AMENDMENT NO. 1 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
ANCHOR QEA LLC.
LANDFILL CELL STABILIZATION,PROJECT NO.02-12
RELATING TO: Landfill Cell Stabilization Project Construction Management Services
THIS AMENDMENT No. I is made and entered into this 2--5, day of WOW,
2015, by and between the City of Port Angeles, a non-charter code city of the State of
Washington, (hereinafter called the "CITY") and Anchor QEA, LLC. a Washington
Corporation authorized to do business in the State of Washington (hereinafter called the
"CONSULTANT").
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT and this
AMENDMENT,the parties hereto agree as follows:
SECTION 1
The City entered into the existing AGREEMENT with CONSULTANT on April 15,2014,
(the AGREEMENT).
SECTION 2
I. AMENDMENT SCOPE OF WORK
The scope of professional services to be performed and results to be achieved by the
CONSULTANT is amended to include additional work as described in the attached
amended Exhibit A. The CONSULTANT shall provide and furnish all services and
material necessary to accomplish the additional work identified in amended Exhibit A.
IV. TIME OF PERFORMANCE
All Tasks shall be completed in accordance with the schedule set forth in the attached
Exhibit 134.
VI. MAXIMUM COMPENSATION
�3
The CONSULTANT'S total compensation and reimbursement is amended to$1,648,927.34. The
maximum compensation set forth in the attached Exhibit C is$219,927.34.
PALF Cell Stabilization CM Contract Amendment 1,Page 1 November 19,2015
XVII EXHIBITS AND SIGNATURES
This Amendment, including its exhibits,constitutes the entire Amendment, supersedes all
prior written or oral understanding related to the subject of this Agreement, and may only
be changed by written agreement by both parties. The following exhibits are hereby made
part of this Amendment:
Exhibit A - Scope of Services of Tasks
Exhibit B - Schedule of Performance to Tasks
Exhibit C - Budget of Tasks
Except as modified herein,the original AGREEMENT is confirmed and ratified. In
WITNESS WHEREOF,the parties hereto have executed this Amendment No.1 to the
Agreement as of the date and year written above.
CITY OF PORT ANGELES CONSULTANT
By: = 't / , By: Ac
rsc ns
Dan McKeen, City Manager
Title: Senior Partner,Arichor QEA LLC.
ATTEST:
�
J•nnifer eneklasen,City Clerk
APPROVED AS TO FO
William . Bloor, City Attorney
PALF Cell Stabilization CM Contract Amendment 1,Page 2 November 19,2015
EXHIBIT A
SCOPE OF SERVICES OF TASK 1
Additional taskl, described below,represent the scope of work required to provide quality
assurance testing related to the low permeable soil barrier placement on the 351 and 304
Cells as well as the MIZE (mechanically reinforced earthen)wall.
BACKGROUND
The original Scope of Services dated April 15, 2014 provided for the CONSULTANT to
provide construction management,consultation, and field observation for the removal of
refuse from the eastern portion of the 304 Landfill and relocation to the 351 Landfill
located further inland to the south,reconfiguration of the 304 Cell to meet geotechnical,
seismic stability,and solid waste landfill closure standards. Stabilizing the seawall ends to
protect the existing structure function,to accommodate the continuing shoreline retreat over
time, and minimizing environmental impacts. Improving the Dry Creek/Shoreline interface
to address overtopping events,reduce the destabilization risk at the west-end, add in stream
roughness elements to help maintain the thalweg separation from the access road, and
provide access for beach nourishment. Task 1 was added as part of Change Order 10, the
Contractor's scope of work was reduced and additional scope was undertaken by Anchor
QEA for the required materials testing for the low permeability soil barrier.
The specific tasks involved for Amendment 1 are:
TASK 1 —TESTING OF LOW PERMEABILITY SOIL BARRIER
Objective: To perform the required material testing for low permeability soil barrier under Contract
Specification Section 3123 02,Paragraph 1.06.
Activities: Consultant shall provide the following engineering services:
A. Complete all required material testing for low permeability soil barrier using a mobile
testing firm.
B. Monitor low permeability soil barrier pug mill operations and placement procedures to
verify the materials and construction methods are in compliance with the technical
specifications.
C. Provide documentation of all tests and test results for low permeability soil barrier
placement.
D.Provide management and oversight of the mobile testing firm.
END OF EXHIBIT
PALE Cell Stabilization CM Contract Amendment 1,Page 3 November 19,2015
EXHIBIT B
SCHEDULE OF TASKS
• Task 1 shall be completed by January 31, 2016.
END OF EXHIBIT
PALF Cell Stabilization CM Contract Amendment 1,Page 4 November 19,2015
EXHIBIT C
BUDGET OF TASKS
TESTS Number of
Tests Cost Per Test Total Cost
Low-Permeabili Soil Barrier Placement 351-MRE
Nuclear Density Moisture 340 $16.00 $5,400.00
Drive—Cylinder Density 17 $45.00 $765.00
Permeability 14 $435.00 $6,090.00
Moisture Content 156 $15.00 $2,340.00
Subtotal $14,635.00
Low-Permeabili Soil Barrier Test Pad 351-MRE
TESTS Number of
Tests Cost Per Test Total Cost
Boutwell—Infiltrometer 18 $7,000.00 $126,000.00
Soil Classification(PI) 8 $200.00 $1,600.00
Grain-Size (bulk)/wash 8 $150.00 $1,200.00
Nuclear Density Moisture 26 $160.00 $4,160.00
Drive-Cylinder Density 8 $45.00 $360.00
Moisture Content 26 $15.00 $390.00
Permeabilit y 50 $375.00 $18,750.00
Subtotal $152,460.00
Low-Permeability Soil Barrier Admixture
TEST'S Number of
Tests Cost Per Test Total Cost
Proctor 8 $30.00 $2,400.00
Soil Classification 96 $150.00 $14,400.00
Grain-Size (bulk)/wash 28 $150.00 $4,200.00
Permeability 34 $435.00 $14,790.00
Subtotal $35,790.00
Total $202,885.00
Tax 8.4% $17,042.34
Total Cost $219,927.34
Cost Per Test for Task 1 includes all labor,materials, and equipment.
END OF EXHIBIT
PALF'Cell Stabilization CM Contract Amendment 1,Page 5 November 19,2015
I
s
II
ROUTE SLIP
0 p�tYgy
SUBJECT: Amendment—2014 Landfill CM Services SW02-12 ' *
ORIGINATOR: Jeremy Pozernick I DATE: 11/20/2015
TO: ACTION REQUESTED: INIT DATE,
1. Mike Puntenne Review —{r 23 AO,s
2. Craig Fulton Review „L Wort rS
3. Byron Olson Confirm Fundin g <-
4. Bill Bloor Si -
5. 1 Dan McKeen Sign Z Y is
6. Jennifer Veneklasen Si ()IV
Lucy Return to Qrigmator zr
ORIGINATOR Amendment 1 was approved by City Council on August 4,2015 in an
COMMENTS: amount not to exceed$219,927.34. This amendment allows the project to
proceed forward by reducing the Contractor's scope of work related to low
permeability soil testing and incorporating the quality control testing
requirements for low permeability soil under Anchor QEA's quality
assurance scope of work.
RETURN BY November 25,2015
UAC N/A
COUNCIL August 4, 2015
ACCOUNTING 454-7588-594-6510 WO#175225