HomeMy WebLinkAbout100 S Laurel St - BuildingApplication Number 09 00001227 Date 11/24/09
Application pin number 779910
Property Address 100 S LAUREL ST
ASSESSOR PARCEL NUMBER 06 30 00 5 1 3155 0000
Tenant nbr name PA DOWNTOWN ASSOC
Application type description PUBLIC WORKS UTILITES
Subdivision Name
Property Use
Property Zoning
Application valuation 0
Application desc
RUP #09 09
Owner
CITY OF PORT ANGELES
PO BOX 1150
PORT ANGELES
Fee summary
T•\Policies \1 102 15 [10/08]
WA 983620217
CITY OF PORT ANGELES
PUBLIC WORKS UTILITIES
321 EAST 5TH STREET PORT ANGELES, WA 98362
Contractor
OWNER
Permit RIGHT OF WAY
Additional desc RUP 09 09
Permit pin number 157180
Permit Fee 00 Plan Check Fee 00
Issue Date 11/24/09 Valuation 0
Expiration Date 11/30/09
Special Notes and Comments
Maintain '6 walking path for pedestrians Do Not Block Exits
Contact Street Department (Eric Wheatley 417 4825) For
sign s or barricades in advance
Charged Paid Credited
Due
Permit Fee Total 00 00 00 00
Plan Check Total 00 00 00 00
Grand Total 00 00 00 00
Separate Permits are required for electrical work, SEPA, Shoreline ESA, utilities private and public improvements This permit becomes
null and void if work or construction authorized is not commenced within 180 days if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
.(Ked i 1:2P,5101
Signature of Contractor or Authorized Agent Date ignature of Owner (if owner is builder) Date
CALL 417 -4831 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
PW UTILITIES (Engineering Division)
WATERLINE METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB GUTTER
DRIVEWAY APPROACH
BACK -FLOW DEVICE
CONSTRUCTION R.W PW/
ENGINEERING 417 -4831
FIRE 417 -4653
PLANNING DEPT 417 -4750
BUILDING 417 -4815
T \Policies \1102.15 [10/08]
RESIDENTIAL
PERMIT INSPECTION RECORD
YES 1 NO
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
DATE YES NO COMMERCIAL DATE ACCEPTED I
YES I NO
CONSTRUCTION R.W
PW ENGINEERING
I FIRE DEPT
PLANNING DEPT
BUILDING
~"ORT~
8~o~~~
ha
... -=:;.a
~
~~
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number
Property Address
ASSESSOR PARCEL NUMBER:
Application description
Subdivision Name
Property Zoning . . .
Application valuation
...
03-00000421 Date 7/22/03
100 S LAUREL ST
06-30-00-5-1-3155-0000-
COMM FOUNDATION ONLY
204000
Owner
Contractor
CITY OF PORT ANGELES
PO BOX 1150
PORT ANGELES
WA 983620217
PRIMO CONSTRUCTION
PO BOX 296
CARLSBORG,WA
SEQUIM
(360) 683-5447
RETAINING WALL FOR SLOPE STABILIZATION -----
TYPE V NON-RATED
FENCES, TOWERS
WA 98382
Structure Information
Construction Type . . . .
Occupancy Type . . . . .
permi:t
Additdonal desc
Permit Fee
Issue Date
Expiration Date
BUILDING PERMIT - COMMERCIAL
.00
7/22/03
1/19/04
Plan Check Fee
Valuation
1039.77
204000
Qty Unit Charge Per
.00 5.6000 THOU BL-100,001-500K (5.60 PER K)
Extension
.00
Other Fees
I
Fee :;,wnmary
STATE SURCHARGE
4.50
Permit Fee Total
Plan Check Total
Other Fee Total
Grand Total
Charged Paid Credited Due
---------- ---------- ---------- ----------
.00 .00 .00 .00
1039.77 1039.77 .00 .00
4.50 4.50 .00 .00
1044.27 1044.27 .00 .00
-
(b
~
ff
r
<i
~
-
fA
~\~O
~~fi.
'??-f't'<;.!-- -# /6 ;;./ ~
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days atter the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work Will be complied with whether specified herein or not. The granting of a permit does not
presume to give authOrity to Violate or cancel the proVisions of any state or local law regulating construction or the performance of
construction.
C)/J FILe
Signature of Owner (if owner is builder)
Date
Signature of Contractor or AuthOrized Agent
Date
T \PLANNING\FORMS\1102 15 [4/2002]
,/~
04/08/2003 14:14 FAX 360 683 6475
PRBfO CONST
14102
BUILDING PERMIT - APPLICATION
FOR OFFICIAL USE ONLY:
Datt Rec.: ~- es -as
Permit #: 1-/2 I
Date Approved:
Date Issued:
FlU out COMPLETEI.,Y and in INK. Your application and site plan MUST BE
Co.MPLETE to be accepted for review. If you have any questions, call
(360) 417-4815
Applicant or Agent: ?'e.,"""'n (' -Or-J.r,ll2-~..7-rler-J
Owner: c,lt-{ oP- P0l2-1 A,.....,......F<-e':;.
Phone: ~CLO- & ~~ - ~4-4-1
Phone: 3{DO- 4-1, - 4~L"
Address: t7Z-1 e. J:=.C:-:-H ..;,.-r. City: R>o:L-;: A.-........l:t2"Le-,.. Zip: "'5~/""Z.
Arc111tectlEnginec:r: Mil Q:>IO! - p,-,~ L, hc;.oc. /;:::-eIlNk. n'(/f Phone: 4zs- 4U- ~.,~I
Contractor fi.u..,..... (o~7\2.UL-TI.::>r-I State Lic~nse #~HoCl\3~p: 4-4-05 Phone: ft. 3~"'~44-1
Address: 970 C$~~ go. City: ~Q.L.J I~ Zip: QJ!J3t3z.-
PROJEer ADDRESS: \ DO L A-(.J/2..i:'L ..;t ZONING: f2-/v./
LEGAL DESCRIPTION: Lotu......ee..... IcfvJ Block: SUbd1vision:
CLALLAMCOUNIYPARCELNlThffiER: 1Z-1C.=:r....-r <DC- \.c....A~"( e~'\: ~c=- ""':o-rA-.~,..... l"'. ~::'O""-r'A-/~ ~A-~
Credit Card Bolder Name:
Billing Address:
Credit CardType VISA MC #
TYPE OF WORK:
CI Residential 0 New COWltr. 0 Rc-roof
o Multi-family 0 Addition [J Move
o COIllIIlCrCial 0 Remodel CI Demolilion
o Repair 0 Sign
BRIEF DESCRIPTION OF THE PROJECT:
City:
Exp. Dale:
SIZEN ALUATION:
SF. @ $ /SF. = $
SF.. @ $ ISF. = $
SF. @ $ /SF. '"' $
TOTAL VALUATION $ ::2.0~) ~ ~
{
(o-,,;,-::-v--J. I L "C" ~II t-lA.-t I . .:...R:Ht..A F~ -r ~ ~LnL.l<-
CI Stovc
o Garage
o Dcck
D O!her
~/l.-~~l/'o-'l::> y~l\-L.J c;.,. (:6e- ~Lc:>~G .,'Io.P>lLI-z......C"/o......(
1
COMMERClALIRESIDENTIAL: Occupancy Group: Occupant Loac:l
No. of Stories: Lot SIZe: EXisting Sq. Ft. & Proposed Sq. Ft.
