City of Port Angeles
Public Works Department
q G
321 East 5t" Street/ Port Angeles, WA 98362
ShING(
Contract No.&Title
CONTRACT CHANGE ORDER WW02-2010 Upgrade and Expansion of Wastewater Utility
Supervisory Control and Data Acquisition(SCADA) System
Date Change 7 Prime. Technical Systems, Inc.
Prepared 4/5/16 Order No.
Change Title: 2016 Maintenance Support Budget
Change Scope/Justification:
The original contract provided for extending the contract for five years of SCADA
maintenance. The maintenance support option was activated as part of change order#5 signed
on 1/15115, with a budget to be authorized by City Council through the City budget process
each year. Maintenance support will be tracked on a time and materials basis and will be
invoiced at the hourly rates on the contract Price Sheet, Section 00301-3, including profit and
overhead, equipment, and labor time. Service rates will be escalated annually per Section
01010.1.513.
SCADA Maintenance work under this change order will service City Solid Waste leachate
pumpstations &flare maintained by Wastewater, Wastewater treatment plant &pumpstations,
and Water utility. The scope and budget for specific maintenance tasks shall be authorized in
writing by the City Utility Superintendents before work commences. Payment will be based
on actual work performed, and documented costs associated with the work. Capital phases of
the SCADA contract are complete, remaining work under the contract will be paid through the
authorized 2016 maintenance budgets for each of the named utilities. The allowable contract
task budgets for maintenance support in 2016 are:
1 1 Budget Quantity
Solid Waste $2,000
( Wastewater $30,000
\ Water $15,000
No change in project schedule for this change order.
CONTRACT
COST 1 ATA AMOUNT 1
Original Contract $570,103.00 Original Project Completion- Phase A&B 5/31/201
Previous Change Orders $273,920.46 Change Order#6,Capital Project Completion 1/15/2016
Change Order#5,Maintenance Support
This Change Order Amount $47,000.0 Completion 12/31/201
CONTRACTOR:Technical Systems, Inc CITY OF PORT ANGELES
Signature Signature
Name&Title Name&Title
r
Date: C ^ �., Date: t
This Change Proposal shall represent full and complete compensation and final settlement of all Claims for all(I)
time;(2)direct, indirect,and overhead costs;(3)profit; and(4)costs or damages associated with delay,
inconvenience,disruption of schedule, impact,ripple effect, loss of efficiency or productivity,acceleration of work,
lost profits,and/or any other costs or damages related to any work either covered or affected by the Change
Proposal,or related to the events giving rise to the Change Proposal.