D 8L
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER $42.14 1T 5D 8L
CRANES, A-FRAME, OVER 10 TON $44,50 1T 5D 8L
Page 5
CLALLAM COUNTY
Effective 03-02-08
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $47.09 1T 5D 8L
ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE (20 - 44 TONS) $44.92 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE (45 - 99 TONS) $45.41 1T 5D 8L
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $45.96 1T 5D 8L
CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $45,96 1T 50 8L
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $46.53 1T 50 8L
CRUSHERS $44.92 1T 5D 8L
DECK ENGINEER/DECK WINCHES (POWER) $44.92 1T 50 M.
DERRICK, BUILDING $45.41 1T 50 8L
DOZERS, D-9 & UNDER $44.50 1T 5D 8L
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $44.50 1T 5D 8L
DRILLING MACHINE $44.92 1T 50 8L
ELEVATOR AND MANLIFT, PERMANENT AND SHAFT-TYPE $42.14 1T 50 8L
EQUIPMENT SERVICE ENGINEER (OILER) $44.50 1T 5D 8L
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $44.92 1T 50 8L
FORK LIFTS, (3000 LBS AND OVER) $44.50 1T 5D 8L
FORK LIFTS, (UNDER 3000 LBS) $42.14 1T 5D 8L
GRADE ENGINEER $44.50 1T 5D 8L
GRADECHECKER AND STAKEMAN $42.14 1T 50 8L
GUARDRAIL PUNCH $44.92 1T 5D SL
HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS $44.50 1T 5D 8L
HORIZONTAUDIRECTIONAL DRILL LOCATOR $44.50 1T 50 8L
HORIZONTAL/DIRECTIONAL DRILL OPERATOR $44.92 1T 5D 8L
HYDRALIFTS/BOOM TRUCKS (10 TON & UNDER) $42.14 1T 50 BL
HYDRALIFTS/BOOM TRUCKS (OVER 10 TON) $44.50 1T 50 8L
LOADERS, OVERHEAD (6 YD UP TO 8 YD) $45.41 1T 5D 8L
LOADERS, OVERHEAD (8 YD & OVER) $45.96 1T 5D 8L
LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $44.92 1T 5D 8L
LOCOMOTIVES, ALL $44.92 1T 5D 8L
MECHANICS, ALL $45.41 1T 5D 8L
MIXERS, ASPHALT PLANT $44.92 1T 5D 8L
MOTOR PATROL GRADER (FINISHING) $44.92 1T 5D 8L
MOTOR PATROL GRADER (NON-FINISHING) $44.50 1T 5D 8L
MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $45.41 1T 5D BL
OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $42.14 1T 50 8L
OPERATOR
PAVEMENT BREAKER $42.14 1T 5D 8L
PILEDRIVER (OTHER THAN CRANE MOUNT) $44.92 1T 50 8L
PLANT OILER (ASPHALT, CRUSHER) $44.50 1T 50 8L
POSTHOLE DIGGER, MECHANICAL $42.14 1T 5D 8L
POWER PLANT $42.14 1T 50 8L
PUMPS, WATER $42.14 1T 50 8L
QUAD 9, 0-10, AND HD-41 $45.41 1T 5D 8L
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $45.41 1T 5D 8L
EQUIP
RIGGER AND BELLMAN $42.14 1T 50 8L
ROLLAGON $45.41 1T 50 8L
ROLLER, OTHER THAN PLANT ROAD MIX $42.14 1T 5D 8L
ROLLERS, PLANTMIX OR MULTILIFT MATERIALS $44,50 1T 50 8L
ROTO-MILL, ROTO-GRINDER $44.92 1T 5D SL
SAWS, CONCRETE $44.50 1T 5D BL
Page 6
CLALLAM COUNTY
Effective 03-02-08