Existing lot coverage _ % & Proposed lot coverage _% = Total lot coverage
Construction Type:
= TOTAL Sq.Fl
%
APPROVALS:
PLAN;
BLDG:
DPWU:
FIRE:
OTHER;_
--
BUILDING PERMIT APPLICATION SUBMITTAL: The Building DiVISion can provide you with infonnation on the application and
plan submittal requirements jfyou have questions.
VALVA TlON OF CONSTRUCTION: In all case.'i, a valuation amount mOit be entered by the applicant 1l1is figure will be reviewed
and may bc revised by the Buildmg Di vision to comply with current fee schedules. Contact the Pcmrit Coordinator at 417-4815 for assistance.
PLAN CHECK FEE: IF a plan check: fec is due it must be submitted at the rime the building permit application and ConstructioD plans are
submittcd. All other permit fees are due at the time of permit issuance.
EXPIRATION OF PLAN REVIEW: If no pennit is issued within 180 days of the date ofapphcation, the appJiQtioD wm expire. The
Building Official can extend the time for action by the applicant up to 180 days upon wrinen request by the applicant (see Section 107.4 of
!he Unifonn Building Code. current edItion). No application can be extcnded more than Oncc.
I
ESNWetland(s): 0 Yes 0 No SEPA Checklist required? 0 Yes 0 No Other:
PLANNING USE ONLY:
, hereby certify that I have read and exammed thiS application and know the same to be true and correct. , am authorized to apply forthis permit and
understand that it is my responsibility to determine what permits are required ,not e City's. and that I must obtain such perrmts prior to work
-- -.. Date: y4~J
Applicanl:
T:\FORMS\APPS\Bulldingpcnnu wpd
<a4
... - -- ~ ..........., .... ,
May~07-03 07:12A M;lbor-P;ta, Inc.
. > >
~~o ~Ol UO((;~ 4
425 861 0677 P.02
Milbor,Pita
SlSSOCIATES, INC.
6May03
#1351
City of Port Angeles
321 East Fifth Street (p.O. Box 1150)
Port Angeles, W A 98362-0217
Attn: Eric Walrath, Project Manager
RE: Response to First Plan Check, 2 April, 2003: Laurel Street Slope Repairs,
Por1 Angeles, W A
Introduct~n an~ Bacqround
This document presents the response by Mjlbor-Pita & Associates, Inc. (MPA) to the
First Plan Check of the Laurel Street Slope Repairs) Port Angeles, W A, dated 2 April
2003, prepared for the City of Port Angeles by Zenovic & Associates. We are
responding to the first three comments only as per the City's request.
Commenll and Responses _
· Comment I-Provide calculations for fence posts mounted on pile cap. Design
loads shall conform to UBC Table 16-B for balcony railing and guardrails.
Response-Calculations for the fence post mounted on pile caps are found tn
Appendix A. A summary of the results is as follows:
1. Anchor bolts need to be O.5.inch diameter stainless steel threaded rod (GR
AlSI 304/316) embedded 8.5 inches.
2. The post spacing cannot be greater than 6 feet.
3. The steel base plate must be 3/8 inch thick to meet UBC requirements, not
the O.5-inch as show on the plans.
4. Weld at the base of the post to base plate needs to be O.25-inch fillet weld.
· Co...ment 2-Clariry spacing on soil nail layout.
Response-In the submittal dated 14 February 2003, there is a drafting error. The
revised plans show that the vertical spacing for all rows is 3 feet.
· Comments 3-Please verifY seismic loading conditions used in the design
Response-As outlined in our report of 14 February 2003, we analyzed the
existing and post-construction stability of the slope, the proposed soil nail system,
and the proposed segmental retaining wall (SR W) system to determine the
minimum factors of safety against failure using a horizontal seismic acceleration
of 0.15g. We have redone the slope stability and soil nail design calculations for
GeOIC(;hni~llll1ld Tunnel COIDIullanls
I n70 Woodlnvillo:-Redmond Rd. SIc 703 www nlllbor-Plta.conl
WoodinYillc, W A 911072 flltge 1
Phone (42S) 486-6~61
Fax (4n) 48S-J660
. May-07-03 07:12A Milbor-Pita~ Inc.
, .
~~o 001 UOf/;n ~
425 861 0677 P.03
the project, using a horizontal earthquake acceleration of O.20g, as recommended.
The new data are as follows.
Summary of Geotechnical Calculatio~
Factors of Safety (F.S.) for each of the systems are outlined in Table 1.
Table 1: Stabilit IS !It
,." S
Factor of Safety
em Factor a etv tlI
lope Stability Slope Stability SOU Nail
~ (Post System
Construction) Cons1ruction) . - ...
1.381 1.49 1.60
-,-,...
of S ~ ResuI
-~. -
SRW System
2.64
The critical failure surface for the pre-construction slope stability is shown on
Figure 1 The base of the failure surface is along the weakest soil layer, Layer J
In the post-construction scenario, Figure 2, the base of the failure surface is also
in Layer 3. However, the upper portion of the failure surface has been moved
back, away from the face of the slope by the soil nails, thereby increasing the F.S.
to 1.49.
The factor of safety (F.S.) for the soil nail wall system (See Figure 3) is calculated
using soil backfill behind the wall instead of Geofoam blocks. The blocks are
one-third of the weight of the soil backfiJl. Therefore, the actual FS is greater
than 1.6.
In each case, the F.S. is greater than 1.25, which the Washington State
Department of Transportation uses as the minimum acceptable F S. fOf design
under earthquake loading.
Closure
We appreciate the opportunity to be of service to you. If after reviewing this report,
should you have any questions or require additional infonnation, please do not hesitate to
call.
Sincerely.
Milbor-Pita & Associates, loe.
Carol Ravano, PE
Project Geotechnical Engineer
I The factor of safety shown in the 14 Februal}' 2003 report of 1.83 represcnted a dC\...p-scaLcd failure
through the toe of Ilte slope and should flot be compared 10 this FS for the non~cular fiulure through the
weak layer.
Geotechnical OIld Tunnel Cotlsultonts
17210 WoodmviUc-Redmund Rd. Stc 703 www,miloor-Pltll ~"'h1
W oodinVI lie. W i\ 98072 Paso 2
l'bun... (42~) 486-6361
}'ax (425) 488-2660
.~ay-07-03 07:12A Milbor-Pita~ Inc.
425 861 0677
Frank Pita, P.E.. P G
Geotechnical Project Manager
Attaclunents;
FibOUrc I
Figure 2
Figure 3
Pre..construction Critical Failure Sutface
Post-Construction Critical Failure Surface
Soil Nail Calculations
Design Calculations
~~o ~Ol Ubll;~ 4
P.04
Appendix A
C1eorechmcal and Tw\nel Consultant!';
17270 Wooclinvillc-R~mOlld Rd. SIc 703 wwwmilbor-pila.com
Woodinv.llc, W A 9110n Pag~ ~
I'honc (425) 41j~561
fUll (42~) 488-2660
Ese - tIenu~ Enter - Surfac:e list
FS = 1.38
"in FS = 1.38
.~
~l
'<
i
o
'-I (
. I (
O'
W~
O(
'-I
ij1rJ~~[~T:~~;.~~~~~1r:~~
~ ... . . .. -. .. .
I~ '." ..: .... ..... . . ~ . . . .
11.~1~ :J;; ;J~.~~~t~:~~;_ 'r
Deacrlptlon: laurvll
Non-clrcul.r shltPtl uall11ll S~r 's ltethod
Port A~. LeureI St. Slope
Pr~lon .J-t.,...,._f... 11
Non-O'eUar SIP SUrface I.:.... "'.'Ox.. ~
~ ~-"'"
......
I-'
N'
)>
~
.,j,
F~ Surface
-J
0"
o
,
I
iJ
.,j,
et
~
~
I-t
:l
f'l
~
N
U1
(Xl
01
I-'
o
01
'-I
'-I
Figure 1
(
o
iJ'
. .
o~
U1
o
May~07-03 07:13A Milbar-Pita~ Inc.
425 861 0677
00 I UO I I ; ~ 0
P.06
;-, II ;-. ~l-'.;I."
I .,',. 'i.f-., .\-1
I ' ,
- . --, . . -
.... ,',
~~ ...., , .1' ~ ~ . . . .' I' '''1
~.'~8~C-"":lPtio~::.,~p,os.t '~'!.;.,' .1" . ,'." , ~ _.~ ,'.
~:L ," -<o.'''':,..~ ";'~r~:.. (~~<Y~':'<._ . ..... r ): -.:!..:..f.','....... . ":-:: I"
l~ HOn-cl....eul.r:_'.h.pa, using Spence.....:: s t1ethQd<?'~,~';," < '1:. <
') ,.IIr .,," 1"'... ." :,',-,0''''' 'l:.J......'"{i-1. t:,"-~.+~ ".J! -:.. rl.'. '.,..., ~..'" -T" "~I.....' .~. '" '.'/;' .
;. 'lka~ - Menlt: Eriier' '~, S'u~f~ca, lis1:' F.~ ~,,;..' r .'49~'" '",i'n' FS
. '
1.44
120
Port Angele$. L~rel Sl Slope
Po$! Constluction. Non-circular ~fJp Surface
Along Weak Plene
so
Surcharg6'=25Op$f
100
5 urchargc=20psf
60
40
"
"'\'\
.......---- ~-
o
-............
~
.........,
"'-
.......
.."......
20
zoo
Figure 2
PROJECT TITLE I aurel Soil Nail Calculations using SNAILZ
Date: 95-01-2e63
MiniMuA factor of Safety =
File: lsw
1.60
14.9 ft Behind Wall Crest
a.9 ft Below Wall Toe
LEGEND:
Crit.Ac= 9.76g
Hoz. KH= a.zeg
Vrt.PKH= 9.eeg
H= 18.1) ft
/SU'cha,ge
ps= 39.9 Kips
F'r'= 36.9 Ksi
Sh= 6.9 ft
Su= 6.9 ft
GAM PHI COH SIG
Layer 1 pef deg ps f ps i
_U__a --..._..~.u______......___......._....u..._ 1 129. e 38 e 4.9:. ;;:
Wate~.~~~.~I.~"........., 2 139.9 38 10aa 6.9
.. . . . .. .. 3 125. e 38 a t1. 9
Layer 2
1:59
'~
' .' --------
..,.....
un............. .......... ..n....._ no. - -..80+-1-.. Boun d... (; ~J. -. ~~. o__u... Uater--..u.
SCALE = 1e ft mID Surcharge
Press: Q= Quit. T= Toe. S= Screen. Z= 200N. R= Report.
Figure 3
.-~
Ill!
" '<
. I I.
o
'-I'
- I:
o
w~
0'
'-I~
..
I-l
W
)>
~
..l,
...l
tT
o
,
J
il
..l,
rt
III
v
I-l
:3
n
.
~
N
U'1
CD
C'I
I-l
o
C'I
'-I
'-I
c
o
il:
o~
'-I
, .....-.J, ....... ,............,...,
,May707-03 07:13A M;lbor-P;ta~ Inc.
~LO ~Ol UOff;~ ~
425 861 0677 P.08
Milbor~Pita
&::SSOc.:IATIS. [NC;.
APPENDIX ^
Railing Structural Calculations
r~(ttechni(:al & Tun De! Consultanb
.May~07-03 07:13A M;lbor-P;ta, Inc.
. .
~~o 001 UO(I;~ ~
425 861 0677 P.09
.
lAUREL STREET HillSIDE REPAIR
STRUCTURAL CALCULATIONS FOR HAND RAILS
Prepared for
Milbor~Pita & Associates~ Inc.
By
Garry Struthers & Associates
April 2003
May-07-03 07:14A Milbor-Pita,
, ,
Inc.
425 861 0677
~~o ~Ol UO((;~ lU
P.I0
I~I
GARRY STRUTHERS AsSOCIATES, INC.
