HomeMy WebLinkAbout000254 Amendment 10+ 000254
AMENDMENT NO. 10 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
HERRERA ENVIRONMENTAL CONSULTANTS
OCA 2011-03
THIS AMENDMENT NO. 10 is made and entered into by and beriveen the ort
Angeles, a non-charter code city of the State of Washington, (hereinafter i the
"CITY")and Herrera Environmental Consultants. ,i %O ashington Corporation aut:nnrized to
do business in the State of�N ashington(hereinafter called the"CONSULTANT.).
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in this AMENDMENT, the AGREEMENT is hereby
amended as follows:
SECTION 1
The CITY entered into the existinc;AGREE\1ENT with the CONSULTANT on December
9, 2011, (the AGREEMENT). Amendment No.I on March 13, 2012, Amendment No. 2
on June 19, 2012, Amendment No. , on March 28. 2013, Amendment No. 4 on .lu1y 16.
2013, Amendment No. 5 on November 17. 2013. Atnendment No. 6 on January, 2I. 2014.
Amendment No. 7 on April 15, 201-1. Amendment No. 8 on December 29, 2015. and
Amendment No. 9 on June 29. 2016.
SECTION 2
1. SCOPE OF WORK
No change.
II. TIME OF PERFORMANCE
The CITY requires additional time for professional services to be provided by the
CONSULTANT on tasks related to finalizing permit-related and closeout documents and
responding to regulatory agencies. The time of performance in Section IV of the original
AGREEMENT is amended to read: The duration of the AGREEMENT shall extend
through February 28, 2017.
III. MAXIMUM COMPENSATION
No change.
PALF Cell Stabilization Engineering Amendment 10,Page 1 December 28.2016
Contract
IV. EXHIBITS
No change.
SECTION 3 RATIFICATION
Except as modified herein, the original AGREEMENT, and Amendments No. 1 through
Amendment No. 9 are confirmed and ratified.
In WITNESS WHEREOF,the parties hereto have executed this Amendment No.10 to the
AGREEMENT as of the date and year of the last signature affixed below.
CITY OF PORT ANG ES CONSULTANT
By: y:
&Ikg Fulto Philip C. Coughlan
Director of Public Works and Utilities
Name(printed)
Vice President
Title
Date: LQ� i Date: December 28, 2016
ATTEST:
Jennifer Veneklasen,City Cl
APPROVED AS TO ' )Rhl:
William E. Bl ttorney
PALF Cell Stabiiization Engineering Amendment 10,Page? December 28.2016
Camra
ROUTE SLIP URGENT
4 PORT
C:F
SUBJECT: Amendment—2011 Landfill Engineering SW02-12
ORIGINATOR: Kathryn Neal DATE: December
28,2016
TO: ACTION REQUESTED: IN AL: DATE:
1. Lucy Hanley Distribute I 2-e 16
2. Heidi Greenwood Review t I.-4r-
3. Craig Fulton Review C. 17-128111&
4. 1 Lucy Hanley Distribute to consultant for signature r
5. Craig Fulton Sign .2°t
7. Bill Bloor Sign
9.Wennifer Veneklasen Sign
10. Lucy Return to Originator y
ORIGINATOR Amendment 10 to the Herrera contract for Engineering Services on the
COMMENTS: Landfill Cell Stabili7.ation project adds two months to the duration of the
contract to allow for closeout activities and responses that are required from
regulatory agencies.
There is no change to the contract amount.
RETURN BY December 28,2016
UAC N/A
COUNCIL. N/A
ACCOUNTING 454-7588-594-6510 WO#175225
Reviewer Comments: