NET REQUIREMENTS AND RESOURCES
Effective June 3, 2016
This revision updates section 2.3.1 and section 5 to reflect the consent for removal of the
non-dispatchable resource Morse Creek
1. NET REQUIREMENTS
Port Angeles'Net Requirement equals its Total Retail Load minus Port Angeles'
Dedicated Resources determined pursuant to section 3.3 of the body of this
Agreement and listed in sections 2, 3, and 4 of this exhibit. The Parties shall not
add or remove resource amounts to change Port Angeles' purchase obligations from
BPA under section 3.1 of the body of this Agreement except in accordance with
sections 3,5 and 10 of the body of this Agreement.
2. LIST OF SPECIFIED RESOURCES
2.1 Generating Resources
Port Angeles does not have any Generating Resources that are Specified
Resources at this time.
2.2 Contract Resources
Port Angeles does not have any Contract Resources that are Specified
Resources at this time,
2,3 Small Non-Dispatchable Resources
All of Port Angeles' Small Non-Dispatchable Resources are listed below. If
the aggregate nameplate capability of Small Non-Dispatchable Resources
that are also New Resources exceeds one megawatt, then BPA shall consider
the impacts of the aggregate shape of such New Resources and may require
the application of DFS to account for the impact of the aggregate shape on
Port Angeles' load.
(1) Morse Creek
(A) Special Provisions
Morse Creek is, a uniquely situated small Specified Resource
that is not connected directly to Port Angeles' distribution
system, and thus does not precisely fit the definition of a Small
Non-Dispatchable Resource provided in this Agreement.
Nonetheless, because of its small size(less than three
megawatts nameplate capability) and its historical use and
billing treatment, BPA shall treat Morse Creek as a Small
Non-Disp atch able Resource and, accordingly, is included in
section 2.3 of this Exhibit A.
09PB-13093, Port Angeles 1 of 9
(B) Resource Profile
Date Resource Date of Percent of ameplate
well Type Dedicated to Resource Resource Used to Capability
Load Removal Serve Load (MW)
Hydro 1985 N/A 1OW/V 0.465
Statutory DIPS or If PNCA,PNCA
Status Resource Status SCS? spatchable? PNCA? Updates?
5b1A 5b1B Existing New Yes 0 Yes No Yes No Yes No
I X X -X X
Note: Fill in the table above with"Y's.
(C) Specified Resource Amounts
S ecified Resource Amounts
Oct Nov Dec Jan FI eb Mar Apr May Jun Jul Aug Sep annual
aMW
Fiscal Year 2012
Total (MWh) 0 1 213 164 15 68 52I11 0 0 0 0 0.157
HLH(MWh) 0 1 119 88 89 40 29 62 0- 0 0 0 0.160
AIW ,3
LLH( h) 0 0 94 76 66 29 249 0 0 0 0 0.153
Peak(MW) 0.0 0.0 0.4 0.3 0.3 0.1 0.1 0.2 0.0 N/A
Fiscal Year 2013
Total (MWh) 0 1 213 164 149 68 1 52 ill 0 o 0 0 0.157
HLH(MWh) 0 1 114 92 85 38 30 62 0 0 0 0 0.156LLH(MWh) 0 0 98 72 64 30 22 49 0 0 0 0 0157
Peak (MW) 0.0.- 0.0 0.4 0.3 0.3 0.1 ().1 0.2 0.0 gOO 0,0 0.0 N/A
Fiscal Year,2014
Total(MWh) 0 1 213 164 149 68 52 ill 0 0 0 0 0.157
HLH (MWh) 0 1 114 92 85 38 30 62 0 0 0 0 0.156
LLH(MWh) 0 0 98 72 64 30 22 49 0 0 0 0 0.157
Peak(MW) 0.0 0,0 0.4 0.3 0,3 0.1 0.1 0.2 0.0 0,0 0.0 0.0 N/A
Fiscal Year 2015
Total(MWh) 0 1 213 164 149 68 52 111, 0 0 0 0 0.157
HLH (MWh) 0 1 119 92 85 38 30 60 0 0 0 0 0.157
LLH (MWh) 0 1 94 72 64 30 22 51 0 0 0 0 0.157
Peak(MW) 0.0 0.0 OA 0,3 0,3 01 OA M M 0.0 0.0 0,0 N/A
Fiscal Year 2016
Total(MNVh) 0 1 213 164 155 68 52 ill 0 0 0 0 0,087
HLH (MWh) 0 1 119 88 89 40 30 60 0 0 0 0 0.087
LLH (MWh) 0 1 94 76 66 29 22 51 0 0 0 0 0.088
Peak (MW) 0.0 0.0 OA 0.3 03 0.1 O'l 0.2 0.0 0.0 0,01 0,0 N/A
Fiscal Year 2017
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0.000
HLH (MWh) 0 0 0 0 0 0 0 0 0 0 0 0.000
LLH (MWh) , 0 0 0 0 0 0 0 0 0 0 0 0'000
0�0
Peak(MW) E� 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0'0 0.0 0.0 N/A
Fiscal Year 2018
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 0 MOO
HLH(MWh) 0 0 0 0 0 0 0 0 0 0 0' 0 -OMO
LLH(MWh) 0 0 0 0 0 0 0 0 0 0 0 0 0.000
Peak(MW) 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 (H 0.0 N/A
09PB-13093, Port Angeles 2 of 9
Revision No. 2, Exhibit A, Net Requirements and Resources
S ecified Resource Amounts
Oct Nov Dee Jan Feb Mar Apr May Jun] Jul Aug Sep-] annual I I I I I I I I I aMW
Fiscal Year 2019,
Total (MWh) 0 0 0 0 0 0 0 0 0 o 0 o 0.000
HLII (MWh) o o o 0 0 0 0 0 0 0 0.()00
00�
LLII (MWh) 0 0 0 0 0 0 0 0 0 0 0,000
Peak (MW) 0,0 0,0 0.0 0,0 �0 0.0 '"1 A
5)(E( 13)0� WA
Fiscal Year 2020,
Total (MWh), 0 0 0 0 0 0 0 0 0 0 0 0 0.000
HLII (MWh) 0 0 0 0 0 0 0 0 0 0 0,000
L1,11 (MWh) 0 0 0 0 0 0 0 0 0 0 0.000
Peak (MW) 0.0 0,0 0.0 0.0 om 0.0 0.0 0,0 0.0 0,0 0,0 0.0 N/A
Fiscal Year 202!1
Total ()W Wb) 0 0 0 Cl 0 0 0 0 0 o 0 OMO
HLII (MkVh) 0 0 0 0 0 0 0 0 0 0 0.000
LLII (MWh) 0 0 0 0 0 0 0 0 0 0 0.000
Peak(MW) 0.0 0,0 0,0 0.0 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 NIA
Fiscal Year 2022
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 0.000
HLII (MWh) 0 0 0 0 0 0 0 0 0,000
LLII(MWh) 0 0 0 T- o 0 0 0 0 0.000
Peak(MW) 0.0 0.0 0.0 0.0 (�w)::�-()00 90)0 0,0 U 0.0 0.0 0,0 N/A
Fiscal Year 2023
Total (MWh) 0 0 01 0 0 0 0 0 0 0 0 (Woo
HLII (MWb) 0 0 0 0 0
0 0 0 0 0 0 (M)00
LLH (MWh) 0 0 0 0 0 0 0 0 0 0 4.1
omo
.0
Peak (MW) 0,0 0.() 0,() 0'o 0.0 0.0 090 0.0 0.0 0.0 0,0 0.0 N/A
Fiscal Year 2024
Total (MWh) 0 0 0 0 0 0 0 0 0 0 00
)0(�
0'
HLII (MWh) 0 0 o 0 0 0 0 0 0 0 0 0 0.000
LLH (MWb) 0 0 0 0 0 0 0 0 0 0 0 o.oloo
Peak (MW) 0,0 0.0 0,0 0.0 0.0 0,0 0.0 0.0 0-0