**********wwwww*ww*************wwwwwwwwww*wwwwww******w*******wwwwwwwwwwww,wwwwwwwwwww**********www**wwwww
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification _ WAGE Code Code Cade
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $44.92 1T 5D 8L
OFF-ROAD EQUIPMENT ( UNDER 45 YD)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $45.41 1T 5D 8L
OFF-ROAD EQUIPMENT (45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL $44.50 1T 5D 8L
SCREED MAN $44.92 1T 5D 8L
SHOTCRETE GUNITE $42.14 1T 5D 8L
SLIPFORM PAVERS $45.41 1T 5D 8L
SPREADER, TOPSIDE OPERATOR - BLAW KNOX $44.92 1T 5D 8L
SUBGRADE TRIMMER $44.92 1T 5D 8L
TOWER BUCKET ELEVATORS $44.50 1T 50 BL
TRACTORS, (75 HP & UNDER) $44.50 1T 5D 8L
TRACTORS, (OVER 75 HP) $44.92 1T 50 8L
TRANSFER MATERIAL SERVICE MACHINE $44.92 1T 5D 8L
TRANSPORTERS, ALL TRACK OR TRUCK TYPE $45.41 1T 5D 8L
TRENCHING MACHINES $44.50 1T 5D BL
TRUCK CRANE OILER/DRIVER ( UNDER 100 TON) $44.50 1T 5D BL
TRUCK CRANE OILER/DRIVER (100 TON & OVER) $44.92 1T 50 BL
TRUCK MOUNT PORTABLE CONVEYER $44.92 1T 50 BL
WHEEL TRACTORS, FARMALL TYPE $42,14 1T 5D BL
YO YO PAY DOZER $44.92 1T 50 8L
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE $37.61 4A 5A
SPRAY PERSON $35,73 4A 5A
TREE EQUIPMENT OPERATOR $36.19 4A 5A
TREE TRIMMER $33.68 4A 5A
TREE TRIMMER GROUNDPERSON $25.43 4A 5A
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC $27,68 1
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEY LEVEL $43.75 1 M 5A
RESIDENTIAL CARPENTERS
JOURNEY LEVEL $17.85 1
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL $25.63 1
RESIDENTIAL DRYWALL TAPERS
JOURNEY LEVEL $18.00 1
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL $27.78 1
RESIDENTIAL GLAZIERS
JOURNEY LEVEL $21.36 1
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL $9.86 1
RESIDENTIAL LABORERS
JOURNEY LEVEL $18.08 1
RESIDENTIAL PAINTERS
JOURNEY LEVEL $15,97 1
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL $14.60 1
Page 7
CLALLAM COUNTY
Effective 03-02-08
wwwwww****************************w******* **********ww*****wwww****************wwwwwww*****************w
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
RESIDENTIAL REFRIGERATION & AIR CONDITIONING MECHANICS
JOURNEY LEVEL $55.41 1G 5A
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $33.04 1E 6L
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL $10.88 1
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $1a67 1
ROOFERS
JOURNEY LEVEL $36.78 1R 5A
USING IRRITABLE BITUMINOUS MATERIALS $39.78 1R 5A
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $51.97 1E 6L
SHIPBUILDING & SHIP REPAIR
BOILERMAKER $31,46 1H 6W
HEAT & FROST INSULATOR $46.59 1S 5J
LABORER $12,16 1
MACHINIST $17.16 1
