HomeMy WebLinkAbout000707 Amendment (2) City of Port Angeles
Record # 000707
AMENDMENT NO. 4 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
MURRAY, SMITH, & ASSOCIATES, INC.
PROJECT WW 07-2013
EDIZ HOOK SANITARY SEWER FORCE MAIN RENOVATION
THIS AMENDMENT NO. 4 is made and entered into by and between the City of Port Angeles,
a non-charter code city of the State of Washington, (hereinafter called the "CITY") and
MURRAY, SMITH, & ASSOCIATES, INC a Washington Corporation authorized to do
business in the State of Washington(hereinafter called the "CONSULTANT");
The CITY entered into the existing AGREEMENT with the CONSULTANT on March 6, 2014,
(the AGREEMENT), August 22, 2014 (Amendment 1), December 31, 2014 (Amendment 2),
September 1, 2015 (Amendment 3), and has proposed Amendment 4 (the AMENDMENT); and
WHEREAS, the CITY desires to amend the AGREEMENT to amend the Time of Performance.
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in this AMENDMENT, the Agreement is hereby amended as
follows:
I. SCOPE OF WORK
No change.
II. TIME OF PERFORMANCE
The City requires additional time for design assistance to be performed by Consultant based on
the findings of their technical memorandum for the Ediz Hook Sanitary Sewer Force Main
Renovation project. Consultant has agreed to continued effort. Therefore, the time of
performance in Section IV of the original Agreement is amended to read: The duration of the
Agreement shall extend through June 1, 2016.
III MAXIMUM COMPENSATION
No change.
In WITNESS THEREOF, the parties hereto have executed this Amendment No. 4 to the
Agreement as of the date and year of the last signature below.
H
Amendment 4,Page 1
CITY OF PORT ANGELES MURRAY, SMITH, AND ASSOCIATES,
INC.
By
By:
Craig Fulton, E
Director of Public Works Title: ce
Date: 1-7 /-j 0 �,j . Date: /t/t 3 �2
ATTEST:
'� ot� O A
J nnife Veneklasen, City Clerk
APPROVED AS TO FORM:
William E. oor, City Attorney
ti
4
Amendment 4,Page 2