ADDENDUM NO. I
TO
Small Works Foster Contract
FOR
Elks Parking Lot Repair
PROJECT NO. CON-2017-28
NOTICE TO PROSPECTIVE BIDDERS
Bid Opening July 18, 2017
NOTICE IS HEREBY. GIVEN that the instructions and requirements of the subject bid are
amended as follows:
ADDITIONS, MODIFICATIONS,AND/OR DELETIONS 10 THE CONTRACT p'ROVISIC NS
1. 1.0 Project Description. is supplemented as follows:
a. The parking lint repair work also includes excavating and backfilling a 1"Acte
trench as indicated on the project planus for electrical conduit to be installed by
City Light.
2. 2,1 Special Provisions Section 1-018.5 Time for Completion;
REPLACE
This project shall be physically completed within 10 working days.
WITH'
This project shall be physically completed within 12 working days.
. 2.1 Special Provisions Section 5-014.5 Payment:
REPLACE
The unit Contract price per square foot for"HMA for pavement Repair Cl.—PG—"shall be full
compensation for all costs Incurred to carry out the requirements of Section 5-04 and this contract
including„ but not limited to, pavement sawing, removal, haul, and disposal of existing asphalt
pavement,excavation, haul,and disposal of existing subgrade material, provision and installation
of soil residual herbicide, haul, placement,and compaction of crush surfacing base course, haul,
placement,compaction of hot mire asphalt„ sealing of pavement joints and moving and resetting
of concrete curb stops..
WITH
Elks Parking Lot Repair Project.No. CON-20117-28
ADDENDUM NO. 1 7/5/2017
The unit Contract price per square foot for~HIVIA for Pavement Repair C|��_,m�| ��U
unmpenaaUmm�vmUcosts incurred t000nyout the requineme�aufSeobnn5-&4undthis contract
including, but not limited to, pavement sawing, removal, haul, and disposal of existing asphalt
pavement,excavation, haul, and disposal of existing subgrade material, excavation, haul and
backfill for electrical conduit to be installed by others, provision and installation of soil residual
herbicide, haul, placement, and compaction of crush surfacing base course, haul, placement,
compaction ofhot mix asphalt, sealing ofpavement joints and moving and resetting ufconcrete
curb stops.
4. 2.1 Special Provisions Section 8-04.5 Payment:
REPLACE
The unit Contract price per liner foot for"Cement Cono. Traffic Curb" shall befull compensation
for all costs incurred to carry out the requirements ofSmcfion 8-04 and this contract including, but
not limited to, removal, haul, and disposal of existing asphalt pavement, excavation, haul, and
disposal of existing subgrade material, provision and installation of root control barrier, haul,
placement, and compaction of crush surfacing base course, provision and installation of
expansion joints, and placement ofcement concrete traffic curb.
WITH
The unit Contract price per liner foot for"Cement Conc. Traffic Curb"shall be full compensation
for all costs incurred to carry out the requirements of Section 8-04 and this contract including, but
not limited to, removal, haul, and disposal of existing asphalt pavement, excavation, haul, and
disposal of existing subgrade material, excavation, haul and backfill for electrical conduit to be
installed by others, provision and installation of root control barrier, haul, placement, and
compaction of crush surfacing base course, provision and installation of expansion joints, and
placement ofcement concrete traffic curb
ADDITIONS MODIFICATIONS, AND/OR DELETIONS TO THE CONTRACT PLANS
Figure 2: Elks Parking Lot `
REPLACE
Figure intheir entirety
WITH
Figure attached to this addendum,
The Bid Opening Date for this project has not been changed from 2:00 p.m. local time on
Tuesday, July 18` 2017. '
This addendum must be acknowledged in the space provided on the Bid Form in the Instructions
to Bidders that is submitted tothe City. Failure tQdnsomay result inthe proposal being rejected
as non-responsive.
Teresa Reed-Jennings, P.E.
City Engineer
Elks Parking Lot Repair Project No. CC}PW-2017-28
ADDENDUM NO. 1 7/5/2017
71
40
co
q
p � lilt :
CL �� <
> �
U -
Ul
r-
LL
r
;w
r
r
f �
l/1 J
r
City of Poil Angeles
K
,.A -t Angeles Record # 0011284
City of Pot
Public Works&Utilities Dept.
Engineering Office
321 E.Fifth Street SMALL WORKS ROSTER
Port Angeles,WA 9S362
TeL 360-4, 17-4541
Fax:360-417-4709 F-1 Request for Bid
Contract
Contract Title: Elks Parking Lot Repair Project Number: CON-2017-28-
THIS CONTRACT is entered into the date last below written between the Cm OF PORT ANGELES, WASHINGTON
("City") AND LAKESIDE INDUSTRIES, INC., WASHINGTON ("Contractor").
1. WORK BY CONTRACTOR
The Contractor shall perform the work as described in Attachment A (Attachment A includes Contractor's
Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents)
that is attached hereto and by this reference is incorporated herein,
2. TERM OF CONTRACT
All work under this Contract is to be completed as indicated (check one :
All work under this Contract is to be completed by this date:
All work under this Contract is to be completed 20 days from the Notice to Proceed. No work is
to be performed prior to written Notice to Proceed by the City. (See attachment A for specific
schedule for work).
The performance period under this Contract commences_-!Q—calendar days after notice to
proceed and ends (10 working days thereafter),
3. PAYMENT
A. The City shall pay the Contractor for the work performed under this contract(check one):
Force Account -Time and material, not to exceed: $
El Force Account- Time and actual expenses incurred, not to exceed:
F1 Force Account- unit prices set forth in the Contractor's bid or quote, not to exceed:
M Firm Fixed Price set forth in Contractor bid or quote in the amount of: $66J 7820
The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance
with and as described in the Attachment A.
The Contractor shall provide and bear the expense of alll equipment, work, and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in this contract and every part thereof, except those indicated to be furnished by the
City of Port Angeles in Attachment A.
B. The Contractor shall maintain time and expense records that may be requested by the City, The Contractor
shall submit invoices to the City for payment for work performed. All invoices must reference the City's contract
number. Invoices shall be in a format acceptable to the City.
C.The City shall pay all invoices from the Contractor within 30 days of receipt of a properly completed invoice.
D. All records and accounts pertaining to this Contract are to be kept available for inspections by representatives
of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon
request.
E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the
(CON-2017-28) Page 1 Rev. 11/28/2016
Contract, the Contractor shall correct or modify the required work to comply with the requirements of this
Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the
Contract Documents.
4. RESPONSIBILITY OF CONTRACTOR
A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and shall
comply with all applicable provisions of federal, state, and local regulations, ordinances, and codes. Contractor
shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all
necessary safeguards for the protection of workers and the public and shall post danger signs warning against
known or unusual hazards,
B. Warranty. Contractor shall be responsible for correcting all defects in workmanship and/or materials discovered
within one year after acceptance of this work. After correcting defect, Contractor shall be responsible for
correcting all defects in workmanship and/or materials in the corrected work for one year after the City accepts
the corrections. The Contractor shall start work to remedy such defects within seven (7)days of mailing notice of
discovery thereof by City and shall complete such work within a reasonable time. In emergencies where damage
may result from delay or where loss of service may result, such corrections may be made by the City, in which
case the cost shall be borne by the Contractor. In the event the Contractor does not accomplish corrections at the
time specified, the work will be otherwise accomplished and the cost of same shall be paid by the Contractor.
C. Damages. Contractor shall be liable for any costs, losses, expenses, or damages including consequential
damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost of
materials and labor expended by the City in making emergency repairs and cost of engineering, inspection, and
supervision by the City. The Contractor shall hold the City harmless from any and all claims that may be made
against the City as a result of any defective work and the Contractor shall defend any such claims at its own
expense. When materials or procedures are not specified in the Contract Document, the City will rely on the
professional judgment of the Contractor to make appropriate selections.