SHIPFETTER $14.66 1
WELDER/BURNER $14.66 1
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL $19.29 1
SIGN MAKERS & INSTALLERS (NON -ELECTRICAL)
JOURNEY LEVEL $12.15 1
SOFT FLOOR LAYERS
JOURNEY LEVEL $36.08 16 5A
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL $10.31 1B 50
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $19.67 1
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEY LEVEL $13.23 1
SURVEYORS
CHAIN PERSON $9.35 1
INSTRUMENT PERSON $11.40 1
PARTY CHIEF $13.40 1
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $32.34 1E 5A
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER $30.66 2B 5A
HOLE DIGGER/GROUND PERSON $17.19 2B 5A
INSTALLER (REPAIRER) $29.41 213 5A
JOURNEY LEVEL TELEPHONE LINEPERSON $28.53 213 5A
SPECIAL APPARATUS INSTALLER I $30.66 213 5A
SPECIAL APPARATUS INSTALLER II $30,05 213 5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY) $30.66 2B 5A
TELEPHONE EQUIPMENT OPERATOR (LIGHT) $28.53 2B 5A
TELEVISION GROUND PERSON $16.31 2B 5A
TELEVISION LINEPERSON/INSTALLER $21.68 2B 5A
TELEVISION SYSTEM TECHNICIAN $35.78 2B 5A
TELEVISION TECHNICIAN $23.19 213 5A
TREE TRIMMER $28.53 213 5A
Page 8
CLALLAM COUNTY
Effective 03-02-08
**w*wwwww**ww*w******w***w*ww*****************ww**w**www****w*********************wwwwwwwww**************w
(See Benefit Code Key)
Over
PREVAILING The Holiday Note
Classification WAGE Code Code Code
TERRAZZO WORKERS & TILE SETTERS
JOURNEY LEVEL $41.96 1M 5A
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER $35.79 16 5A
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL $36.40 1K 5A
TRUCK DRIVERS
ASPHALT MIX (TO 16 YARDS) $41.19 1T 5D 8L
ASPHALT MIX (OVER 16 YARDS) $41.90 1T 5D 8L
DUMP TRUCK $20.23 1
DUMP TRUCK & TRAILER $20.23 1
OTHER TRUCKS $41.90 1T 5D 8L
TRANSIT MIXER $23.73 1
WELL DRILLERS & IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER $11.60 1
OILER $9.45 1
WELL DRILLER $11.60 1
Page 9
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3!212008
Stage of Progression & Hour Range
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL
ENVIRONMENTAL CONTROL PAINTERS
1 0000-1000 HOURS 50.00%
2 1001-2000 HOURS 60,00%
3 2001-3000 HOURS 75,00%
4 3001-4000 HOURS 90.00%
1 0000-1000 HOURS 60.00%
2 1001-2000 HOURS 70.00%
3 2001-3000 HOURS 80.0096
4 3001-4000 HOURS 90.00%
BOILERMAKERS
JOURNEY LEVEL
1 0000-1000 HOURS 70.00%
2 1001-2000 HOURS 75.00%
3 2001-3000 HOURS 80.00%
4 3001-4000 HOURS 85.00%
5 4001-5000 HOURS 90.00%
6 5001-6000 HOURS 95.00%
BRICK AND MARBLE MASONS
JOURNEY LEVEL
1 0000-0750 HOURS 50,00%
2 0751-2250 HOURS 55.00%
3 2251-3000 HOURS 60.00%
4 3001-3750 HOURS 70.00%
5 3751-4500 HOURS 80.00%
6 4501-5250 HOURS 90.00%
7 5251-6000 HOURS 95.00%
CARPENTERS
