Loading...
HomeMy WebLinkAbout5.832 Amendment (2)AMENDMENT NO. 2 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE THE CITY OF PORT ANGELES AND EXELTECH CONSULTING, INC. PROJECT 97 -20 RELATING TO: INTERNATIONAL GATEWAY PROJECT THIS AMENDMENT NO. 2 is made and entered into this Y ' v day of , 2009, by and between THE CITY OF PORT ANGELES, a non - charter code city of the State of Washington, (hereinafter called the "CITY ") and Exeltech Consulting, Inc. a Washington Corporation (hereinafter called the "CONSULTANT "). WHEREAS, the CITY entered in to an AGREEMENT with the CONSULTANT on April 4, 2007, (the AGREEMENT) and WHEREAS, the CITY desires to amend the AGREEMENT to amend the Scope of Work, Budget, and Time of Performance. NOW, THEREFORE, in consideration of the representations and the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows I REVISED SCOPE OF WORK The amended scope of professional services to be performed and the results to be achieved by the CONSULTANT pursuant to the AGREEMENT shall be amended to read as shown in the attached Exhibit A. The Scope of Work shall include all services and material necessary to accomplish the work. II TIME OF PERFORMANCE The duration of this Agreement will extend until April 30, 2009. 111 MAXIMUM COMPENSATION The CONSULTANT'S total compensation and reimbursement are stated in the attached Exhibit B. The budget for any Task may be further adjusted by mutual agreement without an amendment to the Agreement, as long as the maximum compensation amount of $664,559.08 is not exceeded. Amendment No. 2 to Exeltech Consulting Agreement, 97 -20 Page 1 of 2 5132.. IV SIGNATURES Except as modified herein, the original Agreement and Exhibits A and B shall remain in effect. In WITNESS THEREOF, the parties hereto have executed this Amendment No. 2 to the Agreement as of the day and year first written above. CITY OF PORT ANGELES: MAYOR CONSULTANT: APPROVED AS TO FORM: r ' CITY ATTORNEY ATTEST: Amendment No 2 to Exeltech Consulting Agreement, 97 -20 Page 2 of 2 EXHIBIT A AMENDMENT 2 SCOPE OF WORK PROJECT 97 -20 CITY OF PORT ANGELES INTERNATIONAL GATEWAY PROJECT NOVEMBER, 2009 Since execution of the construction management contract dated April 4, 2007, a number of unforeseen issues have been encountered. This additional work, as approved by the Port Angeles City Council on November 17, 2009, includes. 1. Inspection, testing and coordination with the Engineer of Record and City to resolve the delamination / cracking of the east garage structure. 2. Coordination, design and inspection of the Harbor Town South Access reconstruction. 3. Supplemental project management and coordination during scheduled project completion of December, 2008 and actual substantial completion in March, 2009. Exeltech Mayes Testino Cascadia Archaeoloav 100 Construction Management - Base Bid 101 Project Management for Construction 102 Field Construction Management 103 Inspection and Testing 104 Claims/Change Order Administration 105 Scheduling for Construction Contracts 106 Construction Safety 107 Administration/Clencal 108 Quality Control Services 109 Project Closeout 110 Archaeological Monitoring 900 Direct Costs Project Totals Total Contract Amount EXHIBIT B AMENDMENT 2 BUDGET PROJECT 97.20 Revised Budget Changes Budget 1 no Construction Management - Base Bid 101 Project Management for Construction 80,387 89 80,387 89 102 Feld Construction Management 141,913.05 141,913.05 103 Inspection and Testing 36,653.72 36,853 72 104 Claims/Change Order Administration 58,339 20 58,339 20 105 Scheduling for Construction Contracts 58,339 18 14,220 18 106 Construction Safety 12,32416 12,324 16 107 Administration/Clerical 30,960.24 30,960 24 108 Quality Control Services 65,686.29 65,686.29 109 Project Closeout 3,081.04 3081.04 110 Archaeological Monitoring 5,000.00 5,000.00 900 Direct Costs 53,445.00 53,445.00 Amendment #2 48.332.10 48,332.10 Escalation 1,339.21 1,339.21 Total Fxeltech Contract Amount 503,349.98 48,332.10 551,682.08 100 Construction Management - Base Bid 101 Project Management for Construction - 102 Field Construction Management - 103 Inspection and Testing 65,280 16 104 Claims/Change Order Administration - 105 Sched for Construction Contracts 108 Construction Safety 107 Administration/Clerical 108 Quality Control Services - 109 Project Closeout 110 Archaeological Monitoring 900 Direct Costs 16,678.00 Escalation 41884 Total Mayes Testing Contract Amount - 82,377.00 25,540.00 4,960.00 100 Construction Manaaement - Base Bid 101 Project Management for Construction 80,387.89 102 Field Construction Management 141,913.05 103 Inspection and Testing 101,933.88 104 Claims/Change Order Administration 58,339.20 105 Scheduling for Construction Contracts 14,220 18 106 Construction Safety 12,324 16 107 Administration/Clerical 30 ,960.24 108 Quality Control Services 65,686 29 109 Project Closeout 3,081 04 110 Archaeological Monitoring 30,540 00 900 Direct Costs 75,083.00 Archaeological Coordination (out of scope) Hazardous Material Susbstance Disposal SWPPP West Garage - Pile Driving Reset New Strom Drain Amendment #2 (Delamination Fix, Harbortown - Escalation 1,758.05 Management Reserve 0.00 0 00 0.00 0.00 0.00 0.00 0 00 0 00 0 00 0 00 0 00 0.00 48,332.10 65,280 16 16,678.00 418.84 82,377.00 25,540.00 4,960.00 Escalation Total Cascadia Archaeology Contract Amount 30,500.00 0.00 30,500.00 80,387.89 141,913.05 101,933.88 58,339.20 14,220.18 12,324.16 30,960.24 65,686.29 3,081.04 30,540.00 75,083.00 48,332.10 1,758.05 616,226.98 48,332.10 664,559.08