D. Nondiscrimination/Affirmative Action. Contractor agrees not to discriminate against any employee or applicant
for employment or any other persons in the performance of this Contract because of race, creed, color, national
origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local
law or ordinance, except for a bona fide occupational qualification. Contractor agrees to post in conspicuous
places, available to employees and applicants for employment, notices to be provided by Contractor setting forth
the provisions of the nondiscrimination clause,
E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or
services required by the Contractor under this Contract, shall be considered employees of the Contractor only and
not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of those
employees, while so engaged, and all claims made by a third party as consequence of any negligent act or
omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or
rendered herein, shall not be the obligation of the City.
S. COMPLIANCE WITH LAWS
The Contractor shall comply with all federal, state and local laws and regulations applicable to the
work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of
a material provision of this Contract and shall be grounds for cancellation, termination or suspension of the
Contract by the City, in whole or in part, and may result in ineligibility for further work for the City.
6. TERMINATION OF CONTRACT
A. This Contract shall terminate upon satisfactory completion of the work described in Attachment A and final
payment by the City.
B. The City may terminate the Contract and take possession of the premises and all materials thereon and finish
the work by whatever methods it may deem expedient, by giving 10 days written notice to the Contractor, upon
the occurrence of any one or more of the events hereafter specified,
1. The Contractor makes a general assignment for the benefit of its creditors.
(CON-2017-28) Page 2 Rev. 11/28/2016
9 1()Z/8 Z/J I 'A-III (SZ-L 10Z-NOD)
-PejiuoD siqj jo uoqeuiu.ua4
Jo uollejidxa aql amins IIeqS UO!P@S Sl44 JO SUOISIAoid aqi -sai4jed aL14 Aq paletaaq seq
lo5au AlIenlnw u.
JaAlem S141 -uO1IMU!uwaPu1 s'41 40 sasodind a44 ioj Alajos lm:)�1 TS all!i la:)uejnsul leijlsnpuj japun A4!unwwi jo
JaAlem S)OPel4uO:) a salnl!lsuo:) uiajaq Pap!Aoid uoile:)U!uwapul a4l le4l POOISJaPun Alssaidxa pue AlleDU!Dads
Ja4linj si jj -aDua61j6au sjOPelluOD NIP Wa:xa at4i of Aluo aq lie4s japunajaq A4!1!qeil sio:pej4uo:)aLp
1sjaa4unIOA pue Isaakidwa Islei:)Ujo Isia:)io s4! 'A4!D a4l pue jopeiluoD a4l JO aDual5ilbau W
ly ajinmoz) aqj wojj
5ui Insai jo Aq pasne:)A:padoid ol sa6ewep jo suosiad ou
4 Ain[ i Al!poq jo ono 5uisi e sa6ewep jol Al!l!qeiI jo Juana
al-14 Lit 'ua44 'si mDd o4 1:)afqns sn pej4uo:)siq4 4e4l auiwjalap uopipsunf jualadt.um jo:pnoD e pjnoqS -9
,A4!:) aql jo
a:)ua6il6au alas aql Aq pasneo sabewep pue saiinfui joj 4da:)xa IlDej4uo:)siql jo aDueu.tiojiad a4l Om uOlPauuO:)
ui jo jo 4no 6uisije Isaaj Aaujolle 6uipnl:)ui qns jo sassol 'sa6ewep Isaunlui Iswiel:) Ile pue Aue w0ij ssalwie4
sjaalunlOA pue saaklclwa lslepi.4o lsjaDUjo sl! 'A4!:) a44 PIN pue 'Apuwapui 'puajap fle4s JoPeJluo:) a4i 'V
SS31WSVH Q1OH / 1Nor.Lv:)I:IINw3aNI *OT