CARPENTER
1 0000-1000 HOURS 60.00%
2 1001-2000 HOURS 65.0096
3 2001-3000 HOURS 70.00%
4 3001-4000 HOURS 75.00%
5 4001-5000 HOURS 80,00%
6 5001-6000 HOURS 85,00%
7 6001-7000 HOURS 90,00%
8 7001-8000 HOURS 95.00%
DRYWALL APPLICATOR
DRYWALL, METAL STUD, AND CEILING APPLICATORS
1 0000-0700 HOURS 50.00%
2 0701-1400 HOURS 60.00%
3 1401-2100 HOURS 68.00%
4 2101-2800 HOURS 76.00%
5 2801-3500 HOURS 84.00%
Page 1
Prevailing Overtime Holiday Note
Wage Code Code Code
$19.32 1H 5D
$22.12 1H 5D
$28,51 1H 5D
$33.15 1H 5D
$25.02 1H 5D
$27.83 1H 50
$30.63 1H 5D
$33.44 1H 5D
$40.86 1C 5N
$42.44 1C 5N
$44.02 1C 5N
$45.60 1C 5N
$47,17 1C 5N
$48.75 1C 5N
$25.49 1M 5A
$27.05 1M 5A
$28,62 1M 5A
$31.74 1M 5A
$34.87 1M 5A
$37.99 1M 5A
$39.56 1M 5A
$26.68 1M 50
$32.38 1M 50
$34.00 1M 5D
$35.63 1M 5D
$37.25 1M 5D
$38.88 1M 5D
$40.50 1M 5D
$42.13 1M 5D
$23.46 1M 5D
$30.78 1M 5D
$33.38 1M 5D
$35,98 1M 5D
$38.59 1M 5D
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3!2/2008
Prevailing Overtime Holiday Note
Stage of Progression & Hour Range Wage Code Code Code
6 3501-4200 HOURS 92,00% $41.19 1M 5D
ACOUSTICAL WORKER
1 0000-1000 HOURS 50.00% $23.52 1M 5D
2 1001-2000 HOURS 60.00% $30.85 1M 5D
3 2001-3000 HOURS 68.00% $33.46 1M 50
4 3001-4000 HOURS 76,00% $36.07 1M 5D
5 4001-5000 HOURS 84.00% $38.69 1M 5D
6 5001-6000 HOURS 92,00% $41.30 1M 50
MILLWRIGHT AND MACHINE ERECTORS
1 1st Period 60.00% $27.28 1M 50
2 2nd Period 65.00% $33.03 1M 5D
3 3rd Period 70.00% $34,70 1M 5D
4 4th Period 75.00% $36.38 1M 5D
5 5th Period 80.00% $38.05 1M 50
6 6th Period 85.00% $39.73 1M 50
7 7th Period 90.00% $41.40 1M 513
8 8th Period 95.00% $43.08 1M 5D
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING
1 1st Period 60,00% $26.80 1M 5D
2 2nd Period 65.00% $32,51 1M 50
3 3rd Period 70.00% $34.14 1M 5D
4 4th Period 75.00% $35.78 1M 51D
5 5th Period 80.00% $37.41 1M 5D
6 6th Period 85.00% $39.05 1M 50
7 7th Period 90.00% $40.68 1M 50
8 8th Period 95.00% $42,32 1M 5D
BRIDGE, DOCK AND WARE CARPENTERS
1 lst Period 60.00% $26.68 1M 51)
2 2nd Period 65,00% $32.38 1M 5D
3 3rd Period 70,00% $34.00 1M 50
4 4th Period 75.00% $35.63 1M 5D
5 5th Period 80,00% $37.25 1M 5D
6 6th Period 85.00% $38.88 1M 5D
7 7th Period 90.00% $40.50 1M 5D
8 8th Period 95.00% $42.13 1M 5D
CEMENT MASONS
JOURNEY LEVEL
1 0000-1000 HOURS 50.00% $14.02 1H 5D
2 1001-2000 HOURS 60.00% $16.82 1H 5D
3 2001-3000 HOURS 70.00% $19.63 1H 50
4 3001-4000 HOURS 80.00% $22.43 1H 5D
5 4001-5000 HOURS 90.00% $25.24 1H 5D
6 5001-6000 HOURS 95.00% $26.64 1H 5D
DRYWALL TAPERS
Page 2
Stage of Progression & Hour Range
JOURNEY LEVEL
1 0000-1000 HOURS 50.00%
2 1001-2000 HOURS 55.00%
3 2001-3000 HOURS 65.00%
4 3001-4000 HOURS 75.00%
