City Of Port Angeles
Police De rtnl8Ot
321 East 5,' Street / Port Angeles, WA 98362
�
�
�
�
�
�
�
Contract No.&Title
Waterfront Camera Pr
Project Manager: Brian S.Smith
PD,teM Change
,�P,rt PEN Prime: Cascade Networks
Order No, I
Change Title:Computer hardware/software
Change Scope/Justification: Testing has shown that the"virtual machine"(VIVI)application in the patrol roorn and detective work area will
not allow any of the twelve VIVI connected computers to view camera images from tire Waterfront camera system, The Imagesare
scrambled and distorted. The engineers with the vendor and the contractor are working on a solution but have not found anything to date
that will allow officer and detective access to this system while Inside theIrwork areas. What Is proposed In the addition of one CPU,flat
screen,and keyboard for the patrol room and one CPU,keyboard,and flat screen for the detective work area.. This will allow the contractor
to load the needed software and conneetthe DVR,and allow the officers to use the Waterfrontcamera systern Indoors. Dosktopsoutside
the VIVI and all the mobile data computers are able(through a direct Internet connect connection)to access the Waterfront camera system.
Per section 4 of the contract("Expansion Clause"),this change cannot be separately bid,it Is for a reasonable purpose,the change was not
known to the City or Vendor at the time of bK
CONTRACT AMOUNT
Mn -111---I'll 11-1-1. -11-1-1-1-1...........--..-
al Contract $236,805,01 Original SUbstanti rnple
Previous Time
7PievifoUS Chanige Orders N/A e o ays).
7(%ange Order
This Change Order
Amount(including $3845.70 Suspensiori of Work(days) N/A
New Contract Amount 240,650.71 Change Order til Time No extension
Extension(days) Needed.
New$ubstantlal Completion As in contract
CONTRACTOR:Cascade Networks, Inc, CITY OF PORTANGELES
Signature Signature
lw�
Brian E. Magnuson, President Terry K. Gallagher,Chief of Police
'
This Change Proposal shall represent full and complete compensation and final setnemootvf all Claims for all(1)time;(2)
direct,|nmmc\and overhead costs;(3)pmM, and(4)costs o,dmmmgesassociated with delay,|ncummn\onco disruption of
schedule,impact,ripple effect,loss of efficiency or productivity,acceleration of work,lost profits,and/or any other costs or
damages related to any work either covered or affected by the Change Proposal,or related to the events giving rise to
Change Proposal,