.. PROJECTkfd 5fo(eal-- fh"(/~~e. f1:tar-,r
8V /-.J 6 DAT~ 4/~/~HECKED
SHEET -'- OF 3
NO.
DATE
. . .
.......
:~i6 ..~~
. . .
. .. III .. .. ..
. . .
. .
. . .
. . .
. .. .. II
.. .. ~ III .
..,;....
..-:. . o.
. .
: :~ :4:;1,: :
u . ;t.r
......r:
""'Z
:~::
:MB<=
........
. ~: (~:
. . .
r~~:
!"'::~~~~
:::::~
')i~:~:?~::: .
...:'.......~
~f:;z: ~#~~ . :
.... .. .
...........
..;P~ tit! Ie .
- 11 .. .. .. .. .. ..
i:~: 00:
'::Jj,; ~.
z.;. . . . . . .
....ft..
.. . .... "..
.......
. . . . . . . I
.. II .. .. .. .. ..
. 41 .. .. .. .. ..
. .. .. ':1:
...
~
1;....,,...
1 ~~~':e;
1:'2:.:: I........,.
. . . . ~. te;',,~L..
. +-=-~~, :_-~
....1........
ji: /'; : : , . : : . . : I : . : ~
: : ~ ~:o: ~ ~ :1i : :$: ~ r~ : :' .
J,U9: r=' .~. ~ ~~-~3~~~~~'
- ... ---- ..' :." .... '.'-.- .4. '. '. --r-
.. to .. .. .. .. .. .. III - - :-:-:....:--. ~ : I .. .. .. .. .. ..
..,........ ..,...... ........1111.........
. t1': . : iLl ~~: :/~UV~. : ~~~~~:: ifefl.,:
. . . s~ . rr r n . . .. ......... I . a. . . . . . .
i; : ~/:ii_:.. ..:.~: ~~-i : ~ : :j;: :3: 7: ~: js.s: : .: : : :
:nUl1= ~ JtJJ U: l~l~J~,....
. ~.~ . ~Y-<~I.:""..." c.
..... .......... .......
:: ~':7' ~~,~:~~x.~3li:,1g:
... ." i -t " .. " " .. 'S . i " . ., . JL.. .. ... ~"
! : ..,: . 'l:t:'~ ~-!-~''f:
I .eJ~ ,~f. . . . '. .. ,)...,..
:i" ; ~ i : rL : .>. : : :;; ;.:. ii: It.. . l1;'(L?:
~ . M"~' .. .~. ""''-f' ~ 9':'": . . .
. , .. ! ' 41 . .. It. .. ..........,
..:;!., .
. .
:~
I .
.. -,~ "-j
I
,
::0'::'
., . .. ,. ..
. . .. .. ..
... ....
~....
:...~~r:
'';:
.: .
, .
,
I
I
....1..........
~/7' ! . . . . . . . . .
...:~.........
. -.' 1-1, ~-:-:-:-:-~:-:
" .. .................
,
:::::: 1:::::::::1
:it UWJl:~: : : :'f : I
'/'!( _n~~..l.t~1
,
i
,
!
I
I
......
'YO
" . .. I " . .. .. . . .. " "
.May~07-03 07:14A M;lbor-P;ta,
.
. .
" ... . .'
. .' ~I -.
.. . " .
.. . . 1
--...,-
i
J
Inc.
BY
. .
.~te:-: . .
..... ..,
......."...,.,
"1=:1~ ~ t-<". , .
.. .@.
. ... ...
....... .4
.........
~;'.}"~(,.
.. "1' .. .. ..
.. " .. .. '" ..
. " .
-"
. .
. .r
. . .
.. ~
.. .. .. -,
,". f-_"'-' -'_......
,-
. . .
..~....
.. " f' " .. . .
. f." 'r;,
..l.. .. " ... . .. .. .
. . .. " . .. " " ,
. .
. . .
. .
. . .
I
..1(~:..~
~~ . - t~~ :
:-!: " " :.: : :'
" . . .
," .
.. .. .. . .._-.
" . .......
.s..... .
.. -~...
: . :..; r- !"9 .
::~.:'t.
~~: ~ ~ ~' . .
. . .
$:
.
" " ... ..
.. . .. ,:.e' ..
-."..1.".,... ..
.. .. " .. II .. .. .. ..
~~Q 00\ VOl I ,# ,~
425 861 0677
::;
a~:a:~
.. .. .. . .. .. .
~:~ :/:~ j'S
" " .. .. ..
. .. ... ..
.~: .
P.12
SHEET~ OF 3
II'
NO.
.;.~tt(r.~ '~;r::~: ~w: . : : : .
.i ~ . .. , .. ". "..".."........ ......"....
: . {f"/~:~- Qit:; io~ .. i<.::{;~.. .
. .... .........I~.......,.....
.. _' II, .. '_:~: ._:.. ~~~~
f . . . ~,e. . Z. ! . . . . ; . . . .
.~. .. .. .~; ; ~:. ...... ~ : ::: : : : : : : : :
.. .........
.. .. ~'.;;:7: ;,~:
.. .;;;t. .. .. I II .. .... .. .. .. .. ..
I . . . . .
I
. .. (. ~. . I
?{~J : ~ : I'
. . .e
..~: .
DATE
II .. . .. .. " . .. .
:;: .
I
I
. . . . . I~'
-0,-' .
. . . . (i . .
.....1..
..... ..
.....1....
!
I
I
I
I
...~.,..
.....;i1 ..
1~'.a:
.... .....
:~~.
.~e..: .
-'--" -
. :/( : : : :. :::: ~:
.~~~:' rc::
......I..~~:~-
............1-
.//. . . .~. .'.M._'.
.~.. .. ,.
~..41 ... ,..
.1.
I....
, .
I.
I
I
I
i'
,
I'
I
I
I
I .
.May~07~03 07:14A M;lbor-P;ta.
. . .
. . ... . .. ..
. .
I
I .
I '
: () , I . .. to
i1::;' '~'~:~: .
~. . I 0 ~/o 6 .
:--- : ~I ~ . :
o 100
. .
,
----'1-
Inc.
425 861 0677
GARRY STRUTHERS AsSOCIATES, INf.
, ~f.-IJ Sit"', ", II Se 'tie.
PROJECT l..tt ~ ~ tt1
J-1 g DATE 4 /2..3/()~ECKED
12t~;y
, BY
~~ j)"iWl~~?i~:
~:.~ ~
.. 41.,. .CijiJ~
It, ..........
.____u____ __ __I ~- ....
~~~~~
. ~ . ..v
~~ : :ii 3: l~l : . : .