5 4001-5000 HOURS 85.00%
6 5001-6000 HOURS 90.00%
ELECTRICIANS - INSIDE
JOURNEY LEVEL
1 0000-1000 HOURS 40.00%
2 1001-2000 HOURS 50,00%
3 2001-3500 HOURS 55.00%
4 3501-5000 HOURS 65.00%
5 5001-6500 HOURS 75,00%
6 6501-8000 HOURS 85.00%
ELECTRICIANS - POWERLINE CONSTRUCTION
JOURNEY LEVEL LINEPERSON
1 0000-1000 HOURS 60.00%
2 1001-2000 HOURS 63.00%
3 2001-3000 HOURS 67.00%
4 3001-4000 HOURS 72.00%
5 4001-5000 HOURS 78,00%
6 5001-6000 HOURS 86,00%
7 6001-7000 HOURS 90.00%
POLE SPRAYER
1 0000-1000 HOURS 85.70%
2 1001-2000 HOURS 89.80%
3 2001-3000 HOURS 92.80%
ELEVATOR CONSTRUCTORS
MECHANIC
1 0000-1000 HOURS 50.00%
2 1001-1700 HOURS 55.00%
3 1701-3400 HOURS 65.00%
4 3401-5100 HOURS 70.00%
5 5101-6800 HOURS 80.00%
ELECTRONIC TECHNICIANS
ELECTRONIC TECHNICIANS JOURNEY LEVEL
1 0000-1000 HOURS 55.00%
2 1001-2000 HOURS 60,00%
3 2001-3000 HOURS 65,00%
4 3001-4000 HOURS 70.00%
5 4001-5000 HOURS 75.00%
6 5001-6000 HOURS 80.00%
7 6001-7000 HOURS 85.00%
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3/2/2008
Page 3
Prevailing Overtime Holiday Note
Wage Code Code Code
$28.29 1E 5P
$29.82 1E 5P
$32,88 1E 5P
$35.94 1E 5P
$39,00 1E 5P
$40.53 1E 5P
$22.49 1E 5A
$26.30 1E 5A
$31.46 1E 5A
$35.85 1E 5A
$40.26 1E 5A
$44.65 1E 5A
$33.08 4A 5A
$34,30 4A 5A
$35,87 4A 5A
$37,97 4A 5A
$40,42 4A 5A
$43,76 4A 5A
$45.34 4A 5A
$43,55 4A 5A
$45.23 4A 5A
$46.45 4A 5A
$21.61 4A 6Q
$39.43 4A 6Q
$44.00 4A 6Q
$46.88 4A 6Q
$51.53 4A 6Q
$8.07 1
$8.07 1
$8.07 1
$8.45 1
$9.05 1
$9.66 1
$10.26 1
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3/212008
Prevailing Overtime Holiday Note
Stage of Progression & Hour Range Wage Code Code Code
8 7001-8000 HOURS 96.00% $11.47 1
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL
1 0000-0800 HOURS 60.00% $21.18 1E 5A
2 0801-1500 HOURS 65.00% $22,58 1E 5A
3 1.601-2400 HOURS 70.00% $23.97 1E 5A
4 2401-3200 HOURS 75.00% $25.37 1E 5A
5 3201-4000 HOURS 80.00% $26.76 1E 5A
6 4001-4800 HOURS 85.00% $28,16 1E 5A
GLAZIERS
JOURNEY LEVEL
1 0000-1000 HOURS 50.00% $24.38 1H 50
2 1001-2000 HOURS 55.00% $26,32 1H 5G
3 2001-3000 HOURS 60.00% $28,26 1H 5G
4 3001-4000 HOURS 65.00% $30.19 1H 50
5 4001-5000 HOURS 70.00% $32.13 1H 5G
6 5001-6000 HOURS 75.00% $34.07 1H 50
7 6001-7000 HOURS 80.00% $36.01 1H 50
8 7001-8000 HOURS 90.00% $39.88 1H 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC
1 0000-1000 HOURS 40.00% $26.47 15 5J
2 1001-2000 HOURS 45.00% $28.14 1S 5J
3 2001-3000 HOURS 50.00% $29.82 1S 5J
4 3001-4000 HOURS 55.00% $31.50 1S 5J
5 4001-6000 HOURS 65.00% $34.85 15 5J
6 6001-8000 HOURS 75.00% $38,21 1S 5J
7 8001-10000 HOURS 85.00% $41.56 15 5J
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL
1 0000-1000 HOURS60.00% $25.02 1H 5D