'pej4uo:) slq4 japun lsa:)ioAul Ile aAoidde pue MaIAW pue
1suoqe:)iunwwoD a4eulpjom 'pawjopad aq of Njom Ile aAoidde pue aasjaAo lleqs pue pej4uo:)s144 japun A4!:) aqj
joj Al!llq!suodsgi Ajewud aAe,q lleqs aauf)isap,gay/s!4 jo 4uaw4jeda(j saminn pue SNJOAA :)Ilqnd a4I JO JoPaj!G aql
I1N3W39VNVW GNV 1NOLLV*dISINIW(3V 1"31N39 '6
-wielo
4-)ns saq!j:)sap AlInj pue wtel:) jeuoil!ppe jo aDilou sapnl,)ui 4uawAed leuU joj wielo q:)ns ssalun 'apew uaaq IOU
seq uctilmildcle qoiqm joj sa6ewep jaq4o Aue joj wield of 4q6ij si! paAlem aAeq oz pawaap aq IIeqs 'juawAed leuU
joj uoi4e:qIdde 6uiNew uodn 'jopeiluo:) -4uawAed leuil joj A4!:) aql Aq leAcudde jo awls aq4 ueq4 jalel 4uaAa ou
ut pue Issol jo asuadxa 'abewep yens jo AjaAoDsip aqj jaije sAep A4j!ql uiql!m AI!D aql of but ijm ui apew aq Ism
peiluoD siql jo a:)uewjouad aql jo ino bulsije sejlxa jo lslso:) 'sasuadxa 'sa6ewep joj Al!:)aql isuie5e wield AuV
SINIVID *a
-japio)anon Aq jo A4!:)aq4 jo Imidde uall!jm joud Inoql!m jo4:)ejluo:) aql Aq uoi4eziue6jo
jo lenp!AIPUI Aue of alqel!eAe apew aq 4ou lleqs pue lei4uapUuo:)jdaal aq ll!m peiluoD siql japun jo4Dej4uo:) aq4
Aq paiqwasse jo paiedaid jo of LIGIA115 sleiia4ew jo quawmop jaqlo jo le4ep 'uoi;tewjojui Is:podai 'spio:)aj AuV 'S
*4sanbai q! uodn A4!D aqj off, papiemjoj aq lleqs pue A4!:) aq4 jo A4jadoid aq4 awmaq lleqs
pej4uoD siql japun /4!D aql Aq p!ed spun] qjjm jopeiluo:)aq4 Aq pajeclaid leiia4ew pue s4uawn:)op paqsiu!jun
jo paqsiu!j Ile 14Dejluo:)siql japun anp uoi4esuadwoo Ile jo A4!:)aq4 Aq jopejquoD aql o4 4uaw4ed uo -V
SIN3wnaoo :10 dIHS'H3NMO 'L
-alqeuoseaj aq lle4s siso:) le6al q-3ns pap!Aoid 'peiluo:) aql japun A4!:) aqj jo slsaialui
pue s4q6ti aqj pa4oid o4 Al!:) aql Aq patin:)ut qsw le6al Ile apnl:)ui lleqs sa6ewep pup asuadxa qonS -A4!:)aql
o4 a:)uajajj!p vans Aed lleqs pue Al!:),aql o4 ajojajaql ajqeq AllelaAaS pup Apuiof aq lleqs /gains siq pup jopej4ucrj
'a:)ueleq p!edun aq4 paa:)xa sa6ewep pue asuadxa s,A4!:)aqj II *jopeiluoD aql of A4!D aqI,Aq p!ed aq lleqs
ssaoxa qDns '4uawAoldwa jo a:)uenui4uoosip jo ajnl!ej 14Dal6au Ilesnjai q:)ns jo uoseaj Aq pauteisris aq Aew 4oiqm
jo A4!:) a44 Aq pauiqsns sa6ewep Ile pue 1)jjom a44 buiqstuil ui A4!:)at4l Aq paimmi asuadxa aq:t spaa:)xa 13ej4ucr)
siq4 japun p!ed aq of junowe aqj jo aDueleq p!edun aqj j! lawll q:)ns IV -uopeupial jo a4ep aqj o4 do 'palnpaqDs
se 'paialdwo:)Al!jopejsiles si „y„ 4u@wq:)e:pV ui paU!-lads Niom a4l I!Iun pej4uo:)siq4 japun anp s4unowe
jaq4jnj Aue aAla--Gl o4 pallqua aq 4ou lleqs jop,ej4uo:) 'A4!:) aqj Aq pa4eupial si peiluOD S1qj 4UaAa a44 Uj
-ioj papel4uOD
N,jom aq4 jo uoilaldwoD punj of alqel!2Ae IOU We spun] Burlejaclo 4uai:)Wns leql saupialap Al!:) a4j_ -j
toe uo S11.14 jo swia4 R41 saielOIA Allefluelsqns
asiwaq4o jo 1jo4ej4siuiwpV:pejIuo:) aql jo suo!pnj4sui spje6ajslp A14ua4s!sjad jol:)ejlucrj -9
-sa!:)ueuipio pue suoi4eIn6aj leiol jo a4e4s Ilejapaj spie6aisip Allua4sisiad jopej4uo:) -S
-joqel jo leij,?42w joj siopeiluo:)qns of juawAed jdwojd aNew ol-sl!ej JOIDeJ4uoD 17
-uiajaq paiinbai alio m aqj a4aidwoo of sl!ej jo sasnjai Alpa4eadai jo A14ua4sisiad jopeiluo:)a4.L -E
'JOPeJ4UO:)@A41 JO/OUaAlOSUI aql jo llnsai e se, paluiodde si jaAiwai V -Z
11. INSURANCE, BONDS, & RETAINAGE
A. The Contractor shall maintain insurance as set forth in Attachment B.
