HomeMy WebLinkAbout000092 Amendment 2SECTION 1
AMENDMENT NO. 2 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
STUDIO CASCADE, INC
PROJECT WTIP
000092
r
THIS AMENDMENT NO. 2 is made and entered into this 1 day of October, 2012, by and
between the City of Port Angeles, a non charter code city of the State of Washington,
(hereinafter called the "CITY and Studio, Cascade Inc., a Washington Corporation (hereinafter
called the "CONSULTANT
WHEREAS, this amendment to the AGREEMENT satisfies the criteria of Port Angeles
Municipal Code 3.05.110;
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the
parties hereto agree as follows:
The CITY entered into an AGREEMENT with the CONSULTANT on May 5, 2011 (the
AGREEMENT).
SECTION 2
I. MAXIMUM COMPENSATION
Section VI of the Agreement is amended as follows:
The not to exceed amount is increased by $40,000 to $1,299,622.
II. REVISED EXHIBITS
EXHIBIT "A" is amended adding a new Item 6, with tasks, as follows:
6. Construction Design Consultation
The Studio Cascade design team and respective sub consultants, as listed below, will provide technical
support during the Phase 1 construction of the Port Angeles Waterfront Improvements Project
(Esplanade, Railroad Avenue Far West, Oak Street) as follows:
Zenovic
General project coordination between construction manager and design team, site inspections as
required, attend weekly meetings as required
KPFF
On -site observation of pile installation on the first day and final pile installation inspection upon
completion
Hart Crowser
On -site observation of pile installation on the first day and subgrade evaluation in Railroad
Avenue and Oak Street
CGS
On -site observation of rip rap placement on the first day
Studio Cascade
General project coordination between City and technical subcontractors and one site visit as
requested by construction manager
Team Artist
Review of proposed trail marker fabrication strategy, installation approach and field review of
initial prototype installation
LMN
One site visit as requested by construction manager to review formwork, discuss construction
method, or respond to questions
Sazan
One site visit as requested by construction manager to review installation strategy, discuss
construction, or respond to questions
HBB
One site visit as requested by construction manager to review preliminary grading, discuss
construction method, or respond to questions
The City may request Studio Cascade provide additional services on a time and materials basis per section
XII of the Agreement "Extra Work. The cost for these items will be $150 per hour. Examples include
the following:
Review of requests for information and change orders
Review of submittals, including "or equal" items
Project meeting attendance for subconsultants other than Zenovic
EXHIBIT "C" is amended adding a new Task 6 with budget of $40,000.
SECTION 3 RATIFICATION
As modified herein, the AGREEMENT is confirmed and ratified.
In WITNESS WHEREOF, the parties hereto have executed this Amendment No. 2 to the
Agreement as of the date and year first written above.
CITY OF PORT ANGELES
By:
ATTEST:
City Manager
sa Hurd, City Clerk
APPROVED AS TO FORM:
le
William E. Bloor, City Attorney
STUDIO CASCADE, INC