2 1001-2000 HOURS 70.00% $27,83 1H 5D
3 2001-3000 HOURS 80,00% $30,63 1H 5D
4 3001-4000 HOURS 90,00% $33.44 1H 5D
INSULA TION A PPLICA TORS
JOURNEY LEVEL
1 0000-1000 HOURS 50.00% $10.25 1
2 1001-2000 HOURS 60.00% $12.30 1
3 2001-3000 HOURS 75.00% $15.38 1
4 3001-4000 HOURS 90.00% $18.45 1
IRONWORKERS
JOURNEY LEVEL
1 0000-0750 HOURS 65.00%
2 0751-1500 HOURS 70.00%
Page 4
$28.08 10 5A
$29.70 10 5A
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
31212008
Prevailing Overtime Holiday Note
Stage of Progression & Hour Range Wage Code Code Code
3 1501-2250 HOURS 75.00% $39,82 10 5A
4 2251-3000 HOURS 80.00% $41.44 10 5A
5 3001-3750 HOURS 90.00% $44,68 10 5A
6 3751-4500 HOURS 90.00% $444,68 10 5A
7 4501-5250 HOURS 95.00% $46.30 10 5A
8 5251-6000 HOURS 95.00% $46,30 10 5A
LABORERS
GENERAL LABORER
1 0000-1000 HOURS 60.00% $25,02 1H 5D
2 1001-2000 HOURS 70,00% $27.83 1H 50
3 2001-3000 HOURS 80,00% $30.63 1H 5D
4 3001-4000 HOURS 90,00% $33.44 1H 50
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER
1 0000-1000 HOURS 60.00% $25.02 1H 5D
2 1001-2000 HOURS 70.00% $27.83 1H 5D
3 2001-3000 HOURS 80.00% $30.63 1H 5D
4 3001-4000 HOURS 90.00% $33.44 1H 5D
LATHERS
JOURNEY LEVEL
1 0000-0700 HOURS 50.00% $23.46 1M 5D
2 0701-1400 HOURS 60.00% $30.78 1M 5D
3 1401-2100 HOURS 68.00% $33.38 1M 5D
4 2101-2800 HOURS 76,00% $35.98 1M 5D
5 2801-3500 HOURS 84.00% $38.59 1M 5D
6 3501-4200 HOURS 92,00% $41.19 1M 5D
PAINTERS
JOURNEY LEVEL
1 0000-0750 HOURS 52.00% $19,74 2B 5A
2 0751-1500 HOURS 56.00% $20,81 2B 5A
3 1501-2250 HOURS 60.00% $2t88 2B 5A
4 2251-3000 HOURS 64.00% $23.81 2B 5A
5 3001-3750 HOURS 68.00% $24,93 2B 5A
6 4001-4800 HOURS 72.00% $26.06 26 5A
PLASTERERS
JOURNEY LEVEL
1 0000-0500 HOURS 40.00% $10.33 1
2 0501-1000 HOURS45.00% $11.62 1
3 1001-1500 HOURS 45.00% $11.62 1
4 1501-2000 HOURS 50.00% $12.92 1
5 2001-2500 HOURS 55.00% $14.21 1
6 2501-3000 HOURS 60.00% $15.50 1
7 3001-3500 HOURS 65.00% $16.79 1
8 3501-4000 HOURS 70,00% $18.08 1
Page 6
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3/212008
Prevailing Overtime Holiday Note
Stage of Progression & Hour Range Wage Code Code Code
9 4001-4500 HOURS 75.00% $19.37 1
10 4501-5000 HOURS 80.00% $20.66 1
11 5001-5500 HOURS 85.00% $21.98 1
12 5501-6000 HOURS 90.00% $23.25 1
13 6001-6500 HOURS 95.00% $24.54 1
14 6501-7000 HOURS 95.00% $24.54 1
PLUMBERS & P!PEF!TTERS
JOURNEY LEVEL
1 0000-2000 HOURS 50.00% $35.53 1G 5A
2 2001-4000 HOURS 62.50% $46.65 1G 5A
3 4001-6000 HOURS 70.00% $49.70 1G 5A
4 6001-8000 HOURS 75.00% $51.72 1G 5A
5 8001-10000 HOURS 85.00% $55.77 1G 5A
POWER EQUIPMENT OPERATORS
BACKHOES, (75 HP & UNDER)
ALL EQUIPMENT
1 0000-1000 HOURS 65.00% $33,39 1T 5D 8L
2 1001-2000 HOURS 70.00% $34.98 1T 5D 81.
3 2001-3000 HOURS 75.00% $36,56 1T 5D 8L
4 3001-4000 HOURS 80.00% $38.15 1T 5D 8L
5 4001-5000 HOURS 90.00% $41.33 1T 5D BL
6 5001-6000 HOURS 95.00% $42,91 1T 5D 8L
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
1 0000-1000 HOURS 65.00% $33.39
2 1001-2000 HOURS 70.00% $34.98
3 2001-3000 HOURS 75.00% $36.56
4 3001-4000 HOURS 80.00% $38.15
5 4001-5000 HOURS 90,00% $41.33
8 5001-8000 HOURS 95.00% $42.91
POWER LINE CLEARANCE TREE TRIMMERS
TREE TRIMMER
1 0000-1000 HOURS 75.00% $26.65 4A 5A
2 1001-2000 HOURS 80,00% $27.88 4A 5A
3 2001-3000 HOURS 85.00% $29.13 4A 5A
4 3001-4000 HOURS 90.00% $30,37 4A 5A
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
1 0000-2000 HOURS 50.00% $13.84 1
2 2001-4000 HOURS 55.00% $15,22 1
3 4001-6000 HOURS 60.00% $16.61 1
4 6001-8000 HOURS 70.00% $19.38 1
5 8001-10000 HOURS 85.00% $23.53 1
RESIDENTIAL CARPENTERS
Page 6
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3/2/2008
Prevailing Overtime Holiday Note
Stage of Progression & Hour Range Wage Code Code Code
JOURNEY LEVEL
1 1st Period 60.00% $10,71 1
2 2nd Period 65.00% $11.60 1
3 3rd Period 70.00% $12,50 1
4 4th Period 75.00% $13.39 1
5 5th Period 80.00% $14.28 1
6 6th Period 85.00% $16.17 1
7 7th Period 90.00% $16.07 1
8 8th Period 95.00% $16.96 1
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL
1 0000-0900 HOURS 50.00% $13.89 1
2 0901-1800 HOURS 55.00% $15.28 1
3 1801-2700 HOURS 75.00% $20.84 1
4 2701-4000 HOURS 85.00% $23.61 1
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
1 0000-1000 HOURS 55.00% $8.07 1
2 1001-2000 HOURS 65.00% $9,49 1
3 2001-4000 HOURS 75,00% $10.95 1
4 4001-6000 HOURS 85.00% $12.41 1
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
1 0000-0900 HOURS 55.00%$17.03 1E 6L
2 0901-1800 HOURS 60.00% $17.94 1E 6L
3 1801-2700 HOURS 65.00% $19.27 1E 6L
4 2701-3600 HOURS 70,00% $20.19 1E 61..
