HomeMy WebLinkAbout001064 Amendment 1 001064
AMENDMENT NO. 1 TC) THE
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
THE CITY OF PORT ANGELES
AND
LAYNE CHRISTENSEN
OCA 2016-18
THIS AMENDMENT NO. I is made and entered as of the date of the last signature affixed
below, by and between the City of Port Angeles, a non-charter code city and municipal
corporation of the State of Washington, (hereinafter called the "CITY") and Layne Christensen
Inc, a Delaware corporation authorized to do business in the State of Washington (hereinafter
called the"CONSULTANT").
NOW, THEREFORE, in consideration of the representations and the terms, conditions,
covenants and agreements set forth in the original AGREEMENT' and this AMENDMENT, the
parties hereto agree as follows:
SECTION I
The CITY entered into the existing AGREEMENT with the CONSUU17ANT on May 5, 2016
(the AGREEMENT).
SECTION 2
1 TIME OF PERFORMANCE
Section IV of the Agreement is amended in its entirety to read:
The CONSULTANT may begin work upon execution of this agreement by both
parties and written direction to proceed from the CITY. The duration of the
Agreement shall extend through December 31,2017. The schedule for each
specific task is in Exhibit B attached to this agreement,
11 MAXIMUM COMPENSATION
Section VI of the Agreement is amended in its entirety to read:
Unless otherwise agreed to in writing by both parties, the CONSULTANT'S total
compensation and reimbursement are stated in the attached Exhibit C to
Amendment 2. The maximum compensation amount, referenced in Section VI of
the Agreement, is amended from $15,000 to $30,000, and increase of $15,000.
The budget for each task is as set forth in the attached Exhibit C. The budget for
any Task may be further adjusted by mutual agreement without an amendment to
OCA 2016-18 Amendment 1,Page 1 2/2/2012
the Agreement, as long as the maximum compensation amount of$30,000 is not
exceeded.
11 REVISED EXHIBITS
Section XVII is amended to strike Exhibit A attached to the Agreement and replace it
with Exhibit A attached to this Amendment. All references to Exhibit A in the
Agreement shall refer to the Exhibit A attached to this Amendment.
Section XVII is amended to strike Exhibit B attached to the Agreement and replace it
with Exhibit B attached to this Amendment. All references to Exhibit B in the
Agreement shall refer to the Exhibit B attached to this Amendment.
SECTION 3 RATIFICATION
Except as modified herein, the original AGREEMENT is confirmed and ratified.
In WITNESS WHEREOF, the parties hereto have executed this Amendment No. I to the
Agreement as of the date and year first written above.
CITY OF PORT ANGELES Layne Christensen, INC
By: By: 444-1
Dan McKeen, City Manager
Title:
ATTEST:
Jennifer Veneklasen, City Clerk
APPROVED AS TO FORM:
z
Wifriam E. Bloor, City Attorney
OCA 2016 18 Amendment 1,Page 2 2/2/2012
EXHIBIT A
Professional Services Agreement
SCOPE OF SERVICES
BACKGROUND
The Consultant is to assist the City with the performance testing and continued long-term
monitoring program of the City's Ranney Collector Well. A reduction in infiltration/recharge to
the aquifer may impact the performance of the Ranney collector well, as might the continued
presence of the main channel of the river, and majority of flow within the river, toward the
opposite river bank from where the well is located.
The Scope of Work shall include professional services to evaluate the Ranney Well
performance which shall encompass the following professional services:
Task 1: Ranney Well Performance Testing
Activities: Performance tests of the Ranney Well will be completed by City staff every six
months (April and October). The performance tests should be consistent with previous
testing for comparison purposes. The performance tests should include a 6-hour variable-
rate step-drawdown test conducted at the following rates and durations:
Step Pumping Rate Duration, hours
1 4000 gpm 2
2 5000 gpm 2
3 6500 gpm 2
These are the same rates and durations as previous testing completed in 2013, 2014, 2015
and 2016. Following recovery from the step-drawdown test, City staff shall perform a
constant-rate test at a rate of 4000 gpm for a period of at least 30 hours.
Assumptions:
• City staff will perform the step-drawdown and constant-rate testing similar to that
recently completed. The City shall provide the water level data to the Consultant for
evaluation.
• The tests of the Ranney Well shall be conducted in April and October 2017.
Task 2: Reporting
Activities: The consultant shall provide the City with a report developed from the data that
presents the current status of the well. These reports shall include the following:
Professional Services Agreement
Amendment 1
Page 1 of 4
1. Results of the Ranney Well performance tests shall be analyzed to evaluate the
efficiency of the Ranney Well and to make projections of yield and anticipated
operating conditions.
2. Review of long-term operational data for the Ranney Well provided by the City.
3. Outline potential remedial measures to enable the Ranney Well to continue to
meet City water demands.
4. Graphical and tabular displays of the current data for the Ranney Well.
5. All pertinent data collected during the project that shall be useful to facilitate future
comparisons of the condition of the Ranney Well.
Deliverables:
1. Draft Report
2. Final Report.
Professional Services Agreement
Amendment 1
Page 2 of 4
Exhibit B — SCHEDULE OF TASKS
Task 1 shall be completed in April 2017 and October 2017.
Task 2 reports will submitted one month after completion of the Task I performance
tests.
END OF ATTACHMENT
Professional Services Agreement
Amendment I
Page 3 of 4
EXHIBIT C
BUDGET OF INITIAL TASKS
Estimated
Task Estimated Estimated Sub-
Labor Direct consultant Total
Cost Cost Cost Budget
Task 1 & 2: Performance Testing and
�
Ana $
lysis 9 X14„900.00 L X100.00
1 5'000 00
0�t $1
Total Cost
All tasks above (Tasks 1 & 2) shall be paid on an hourly (time and materials) basis. This includes both April and
October 2017 Performance Tests,
END OF ATTACHMENT
Professional Services Agreement
Amendment I
Page 11 of 12
Uk"GENT
ROUTE SLIP
T
CT
Su : Performance fv�rrraa�n Testing of Ranney Well
ORIGINATOR: Www Janes Burke .......... DATE: 12/28/2016 -
To:^M� _. ACTION REQUESTED: INITIAL: DATE:
1. Crai Fulton
B can C)ls€n......_.._� Confirm Fundin 4012-73110-534- 50 ......... r xtim O+
2. _ �
3. 13111 Bloor _m.. Sigma _ �__ .._.... .._ _ .
4.
5. 6D��McKeen
rVeneklasenm ._.. Return to Luck}
' CI'RzCTzfiiATort
COMMENTS: Layne Christensen, Inc., has been assisting the City with professional
engineering services to evaluate the operating performance of the
City Ranney well and the recharge to the aquifcr, City Counil
approved a contract arnendrnent to extend Layne Christensen„ Inc.,
technical and engineering services through 2017. The arnendnient
will allow the City to continue to monitor and evaluate the
infiltration/recharge to the aquifer and any impacts on the
performance of the Ranney well. To accomplish this,Layne
Christensen will assist with the following tasks:
Task 1:Ranney Well Performance Testing
Task 2:Reporting
Funding for the contract extension is available in the 2017 Water
Utility Operations budget,,line item 402-7380-534-4150.
The professional service agreement,PSA 2016-18,with Layne
Christensen,Inc.,has been accepted by City Council in an amount
not to exceed S 15,0001,increasing the total contract amount to
$30,0010.
TURN BY 12-31-2016 _......_.._ .....
UAC
COUNCIL
ACCOUNTING 507-31...._...w..._.