HomeMy WebLinkAboutAgenda Packet 12/13/2016 r
f
�r
STREETS 10 1 --- PAVEMENT PRESERVATION WINDOW
Preventive
Good Pavement Preservation window
I--
0
Reconstruction
E
Re!iabifitatlon
Poor Maintenance
Time
PAVEMENT 'A
PAVEMENT CONDITION
Excellent
Pavement Preservation - Low cost
ca
is
C Good a
0
CD Fair
a 75% of life
C_ Reactive Maintenance
cc c -- Cost dependent on
WPoor
� 9 condition
w o
Q Very
Poor o ~— Road Reconstruction
� �
--Very high cost
Failed 12%of life
5 10 15 20
AGE OF PAVEMENT
PP=Pavement Preservation RM R�irt�:i•f.1,u�t:-aanc.
COST ESCALATION OVERTIME
saa
CLC
Good
a sa_
r- 60 Fa i r- Resurface(51.75-52.50M)
O - _
40PoorRIFR16billtation($3451sF I
O
U
w 20
E Failed
ria a
CL
Pavement Age
STREET FUND REVENUES
■ Property Tax --- Discontinued in 2013
■ General Fund Contributions --- Property tax to GF to Street fund
■ MotorVehicle Fuel Tax --- State administers (inconsistent funding)
■ Internal Transfers — Street support for other utilities /Alley transfers
■ No Revenue adjustments for Inflation
OMC Street Vacation
REVENUEVS EXPENDITURES Funds $280K
Delta
$300,000
$200,000
$100,000
$0 —
x 2007 2008 .......... 2012 2013 2015
..................
($100,000) ...........
........... ................................
............
($200,000)
($300,000)
($400,000)
Year
REVENUE SHORTFALL --- RESULT
RESULT
■ Not adequately funding operations (using Reserves to balance)
■ No funding for State Grant matches for Capital Improvements (Arterials only)
■ Arterial roads -- 14% of City streets
■ City match requirement -- 12.5%
■ No Funding for Residential street Capital Improvements
■ Residential roads -- 86% of City Streets
■ No State grants allowed -- 100% City funded
■ No funding for new sidewalks,ADA ramps, bike improvements, etc
TBD -WHY PORT
■ Pavement Condition Index from 0- 100:
■ COPA is a rated as a"35"...POOR
■ No major road repairs funded since 2010
■ 18th Street paved 2016 — funded with STP Grant
■ No flexibility for General Fund expansion
■ Asphalt streets will last 20 years...many COPA streets are over 30 years old.
■ It will take a sustained 20 year effort of million budgets to get to GOOD rating due to
advance deterioration
■ Transportation Benefit District is only a START, not a final solution
"TRANSPORTATIONWHAT IS
■ Ability for local governments to fund transportation improvements
("fenced")
■ Independent taxing district created for sole purpose to acquire,
construct, improve, provide and fund transportation improvements in the
district
■ Legislative Authority granted in RCW 35.21 .225
■ Provisions outlined in RCW 36.73.010
RCW 1 10
■ Enhance municipalities ability to fund transportation improvements to improve
transportation performance and necessitated by economic development
■ Allow municipalities to establish TBD to respond to special transportation
needs and economic opportunities
■ Facilitate equitable participation for developers whose developments may
generate the need for improvements.
