HomeMy WebLinkAbout000745 Amendment 5 000745
AYIENDMENT NO. 5 TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELFS
AND
ANCHOR QEA LLC.
LANDFILL CELL STABILIZATION,PROJECT NO. SNN'02-12
RELATING TO: Landfill Cell Stabilization Project Construction Management Services
THIS A%IENDMENT No. 5 is made and entered into by and between the City of Pon
Angeles, a non-charter code city of the State of Washington, (hereinafter called the
"CITY")and Anchor QEA, LLC.,a Washington Corporation authorized to do business in
the State of Washington (hereinafter called the"CONSULTANT").
NOW, THERFt );zF, :n consideration of the representations and the terms, conditions,
covenants ar.j .icrc=c-its set forth in this AMENDMENT, the AGREEMENT is hereby
amended as
SECTION 1
The City entered into the existing AGREEMENT with the CONSULTAN I on April 15.
2014,(the AGREEMENT)and Amendment No. I on No\emher 25. 20'. 5, AmendTnent
No.2 on December 30,2015, Amendment No. 3 on Nla% U. ?016_ <.nd .Ar.iendmcnt No.
on June 29,2016.
SECTION 2
I. SCOPE OF WORK
No change.
11. TIME OF PERFORMANCE
The CITY requires additional time for professional services to be provided by the
CONSULTANT on tasks relat,°J to finalizing permit-related and closeout documents and
responding to regulatorN ale ,cies. The time of performance in Section IV of the original
AGRF.FMENT is amended to read:The duration of the AGREEMENT shall extend
through February 28,2017.
III. MAXIMUM COMPENSATION
No change.
PALF Ccll Stabilization CM Contract Amcndmcnt 5,Pagc I Dcccmbcr 28.2016
V II. EXHIBITS
No change.
SECTION 3 RATIFICATION
Except as modified herein, the original AGREEMENT, AND Amendments No. 1
through Amendment No. 4 are confirmed and ratified.
In WITNESS WHEREOF, the parties hereto have executed this Amendment No. 5 to the
A(iRF.I:MEI'as of the date and year of the last signature written below.
N
CITY OF PORT ANGEL S CONSULTANT-,
By:
C Fulto --- — ;
Director o ublic Works and Utilities �� "�C.�'SCG!!ll`
Name(printed)
Title-
Date:
tli e � _
Date:—2-t_14.0 4j) (10 Date:
ATTEST:
Jennifer Veneklasen, City C
APPR )VE-1) AS TO F M:
William .. l3loor,City Attorney
HALF Celt Stabilization CM Contract Amendment 5.Page 2 tkcember 28.2016
i
i
ROUTE SLIP URGENT
ck� `�
s
SUBJECT: Amendment—2014 Landfill CM Services SW02-12
ORIGINATOR: Kathryn Neal DATE: December
128,2016
To: ACTION REQUESTED: INTY DATE:
1. Lucy Hanley Distribute
2. Heidi Greenwood Review
3. Craig Fulton Review Z.
4. Lucy Hanley Distribute to consultant for signature
5. Craig Fulton Sign ,2 f
7. 13ill Bloor Sin JV231$,
9. ennifer Veneklasen Si
10. Lucy Return to Originator Z
ORIGINATOR Amendment 5 to the Anchor QEA contract for Construction Management
COMMENTS: on the Landfill Cell Stabilization project adds two months to the duration of
the contract to allow for closeout activities and responses that are required
from regulatory agencies.
There is no change to the contract amount.
RETURN BY December 28,2016
UAC N/A
COUNCIL N/A
ACCOUNTING 454-7588-594-6510 WO#175225
Reviewer Comments: