HomeMy WebLinkAbout5.923 Amendment 1Revision No. 1, Exhibit E
METERING
Effective on October 1, 2011
Revision No. 1 updates sections 1.1 and 1.3 to include current point of delivery and point of
metering locations and adds section 3, ,Signatures.
1 METERING
1.1 Directly Connected Points of Delivery and Load Metering
(1) BPA POD Name: Nippon 69 kV;
BPA POD Number: 163;
WECC Balancing Authority: BPAT;
Location: the point in BPA's Port Angeles Substation, where the
69 kV facilities of BPA and Port Angeles are connected for service to
the Nippon Paper Mill;
Voltage: 69 kV;
Metering: in BPA's Port Angeles Substation in the 69 kV circuit over
which such electric power flows;
(A) BPA Meter Point Name: Nippon In;
BPA Meter Point Number: 158;
Direction for PF Billing Purposes: Negative;
Manner of Service: Direct, Port Angeles to BPA;
(B) BPA Meter Point Name: Nippon Out;
BPA Meter Point Number: 459;
Direction for PF Billing Purposes: Positive;
Manner of Service: Direct, BPA to Port Angeles;
Metering Loss Adjustment: None;
Exception: None.
(2) BPA POD Name: Port Angeles 69 kV;
BPA POD Number: 542;
WECC Balancing Authority: BPAT;
Location: the points in BPA's Port Angeles Substation, where the
69 kV facilities of BPA and Port Angeles are connected;
Voltage: 69 kV;
5, 7-13
09PB- 13093, Port Angeles 1 of 3
Metering: in BPA's Port Angeles Substation in the 69 kV circuit over
which such electric power flows;
(A) BPA Meter Point Name: Port Angeles #2 Out;
BPA Meter Point Number: 152;
Direction for PF Billing Purposes: Positive
Manner of Service: Direct, BPA to Port Angeles;
(B) BPA Meter Point Name: Port Angeles #1 Out;
BPA Meter Point Number: 251;
Direction for PF Billing Purposes: Positive
Manner of Service: Direct, BPA to Port Angeles;
Metering Loss Adjustment: None;
Exception: None.
1.2 Transfer Points of Delivery and Load Metering
None.
1.3 Resource Locations and Metering
Resource Name: Morse Creek
Metering: in Port Angeles City Light's Morse Creek Hydro Substation in
the 480 volt circuit over which such electric power flows;
(A) BPA Meter Point Name: Morse Creek In;
BPA Meter Point Number: 1564;
Direction for PF Billing Purposes: Negative;
Manner of Service: Wheeled to System, Clallam Co. PUD to BPA to
Port Angeles;
(B) BPA Meter Point Name: Morse Creek Stn Sry Out;
BPA Meter Point Number: 1565;
Direction for PF Billing Purposes: Not used for power billing;
Manner of Service: Clallam provides this station service;
Metering Loss Adjustment: BPA shall adjust for losses between the Port
Angeles 69 kV POD and the Morse Creek In POM. Such adjustments shall
be specified in writing between BPA and Port Angeles;
Exception: The Morse Creek Stn Sry Out POM is part of Clallam Co. PUD's
load and should not be added to Port Angeles' power bill. This is because
Clallam Co. PUD and Port Angeles have an agreement..
09PB- 13093, Port Angeles 2 of 3
Revision No. 1, Exhibit E, Metering
1
2. REVISIONS
Each Party shall notify the other in writing if updates to this exhibit are necessary to
accurately reflect the actual characteristics of POD and meter information described
in this exhibit. The Parties shall revise this exhibit to reflect such changes. The
Parties shall mutually agree on any such exhibit revisions and agreement shall not
be unreasonably withheld or delayed. The effective date of any exhibit revision shall
be the date the actual circumstances described by the revision occur.
3. SIGNATURES
The Parties have caused this Revision to be executed as of the date both Parties
have signed this Revision.
THE CITY OF PORT ANGELES
UNITED STATES OF AMERICA
Department of Energy
Bonneville Power Administration
By By /I
Name Kent Myers Name Shannon K. Greene
Title City Manager Title Account Executive
Date c� 1 Date 7 -2 (o -ll
(PSW-S PM CUST_SKG PORT ANGELES PSC_2009_PF_Regional Dialogue Exhibit E Exh E_Rev #1 Pa_13093_20110725_Exh E_Rev 1_Final doc) 07/25/2011
09PB- 13093, Port Angeles 3 of 3
Revision No. 1, Exhibit E, Metering
July 26, 2011
In reply refer to: PSW /Seattle
Larry Dunbar, Deputy Director of Power Systems
City of Port Angeles
P.O. Box 1150
Port Angeles, WA 98362 -0217
Dear Larry:
Department of Energy
Bonneville Power Administration
Seattle Customer Service Center
909 First Avenue, Suite 380
Seattle, Washington 98104 -3636
POWER SERVICES
Enclosed are two originals of Revision No. 1 to Exhibit E of the City of Port Angeles' Power
Sales Agreement, Contract No. 09PB -13093 (Agreement).
This Exhibit Revision updates any changes to Points of Delivery, Points of Metering, and other
related elements that have occurred since the Agreement was executed in 2008.
If you find this offer to be acceptable, please have Kent Myers sign and date both originals and
return one executed original to me by no later than August 9, 2011. The other executed original
is for your records.
Please feel free to contact me at (206) 220 -6775 or email me at skgreene @bpa.gov if you have
any questions or concerns.
Sincerely,
Enclosures
7‹,e&-be-ubc-k--
Shannon K. Greene