~.......... ...
. " . . , . . . y/
:d~ . . :~ --
I .
.t..all....... I
:.. 't,i{: @~ :L:~:
. . 'r: Z ~ . .~:. . 0 . . ' : : : . . . ~ . .
W6til :f4:4'J/~f:""""
I'f::~" .~. ~....It.
I 'J , il!>' .. 'iW4--, . .
. . . . . . . I . . f ... <II.. l" "...
I............!..... ...
I
,
I
---1----------- --
1
. . .
. . .. .
. . '..i-:~" ~ :
.. V
.. ,. . . ..
. . ~.~. . 0
.. ., ,~-"
. ~.
. .........
: 2J;;ti"
. . .. . ..
. . ~
. .
. t1:.
. ..
o .
~~~j~
. . ~:11 ~
:t: .
. .
. . . :
.. . ij.: (~
. . .
.;.. .
:/1 ':~:'! :/~
. : ~I.'~ .
I .
I
I'
I
i
I
!
I .
I
I
!
.
-,
__n_~ j
. .
I'
i .
I
i
"+~o (;)10 I UO I I ; ~ 1 1
P.ll
SHEET ~OF..L
NO.
DATE
/
.
I
I
I :
I
I
j~:
~ pORT ~
t4.0~~~
rGlii
L~
~
~
DUIL.lJllVu rt=I"CIVlII
CITY OF PORT ANGELES
PUBLIC WORKS - BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
ISSUED: 3/18/2002
PERMIT NO:
13219
S:
PROPERTY L:OCA TION
100 LAUREL S
Lot: Stairs in Right of Way
Block: D Long Legal
Subdivision: Right of Way
Parcel No:
OWNER/APPLICANT
CITY OF PORT ANGELES
321 E 5TH STREET
Port Angeles, W A 98362
360/000-0000
T:
CONTRACTOR
PRIMO CONSTRUCTION
P. O. BOX 296
CARLSBORG, W A 98324-0000
360/683-5447
PROJECT INFO
Project Value: $116,000.00
Project Type: PUBLIC REPAIR
Occupancy Type: RESIDENTIAL
Occupancy Group:
Construction Type:
Zoning Use:
ARCHITECT
N/A
, 98360-0000
360/000-0000
SFD Units: 0 Commercial: 0
SFD sa FT: 0 Industrial: 0
Garage: 0
MFD Units: 0
MFD sa FT: 0
f
Q
Q
tP
\).
~
PROJECT NOTES
RETAINING WALL REPAIR IN SLIDE AREA BEHIND FOUNTAIN AT LAUREL STREET
FEES ASSESSMENT
BUilding Permit:
Plan Check:
State Surcharge:
House Moving:
Manufactured Home:
Sign:
Plumbing:
Mechanical:
Radon:
~b t-~
<S~5:
~~~~
~l~
$1,083.35
$433.34
$4.50
$0.00
$0.00
$000
$0.00
$0.00
$0.00 ,
?e\\.M~ i :;zr 0 ~ =- 42.1
~ w,"4J1 vp.~LtI~
r
~
,
(\l
Misc Fee 1 :
Misc Fee 2:
Misc Fee 3:
$0.00
$0.00
$0.00
,--.
TOTAL FEE:
AMOUNT PAID:
$1,521.19
$1,521.19
BALANCE DUE:
$0.00
~
~~~
~c
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authonty to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction. ~ /
~ U/V]~~ 3//8/oc
Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date
BlJaDING PERMIT INSPECTION RECORD
CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLA WFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
FOUNDATION:
FOOTINGS
WALLS
FOUNDATION DRAINAGE
ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT #
ROUGH-IN
PLUMBING
UNDER FLOOR / SLAB
ROUGH-IN
WATER LINE
GAS LINE
BACK FLOW / WATER
AIR SEAL
WALLS
CEILING I I
FRAMING
JOISTS / GIRDERS
SHEAR WALL
WALLS / ROOF / CEILING
DRYWALL
T-BAR
INSULATION
SLAB I
WALL / FLOOR / CEILING
MECHANICAL
HEAT PUMP
WOODSTOVE / PELLET/CHIMNEY /INSERT
HOODIDUCTS
PW UTILITIES / SITE WORK (EnglOeenng DIVISIOn) SEPARATE PERMIT #'s
WATERLINE / METER
SEWER CONNECTION
SANITARY
STORM
PLANNING DEPT. SEPARATE PERMIT #'s SEPA-
PARKING/LIGHTING " ESA-
LANDSCAPING SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL
LIGHT DEPT
CONSTRUCTION R W / PW/ CONSTRUCTION - R W
ENGINEERING 417-4807 PW / ENGINEERING
FIRE 417-4653 FIRE DEPT
PLANNING DEPT. 417-4750 PLANNING DEPT
BUILDING 417-4815 j?"-?S-D<' \10 I r) BUILDING
C \APPL WPD ~~rm 1/(
>~'\ \
INCORPORATED
519 South Peabody Srreer, SUIre 22
Port Angeles,Washmgron 98362
(360) 417-0501
Fax (360) 417-0514
E-mail: zenovlC@olympus.ner
March 4, 2002
Mr. Lou Haehnlen
City of Port Angeles Public Works & Utility Department
321 East Fifth Street
Port Angeles, W A 98362
SUBJECT: Laurel Street Slide Repair - Port Angeles, Washington
Dear Mr. Haehnlen:
I have examined the plans and calculations for the proposed Laurel Street Slide Repair.
The following items of concern were found during the review and should be addressed
prior to issuance of a permit on the project:
1. There are a number of geotechnical Issues which are outside the expertise of this
office which should be reviewed by a qualified geotechnical firm including the
following:
a. The assumed internal angle of friction for sOil reinforced earth is higher than
values normally used in this area and recommended by Washington State
Department of Transportation.
b. The global stability models should be reviewed and probably take into
account a pOSSible sliding plane which intersects the back of the
benches/back of reinforcements to verify global stability.
c. Design soil property assumptions should be reviewed by a qualified
geotechnical firm to verify that they are appropriate for this site. Note that the
transmittal letter from Earth Improvement Technologies also recommends
review by geotechnical engineer.
d. The on-site soil strengths need to be verified by testing prior to beginning
construction as noted In the transmittal letter from Earth Improvement
Technologies.
e. The reinforced (infill sOil) silt to silty sand shall be tested to verify that the
internal friction angle is greater than 29 degrees by direct shear testing as
noted on the structural plans. These plans assume that on-site material may
be used for this fill material.
f. Plans call for temporary cut slopes as steep as 0.33H:1V.
g. Plans call for finish grade slopes as steep as 0.8H:1V.
