HomeMy WebLinkAbout311 S Valley St - Land Use WASHINGTON, U.S.A.
PLANNING DEPARTMENT
September 11, 2001
Mr. JeffHinds
Peninsula Bottling
311 South Valley Street
Port Angeles, WA 98362
RE: Street Vacation Petition - STV 01-03
3/4 Alley east of Valley Street
Dear Mr. Hinds:
On September 4, 2001, the City Council of the City of Port Angeles approved your petition for
vacation of a portion of the 3/4 alley abutting property in Block 72, Townsite of Port Angeles.
The vacation encompasses Lots 7 - 14, Block 72, of which you own Lots 7 - 10. The City
Council attached the following conditions to the street vacation:
Conditions:
1. A ! O-foot easement over an existing 6" sanitary sewer line centered in the 3/4
alley right-of-way shall be retained for utility purposes.
2. The property owner(s) of the right-of-way shall be responsible for all costs
incurred to convert the pr/mary overhead utility line underground in the required
10-foot easement retained, and to provide 24-hour access to the utility line and
related equipment.
3. A Zoning Lot Covenant shall be required to combine the 8 lots into one large
building site.
I have enclosed a copy of Ordinance//3097 for your records.
Compensation was set at $5.00 per square foot of which fifty (50%) percent may be charged.
for the property. Your ownership of the four lots would equal a total attainable square footage
of 2000 square feet which equals a total of $10,000. Fifty percent of that amount would bring
the amount due for the north one-half of the fight-of-way to $5,000. The City Clerk's office
will be sending a billing for the compensation amount to both yourself and Peninsula Bottling.
Fidler.
321 EAST FIFTH STREET · p O. BOX 1150 · PORT ANGELES, WA 98362~O217
PHONE: 360-417-4750 · FAX: 360-417-4609 · TTY: 360-417-4645
E MAIL: PLANNING~CI PORT-ANGELES WA US
Once the compensation amount is received for the right-of-way, necessary quit claim deeds will
be prepared and filed by the City.
If you have any questions regarding this transaction, or if we can be of further assistance, please
don't hesitate to contact this Department.
Sincerely,
Sue Roberds
Planning Specialist
cc: Dennis Dickson, Property Manager
Building Division
Engineering Department
City Clerk
L~ J~ Schwagler
pORTANC L S
WASHINGTON, U.S.A.
PLAN N II~IG DEPARTMENT
September 11, 2001
Mr. Jeff Hinds
Peninsula Bottling
311 South Valley Street
Port Angeles, WA 98362
RE: Street Vacation Petition - STV 01-03
3/4 Alley east of Valley Street
Dear Mr. Hinds:
On September 4, 2001, the City Council of the City of Port Angeles approved your petition for
vacation of a portion of the 3/4 alley abutting property in Block 72, Townsite of Port Angeles.
The vacation encompasses Lots 7 - 14, Block 72, of which you own Lots 7 - 10. The City
Council attached the following conditions to the street vacation:
Conditions:
1. A 10-foot easement over an existing 6" sanitary sewer line centered in the 3/4
alley right-of-way shall be retained for utility purposes.
2. The property owrier(s) of the right-of-way shall be responsible for all costs
incurred to convert the primary overhead utility line underground in the required
1 O-foot easement retained, and to provide 24-hour access to the utility line and
related equipment.
3. A Zoning Lot Covenant shall be required to combine the 8 lots into one large
building site.
I have enclosed a copy of Ordinance//3097 for your records.
Compensation was set at $5.00 per square foot of which fifty (50%) percent may be charged.
for the property. Your ownership of the four lots would equal a total attainable square footage
of 2000 square feet which equals a total of $10,000. Fifty percent of that amount would bring
the amount due for the north one-half of the right-of-way to $5,000. The City Clerk's office
will be sending a billing for the compensation amount to both yourself and Peninsula Bottling.
Fidler.
321 EAST FIFTH STREET · P O BOX 1150 · PORT ANGELES, WA 98362-0217
PHONE: 360-417-4750 ® FAX: 360-417-4609 · TTY: 360-417-4645
E-MAIL: PLANNING~(~CI PORT-ANGELES WA,US
Once the compensation mount is received for the right-of-way, necessary quit claim deeds will
be prepared and filed by the City.
If you have any questions regarding this transaction, or if we can be of further assistance, please
don't hesitate to contact this Department.
Sincerely,
Sue Roberds
Planning Specialist
cc: Dennis Dickson, Property Manager
t B~uildmg D~vlsxon
Engineering Department
City Clerk
Jerry Schwagler