5 3601-4500 HOURS 75.00% $21.35 IE 6L
6 4501-5400 HOURS 80.00% $2226, 1E 6L
ROOFERS
JOURNEY LEVEL
1 0000-0820 HOURS 60.00% $23.83 1R 5A
2 0821-1630 HOURS 67.00% $25.70 1R 5A
3 1631-2450 HOURS 74.00% $27.56 1R 5A
4 2451-3270 HOURS 81.00% $31.72 1R 5A
5 3271-4080 HOURS 88.00% $33.59 1R 5A
6 4081-4899 HOURS 95.00% $35,45 1R 5A
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
1 0000-2000 HOURS 45.00% $22,90 1E 6L
2 2001-3000 HOURS 50,00% $31.63 1E 6L
3 3001-4000 HOURS 55.00% $33.53 1E 6L
4 4001-5000 HOURS 60.00% $35.46 1E 6L
5 5001-6000 HOURS 65.00% $37.40 1E 6L
Page 7
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3!2/2008
Prevailing Overtime Holiday Note
Stage of Progression & Hour Range Wage Code Code Code
6 6001-7000 HOURS 70.00% $39.31 1E 6L
7 7001-8000 HOURS 75.00% $41.24 1E 6L
8 8001-9000 HOURS 80.00% $43.16 1E 6L
9 9001-10000 HOURS 85.00% $45.09 1E 6L
SOFT FLOOR LAYERS
JOURNEY LEVEL,
1 0000-1000 HOURS 50.00% $17,97 16 5A
2 1001-2000 HOURS 60.00% $20.08 1B 5A
3 2001-3000 HOURS 70.00% $26,94 1B 5A
4 3001-4000 HOURS 75.00% $28.46 16 5A
5 4001-5000 HOURS 80.00% $29.98 16 5A
6 5001-6000 HOURS 85.00% $31.51 16 5A
7 6001-7000 HOURS 90.00% $33.03 16 5A
8 7001-8000 HOURS 95.00% $34.56 1B SA
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL
GRADE 1 (INDENTURED AFTER APRIL 1, 2000)
1 0000-1000 HOURS 45,00% $8.85 1
2 1001-2000 HOURS 50.00% $9.84 1
3 2001-3000 HOURS 55.00% $10.82 1
4 3001-4000 HOURS 60.00% $11.80 1
1 0000-1000 HOURS 40.00% $8.07 1
2 1001-2000 HOURS 45.00% $8.85 1
3 2001-3000 HOURS 50.00% $9.84 1
4 3001-4000 HOURS 55,00% $10.82 1
1 0000-1000 HOURS 65.00% $12.79 1
2 1001-2000 HOURS 70.00% $13.77 1
3 2001-3000 HOURS 75,00% $14.75 1
4 3001-4000 HOURS 80.00% $15.74 1
5 4001-5000 HOURS 85.00% $16.72 1
6 5001-6000 HOURS 90.00% $17.70 1
1 0000-1000 HOURS 60.00% $11.80 1
2 1001-2000 HOURS 65.00% $12,79 1
3 2001-3000 HOURS 70.00% $13.77 1
4 3001-4000 HOURS 75.00% $14.75 1
5 4001-6000 HOURS 80.00% $15,74 1
6 5001-6000 HOURS 85.00% $16.72 1
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
1 0000-1000 HOURS 50.00% $24.35 16 5A
2 1001-2500 HOURS 55.00% $25,82 1B 5A
3 2501-3500 HOURS 60,00% $27.27 16 5A
4 3501-4500 HOURS 70.00% $30.22 16 5A
TERRAZZO WORKERS & TILE SETTERS
Page 8
Stage of Progression & Hour Range
JOURNEY LEVEL
PREVAILING WAGE RATES
FOR
CLALLAM COUNTY
APPRENTICES
EFFECTIVE DATE
3/2/2008
Prevailing Overtime Holiday Note
Wage Code Code Code
1 0000-1000 HOURS 50.00% $25.00 1M 5A
2 1001-2500 HOURS 55.00% $26.53 1M SA
3 2501-3500 HOURS 60.00% $28.06 1M 5A
4 3501-4500 HOURS 70.00% $31.12 1M SA
5 4501-5500 HOURS 80.00% $34.19 1M 5A
6 5501-6250 HOURS 90.00% $37.25 IM 5A
7 6251-7000 HOURS 95.00% $38.78 1M 5A
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL
1 0000-0500 HOURS 60.00% $15,23 1K 5A
2 0501-1000 HOURS 60.00% $20.55 1K 5A
3 1001-2333 HOURS 60,00% $24,05 1K 5A
4 2334-4666 HOURS 73,00% $28.06 1K 5A
5 4667-7000 HOURS 88.00% $32.69 1K 5A
TRUCK DRIVERS
DUMP TRUCK
ALL TRUCKS
1 0000-0700 HOURS 70.00% $14.16 1
2 0701-1400 HOURS 80.00% $16.18 1
3 1401-2100 HOURS 90,00% $18.21 1
Page 9