...
1 .
, -
Page 2
March 5, 2002
2. A qualified geotechnical firm should be hired to provide continuous on-site
supervision dunng the construction process to verify that design assumptions are
correct and on-site conditions do not very from assumptions used In the design.
It is recommended that this firm be approved and retained by the City of Port
Angeles. Please note that the documentation provided by Earth Improvement
Technologies notes the need for continuous on-site geotechnical inspections.
Note that on-sIte soil conditions, which may vary from the optimistic values used
in the design, may have substantial effects on the design and construction costs
on the project.
3 The construction sequence should be submitted to and approved by the design
engineer pnor to beginning construction so that exposed base soils are not left
exposed to the weather for unreasonable amounts of time.
4. It is recommended that construction activities occur during the dry season since
any appreciable amount of moisture may have an adverse affect on the
underlying base soils and construction costs.
5. The City of Port Angeles should determine whether a ground acceleration value
of 0.1 is acceptable for this project. Based on consultation with a geotechnical
firm practicing in the Puget Sound area, a value of 0.2 it tYPically used in the
Puget Sound.
6. Grading plan indicates that finish grades will be as steep as 0.8H:1V on East End
of walls. Due to fact that native soils will probably be unable to handle this slope
it is recommended that the design provide measures to protect these overly
steep slopes.
7. The plans call for a lined drainage swale on the west side of the walls to convey
surface runoff down the west side and direct it to the proposed catch basin
behind tier #1. The slopes on this lined drainage swale are as steep as 2H'1V. It
is unlikely that hydroseeding this lined swale will result in the establishment of
permanent vegetation and other alternatives, such as the options shown In the
plans, should be considered for these steep slopes within the swale.
Please call me if you have any further questions on this matter.
Enclosure
Fc: IN 02031
Cc: Primo Construction (Steve Lee, fax no. 683-6475)
MEMO
PUBLIC WORKS
& UTILITIES
DEPARTMENT
Glenn A Cutler
Director [4801]
Phyllis Rasler
Administrative Assistant
[4800]
Cate Rinehart
Administrative Assistant
[4700]
Ken Ridout
Deputy Director [4802]
Gary Kenworthy
Deputy Director
and
City Engineer [4803]
Scott McLain
Deputy Director [4703]
Jim Harper
Electrical Engineering Mgr
[4702]
Larry Dunbar
Power Resources Mgr
[4710]
Doyle McGinley
Water, Wastewater Collection
Superintendent [4855]
Pete Burrett
Equipment Services
Superintendent [4835]
Dave Ireland
Light Operations Manager
[4731]
Jeff D Young
Treat Plant Superintendent
[4845]
Tom McCabe
Solid Waste
Superintendent [4872]
Steve Evans
Landfill Supervisor [4873]
Mike Horton
Street Maintenance Supervisor
[4825]
nOR'Tr~ A ~NG' 'E'L' EIS;
1~ ,j i~ '~ i ' ~,. j <u !I
WAS H I N G TON, U. S. A.
DATE:
March 18, 2002
TO:
Lou Haehnlen, Building Official
FROM:
Terin Gloor, Assistant Civil Engineer
~<-6~
RE:
Laurel Street Slide Repair - Building Permit
Engineering staff have reviewed the concerns identified by Zenovic and Associates.
We requested further information on three of the thirteen points and sub-points identified in
Zenovic's report. The engineer of record, Mike Simac of Earth Improvement Technologies,
chose to respond to each of the concerns identified. The justification provided adequately
addresses each concern and provides assurance of further testing to verify the design
assumptions.
The design was performed by a qualified professional engineer licensed by the State
of Washington. As such, the engineer of record assumes responsibility for design. In the
letter from Earth Improvement Technology (3/15102), each of the "Items of Concern"
identified by Zenovic and Assoc. was thoroughly addressed. Therefore, the City
engineering staff takes no exception to the design as provided and recommends issuance of
the building permit.
cc: Gary Kenworthy, City Engineer/Deputy Director of Engineering Services
N \PROJECTS\96-05 Laurel Shde\Bldg Permit memo wpd
qb 0:). 7701
4/5D
?~rf'r-\;+:t+ 132/9
UJ/~O/~UU~ ~4:0~ ~AA JBO 683 6475
PRIMO CaNST
CZ&2-05,07 19JOl
Primo
CONSTRUCTION, INC.
Fax Transmittal
.-r- _
Atto: I~ R , "'-
From:
~~~-<- L~~
~
Company: r f Ty of P A
Date:
~
1 /~ 12001
Fax No.: (
) ~/" . 9 7 d7
Phone No.: (360) 683-5447 En. ;1.2-'
Total Pages (lncludiDg This): {,
He:
I Comments:
reR.. ,.~ 1 J
- ~,-5
e.... t-... e... S )1 0 ~ 0 V\...
~ ' 0-,", {YI e A 'I I?
~~ tI1 r?;.e. R.e u c:.(~
-
,s ~-Ir ""'--e .$f?an.c ~ To ~~h..~rvtc.
.,t..,1QiA... r<. ff!.-I ~ T. Pr (;rj" e.._ "
""41 /V /~ s
V~ L..
970 Ca,lsbotg Ruad. SeqUlnl. H~-1 98382
phone (360) 683-SU7 fax (360) 683-6475 e-mail primo@o(Y11IpJls.net
UJ/~O/~UU~ 14:53 ~AX 360 683 6475
PRIMO CaNST
~02
.
101.1 M:J..rlow~ra_
1"'0 ~>.=' .197
CramCr1tm. NC
2:i032
(7'J~)
R24,1l121
Fax
"24 Il151
EAR'IH IMPROVEMENT TECHNOLOGIES
March 15, 2002
Mr. Steve Lee
PRIMO Construction, Inc.
970 carlsborg Rd.
Sequim. W A 98382
FAX: (360) 683-6475
Page 1 of 4
RE:
Response to "Items of Concern" raised in
Zenovic 85 Assocs. Design Re'riew for City of Port ADgeles
Lau reI Street Slide Repair - Four Tier SRW Construction
City of Porr Angeles Project # 96-05 Port Angeles, WA
EIT Project No.: COI036
Project:
Dear Mr. Lee:
Earth Improvement Technologies, Inc. (&11') would like to offer the following
additional information to address the "Items of Concern" raised in Zenovic &
Associates (ZA) design review letter dated March 4, 2002.
la-J The .Coarse Aggregate Fill" specified foe the .reinforce zone is a coarse,
angular gravel with veJy little sand (max. 25%) and no fines. The
approved stockpile '1.25" PUD Switchyard Rock' has 700/0 of its weight
between 1-5" and 0.75~. EIT's experience in testing angular materials
with similar gradations in large shear boxes yields phi angles greater
than 50 dcgs. On EIT's most recent project the results were 58 degs.