■ Foster Cooperation between public and private sectors
PROJ
■ Street/Alley Replacement, Repairs, Overlays, and Chip Seals
■ Convert Gravel roads to Asphalt
■ Sidewalk Installation
■ Bridge Repairs
■ Non-motorized facilities
: D REVENUE OPTIONS
NOT SUBJECTTOVOTER APPROVAL
I. Annual vehicle fee up to $20 per vehicle registered within the District.Collected at time of license
renewal...and/or
2. Option to increase to $40 per vehicle after 2 years
3. Transportation impact fees on commercial and industrial buildings. Residential buildings excluded.
Annual Expected Revenues: $325,000 / year for vehicle fees
: D REVENUE OPTIONS
SUBJECT TO VOTER APPROVAL:
I. Up to 0.2% sales and use tax (paid by all shoppers)
■ 2 cent tax on $10 purchase
■ 2/3 of COPA shoppers live outside City limits
2. Property Tax Levy (paid only by COPA residents)
3. Annual vehicle fee > $20 and < $100 / vehicle registered in the District (paid only by COPA
residents)
Annual Expected Revenues:
■ $550,000 to $650,000 based on annual sales
■ $325,000 ($20 vehicle fee) up to $1,622,000 ($100 vehicle fee)
STEPSTO D
■ Develop policy to address major changes in plan
■ Staff prepare list of proposed projects for Council approval
■ Conduct Public hearing
■ Adopt Ordinance
■ Find that District is in public interest
■ Establish boundaries of District
■ Description of activities or functions
■ Public Vote — If required, could be general ($) or special election ($$$)
WHAT
1 $ BUY
■ Street - Pave one gravel street,one block --------- $200,000
■ Street— Rebuild failed street,one block ----------- $140,000
■ Street— Grind and overlay,one block -------------- $100,000
■ Street - Chip seal,one block ------------------------ $ 25,000
■ Alley - Restore alley,one block (poor condition) --- $100,000
■ Sidewalk— Build new,one block- one side --------- $ 30,000
■ ADA Ramp - Build one end of sidewalk ------------- $ 7,000
■ ADA Ramp - Build one intersection corner --------- $ 10,000414,000
One average block = 500 feet
COST FOR PRESERVATION AND REPAIR (281 ��LANE MILES" IN CITY)
Cost per Lane Public Works Average Lane Average Cost
$120,000 10 - 20 yrs 14 miles $1,680,000
$350,000 20 - 40 yrs 7 miles $2,450,000
$425,000 20 - 40 yrs 7 miles $2,975,000
Method Mile Longevity Miles per year per year
Needed Needed
Double Chip Seal
Overlay-2"
Overlay-2" with mesh
Complete Rebuild - 3" 0
CAPITAL PROJECTS UNABLETO FUND
Capital Facility Projects
■ 10 St Reconstruction (M St to N St) — $700,000 (require Grant match)
■ 10 St Overlay (M St to I St) - $325,000
■ N St Chipseal (5th to 15th St) - $300,000
■ 8th St Chipseal (C St to I St) - $200,000
■ Peabody St Chipseal (Alhvers Rd to Park Ave) $175,000
■ Park Avenue Chipseal (Race to Liberty) - $325,000
■ Lauridsen Blvd Chipseal (Lincoln to Ennis) - $550,000
■ ADA Ramps Francis St / Peabody St - $300,000 / $300,000
■ Alley restorations
CITIZEN PROJECTS
Citizen Request Projects
■ Railroad Ave (Lincoln St — Laurel St)
■ Alley Improvements
■ Intersection Street Signs
■ School Sidewalk construction
■ ADA Ramps
■ Solar speed limit signs - $10,000+ each
■ Walkability improvements
■ Bike Lane improvements
FUNDED PROJECTS / I
-2017)
YEAR PROJECT TOTAL COST CITY COST
2014 TR4299—Lauridsen Bridge Replacement(STP Grant/REET,GF,LID) 6,121,000 1.316,000
2014 TR0509- Ediz Hook Erosion Repair(FEMA Grant) 172,000 46,000
2014 TR0514-Signal at Marine Drive and Truck Route 14,000 14,000
2014 TR0609-Tumwater Slide Repair(FEMA Grant) 268,000 134,000
2015 TR 1699— 181h Street Reconstruction(STP Grant) 1,148,000 0
2015 GG01 10—City Hall Parking Lot(GF) 1 16,000 1 16,000
2015 TR9814—Peabody St Repair 100,000 100,000
2016 TRO 1 14—ODT Design:Hill St/Marine Dr(Grant Funded-- Design Only) 200,000 0
2016 TRO 1 I I —Marine Drive Channel Bridge Repair(STP Grant) 698,000 1 13,000
2017 TR0216—Tumwater Bridge Expansion Joint Repair(REET) 210,000 210,000
2017 TR0209—Race St-Complete Street(FLAP Grant-Design Only) 482,000 63,000
NEXT STEP ?