HomeMy WebLinkAboutAgenda Summary - 07/10/2014PORT ANGELES FORWARD COMMITTEE
MEETING NOTICE for JULY 101 2014 at 7:30 a.m.
PITTIS MEMORIAL CONFERENCE ROOM / CITY HALL
Port Angeles, Washington
AGENDA
1. Call to Order /
2. Roll Call �QP2�V
3. Minutes / Approve: March, April and May Meeting Minutes��
4. Late Items
5
r64
7
New Business
A. Presentation — Waterfront Transportation Improvement Project — Phase II Progress
Ongoing Business
A. 2014 Cruise Schedule
Adjournment
PA FORWARD — COMMITTEE MEMBERS
/Cherie
PORT/ANGELES CITY COUNCIL
Kidd, Chair / '+Patrick Downie, Vice Chair / Alternate: issi Bruch
Cla}?am County Lower Elwha Tribe PortPort Angeles Clall County PUD
✓Jim Jones Frances Charles Jim Hallett VLarry Morris
Alt. Mike Chapman Alt, Sonya Tetnowski Alt, Alt. Doug Nass
Clallam Transit
Wendy Clark-Getzin
Alt.
PA
,fiowntown Assoc.
/Andrew Schwab
Alt. Jan Harbick
Economic Dev. Council
Bill Greenwood
Alt. Matt Fast
rtizen-At-Large
George Bergner
Char
of Commerce
Gubler
Alt. _
Citizen -At -Large
Mike Edwards
Staff: Dan McKeen -"Nathan West - Corey Delikat - Scott Johns
Others: Russ Veenema, Chamber of Commerce
PA Business Assoc.
Kaj Ahlburg
Alt. Ted Simpson
Citizen -At -Large
dark Ohman
Autodesk
Architecture, Engineering & Construction o Topcon
D
I�
OS
• � o
3� v7
C-t/ay-71 fir//i'Y-70?N 1 P
`eHCJ
�� f r
-Av
5j�--"I ry? --7 n-�LJ-OW�t
1
Idd
►�
D IA
a
m m
C`<¢ u-bi Iu CYl 45 _ X
CJ
�o
v�
,,v t ✓/ -�
CY0
0 Cy
s �c-Y,7
Sd!/
woxdnoa�iiddo41-A'i
T ;-) f-; �T f-) ■�
■ ■ PPI
0UP
www.thePPigroup.com
CO -�5� 77-3�rL mAPs
�-D �,foot �,�,�� T
Ole
� c�
Z711, :4o4
0
0
V
N
C
O
IR
00
C
C
M�
al
�`02 �1:5
`�/L"NcL� y'iePsz>P
IVB, D> �Ierwqvo—,
WATERFRONT PARK PROJECT SCOPE OF WORK SUMMARY
Package No. 1 - Beach Creation Project
Currently under construction and to be completed by the end of October. The project involves the
creation of two pocket beaches with drifts sill/revetment armoring structures, some pedestrian path
and landscaping.
Package No. 2 - Trail Creation Project
Actual date will be determined by the approval of Plans and Specifications and authorization to
advertise the project by WSDOT. Anticipated schedule is to advertise in August and begin construction
in September and finish in December.
The project will involve the construction of the trail, installation of the conduit and bases for future
lighting. Some minor landscaping will be included.
Package No. 3 — Lighting and Landscaping
Anticipated advertising would be late August award late September. Because of long lead time on the
light fixtures the actual construction to begin December with final installation of lighting and other
electrical work. Then the final landscaping to be completed in late Winter to early Spring.
WATDJECT
...M_..
Commercial
Terminal
Wind Spires
Circle -Up Plaza
Soroptomist Plaza
History Walk
Captain's Cove
Multi -Use Plaza
Oak Street
Electric Vehicle
Charging Station
Gathering Green
Viewpoint
Waterfront
Discovery Trail
dillow
gr
� WATDJ ECT
HE r1jamm
Continuing th, the 1.8 \
acre Waterfror
• TWO NEW BEACHE \ ,
& NON-MOTORIZE,ATERFRONT
• NATIVE HABITAT ADCKS
& RAIN GARDENS ]CAL INTERPRETIVE
• PLAZA AREAS FOR
& FESTIVALS