HomeMy WebLinkAbout000953 Original Contract City of Port Angeles
Record # 000953
2015-1323789
Page 1 of 2 Agreement
Port Angeles City Of
Clallam County Washington 07/30/2015 12:05:50 Pfd
®III W"rol'i Iw,I v IOC
RETURN ADDRESS
City of Port Angeles
Department of Public Works and Utilities
PO Box 1150
Port Angeles,WA 98362
AGREEMENT TO REMOVE ENCROACHMENT
within
PUBLIC RIGHT-OF-WAY
WHEREAS: I, ` °({ ti ( the undersigned owner in fee simple of the
following described property:
Lots 11 and 12 of the Norman R. Smith's Subdivision of the Townsite of Port Angeles
Parcel Number: 0630005121600000
Address: 601 East First Street, Port Angeles, Washington 98362
do hereby acknowledge that ground water monitoring wells have been and will be constructed by
me within the adjoining public street or roadway.
NOW, THEREFORE: For adequate consideration, I agree that said ground water monitoring
wells and any associated appurtenances shall be expeditiously demolished, removed, modified,
rebuilt or restored at my expense within sixty(60) days of receipt of written notice from the
Director of Public Works and Utilities Department (Director) with work to be done in accordance
with the requirements and conditions deemed necessary by the Director or his designee at such
time as the City finds that it is necessary to modify the right-of-way. If the required work is not
done in a timely fashion and/or if the work does not meet the requirements and conditions set forth,
the City is authorized to have the work done and the cost thereof including reasonable overhead
and attorney's fees shall become a civil debt of the property owner and shall be a lien against the
property.
We do also hereby agree that the Director may, without notice, remove the private improvements
as necessary to repair utilities or other public facilities and that the City has no obligation to
reconstruct or replace such private improvements.
The property owner agrees to indemnify,hold hannless, and defend the City, its employees, agents
and assigns from and against all claims or lawsuits as alleging injury or damage to persons or
property as a result of the construction and location of the private improvements as provided
herein.
It is understood that this agreement shall run with the land and shall be binding on the undersigned
owner, his heirs, devisees, successors and assigns and all owners now or hereafter of the land
described above.
Property Owner(s) Date
STATE OF WASHINGTON )
ss.
COUNTY OF CLALLAM )
On this date, before me the undersigned Notary Public in and for the State of Washington,
personally appeared Syb ��J eA( ,to me known to be the individual
who executed the foregoing Agreement to Remove Encroachment within Public Right-of-Way
and acknowledged to me that they signed the same for the uses and contents therein mentioned.
DATED this 2-3 day of c c- — , 20 1
:Septefftw Public NOTARY PUBLIC for Washin on,
of ' chingtar�
residing at f
M `'OW�R My commission expires:
MY bt!i lC?N EXi
9,201 7
HTE #7
goer
°�" ECEIVED
PORT ANN04T OF WAY CONSTRUCTION PERMIT
® �LIC WORKS APPLICATION
mc�F
1 AY 15 AM 11: 05
NAME OF APPLICANT/CONTRACTOR Antea Group DATE 04/21/15
CONTRACTOR ID. NO. (if work is over$3500) Cascade Drilling - CASCADL91508
MAILING ADDRESS 4006 148TH Ave NE, Redmond WA 98052
PHONE NUMBER (425) 498-7722
STREET ADDRESS OF PROPOSED WORK 601 East First Street (Chevron Station)
DESCRIPTION OF WORK(include drawings required for clarity): [If street closure is requested, please state the
name of the street and limits of closure, together with the duration of closure.]
One well is to be installed in the alley behind the service station. The proposed location is shown on the attached
Figure 2. Traffic Control will be utilized in the street and the alley. The work is expected to be completed in one
day and will likely be 4 hours in the alley. We will return quarterly to sample all wells on site. Well sampling takes_
about 0.5 hours per well and will not require traffic control.
WHAT IS THE ESTIMATED COST OF THE PROJECT? $15,000
WHAT IS THE ESTIMATED DURATION OF THE PROJECT? 1-day with quarterly follow-up sampling
WHAT ARE THE HOURS OF WORK? 8-5
LIST THE CONTRACTOR(S)THAT WILL BE DOING THE WORK:
Cascade Drilling;Altus Traffic Control, Antea Group (Environmental Consultant)
HOLD HARMLESS and INDEMNIFICATION AGREEMENT
In compliance with the Port Angeles Municipal Code,and in consideration of the issuance by the City of Port Angeles of a
Right Of Way Use Permit to the undersigned allowing the placement of the above described street use or obstruction,the
undersigned for himself and for his successors in interest,hereby agrees to indemnify,hold harmless, and defend the City of
Port Angelej1l gy'{�st any claims or lawsuits for personal injury or property damage arising out of, or in any way connected
with,tft4��?a� � n'4 6'6, e use or obstruction on the City street,sidewalk,planting strip,or right f way
�`Q ,,, ��j`/�i�r D TED this 14.th day of Ma/� _._,2015
t° OOTARk = Applicant
UBOC
NOTARY P IC or Was ington,
residing at
�P WASH\ My commission expires:
(This permit,if approved,maybe terminated by the City of Port Angeles without cause and at any tf e)
[OF'F'ICE USE ONLY) Se(--
Date application received �-1 — `� Fee paid $/56) Receipt#
Date Certificate of Insurance per PAMC 11.08.110 received -S,
Temporary Traffic Control Plan Approve -eat lw N/A
Performance Bond Received on 141A ✓
Application r wiewpd and recommendation by City Engineer Date
is to deny r rove d with the folio//Wfu1g c ditions:
/sfel r7 �'S o�rS/dam r /a ovr e-6 r 1 &,,v o
c / r L' e r o,— ,4, S r
�..1OA/T T /T S" L-; T ObeagTiotis / ISl o N s x Y -7 Y73
Approved copies lo; Applicant/Fire O Police O Street O Other—O Addressfile,o" RCP#
NIPWKSIENGINEER/ROW Constructionl2010 ROW Construction Permit Application.doc