AMENDMENT NO. 1 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN THE
THE CITY OF PORT ANGELES
AND
NORTHWESTERN TERRITORIES INC.
RELATING TO
ENGINEERING, SURVEYING, AND PERMITTING SERVICES FOR SUBDIVISION CITY'S
DELGUZZI DRIVE PROPERTIES
THIS AMENDMENT NO. 1 TO THE AGREEMENT is made and entered into this al 4t day
of May, 2002, by and between THE CITY OF PORT ANGELES, a non charter code city of the
State of Washington, (hereinafter called the "CITY and NORTHWESTERN TERRITORIES
INC., a Washington Corporation (hereinafter called the "CONSULTANT
WHEREAS, the CITY entered in to an AGREEMENT with the CONSULTANT on FEBRUARY
5, 2002, and
WHEREAS, the CITY desires to amend the AGREEMENT to revise the Scope of Work,
Budget, and Time of Performance,
NOW, THEREFORE, in consideration of the above representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the
parties hereto agree as follows:
I REVISED SCOPE OF WORK
The revised scope of professional services to be performed and the results to be achieved'by
the CONSULTANT shall be as detailed in the attached Exhibit Al and shall include all services
and material necessary to accomplish the work.
II TIME OF PERFORMANCE
The work shall be completed by JULY 31, 2002 unless extended by mutual agreement.
III MAXIMUM COMPENSATION
The CONSULTANT'S total compensation and reimbursement under the original Agreement
and Amendment No. 1 to the Agreement, including labor, direct non -salary reimbursable costs
and outside services, shall not exceed the total and subtotals for the tasks as set forth in the
attached Exhibit Al Amounts budgeted for each task may be adjusted by mutual agreement
without an amendment to the Agreement, as long as the maximum compensation amount of
$38,500.000 is not exceeded.
A
IV SIGNATURES
Except as modified in this Amendment No. 1 to the Agreement, the original Agreement and its
Exhibits shall remain in effect.
In WITNESS THEREOF, the parties hereto have executed this Amendment No. 1 to the
Agreement as of the day and year first written above.
CITY OF PORT ANGELES:
M OR
CONSULTANT:
TITLE: Fri 1 cL (des eer
APPROVED AS TO FORM:
CRAIG KNUTS CITY ATTORNEY
ATTEST:
1 1,
BECKY U N, ITY CLERK
N. \PROJECTS\22 -05 DelGuzzi\Amendment No 1.wpd
EXHIBIT Al
City of Port angeles Del Guzzi Drive Subdivision Phase 2
Cost Estimate for Final Platting Activities
Task Who Type Function Status Hrs Rate Amount Task Amount
0 Preliminary Study (Phase 1) Done $3,500.00
1 Preliminary Plat Map (Directed Phase 1 Services) Done $1,672.00
2 Preliminary Plat Hearings /Mt Bob Leach Engineer Attendance Pending 8 $83 00 $664 00
Kate Waddell Technician Support Pending 4 $63 00 $252.00 $916.00
3 Prepare Construction Plans Bob Leach Engineer Design Pending 16 $83 00 $1,328 00
(Scope of work unknown) Kate Waddell Technician Design Drafting Pending 16 $63 00 $1,008.00
Debora West Technical Aide Engr Assistance Pending 4 $40 00 $160 00 $2,496.00
4 Coord w/ Other Infrastructure Bob Leach Engineer Design Pending 16 $83 00 $1,328 00
Installation, etc (Pwr, Ph, Cab Kate Waddell Technican Design Drafting Pending 8 $63.00 $504 00
Bob Leach Engineer Inspection, etc Pending 16 $83 00 $1,328 00 $3,160.00
5 Prepre Final Plat Rob Johnston Office Surveyor Design Calcs Pending 64 $83 00 $5,312 00
Bob Leach Engineer Design Pending 8 $83 00 $664 00
Brian McElravy Technican Drafting Calcs Pending 48 $63 00 $3,024.00
Field Crew Field Surveyors Staking Pending 80 $115 00 $9,200 00
Misc Fees, etc Pending 1 $500 00 $500.00 $18,700.00
6 Final Plat Hearings /Mtgs Bob Leach Engineer Attendance Pending 8 $83 00 $664 00
Kate Waddell Technician Support Pending 4 $63 00 $252 00 $916.00
7 Permitting Assistance Various Pending 1 $2,140 00 $2,140.00 $2,140.00
8 Directed Services Various Pending 1 $5,000 00 $5,000 00 $5,000.00
Estimated Cost $38,500.00
Proposed Phase 1 2 Budget "°1V $38,500.00
.'b4 ors Arc.•.a
The scope of work for the installation of require�faciltiies h not yet been determined