o.0 O.O 0.000
HLII
Fiscal Year 2025
Total (NlWh) 0 0 0 0 0 0 0 0 0 0 0 0 0,000
HLH (MWh) 0 0 0 O 0 0 0 0 0 0 0,000
LLII (AWh) 0 0 0 0 0 0 0 0 0 0 0 (Hoo
Peak (MW) M 0,0 0,0 0.0 0.0 0.01 0.0 0.0 0,0 0.0 0.71- X/A
Fiscal Year 2026
Total (MWb) 1 0 0 0 0- 0 0 0 0 0 0 0 0,000
HlAl (MWh) 0 0 o 0 0 0 0 0 0 0 0 0 0.000
w
LLH ('Mh) 0 0 0 0 0 0 0 0 0 0 0.000
Peak (MW) 0.0 0.0 0.0 0'0 0.0 0.0 0.() 0.0 1 090 0.0 0A) (1.0 N/A
Fiscal Year,2027
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 OMO
HLII (N[Wh) 0 0 0 0 dl 0 0 00 0 0 0 0.000
LLH (MW0.000h) 0 0 0 0 0 0 0 0 0 0 0 0 OO
Peak (MW) 0,0 0.0 0.10 0.0 0,0 0.0 0.0 0.0 0.0 1 OJI ().0 I
0' PB-1; Port Angeles 3 of`9
Revision No. 2, Exhibit A, Net Requirements and Resources
S ecified Resource Amounts
Oct Nov Dee Jan Feb Mar Apr ley rlun Jul Aug Sep annual
a
Fiscal Year 2028
Total (AlWh) 0 0 0 0 0 0 0 0 0 0.000
HLH (M 0 0 0 0 0 0 0 Cl 0 0 0 0 0.000
LLIJ (MWh) 0 0 0 0 0 0 fl 0 0 0 0 0A)00
Peak(MW) 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0'o 0.0 0.0 0.0 0.0 N/A
Notes: Fill in the table above with megawatt-hours rounded to whole megawatt-hours, with me,gawatts rounded to
one decimal place, sand annual Average Megawatts rounded to three decimal places.
Morse Creek removed from sj2eciflied resource amounts beginning June 2016 per BPA's determination letter.
3. UNSPECIFIED RESOURCE AMOUNTS
3.1 Unspecified Resource Amounts Used to Serve Total Retail Load
3.1.1 Shape of Unspecified Resource Amounts
Port Angeles" Unspecified Resource Amounts shall be calculated using
the selected monthly and Diurnal shapes listed below. BPA shall
update the table below consistent with section 3.4.2 of the body of this
Agreement,
Shape of Unspecified Resource Amounts
Monthly aha pe Choice Diurnal Shape_f�Choice
Total Retail Flat Annual H. L11 Diurnal Flat Within-
Purchase Period Load Monthly Shape Month Shape
Shape Shape
FY 2012-FY 2014 x x
FY 2015 - FY 2019 x x
_F" x x
FY 2025-FY 20213x x
3.1.2 Unspecified Resource Amounts
Port Angeles does not have any Unspecified Resource Amounts at this
time.
3.2 Unspecified Resource Amounts for 9(c) Export, Decrements
BPA shall insert a table below pursuant to section 3.5.3 of the body of this
Agreement.
4. DEDICATED RESOURCE AMOUNTS FOR AN NLSL
Port Angeles does not have any Dedicated Resource amounts serving an NLSL at
this time, in accordance with section 3.5.7 of the, body of this Agreement.
09PB-13093, Port Angeles, 4of9
Revision No. 2, Exhibit A, Net Requirements and Resources
5. TOTAL DEDICATED RESOURCE AMOUNTS
The amounts in the table below equal the sum of all resource amounts used to serve
Port Angeles"Total Retail I,oad listed above in sections 2, 3, and 4.
