HomeMy WebLinkAbout000878 Original Contract City of Port Angeles
Record #000878
GRANT PROGRAM AGREEMENT
BETWEEN
City of Port Angeles and
Sara Dutrow
for Olympic Veterinary Clinic
This Agreement is made between the City of Port Angeles (hereinafter referred to as the "City")
and Sara Dutrow for Olympic Veterinary Clinic (hereinafter collectively called the Grantee) for
the facade improvement project described in this document and its attachments (herein called the
Project).
WHEREAS, the City allocated Community Development Block Grant (CDBG) program
income to a fagade improvement and rehabilitation grant program, which is CDBG-eligible
activity; and
WHEREAS, the City has awarded a grant to reimburse a part of the costs of fagade
improvements for the property located at 1331 East Front Street, Port Angeles; Parcel Number
06300531491; and
WHEREAS, the Grantee has agreed to perform the work to improve the facade of the above
described property;
NOW, THEREFORE, the City and Grantee do mutually agree to the following terms and
conditions regarding the above mentioned property to be improved using City funds through the
Facade Grant Program:
1. SCOPE OF SERVICES
The Grantee will complete in a satisfactory and proper manner as determined by the City the
work described in the Project Overview that is attached hereto, marked as Attachment A, and
incorporated herein by reference. A listing of detailed project tasks is marked as Attachment B,
and incorporated herein by reference.
2. GRANTEE'S OBLIGATIONS
The Grantee warrants that she is the owner of the above property or has written permission from
the Owner of the property to authorize the proposed improvements described in Attachment B.
The effective date of this agreement will be the date the parties sign. Grantee agrees to complete
work described in the attached Plans and Specifications within ONE HUNDRED EIGHTY (180)
days after the effective date. In the event the Director of Community and Economic
Development finds that the Grantee has prosecuted the work with reasonable diligence but, due
to factors beyond its reasonable control, the Grantee is unable to complete the work within 180
days, the City Manager is authorized to extend the time to complete the work.
.......... ..........
... ..... ...........
All facade improvements shall be consistent with zoning and building codes currently in effect
for the City. The Grantee shall assure that any permit or review necessary under City Ordinance
shall be approved before the work on the fad ade improvement begins.
The Grantee shall be responsible for the construction and management of the entire project.
If the fagade improvements are maintained for at least five years, the Grantee is not obligated to
repay any part of the grant to the CITY. If the fagade improvements are not maintained for at
least five years, the Grantee shall immediately repay to the CITY the amount of the grant, less
20% of the amount for each year the fagade improvements were maintained.
3. BUDGET
The City will reimburse to the Grantee the amount of 50% or $10,000, whichever is less, for
eligible incurred costs and expenses for the Project according to the budget shown on the
Attachment B. Only the work that is outlined in Attachments A & B will be eligible for
reimbursement.
It is understood that this agreement is funded with CDBG program income funds. The Grantee
acknowledges and agrees that the funds must be used only for CDBG-eligible expenditures.
4. PAYMENT
Disbursement of funds shall be made only after the Project is complete and certified by City staff
to be in compliance with the approved design. The work must also adhere to any required
inspections before funds are disbursed for reimbursement. All documentation for payment must
be provided at one time to the City for one payout, and the receipts must be provided no later
than six (6) months after the application has been approved or as stipulated in the request for an
extension. Payment will be made to the Grantee by the City within four weeks after City deems
all Project costs and documentation to be complete. Payment shall be made only to the Grantee.
The Grantee's submission must include itemized invoices detailing the work completed and
materials purchased, with proof that payments in full have been made to Contractors and
vendors, if applicable.
Grantee acknowledges, and agrees to inform its Contractor, that the City has no obligation to pay
the Contractor for work performed for the Grantee under this Program. This agreement shall not
be construed or deemed to be an agreement for the benefit of any third party or parties, and no
third party shall have any claim or right of action hereunder for any cause whatsoever.
Unless otherwise agreed to in writing by both parties, the Grantee's total reimbursement under
this agreement, including labor and materials, shall not exceed the maximum sum of$10,000.00.
The budget for labor and materials is found in Attachment B. Budgets for each line item may be
modified upon mutual agreement between the two parties, but in any event, the total payment to
Grantee shall not exceed $10,000.00.
5. GENERAL CONDITIONS
A. General Compliance. The Grantee agrees to comply with all applicable Federal, state and
local laws, regulations, and policies, governing the funds provided under this agreement.
