HomeMy WebLinkAbout000570 Amendment WASHINGTON STATE #o O-.x70
Recreation and
Conservation Office Amendment to Project Agreement
Project Sponsor: City of Port Angeles Project Number: 10-1618D
Project Title: Port Angeles Waterfront Park Phase I Amendment Number: 2
Amendment Type:
Cost Change
Amendment Description:
With the availability of additional Aquatic Lands Enhancement Account funds, the Project Agreement is amended
to increase the grant amount by$27,027 for a total of$702,709 for this partially funded project. The Sponsor
match is increased by $27,027 for a total of$702,709. The grant funds are from the 2011-2013 biennium for the
#12-1299C project.
Project Funding:
The total cost of the project for the purpose of this Agreement changes as follows:
Old Amount New Amount
Amount % Amount %
RCO-ALEA $675,682.00 50.00% $702,709.00 50.00%
Project Sponsor $675,682.00 50.00% $702,709.00 50.00%
Total Project Cost $1,351,364.00 100% $1,405,418.00 100%
Admin Limit $0.00 5.00% $0.00 5.00%
A&E Limit $225,227.00 20.00% $234,236.33 20.00%
Agreement Terms
In all other respects the Agreement, to which this is an Amendment, and attachments thereto, shall
remain in full force and effect. In witness whereof the parties hereto have executed this Amendment.
State Of Washington City of Port Angeles
Recreation and Conservation Office
AGENCY: °°` �, - -
BY: -.
,�,Ka1'ee Cottingham
`,c RUC C
TITLE: Director
TITLE:
DATE:
DATE: 1111 -7
1
Pre-approved as to form:
BY: /S/
Assistant Attorney General
ALEA Project Cost Change Amendment
Aauatic Lands Enhancement Acct Chapter 79.105.150 RICK Chaster 286 WAC
AMENAGR1.RPT
Amendment Agreement Description
Project Sponsor: Cih/ nf Port Angeles Project Number: 10-1018 [}
Project Title: PVrtAngeles Waterfront Park Phase Amendment Number: 2
Agreement Description
The City of Port Angeles will develop a 2.4-acre park located on the waterfront in the downtown area. This park will be
developed as passive use open space to support activities such as walking, biking, kite flying' picnioking, dog walking,
fishing, beachcombing, and non-motorized boat launching. The developed park will consist of a .18-mi|e segment ofthe
Olympic Discovery Trail, the creation of two small natural beaches (protected by hp-nap jetties or"rock dhftsiUs'). p|azoa,
seating areas, public art, an informational kiosk, signage, native plantings along the shoreline, benches, lighting, and
formal landscaping throughout the property to include grass and trees. In addibon, paved and pervious surface pathways
will be built to connect all park features and provide access to adjacent public areas. The scope of this project does nnt
include the existing pier.
Page 1
AAGREEDSC,RPT March 21, 2014
Amendment Special Conditions
Project Sponsor: City Cf Port Angeles Project Number: 10-1018D
Project Title: Port Angeles Waterfront Park Phase | Amendment Number: 2
Special Conditions
At the signing of this Agreement, the City of Port Angeles' |aoSe of the project property does not satisfy RC[}'e
requirements for Control and Tenure. The City's Lease with Washington Department of Natural Resources (DNR
#22-O81288' terminating June 3O' 2O22) does not include the entire project pnoporty. nVrexbandthnough2O41.
Therefore, oe conditions of this agreement;
a) The City of Port Angeles will not begin construction of the pmrh, nor he reimbursed by ROO for eligible project
expnnsea, until its current |omee is amended to secure Control and Tenure of the entire project property including
the footprint of the planned rook drift sills.
b) Furthermore, after the current lease is amended and prior to June 30 2021, the City of Port Angeles agrees to
seek (and subsiquently obtain) a new lease or a lease extension with DNR that satisfies RCO's policy for
sponsor Control and Tenure of funded projects. Any new lease, or lease extension must have otermination
date of November 3U. 2O41orlater. The City of Port Angeles may seek and obtain another instrument that
satisfies RC<]'m Control and Tenure policies. Any such instrument must also have a termination date of
November 3O. 2O41 or later.
If sponsor fails to satisfy these Special Conditions, the City of Port Angeles is responsible for satisfying the conversion
replacement requirements established by the Recreation and Conservation Funding Board, per Section E: Ongoing
[)b|igadmn, of the project agreement and Gaction 23: Restrictions on Conversion of Real Property and/or Facilities to
Other Uses of the Standard Terms and Conditions.
�
AGpECCONDRPT March 21. 2O14 Page
Amendment Eligible Scope Activities
Project Sponsor: City of Port Angeles Project Number:1D-1O18
Project Title: Port Angeles Waterfront Park Phase | Project Type:Development
PnmQnnnm: Aquatic Lands Enhancement Acct Anoendmment#: 2
Project Metrics
Sites Improved
Project acres developed: 2.00
To include two small natural beaches.
