AMENDMENT NO. 1 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
Vanir Construction Management, Inc.
Combined Sewer Overflow (CSO) Phase II, Project No. 06-02
RELATING TO: CSO Phase II Construction Management Services
THIS AMENDMENT NO. 1 is made and entered into by and between the City of Port Angeles,
a non-charter code city of the State of Washington, (hereinafter called the "CITY") and Vanir
Construction Management, Inc., located at 10900 NE 8th Street, Suite 1486, Bellevue,
Washington 98004 authorized to do business in the state of Washington (hereinafter called the
"CONSULTANT");
The CITY entered into the existing AGREEMENT with the CONSULTANT on May 14, 2014,
(the AGREEMENT).
WHEREAS, the PARTIES mutually desire to amend the AGREEMENT, and
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the
parties hereto agree as follows:
I. SCOPE OF WORK
No change.
II. TIME OF PERFORMANCE
Article IV Time of Performance is amended, the second sentence to read:
The duration of the Agreement shall extend through December 31, 2016.
III MAXIMUM COMPENSATION
Article VI Maximum Compensation is amended to include the CONSULTANT'S compensation
and reimbursement of$360,099 to compensate the consultant for the additional time and
construction management services required to complete the project. The maximum compensation
amount shall not exceed $1,923,825.
x
Amendment 1, Page 1
In WITNESS THEREOF, the parties hereto have executed this Amendment No. 1 to the
Agreement as of the date and year of the last signature below.
CITY OF PORT ANGELES VANIR CONSTRUCTION
MANAGEMENT, INC.
Dan McKeen, City Manager
Joseph A. Mehula
Date: al A d TITLE: President
ATTEST: Date:
J fifer Veneklasen, City Clerk
AP OVED AS TQ RM:
William E. Blo , y t y
i
Amendment 1, Page 2