- 2 -
ti
B. Independent Contractor. Nothing contained in this agreement is intended to, or will be
construed in any manner, as creating or establishing the relationship of employer/employee
between the parties. The Grantee will at all times remain an "independent contractor" with
respect to the services to be performed under this agreement. The City will be exempt from
payment of all Unemployment Compensation, FICA, retirement, life and/or medical insurance
and Workers' Compensation Insurance, as the Grantee is an independent contractor.
C. Hold Harmless. The Grantee will hold harmless, defend and indemnify the City from any
and all claims, actions, suits, charges and judgments whatsoever that arise out of the Grantee's
performance or nonperformance of the services or subject matter called for in this agreement.
D. Workers' Compensation. The Grantee will provide Workers' Compensation Insurance
Coverage for all of its employees involved in the performance of this agreement.
E. Contract with Contractor. Each contractor who is performing the work approved for this
Project shall have a valid State of Washington Contractor's License.
F. Labor Code/Prevailing Wage. Grantee acknowledges and agrees that the Grantee's
improvements to be constructed with the proceeds of the grant constitute construction, alteration,
demolition, installation, or repair work done under contract and paid for in whole or in part out
of public funds. Grantee shall comply with all requirements of applicable federal, state and local
laws and regulations pertaining to labor standards and payment of prevailing wages (collectively,
"Prevailing Wage Laws").
Grantee shall (i) require its contractors and subcontractors to submit certified copies of payroll
records to Grantee; (ii) maintain complete copies of such certified payroll records; and(iii) make
such records available to City and its designees for inspection and copying during regular
business hours.
Grantee shall defend, indemnify and hold harmless the City and its officers, employees,
volunteers, agents and representatives from and against any and all present and future claims,
arising out of or in any way connected with Grantee's obligation to comply with all Prevailing
Wage Laws, including all claims that may be made by contractors, subcontractors or other third
party claimants.
G. Fundim4 Source Recognition. The Grantee will insure recognition of the roles of the City in
providing services through this agreement.
H. Suspension or Termination. The City may suspend or terminate this agreement if the
Grantee materially fails to comply with any terms of this agreement, which include (but are not
limited to) the following:
• Failure to comply with any of the rules, regulations or provisions referred to herein, or such
statutes, regulations, guidelines,policies or directives as may become applicable at any time;
® Failure, for any reason, of the Grantee to fulfill in a timely and proper manner its obligations
under this Agreement; or
Submission by the Grantee to the City of reports that are incorrect or incomplete in any material
respect.
- 3 -
6. ADMINISTRATIVE REQUIREMENTS
A. Financial Management Accounting_Standards. The Grantee agrees to adhere to the
accounting principles and procedures required therein, utilize adequate internal controls, and
maintain necessary source documentation for all costs incurred.
B. Documentation and Record Keepin . The Grantee will maintain thorough records pertinent
to the activities to be funded under this agreement, including records adequate to document that
the funds were expended on CDBG-eligible activities.
C. Access to Records and Retention. All such records and all other records pertinent to the
work undertaken under this agreement will be retained by the Grantee for a period of six years
after the City's final audit of Project, unless a longer period is required to resolve audit findings
or litigation. In such cases, the City will request a longer period of record retention.
D. Audits and Inspections. All Grantee records with respect to any matters covered by this
Agreement will be made available to the City and duly authorized officials of the state and
federal government, at any time during normal business hours, as often as deemed necessary, to
audit, examine, and make excerpts or transcripts of all relevant data.
Any deficiencies noted in audit reports inust be fully cleared by the Grantee within 30 days after
receipt by the Grantee. Failure of the Grantee to comply with the above audit requirements will
constitute a violation of this agreement and may result in the withholding of future payments.
E. Reporting. The Grantee, at such times and in such forms as the City may require, will
furnish the City such periodic reports as it may request pertaining to the work or services
undertaken pursuant to this agreement, the costs and obligations incurred or to be incurred in
connection therewith, and any other matters covered by this agreement.
7. SEVERABILITY
If any provision of this agreement is held invalid, the remainder of the agreement will not be
affected thereby and all other parts of this agreement will nevertheless be in full force and effect.
8. PERFORMANCE WAIVER
The City's failure to act with respect to a breach by the Grantee does not waive its right to act
with respect to subsequent or similar breaches. The failure of the City to exercise or enforce any
right or provision will not constitute a waiver of such right or provision.
9. ENTIRE AGREEMENT
This document states the entire agreement between the City and the Grantee for the use of funds
received under this agreement and it supersedes all prior communications and proposals, whether
electronic, oral, or written between the City and the Grantee with respect to this agreement.