B. If the total bid amount including tax exceeds $35,000, this project will be awarded as a small works roster
contract and payment and performance bonds and retainage will apply in accordance with Washington State law.
A retainage of 5% will then be applicable to this contract, The Contractor shall obtain payment and performance
bonds in accordance with this Contract and all Attachments incorporated herein. Copies of the Bid Security
Transmittal Form, Performance and Payment Bond form, and Escrow Agreement for Retained Percentage form
are available from the Operations Office of Public Works &Utilities (Telephone 360-417-4541). Performance
Bond and Retainage forms are provided in Attachment C.The party to whom the Contract is awarded will be
required to execute the Contract and obtain the Performance and Payment Bond within ten (10)calendar days
from the date the notice of award is delivered to the bidder. Such bonds shall be on the form provided by the
City, specify the name, contact phone, and address of the surety, and shall include a power of attorney
appointing the signatory of the bonds as the person authorized to execute it(them).
12. PREVAILING WAGE
This Contract is subject to Chapters 39.12 and 49.28 RCW, amendments thereto and regulations issued
thereunder, relating to prevailing wages, benefits, and other requirements. Workers shall receive no less than
the prevailing rate of wage. Bidders shall examine and be familiar with such requirements. No claim for
additional compensation will be allowed which is based upon a lack of knowledge or a misunderstanding of any
such requirements by the Contractor or a failure to include in Contractor's price adequate increases in such wages
during the performance of this Contract, The Contractor is advised to consult the Washington State Department
of Labor and Industries to determine the prevailing wages that must be paid.
This public works project is being done in Clallam County. Washington State wage determinations for Clailarn
County Journeymen and Apprentices can be found at:
h oftres swa,00v&njLwaqglookp nfflaoe[ookuo.A-SP—X
kqpasx
The applicable wage determinations to use have an effective on the bid due date.
A copy of the applicable wage rates is available for viewing at the Port Angeles, Public Works and Utilities
Contracts Office, In addition, the City will mail a hard copy of the applicable wage, rates upon request.
For a contract award under$2,500, and in accordance with RCW 39,12.040(2), the Contractor or subcontractor is
authorized to submit a combined Statement Of Intent To Pay Prevailing Wages &Affidavit Of Wages directly to
the City of Port Angeles at final invoicing. Submission shall be made on the form developed by the Washington
State Department of Labor and Industries and available from the City of Port Angeles Public Works and Utilities
Department,
In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or occupation
and such dispute cannot be adjusted by the parties in interest, including labor and management representatives,
the matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his
decision shall be final, conclusive, and binding on all parties involved in the dispute.
