Loading...
HomeMy WebLinkAbout5.832 Amendment 5.83,1.. AMENDMENT NO.1 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE THE CITY OF PORT ANGELES AND EXEL TECH CONSULTING, INC. PROJECT 97-20 RELATING TO: INTERNATIONAL GATEWAY PROJECT THIS AMENDMENT NO.1 is made and entered into this J q-J;A., day of aJ~~ ' 2008, by and between THE CITY OF PORT ANGELES, a non-charter code city 0 e State of Washington, (hereinafter called the "CITY") and Exeltech Consulting, Inc. a Washington Corporation (hereinafter called the "CONSULTANT"). WHEREAS, the CITY entered in to an AGREEMENT with the CONSULTANT on April 4, 2007, (the AGREEMENT) and WHEREAS, the CITY desires to amend the AGREEMENT to amend the Scope of Work, Budget, and Time of Performance. NOW, THEREFORE, in consideration of the representations and the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows: REVISED SCOPE OF WORK The amended scope of professional services to be performed and the results to be achieved by the CONSULTANT pursuant to the AGREEMENT shall be amended to read as shown in the attached Exhibit A. The Scope of Work shall include all services and material necessary to accomplish the work. II TIME OF PERFORMANCE The duration of this Agreement will extend until December 31,2008. III MAXIMUM COMPENSATION The CONSULTANT'S total compensation and reimbursement are stated in the attached Exhibit B. The budget for any Task may be further adjusted by mutual agreement without an amendment to the Agreement, as long as the maximum compensation amount of $616,226.98 is not exceeded. Amendment No I to Exeltech Consultmg Agreement. 97-20 Page I of2 IV SIGNATURES Except as modified herein, the original Agreement and Exhibits A and B shall remain in effect. In WITNESS THEREOF, the parties hereto have executed this Amendment NO.1 to the Agreement as of the day and year first written above. CITY OF PORT ANGELES: 4-'-71 0-_L~IL1- MAYOR CONSULTANT: APPROVED AS TO FORM: ~~~~ CITY ATTORNEY ATTEST: b ~~ ~ lpto^ CITY CLER - .- Amendment No 1 to Exeltech Consultmg Agreement, 97-20 Page 2 of2 EXHIBIT A AMENDMENT 1 SCOPE OF WORK PROJECT 97-20 CITY OF PORT ANGELES INTERNATIONAL GATEWAY PROJECT JULY, 2008 Since execution of the construction management contract dated April 4, 2007, a number of unforeseen issues have been encountered. This additional work, as approved by the Port Angeles City Council on June 3, 2008, includes: 1. After award of the contract it was determined that a certified Archaeologist was required to be on site during any subsurface disturbing activities. The Consultant has provided these services as requested by the City of Port Angeles. 2. Support documentation for the unforeseen hazardous material (petroleum contaminated soil) found on site. 3. Development and monitoring of a Storm Water Pollution Prevention Plan (SWPPP) due to the new NPDES requirements. 4. Additional inspection and material testing for the West Garage. 5. Design of the storm drainage improvements in the Railroad Avenue / Front Street alley. EXHIBIT B AMENDMENT 1 BUDGET PROJECT 97-20 Description of Additional Services Estimated Fee Archaeological $31,000.00 Hazardous Matenal $5,181.70 SWPPP $27,202.57 FronVRallroad Alley Storm Dram (DR) $14,647.58 West Garage Inspection $26,968.15 Total Estimated Fee $105,000.00 . EXHIBIT B AMENDMENT 1 BUDGET PROJECT 97-20 Revised BudQet ChanQes BudQet Exeltech 100 Construction Manaoement . Base Bid 101 Project Management for Construction 76,38789 4,000 00 80,38789 102 Field Construction Management 122,11124 19,80181 141,91305 103 Inspection and Testing 26,653 72 10,000 00 36,653 72 104 Claims/Change Order Administration 58,339 20 58,339 20 105 Scheduling for Construction Contracts 14,22018 14,22018 106 Construction Safety 12,32416 12,32416 107 Admlnlstratlon/Clencal 18,96024 12,000 00 30,960 24 108 Quality Control Services 65,686 29 65,68629 109 Project Closeout 3,081 04 3,081 04 110 Archaeological MOnltonng 5,000 00 5,000 00 900 Direct Costs 53,445 00 53,445 00 Escalation 1,33921 1,33921 Total Exeltech Contract Amount 452,548.17 50,801 81 503,349.98 Maves Testino 100 Construction Manaoement . Base Bid 101 Project Management for ConstructIon 102 Field Construction Management 103 Inspection and Testing 44,28016 21,000 00 65,28016 104 Claims/Change Order Administration 105 Scheduling for Construction Contracts 106 Construction Safety 107 Admlnlstratlon/Clencal 108 Quality Control Services 109 Project Closeout 110 Archaeological MOnltonng 900 Direct Costs 16,67800 16,678 00 Escalation 41884 41884 Total Mayes Testln9 Contract Amount 61,377 00 21,000.00 82,377 00 Cascadia ArchaeoloQY 100 Construction Manaoement . Base Bid 101 Project Management for Construction 102 Field Construction Management 103 Inspection and Testing 104 Claims/Change Order Administration 105 Scheduling for Construction Contracts 106 Construction Safety 107 Admlnlstratlon/Clencal 108 Quality Control Services 109 Project Closeout 110 Archaeological MOnltonng 22,361 56 3,17844 25,540 00 900 Direct Costs 4,960 00 4,960 00 Escalation Total Cascadia Archaeology Contract Amount 27,321 56 3,178 44 30,500 00 Proiect Totals 100 Construction Manaoement. Base BId 101 Project Management for Construction 76,387 89 4,000 00 80,38789 102 Field Construction Management 122,11124 19,80181 141,91305 103 Inspection and Testing 70,933 88 31,00000 101,93388 104 Claims/Change Order Administration 58,339 20 000 58,339 20 105 Scheduling for Construction Contracts 14,22018 000 14,22018 106 Construction Safety 12,32416 000 12,32416 107 Admlnlstratlon/Clencal 18,96024 12,000 00 30,960 24 108 Quality Control Services 65,68629 000 65,686 29 109 Project Closeout 3,081 04 000 3,081 04 110 ArchaeologIcal MOnltonng 22,361 56 8,17844 30,540 00 900 Direct Costs 75,083 00 000 75,083 00 ArchaeologIcal Coordination (out of scope) . Hazardous Matenal Susbstance Disposal . SWPPP . West Garage. Pile Dnvlng Reset . New Strom Drain . Escalation 1,75805 1,75805 Management Reserve 41,33785 141,337851 . Total Contract Amount 582,584 58 33,642.40 616,226.98