IN WITNESS WHEREOF, the City and the Grantee have executed this agreement as of the
date and year last written below,
- 4 -
CITY OF PORT ANGELES GRANTEE:
Sara Dutrow
for Olympic Veterinary Clinic
By: By:
Title:—Uji riA Title:Le
Date:— t Date:
Approved as to form:
William E. Bloor, City Attorney
Attachments: A–Project Overview
B– Scope of Work and Budget
ATTACHMENT A - PROJECT OVERVIEW
Grantee: Olympic Veterinary Clinic
Grant No. 15-03a
Section A. Brief Description
Funds will enable upgrade to the building facade located at 1331 East Front Street, Port Angeles, in
the Cit 's Commercial Arterial (CA), and provide funds for replacement materials and labor.
Improvements to the landscaping along the Front Street property, installation of
Budget lighting, painting of a mural and replacing signage along fagade of the building.
Cate qo�y_
2 1 AGeneral This project will result in development of the parking lot landscaping and a
Admin. fenced area along the Front Street property line, installation of goose neck
lighting above the fagade signage, and paint a mural along the building facade.
All project elements and estimated budget amounts are available in Attachment
C.
- 5 -
ATTACHMENT B - SCOPE OF WORK AND BUDGET
Grantee: Sara Dutrow for Olympic Veterinary Clinic
Grant No. 15-03a
Section C: Project Schedule and Budget
Budget Project Activities Project Applicant's City
Category Totals Contribution Contribution
2 1 AGeneralAdmin Landscape Materials $ 7,540.00
Landscape Labor $ 9,634.50
Mural Materials $ 2,377.85
Mural Labor $ 2,135.50
Lighting M&L $ 5,150.00
Consulting Labor $ 525.00
Total M&L $27,362.85 $17,362.85 $10,000.00
- 6 -
Attach
Creative Landscapes Proposal For OlVmpic Veterinary Clinic FaCade Improvement Project
Plant list and prices for Olympic Veterinary Clinic
Provide Place and Plant for the Fg1lowing
Quantity Size Type or Similar Cost Planted Cost bd
40 1 Gallon Heather $7.98 $7.02 $600.00
3 8& 8 Mountain Hemlock $150 $50 $60010
1 B&8 Uncle Foggy Pine $175 $50 $225.00
25 1GaUnn Sword Fern $8.98 $6.02 $375.00
3 SGoUon DvvarfMuOV $40 $20 $180.00
1 20 Gallon Red Japanese Maple $225 $75 $300.00
1 20 Gallon Weeping Sequoia $150 $75 $225.00
S 20 Gallon Weeping Alaska Cedar $125 $75 $1,000.00
1 20 Gallon Weeping Blue Atlas Cedar $300 $100 $400.00
15 1GaUon Black-eyed Susan $8.98 $7,82 $226.00
12 1GaUon Mini Russian Sage $8.98
Product TOTAL $4,310.00
Planting Bed at Front Door Etc...
Quantity Unit Cost Tb /Co t
7 Cu.Yards 4-8 Spalls or River Rock $35 Delivered $245.6-0
20 Sq,Yurds Heavy Black Landscape Fabric $5.85 $117.00
27 Pieces Tree Stakes $4 $108,00
81 R. Tree Tie $0.74 $60.00
25 |ba. Grass Seed $4 $100.00
52 Hours Landscape Labor @ Prevailing Wage $50 $2,600.00
Assorted irrigation parts $300.00
Licensed Herbicide Applicator to Kill East Lawn $100.00
Aerate,Thatch,Overseed, Front Lawns.Stake 9 existing trees as needed.Add risers and
TOTAL $3,630.00
Front Fence at Sidewalk Eqye
-
Quantity Unit Product Total Cost
7 10 Ft. Treated 4"x6" $181.50
52 8RL Treated 2"x4" $278.50
8 16 Ft. Treated 2"x6" $132.00
26 &Ft. Treated 2"x2" $115.00
52 31/2" Galvanized Carriage Bolts,Nuts and Washers $39.00
7 34"x16 Ft. Galvanized Fence Panels $270.00
14 Bags Qu|krete $126.00
38 Hours Labor @PwevaiUnQ Wage for Fence Erector $1,988.00
K4|SC Galvanized Brackets,Screws, Etc..