13. INTERPRETATION AND VENUE
This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The
venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington,
14, BRANDS OR EQUAL
When a special "brand or equal" is named it shall be construed solely for the purpose,of indicating the standards
of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered,
provided Contractor specifies the brand ands model and submits descriptive literature when available. Any bid
containing a brand which is, not of equal quality, performance, or use specified must be represented as an
alternate and not as an equal, and failure to do so shall be sufficient reason, to disregard the bid.
Page 4 Rev. 11/28/2016
15. INSPECTION AND REJECTION
All goods, services, work, or materials purchased herein are subject inspection and to approval by the City. Any
rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications
of this order, whether held by the City or returned, will be at Contractor's risk and expense.
16. SUBLETTING OR ASSIGNING OF CONTRACTS
Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from
this Contract without the express prior written consent of the other.
17. INDEPENDENT CONTRACTOR
The Contractor is and shall be at all times during the term of this Contract an independent contractor and not
an employee of the City,
11.8. EXTENT OF CONTRACT/MODIFICATION
This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract
between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written
or oral. This contract may be amended, modified or added to only by written instrument property signed by both
parties hereto.
19. SUBCONTRACTOR RESPONSIBILITY
The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each
of its subcontractors to include substantially the same language of this section in each of their subcontracts,
adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to
all subcontractors regardless of tier.
At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets
the following bidder responsibility criteria:
- At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter 18.27
RCW;
- Have a current state unified business identifier number;
- If applicable, have:
1) Industrial insurance coverage for the subcontractor's employees working in Washington as required in
Title 51 RCW;
2) An employment security department number as required in Tile 50 RCW; and
3) A state excise tax registration number as required in Tile 82 RCW;
4) An electrical contractor license, if required by Chapter 19.28 RCW;
5) An elevator contract license, if required by Chapter 70,87 RCW.
- Not be disqualified from bidding on any public works contract under RCW 39,06.010 or 39.12,065(3).
20. COMPENSATION AND METHOD OF PAYMENT.
A. The City shall pay the Contractor for work performed under this Contract as detailed in the bid, as incorporated
in the Contract.
B. Payments for work provided hereunder shall be made following the performance of such work, unless otherwise
permitted by law and approved in writing by the City. No payment shall be made for any work rendered by the
Contractor except as identified and set forth in this Contract.
C. Progress payments shall be based on the timely submittal by the Contractor of the City's standard payment
request form.
(CON-2017-28) Page 5 Rev. 11/28/2016
D. Payments for any alterations in or additions to the work provided under this Contract shall be in accordance with
the Request For Information (RFI) or Construction Change Order (CCO) process as set forth in the Contract
Documents. Following approval of the RFI or CCO, the Contractor shall submit the standard payment request
form(s).
E. The Contractor shall submit payment requests with a completed Application for Payment form, an example of
which is included in Attachment D to this Contract. This form includes a lien, waiver certification and shall be
notarized before submission. Applications for payment not signed or notarized shall be considered incomplete and
ineligible for payment consideration. The City shall initiate authorization for payment after receipt of a satisfactorily
completed payment request form and shall make payment to the Contractor within approximately thirty (30) days
thereafter. Final payment requests shall also include a Certification of Work Completion and Acceptance located in
Attachment D).
IN WITNESS WHEREOF, the parties have executed this Contract as of the date of the last signature affixed
below.
LAKESIDE IN INC CITY 0 T ANGELES
By: By-
%
Printed Name: f";Vo— I 'S Printed Name:.-- C"n
Title: ?rosg—CA ryle'AaCiA�r Title:- ("'A
Date: 1m 14 . 1-7, Date:
Address:
City: A L&LS A q P16 7- APPROVED AS TO FORM:
Tax ID #:
BY:
CITY ATTORNEY
Phone Number: 3 6o - 4 5 t -7103
ATTEST:
BY: 4"CL,
.k--C4- CITY CLERK
(CON-2017-28) Page 6 Rev. 11/28/2016