Dedicated Resource Amounts
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep annual
aMW
Fiscal Year 2012
Total (N[Wh) 0 1 21.`3 1(54 15 68 52 111 0 0 0 0 QA57
111,11 ((Yl4Pti?'h) 0 1 119 88 89 40 29 62 0 0 0 0.160
LLI-I (M h) 0 0 94 76 66 29 23 49 0 0 0 0,153
Peak(MW) 0,0 0.0 0.4 0.3 0.3 0.1 0,1 0.2 0.0 0.0 0.0 0.0 N/A
Fiscal Year 2013
Total(MWh) -o 1 213 164 149 68 52 ill 0 0 0 1 0.157
HLH (MWh) 0 1 114 92 85 38 30 62 01 0 0 0 OA56
LLH(MWh) 0 0 98 72 64 30 22 49 0 0 0 0 0.157
Peak(MW) 0.0 0.0 0.4 U 0.3 0.1 0,1 0.2 0.0 0.0 0.0 0A) N/A
Fiscal Year 2'014
Total (MWh) 0 1 213 164 149 68 52, ill 0 0 0 0 0157
IlLH (MWh) Q 1 114 92 1 85 38 30 -17-6-2 0 0 0 0 0.156
LL�HM
( Wh) 0 0 98 2 64 30 22 49 0 0 0 0 0.157
Peak (MW) 0.0 0.0 0.4 0-3j 0,3 0.1 0.1 0,2 0 0 0.0 0.0 0.0 N/A
Fiscal Year 2015
Total (MWh) 0 1 213 164 149 68 52 ill 0 0 0 10 0,157
HIM (14IWh) 0 1 119 92 85 38 30 60 0 0 0 0 0,157
LLH(MWh) 0 1 94 72 64 30 22 51 (0) 0 0 0 0A57
leak (MW) 0.0 0.0 0.4 01,3 U 0.1 01 0.2 0.0 0.0 0.0 0.0 N/A
Fiscal Year 2016
Total (MWh) 0 1 21,3 7164 55 68 52 1 11 0 0 0 00,087
HLH (MWh) 0 1 119 88 89 40 30 0 0 0 0-- 0.087
LIM (MWh) () - 1 94 76 66 29 22 51 0 0 0 0 0,088
-Peak(MW) 0,0 0.0 0, 0A 0.2 0.0 0�0 o(I 0'o
- N/A
Total(MWh) 01 0 Fiscal Year 2017
0 0 0 0 0 0 0 0 0 0,000
HIM (MWb) 0 0 0 0 0 0 0 0 0 0 0 0-000
LLII (MWh) 0 0 0 0 0 0 0 0 0 0 0 0 0.000
Peak (MW) 0.0 0,0 0.0 0.() 0.0 0.0 0.0 OM 0.0 0,0 0.0 0.0 N/A
Fiscal Year 2018
Total (MWh) 0 0 0 o 0 0 0 0 0 0 0 0 0.000
IILH (MWh) 0 0 0 0 -0 0 0 0 0 0 0 0 OMO
LLH (MWh) 0 0 0 0 o 0 0 0 0 0 0 0 0.000
Peak(MW) 0.0 0,0 0,0 0.0 0.0 0.0 0.0 01.1 0.0 0.0 0.0 0.0 N/A
Fiscal Year 2019
Total (MWh) o 0 0 0 0 0 0 0 0 0 0,000
HLH(MWh) 0 0 0 0 0 0 0 0 o 0 0 0.000
1,1,11 (MV;h) 00 0 0 0 0 0 0 0 0 0 0.000
Peak(MW) -02. 0.0 0,0 0.0 0,0 0.0 01.0 0.0 0,0 0.0 0.0 0,0 N/A
Fiscal Year 20210
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 0 0.000
111,11 (MWh) 0 0 0 0 () 0 0 0 0 0 0 0 0.0100
LLII(M h) 0 0 0 0 0 0 0 0 0 0 o0000
-11'eak (MW) 0.0 0.0 0.0 0,0 0.0 0.0 0.0 -0A) 0.0 0.0 0.0 E=o-0 N/A
09PB-130,93, Port Angeles 5 of 9
Revision No. 2', Exhibit A, Net Requireinents and Resources
Dedicated Resource Amounts
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep aM1 annual W
Fiscal Year 2021
Total(NlWh) 0 0 0- 0 0 0 0 0 0 0 0 0 0,000
HLH (MWh) 0 0 0 o 0 0 0 0 0 0 0 0 0.000
LLH (MWh) 0 0 0 0 o 0 0 0 0 00 0 0.000
Peak (MW) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0,0 (),0 ().0 N/'A
Fiscal Year 2022
Total (MWh) 0 0 0 0 0 0 0 0 0 1) 0 0.000
HLH (MWb) 0 0 0 0 0 0 0 0 0 0 0 OMO
LLH(MWh) 0 0 0 0 0 0 0 0 0 0.000
Peak (MW) 0,0 0,0 0.0 0,0 0.0 0.0 0A) 0.0 0.0 0,0 0.0 N/A
Fiscal Year 2023
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 0.000
HLH (MWh) 0 0 0 0 0 0 0 0 0 0 0 0 0,000
LLH (MWh) (�) 0 0 0 0 0 0 0 0 0.000
Peak (MW) I 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0.0 0.0 0,0 0,0 N/A
Fiscal Year 2024
Total (MWh) 0 0 0 0 0 0 0 0 0 00 0,000
111,11 (Mwh) 0 0 0 0 0 0 0 0 00 0.00()LLII (MWh) 0 0 0 0 1 0 0 0 0 0 0 0 0A)0()
Peak(M( `) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.(:) 0,0 N/A