Project acres renovated: 0.40
To include demolition nf rip rap h7allow
for the development of two small
beaches and drift sills.
Development Metrics
Worksiteff1. Waterfront Park
Boating Infrastructure
Breakwater development
2 rock drift sills (or '}otties') that provide
protection /o the natural beach.
General Site Improvements
Oeve|oppathshwe|kxvmys
Select the surface of the path/wa|kmoy: Concrete, Crushed rock, Other pervious
surface
Linear feet ofpath/wg|kvvay: QOO
Walkway lighting provided (yes/no): Yes
Number of walkway bridges: O new, Orenovated
Develop viewpoint
Number of designated viewpoints: 2 new, Orenovated
Two new viewpoints will 8ecreated
along park trails ms they near the beach.
Select the viewpoint structures: Benchoe/seadng. Other
Various public art pieces.
|nste|| fenc|nQ/bmrrinrs
Install general site structures
Select one or more of the sheltered structures included in the project: None
Select one or more of the surface structures included in the project: P|azao. Recycle stations, Retaining wo||.
Seating wall
Install lighting (general security)
Number of general security lights installed: U
|nstaUoiQns/kiosk
Number ofkiosks: 2 new' O renovated
Number nfinterpretive signs/displays: 2 new, O renovated
Number of permanent entrance signs: 2 new, Orenovated
Project involves installation of informational signs (yes/no): Y*»
Install site furnishings
Landscaping improvements
Acres of landscaped area 2.00
Select the landscape features: Graas/turf. Groundcover. Irrigation,
Native vegetation, Planters, Raised
beda. Tnaea/shruba
Shoreline protection
�
Linear feet of shoreline protection: 100
AeL|GnEURPT March 21' 2014 Page: 1
Amendment Eligible Scope Activities
Select the shoreline protection type: Boulders, Plantings/vegetation, Rip nsp.
Rock armor
Site Preparation
General site preparation
Trails
Trail development
Linear miles oftrail O.10 new, O.00renovated
A1O foot wide section of the Olympic
Discovery Trail.
Select the trail surface types: Concrete, Crushed rock, Other pervious
surface
Linear miles ofboardwalk U.00 new, O.00renovated
Select the trail structures Pull-outs
Number oftnai|heods: O new, Urenovated
Utilities
Install power utilities
Select the power utilities: General service connection, Power line
Water Access
Develop access point
Number of designated water access points: 2
Describe the designated water access point(stairs, ramp. etc.): It is anticipated that two water access
points via the natural beaches will be
developed with stairs and/or natural
slope to the water.
Develop beach
Linear feet ofbeach 150
Select the type of beach: Gravel/rock, Natural, Sand
Develop hand launch facilities
Number of hand launches: 2 new, Orenovated
Select the type Of hand launch facility: Natural
Cultural Resources
Cultural resources
Permits
Obtain permits
Architectural 8. Engineering
Architectural @. Engineering (/\&E)
AELIGREURPT March 21, 2014 Page: 2
RECREATION AND CONSERVATION OFFICE FnRMA49 State ofWashington
Agency Name INVOICE VOUCHER
Sponsor's Certificate. |hereby certify under penalty ofperjury that the items
Recreation and Conservation Office and totals listed herein are proper oho nformmo,ie|*.morchand|uanr
P.O. Box 40917 services furnished m the State o[Washington,and that all goods furnished
Olympia, WA 98504-0917 and/or services rendered have been provided without discrimination because
of age,sex,marital status,race,creed, color, national origin, handicap,
religion o,Vietnam era nr disabled veterans status.
Sponsor
BY
Port Angeles City of
PO Box 1150
Port Angeles,WA 98362 (TITLE) (DATE)
Category 4: Backup documentation tobe submitted upon request
Project Number 10-1618 D Billing# Billing Period This is a Final Billing?
Project Name Port Angeles Waterfront Park Phase I From: To: Yes[ No[ I
rev lou sti�4 6dh6 Costs For This Billing
Project N ' Non-Reimbursable
Expenclitu
CATEGORIES: Agreement Expenditure, res Match Total
Construction
Development Total
FUNDING& EXPENDITURE FORMULA
For RCO Use ONLY
Sponsor: 50.00000% $702,709.00 Total Billed
RCO Federal: Share Billed
RCO: ALEA 50,00000% $702,709.00 Share Approved
Advance Balance
Match Owed Balance
Share Retained
Share Paid
Agreement Total: 100.00000% $1,405,418.00 Match Bank
en
oc Date;!
0086 SWV0007712-00 10-1618 D
Tra
210 02R J10 95000 NZ 0086
210 02R S07 95000 NZ 0086
Project Manager/Date Accounting/Date-
1|NVO|CERPT 3/21/2014