AMENDMENT NO. 5 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
STUDIO CASCADE, INC
PROJECT WTIP
THIS AMENDMENT NO. 5 is made and entered into this day of March, 2014, by and
between the City of Port Angeles, a non-charter code city of the State of Washington,
(hereinafter called the "CITY") and Studio, Cascade Inc., a Washington Corporation (hereinafter
called the "CONSULTANT").
WHEREAS, the CITY and the CONSULTANT entered into an Agreement on May 5, 2011 for
design of the Waterfront Transportation Improvements ("AGREEMENT"); and
WHEREAS, the CITY and the CONSULTANT now wish to amend the scope of work and
budget of that AGREEMENT; and
WHEREAS, this amendment to the AGREEMENT satisfies the criteria of Port Angeles
Municipal Code 3.05.110;
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the
parties hereto agree as follows:
SECTION 1
The CITY entered into an AGREEMENT with the CONSULTANT on May 11, 2011 (the
AGREEMENT).
SECTION 2
I. REVISED SCOPE OF WORK
Exhibit A is amended to add the following additional work to Item 6:
The West End Park design process is essentially complete, except for a final set of revisions to
respond to agency comments and a change in trail width from 10' to 12' with 2' shoulders on
either side. This Addendum 5 includes an allowance for design team fees to make those
revisions to the design and bid specifications. It also includes work tasks to reimburse the design
team for design team support through the esplanade's construction.
Addendum 5 includes these additional services, resulting in a contract value increase of$46,030.
Task Description I SCI Zenovic HBB Total
Esplanade Response to project changes related to 1 2,000 22,830 24,830
construction design Black Ball Ferry terminal, Railroad Ave
support curb design, piling modifications,and
contractor requests for information in
excess of initial budget allocation.
100%design Revision of design and bid specifications 0 8,000 8,100 16,100
revisions to accommodate widened trail and to
respond to other agency comments.
Mitigation planting Revision of West End Park design and 0 1,000 4,100 5,100
and irrigation plans specifications to reflect agency
requirements for immediate improvement
of rni!i gation planting at-ea.
Total extra 2,000 31,830 12,200 46,030
services
11. MAXIMUM COMPENSATION
Section VI of the Agreement is amended as follows:
The not to exceed amount is increased by $46,030 to $1,561,172.
Ill. REVISED EXHIBITS
EXHIBIT "C" is amended, increasing the budget for Task 6 by $46,030 to $132,935.
SECTION 3 RATIFICATION
As modified herein, the AGREEMENT is confirmed and ratified.
In WITNESS WHEREOF, the parties hereto have executed this Amendment No. 5 to the
Agreement as of the date and year first written above.
CITY OF PORT ANGELES STUDIO CASCADE, INC
By: B
City Manager
ATTEST:
Ja �saHur�dCity�Clerk���
APPROVED AS TO FORM:
William E. Bloor, City motor ey