Fiscal Year 2025
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0.000
HLH(MWh) 0 0 0 0 0 0 0 0 0 0 0 0.000
LLH (MWh) 0 0 0 0 0 0 1) 0 0 0 0.((k()
Peak (MW) OD 0.0 0.0 0,0 0A) 0.0 0,0 0,0 0.0 0.0 0,0 N/A
Fiscal Year 202!6
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 0 0.000
HLH (MWh) 0 0 0 0 0 0 0 0 0 0 0.000
LLH(MWh) 0 0 0 0 0 0 0 0 1) 0 0.000
Peak (MW) 0.0 0'0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0,0 (W 0,0 N/A
Fiscal Year 2027
Total(MWh) 0 0 0 0 0 0 0 0 0.001)
HLH fflWh) 0 0 0 0 0 0 0 0 0 0 0,000
LLH (MW 0 0 0 0 0 0 0 0 0 0 0 0,000
Peak (MW) j 0.0 0.0 0.0 0,0 OM 0.0 0.0 0.0 (4).() ()o N/A
Fis,cal Year 2028
Total (MWh) 0 0 0 0 0 0 0 0 0 0 0 00)0
111111 (mWh) 0 0 0 1 0 0 0 0 0 0 0 0,000
AlW
LLH ( h) 0 0 0 1 0 0 0 0 0 0 0 0 0,000
Peals (MW) 1 00() 0,01 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 N/A
Notes: Fill in the table above with megawatt-hears; rounded to whole inegawatt-hours, with megawatts, rounded to
one lecinial place, and annual Average Megawatts rounded to three decinial places.
�Mo�rse Creek removed from dedicated resource amounts beginning June 2016 per I)etermination Letter.
6. LIST OF RESOURCES NOT USED TO SERVE TOTAL RETAIL LOAD
Pursuant to section 17 of the body of this Agreement, Port Angeles, does not own any
Generating Resources or Contract Resources that are (1) not Specified Resources
listed in section 2 of Exhibit A, and (2) greater than 200 kilowatts of nameplate
capability.
09PB-13093, Port Angeles 6 of 9
Revision No. 2, Exhibit A, Net Requirements and llessura s
7. LIST OF CONSUMER-OWNED RESOURCES
71 Consumer-Owned Resources Serving Onsite Consumer Load
Pursuant to section 3.6 of the body of'this Agreement, Port Angeles does not
have any Consuiner-Owned Resources serving Onsite Consumer Load at this
time.
7.2 Consumer-Owned Resources Serving Load Other than Onsite
Consumer Load
Pursuant to section 3.6 of the body of this Agreement, all of Port Angeles'
Consumer-Owned Resources serving load other than Onsite Consumer Load
are listed below.
1) Nippon Paper Industries USA
(A) Resource Profile
..............
Resource Owner Fuel Type Nameplate
Capability (M'W)
NPIUSA Co-gen 20.00
(B) Expected Resource Output
xpected Out purt-Ener (aMW)
Fiscal Year 2012 2�013 2014 2012�016 2017 2018 2019 2020
Annual aMW N/A N/A 19,178 19.178 19.126 19,178 19.178 19.178 19,126
Fiscal Year 2021 i0ii 202:3 t2024 2025 2026 2027 2028
Annual aMW 19,178 19.178 19.178 RIM 19.�178 19.1711 19.1711 19.1?(i
Nte�: Fill in the table above with annual Average Megawatts rounded to
three dechnal places,
7'.3 Consumer-Owned Resources Serving Both Onsite Consumer Load
and Load Other than Onsite Consumer Load
Pursuant to section 3.6 of the body of this,Agreement, Port Angeles, does not
have any Consumer-Owned Resources serving both Onsite Consumer Load
and load other than Onsite Consumer Load at this time.
7.4 Consumer-Owned Resources Serving an NLSL
Pursuant to section 23.3.7 of the body of this Agreement, Port Angeles does
not have any Consumer-Owned Resources serving an NLSL at this time.
