HomeMy WebLinkAbout000213 Correspondence 000213
Washington State Transportation wilding
310 w7o' Department P.O Maple Park Avenue S,E.
P.O. box 47300
Olympia,WA 98504-7300
Lynn Peterson 360-705-7000
Secretary of Transportation March 18, 2015 TTY: 1-800-333-6388
www.wsdot.wa.gov
Mr. Craig Fulton, PE
Public Works Director
City of Port Angeles
PO Box 1150
Port Angeles, Washington 98362-0217
City of Port Angeles
Lauridsen Blvd. Bridge
Replacement
BRM-7568(001)
FUND AUTHORIZATION
Dear Mr. Fulton:
Enclosed for your information and file is a copy of Supplement Number 2 to Local Agency
Agreement LA-7581 for the subject project between the state and your agency.
This supplement modifies the funding for this project to the amounts shown below:
PHASE TOTAL FEDERAL SHARE
Preliminary Engineering $659,608 $527,686
Construction $5,311,423 $4,249,138
All costs exceeding those shown on this agreement are the sole responsibility of your
agency.
The following are required to ensure compliance with federal and state requirements:
• Advertisement of the project within six weeks of construction authorization.
• Submit the Award Data to the Region Local Programs Engineer prior to construction
start.
• Show continuous project progress through monthly billings, until the project is
complete. Failure to show continuous progress may result in the project becoming
inactive per 23 CFR 630.106(a)(5) and subject to de-obligation of all federal funds
and agreement closure.
You may proceed with the administration of this project in accordance with your WSDOT
approved Certification Acceptance agreement.
Sincerer
Stephani Tax
Manager, Program Management
Local Programs
ST:ds:ac
Enclosure
cc: Neal Campbell, Olympic Region Local Programs Engineer, MS 47440
Washington State
Department of Transportation Local Agency Agreement Supplement
Agency Supplement Number
Cit of Port Angeles 3 _
Federal Aid Project Number 1 Agreement Number CFDA No. 20.205
BRM-7568 001 LA-7581 (Cataloq of Federal Domestic Assistance
The Local Agency requests to supplement the agreement entered into and executed on September 20, 2011
All provisions in the basic agreement remain in effect except as modified by this supplement.
The changes to the agreement are as follows:
Project Description
Name Lauridsen Blvd Bridge Length 205 Feet
Termini 300 Feet west of Race Street to east of Race Street Intersection
Description of Work ® No Change
Reason for Supplement
Transfer excess PE funds to the Construction work. Increase funds for WSDOT Staff(State Services). Increase contract cost due to
additional change orders associated with required storm drainage not identified on City as-builts. This cost increase would bring
federal funding to the allowable budget as per WSDOT letter dated March 12,2013 (copy attached)
Does this change require additional Right of Way or Easements? ❑ Yes ® No
Estimate of Funding
Type of Work (') (2) (3) (4) (5)
Previous Supplement Estimated Total !Estimated Agency Estimated
A reement/Su I. Project Funds I Funds Federal Funds
PE a.Agency 36,000.00 36,000.001 7,200.00 28,800.00
80 % b.Other Consultant 665,000.00 -46,392.00 618,608.001 123,722.00 494,886.00
c.Other
Federal Aid d.State 5,000.00 5,000.00 1,000.00 4,000.00
Participation
Ratio for PE e.Total PE Cost Estimate(a+b+c+d) 706,000.00 -46,392.00 659,608.00 131,922.00 527,686.00
Right of Way f.Agency
g.Other
Federal Aid h. Other
Participation --- -
Ratio for RW i.State
j.Total R/W Cost Estimate(f+g+h+i)
Construction k.Contract 4,630,525.00 113,006.00 1 4,743,531.00 948,706.00 3,794,824.00
I. Other Consultant 463,500.00 46,392.00 509,892.00 101,978.00 407,914.00
80 % m.Other
Federal Aid n.Other
Participation o.Agency 30,000.00 _ 20,000.00 50,000.00 10,000.00 40,000.00
Ratio for CN p.State 5,000.00 3,000.001 8,000.00 1,600.00 6,400.00
q.Total CN Cost Estimate k+l+m+n+o+ 5,129,025.00 182 398.00 51311,423.00 1 062 284.00 4,249,138.00
r.Total Project Cost Estimate(e+j+q) 5,835,025.00 136.006.00 5,971,031,001 1,194,206.00 4,776,824.00J
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency O ial Washington State De a ent of Trans po tion
By — -- By - r
Title City Mnnager Director of Highways and Local 4ograms
– Date Executed FEB L o .
DOT Form 140-041 EF