HomeMy WebLinkAbout1701 S Butler St - Engineering
f ~ORT ~
lO~~~
,.
"--~
~
~"'~
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number
Pin number
Property Address
ASSESSOR PARCEL NUMBER:
Appl1cation description
Subdivision Name
Property Use
Property Zoning . . .
Application valuation
04-00001045 Date
.981535
1701 S BUTLER ST
06-30-00-4-4-0090-0000-
RES MANUFACTURED HOME
1/14/05
RS9 RESDNTL SINGLE FAMILY
55000
Owner
Contractor
BRULE, SUSANN
279 PIERSON RD
SEQUIM
(360) 775-0925
WA 98382
NU TREND ENTERPRISES
PO BOX 1780
SEQUIM, WA
SEQUIM
(360) 683-6080
1456SF MANUFACTURED HOME
TYPE V NON-RATED
SINGLE FAM & CONGREGATES
TOTAL % LOT COVERAGE
EXISTING LOT COVERAGE
LOT SIZE
PROPOSED LOT COVERAGE
TOTAL LOT COVERAGE
NUMBER OF UNITS
WA 98382
Structure Information
Construction Type
Occupancy Type
Other struct info
6.20
1. 00
9000.00
1456.00
1456.00
1. 00
Permit
Add1t1onal desc
Permit Fee
Issue Date
Expiration Date
DRIVEWAY INSTALLATION
145.00
1/14/05
7/13/05
Plan Check Fee
valuation
.00
o
Qty Unit Charge Per
BASE FEE
Extens10n
145.00
Permit PUBLIC WORKS RES WATER SERV
Additional desc 1
Permit Fee 640.00 Plan Check Fee .00
Issue Date 1/14/05 Valuation 55000
Expiration Date 7/13/05
Qty Unit Charge Per Extension
1. 00 640.0000 EA PW W/M 1" SERV 5/8" METER 640.00
Permit SANITARY SEWER HOOK UP
Add1tional desc
Permit Fee 95.00 Plan Check Fee
Issue Date 1/14/05 Valuation
Expiration Date 7/13/05
.00
55000
Qty Unit Charge Per
1.00 95.0000 EA SAN SEWER HOOKUP
Extension
95.00
Special Notes and Comments
Building address sign shall not be less than 6" & not more
than 12" in height. Numbers colors must contrast with wall
color they are mounted on. (Ord. 14.36.050-E)
When roof gutters are 1nstalled, drains will located in dry
I
Separate Permits are required for electrical work, SEPA, Shoreline. ESA, utilities, private and public improvements. This permit becomes.
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to IV trttTGrity to violate or cancel the provisions of any state or local law regulating construction or the performance of
onstruc .
~/' ~~
Date
Signature of Owner (if owner is builder)
Date
f ~ORT ~
~ ~.I,.O~~,,:~
Ur...a~
L~
~
~~
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 04-00001045
pin number . . .981535
Page
Date
2
1/14/05
Special Notes and Comments
wells or piped to approved storm drain locations.
Manufactured home must be pit set so that no more than 12"
of sk1rting is visable above grade.
A residential fire sprinkler system shall be installed per
NFPA 13D w111 be required.
2nd option is to install an out side alarm bell that is
eletronicly connected to the residence's smoke detectors.
The alarm bell will be painted red in color and identified
as "F1re alarm"
The proposal will result in the placement of a manufactured
home in the RS-9 zone for a total lot coverage of 16%.
Setbacks are good. No land use issues are noted.
Electrical load calculations and elctrical permits are
required.
Construct driveway to C1ty Standards.
No concrete with exposed aggregate is allowed in the City
road right of way.
Sanitary sewer connection inspect10n is required by
Public Works prior to back fill of ditch.
Other Fees
SEWER SYSTEM DELV CHARGE
STATE SURCHARGE
PW WATER SYSTEM USE FEE
745.00
4.50
1025.00
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Perm1t Fee Total 880.00 880.00 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 1774.50 1774.50 .00 .00
Grand Total 2654.50 2654.50 .00 .00
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent
Date
Signature of Owner (if owner is builder)
Date
T:\PohCles\1102 15R [1105]