8. TABLES FOR ALLOWABLE DEDICATED RESOURCE SHAPES
8.1 'Total Retail Load Monthly Shape
By March 31 immediately following each of the Fiscal Years, 2010, 2015, and
2020, BPA shall fill in the table below with Port AngelesTotal Retail Load
Monthly Shape, in accordance with section 3.4.2 of the body of this
Agreement. Port Angeles'Total Retail Load Monthly Shale shall be
calculated bµy dividing Port Angeles' Total Retail Load (in ugawatt-hours) in
09P13-13093, Port Angeles 7 of 9
Revision No, 2, Exhibit A, Net Requirernents and Resources
each month of Fiscal Years 2010, 2015, and 2020 by the Fiscal Year total of
Port Angeles" Total Retail Load (in megawatt-hours), BPA shall weather-
normalize Port Angeles' Total Retail Load data, prior to calculating the Total
Retail Load Monthly Shape, using the same weather-normalization
procedures set forth in section 4.L I of the TRXI.
Total Retail Load Monthly Shape
...........
� Oct Nov Dec Jan Feh Mar ZApr [May Jun Jul Aug LStp_ Totat
FY 2010 100.0
FY 2015 100,0
FY 2020 iWo
Note: Fill in the table above with percents,rounded to the nearest one decinaaal .lacca
8.2 HLH Diurnal Shape
8.2.1 Specified Resources
If Port Angeles elects the HLH Diurnal Shape for its Specified
Resources, Port, Angeles shall fill in a table with monthly LLH and
HLH amounts, for each year of the upcoming Purchase Period for each
Specified Resource. The monthly LLH and HL14 distributions shall be
the same across all years of a Purchase Period. Port Angeles shall
submit the tables to BPA when Port Angeles makes its reshaping
elections. BPA shall update the appropriate Dedicated Resource
amounts pursuant to Port Angeles,' submitted elections and consistent
with section 3.4.2 of the body of this Agreement.
8,2,2 Unspecified Resource Amounts
If Port Angeles elects the HLH Diurnal Shape for its Unspecified
Resource Amounts, then Port Angeles shall submit to BPA in writing
its elected ratios of megawatt-hours per hour in HLH to
megawatt-hours, per hour in LLH by the Notice Deadline., Port
Angeles shall submit to BPA twelve monthly ratios and such monthly
ratios shall apply for all years of the corresponding Purchase Period.
BPA shall update,the table below pursuant to Port Angeles' submitted
elections and consistent with section 3.4.2 of the body of this
Agreement. FPA shall calculate Port Angeles' Unspecified Resource
Amounts using the ratios in the table below.
HLH Diurnal Shape for Unspecified Resource Amounts
HLH to LLH Ratios (HL,H:LLH)
Purchase Period Oct I Nov Dec Jan Feb Mar Apr I May 11, Jun Jul Aug Sep
FY 2012—FY 2014
FY 201.5—FY 2019
FY 2020—FY 2024
FY 2025—FY 2028
9. SUPER PEAK AMOUNTS
Port Angeles may reshape some or all of its HIM Dedicated Resource amounts for its
(1) Specified Resources listed in section 2 of this exhibit, except for any Small Non-
09PB-13093, Port Angeles 8 of 9
Revision No, 2, Ex.bibit A, Net Requirenients and Resources
Dispatchable Resources and any Specified Resources Port Angeles is supporting
with DFS, or SCS from.BPA; and (2�) Unspecified Resource Amounts listed in
section 3.1.2 of this exhibit; into the Super Peak Period to receive a Super Peak
Credit. BPA shall update the table below consistent with section 3.4.4 of the body of
this Agreement.
Super Peak Amounts (MW)
Fiscal Oct Nov Dec Jan Feb Mar Apr May Jun Jul 1 Aug Sep
Year
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2!028
Note: Fill in the table above with megawatts round, st three decimal places.
10. REVISIONS
BPA shall revise this exhibit to reflect (1) Port Angeles"elections regarding the
application and use of all resources owned by Port Angeles and Port Angeles' retail
consumers and (2) BP 's determinations relevant to this exhibit and made in
accordance with this Agreement
11SW(S-ul,S,I,PINI\Ct'S"r mmwt,sl PAM1VSC 2(W PV,Rgz
09'PB-13093�, Port Angeles 9 00
Revision No. 2, Exhibit A, Not Requirements and Resources