If the City of Port Angeles (CI1i') , ZA, or the Project Geotechnical
Engineer (PGE) still question this soil's strength, it can be tested.
1 b.J The suggested mode of failure was thoroughly investigated by Err in its
design analysis see calculation pages lCp) 54, 57, 74, 77. 94. 97, 115,
and 118. In fact the bench width (min. 51 into the competent natural
till material is an in tegral part of the design detailed on ElT's drawings.
Each onc of the plotted potential failure surfaces (on the Cps listed
above) represents the minimum safety factor for 50 to 90 analyses at
each tangent. The shallow failurc arc postulated by ZA does not
control the design and produces safety factors well above the
minimums shown by EIT's calculations. The shallow failure surface
ZA postulates is shown on Cp 115 for the excavation analysis but only
OCcurs in the weaker overburden soils above the competent till. Also
note that even with NO SRW (earth) structure present on the slope the
minimum safety factors OCcur much deeper in the slope. Although EIT
is confident that the ZA postulated failure mode has been eliminated
by the design presented I EIT would welcome the results of any
additionaJ analyses conducted by other engineering professionals for
this panicular project.
1 . d
ISI0-to28 ftoOLI t
.~O.l ~u.w.^o~dWI 4~~e3
d€2=21 20 ~t ~ew
03/15/2002 14:53 FAX 360 683 6475
PRIMO CaNST
III 03
C01036: Response to Design Review. 'Items of Concern'
four Tier SRW Construction, laurel Sl Sfide Repair, Port Angeles, WA
Page 2 of 4
Ic.) The design property assumptions made by Err are based on the three
previous geotechnical investigations performed at or near the current
project location, see Cp 1 and 26-34, Because Err does not routinely
work in the project area it is required that a competent professional
geotechnical engineer (PGE) with local knowledge pass judgment on
the reasonableness of ElT's design assumptions. That geotechnical
engineer will also then become familiar with the design and be better
able to assess the influence of soil variation at the site as constrUction
progresses. This is particularly importa.nt in monitoring and
evaluating the steep excavation slopes required for this project.
id.) The entire design, viability and structural integrity relies on the
strength of the underlying competent natural glacial till soils at this
site. The design soil property assumptions made by EIT were based on
soils investigation J testing provided and the physical evidence at this
site, see Cp 34. As mentioned in my calculation transmittal letter
those critical assumptions must be verified by testing. prior to the
start of construction. Should testing at the site reveaJ that the
underlying soils are weaker than assumed by EIT ( total strength: cIt =
21", c= 700 psf and effective strength: ,'''''' 29" . c= 500 psfl, the design
is invalid and the SRW structure contemplated could NOT be built.
Ie.) The design property assumptions made by EIT are based on the three
previous geotechnical investigations perfonned at or near the current
project location, see Cp 1 and 26-34. EIT's design and plans require
that the soil properties for the fill material placed above the .Coarse
Aggregate Fill'" be verified by direct shear testing. Please note that
previous direct shear tests on the site overburden soils (see Cp 281
yielded a phi angle of 29 degs. This allows [he possibility at the PGE
being able to make visual observations and material classification tests
to verify its reuse at this tocation_
If.) The excavation cut slopes are designed at O.SH: IV throughout most of
the excavation. Based upon competent underlying soils (see item Id
above) EIT's engineering analysis of the planned cut excavation slopes
(~e Cp S and 115-120) shows this to be a safe excavation. To
minimize encroachment on the adjacent propcrty owner, the upper 10-
12 ft. of excavation in the southeast corner of the Tier 3 and 4 are
steepened to 0.33H: 1 V. These corner excavations are buttresses by
the adjacent excavation sides and should net pose a problem to
stability or safety.
19.) The vast majority of the finish grades on this site are at 1.6H: IV to
match the existing slope west of the project site. The: maximum finish
grade slope of O.8H: IV is a project requirement. to match the grades
on the adjacent property (to the east, behind rhe bank building).
Without significantly encroaching on the adjacent property. that
maximum grade can not be avoided.
2'd
IGIO-!>29 (!>OLI t
.~~~! ~U~w~^o~dWI 4~~W3
aEZ:Zt 20 51 ...ew
03/15/2002 14:53 FAX 360 683 6475
PRIMO CaNST
14J04
C01036: Response to Design Review - "'terns of ConcernJ
Four Tier SRW Construction, Laurel Sl Slide Repair, Port Angeles, WA
Page 3of4
2.) As outlined above, EIT has attempted to model the conditions at this
site in a realistic manner that reflects the subsurface infonnation
available to date. Full-time geotechnical observation is not required
because EIT's design parameters are 'too optimistic,' but rather that
the Project Geotechnical Engineer (PGEl, whether hired by the CITY or
Contractor, needs to be an integral part of the project team. Granted
excavation monitoring is a full-time task to ensure the safety of
workers and equipment, even with an appropriately designed
excavation. However, the PGE w:ill also be needed to approve the base
~vation for each tier, ensure the minimum 5 ft. bench in competent
native glacial till soils is obtained, and observe compaction.
Compaction observation is criticaJ due to the 'Inethod' specification
utilized for this project. All observation and testing work. along with
excavation monitoring will be accomplished in a short time frame,
which EIT estimates to be about three weeks. Therefore~ the short
construction schedule is what dictates full-time monitoring by the
PGE, since this project does not lend itself technically, operationally.
or financially to periodic or 'on-caIP site visits.
3.) The construction sequence is shown on the plans. It consists of
excavating and constructing each t.ier individually (in sequence 1 to 4)
before proceeding up to the next. Provided this occurs within the
estimated three week construction schedule, no further submittals are
necessary. However, any change to this sequence, such as mass
excavation of all tiers prior to building any walls would need to be
reviewed and approved as suggested by ZA. The base excavation for
the most critical tier (# 1) will be the first to be backfilled and protected.
4.) EIT will defer to the 10caJ knowledge of ZA. the CIlY, the PGE, and the
Contractor as to the best time [0 proceed with constrUction.