TOTAL$3,300.00
Quantity Unit Product Cost Total Cost
Excavator Move-In/Move-out $150.00
5 Hours Direct Placement ofBoulders $150.00 $750.80
24.5 Hours Direct Job $75.00 $1,837.50
6.5 Hours Excavator&Operator @ Prevailing wage $110.80 $715.00
2 Hours Dump Truck tn Transfer Station $115.00 $230.00
16.85 Hours Landscape Labor @ Prevailing Wage $60.00 $842.50
Estimated Disposal Fee $200.00
Remove 10 existing Palm trees and Canna. Move boulders to side. Reconfigure mound
after additional material from site is added. Reset granite boulders on mound and at
various locations identified#n plan. Final grade on mound and final rake out.
TOTAL $4,724.50
Provide and Place Mulch
Quantity Unit Product Cost Total Cost
40 Cu.Yards Bark Mulch $20.00 $800.00
1 Homo Excavator&Operator @p Prevailing Wage $110.00 $110.00
6 Hours Landscape Labor@ Prevailing Wage
TTAL $1,210.00
GRAND TOTAL $17,174.50
Dan Blood's Creative Landscaping, Inc. Invoice
1137 West Fifth Street
Date Invoice#
Port Angeles, WA 98363
360-683-5007 2/9/2015 11 1508
Bill To Ship To
Olympic Vet Clinic
ATTN:Sarah
1417 E Front St
Port Angeles,WA 98362
P.O. Number Terms Rep Ship Via F.O.B. Project
2/9/2015
Quantity Item Code Description Price Each Amount
7 Consulting Charge Consult and design on proposed new location 75.00 525.00
Sales Tax-Port Angeles 8.40% 0.00
Total $525.00
� Fax Cover This is a privileged and confidential f nessage, intended solely for the person to whoin it is
addressed The attached document(s)remains the sole property Of Olympic Electric Co.Inc. until
transferred by contract,Any copying,distribution, faxing, electronic scanning,Or any other
method of dissemination, including verbal, WithOUt the written permission of the Olympic Electric
Co, Inc. is strictly prohibited. If you receive this message in error,please notify us by phone
immediately and mail it back to us. Thank you,
7v Sara Dutrow@ Olympic Vet Clinic
Fax
From Mike Rutten@ Olympic Electric
— ]�idl0 oc
Date 02/11 /2015
Subject Sign Lighting
� polgeu 1. including this one
'
Olympic Electric is pleased to provide a quote on providing and installing 11 new
goose neck type"sign light fixtures to illuminate the sign and murals at the new vet
clinic.
�=�=4
ELECTRICAL BASE BID
LIGHTING ALLOWANCE
$ 3100.0 �
An electrical permit is required for this project and included in the bid. State,
county,city sales tax or material use tax are I�tincluded. AmyzorreuLionunaqui/od
for existing wihngare not included. NoGtatep|an review or its fee has been
included. No temporary heat ur lighting imincluded. All utility charges are
excluded. overtime ia included uranticipated. Although o performance bond ia
4 n�inc|uded. one can bepm�dad for anaddiUona|cost. Our quote excludes all
^����* fmoiUhee. semioea. and work pmvidedfor under other divisions such as, but not
-��� limited to, added site trips due to scheduling errors by others, dumpster fees,
sanitation facilities, painting,sheet rock repairs,and general non-electrical cleanup.
This quote is good for 3O days from the date above.
We thank you for the opportunity of submitting this quotation and trust we will
receive your favorable consideration, Please contact our office to arrange for
scheduling,contact, and payment terms,
Mike Ru#an'Estimator/Project Manager
4230Tummate,
Port Angeles, WA
96363
WA License*
DLYMPEC205D/
(300)*5 7-5303 phone QUALITY WORK 8Y A RELIABLE ELECTRICAL CONTRACTOR, SINCE 1946
(3V0)452'3*98fax
Mural Bid for Olympic Veterinary Clinic
Materials Estimate
O 3/4 inch marine grade plywood (AquaTech )-$152.OU per sheet=$1,216.UO
3 Gallons base coat sealer(Penninizer Plus)-$53,95 per gallon= $1G1.85
Assorted paint colors in neutral blues,greens, browns,white, black,orange,grey/aprox. I5-4 gallons)=$25O.0O
2 Gallons anti 8rafitti coating(One Shot Brand )=$25O.UO
Assorted materials(brushes,drop cloth,tape,wood screws, router bit, masonery bit,transfer paper,ect.)=$3OO.0O-$380.O0
Total Materials Cost'$2,O77.85-$2377.Q5
Apnox. Labor cost at$450O per hour
Aprox. y.S hours per mural =47.5 total hours
Total cost of labour=$l13G.SO
Total bid cost labor and materials=$4,215.3S-$4,5l3.36