5.) Please notify EIT should the CITY desire to change the design ground
acceleration for this project to O.2g. The design produced by EIT
utilized a design acceleration of O.lg. based on a map found in the 16th
edition of the .Standard Specifications for Highway Bridge~ published
by AASHTO in 1996 (see attached copy). The AASHTO design
acceleration represents a 100/0 probability of being exceeded in the
next 50 years. Prior to executing the design Err was told by ZA that
the AASHTO design acceleration would be acceptable.
6.) At some point the project must tie into existing gr-ades. The existing
site grades on the east end of the project are O.8H:IV. and appear to
have been that way since the firs [ site investigation in 1983.
Therefore. evidence exists that the native: soils can be maintained at
this grade- Furthermore. the Err design utilizes gcogrid reinforcement
to improve the stability of- the reconstructed slope above Tier 4, and
includes an erosion control mat until vegetation can be established.
EfT can reduce the grades on the east end by extending and increasing
the height of the Tier 4 wall to the east, should the CI1Y' desire.
E.d
lC;10-t>28 I~OL) I
'~~.1 ~U-~_^o4d~1 4~~e3
dE2:21 20 Sl ~eu
03/15/2002 14:53 FAX 360 683 6475
PRIMO CaNST
I4J 05
C01036..- Response to Design Review - 'Items of Concern'
Four lier SRW Construction. Laurel Sl Slide Repair, Port Angeles, WA
Page 4 of 4
7.) The side slopes of the drainage swalc are at 2H: 1 V. but the channel
grade is even steeper 1.6H:IV. The preferred option specified by Err, a
hydro-seeded permanent erosion control mat (North American Green
C350) is consistent '\I7ith the intent of the CITY's plans as presented in
the contract project manual. A permanent erosion control .mat
produces a channel lining that has been documented to resist floW'
velocities in excess of 9 feet per second (fps) un-vegetated, and:lo 15 fps
after 12 months of grass growth. This will certainly be sufficient for
this application. The other options provided (concrete or asphalt) will
work equally well but are more costly and can be substituted by the
CI1Y should a more conservative, but obtrusive solution be desired.
Err appreciates the CITY showing the initiative to have this project design.
approach reviewed by another design professionaL EIT has taken this
opportunity to respond to the 'Items of Concern' expressed by Zenovic &
Associates CZA) in their review, so that PRIMO and the CITY may have a
thorough understanding of the design submitted by EIT and the project
constraints that guided much of the design approach.
Should further clarification become necessary or additional questions arise~
please don't hesitate to call me at (704) 824-0121.
Sincerely,
1L&u/frf-~
Michael R. Simac, PE
Principal Engineer
attachment: AASHTO Sdsmic Map
b'd
ISIC-t.aa 't.OLI t
-40aL ~ua~a^o~dWI ~~~e3
d.a:at ao Sf ~8U
03/15/2002 14:53
~
{
~
J'
~-
~
if'
II:)
'lif'
&~
\"~
-I-
'](1)
f"'>-.
o (3_
F ~~
:r:~j..
~~
4:~
...
10
~7~
-
-
FAX 360 683 6475 PRIMO CaNST 14I 06
l:j-!-r-;'1 j r':...(=-.o:.L-rl ,.t:l"j't~Jf;.!II~""1 .\jfi!.....F'V..q.i 'j','.':,'I,'
II j':tl'i /- 'j!Jlt I, J Ilj.t,'II/I . '11!l'_"~'I.J.!~ ill! 'Ii':,,:~fii
-'Io-L.r/;II~., l.-'H- 11-i.1 'r j!.......'i-f:';/ i !~:!'l..:i.).i', j",' jUt '11':_1','
f r-- I' .! 1 ,./! " ;., ' j - I' ' I' J If:
T~ . I · L-:--! ~ f . .' . , 1(_......-' J ...', '-;-- ;., ',. __, i '. '... ' i. I . ~,_,. "
j 1:~-L f! I L..' ,~ f,:.' '1, _,nO "1_-' ,4 , ----if;l I! i,: ,t L 1'1,1
'''"'']-,-':-!-:'-';-'i i f "i', I~:) I ir ,-,01 i "....1.....1 ,-q : ';j....!.~
t I ' I...'; 1- /' -~.~-' . I ;, , ". - ,-'-,--: I,' .-1.- i:';'" ',' J ' J
. ,...... -r-- _, .__ _ , , ,
· ';r--''': ..!--y' 'I' J " -, , .i I I ' , ,.' l' Ii: " " ,
. ,; " T J 1 l , " ; ~ , '. J " , . '0 ; . t
J ;~...........'\i"_..J~"L -J-....I'. _...,. ____._ ..
j~.~__.'\.~l"'_ '~ i ~ ;,,\',., ~t/,':; ,,:: I ;j:-; I:! !TT
"".. I .': I, I I ~ . I .. ~ I i ---: ,
I 'I - - ,'-,.---. ' .' , I' J :,:, j, I ; I ,; I ,.
, p~: I :,:;' f .. 'I. -- , I'" ; . " . I ~ I : ~ ',oP\.-: 'j,
- ,.... I I ~ . . , I ' If: )
" ! '1 l' ' i-l:o .".. , II) i, ':.1.. , . .: ,I . 1
I ~. i i. '(, I rti ; ~ , " , J '., 1 I
-, .-~._-~ . , I ~ i: . i . . I I" - I
L "'. 0 _ I'
I ~. ' .. , .
I ",! , . ~ I' , ;: '/ ~ ' f
: ,; " I "'.' I, - j .
l.' J '~: . ...- .' I ; '- t'. ., J' ~ ......
.:-- -',~ ! . , ~ j. i i ;1,. r
. - -,,; . : i r I 1 ~'\. i' ;.. l'
; - . .!"". .... I", '. J
---"l...~ \ 'i I .L - ...... .~ JI ~: .
J - .. ' '. I' , .-'- - i I .--::. '. ' ",' 'j~l" , i'
. . , / 'I I I I .- '." _ .. . I
, ;'--., _.I~,-i.;:' i, I /.1' ; .-- -..-:.... !" i 1.),-1..,.' 1 ':1
---'"""\. :.... '1 J i '; '" -, ,-' , t , I ~ I; ,I
I .. t -. j ., I.... , :0 "f
~~"I:'t.~.~;L' I.. ~'. _ 'I" I .
1 ... . "0 I -0 .". 1 - I
, . i ." ! . , I: :.", ; .J , . '.. 1
-: . -' , . \ : '-'. "
),:'; J ( , : . , - J .
"'f..
ID
fill
o
-
\I)
...
Cl
N
-
'"
'"