Loading...
HomeMy WebLinkAbout5.710 Original Contract ~ " 5./ID ~...: AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE THE CITY OF PORT ANGELES AND HDR Engineering, Inc. 'j' - ,.., RELATING TO: Electric Utility Cost of Service Study THIS AGREEMENT is made and entered into this I~ day of ~ ~J\. ~ , 20aQ, by and between THE CITY OF PORT ANGELES, a non-charter co city of the State of Washington, (hereinafter called the "CITY") and HDR Engineering, Inc. , a Washington Corporation (hereinafter called the "CONSULTANT"). WHEREAS, the CITY desires to develop a revenue requirements and rate study (cost of service) for the electric utility, and WHEREAS, the CITY desires to engage the professional services and assistance of a qualified consulting firm to perform the scope of work as detailed in Exhibit A, and WHEREAS, the CONSULTANT represents that it is in full compliance with the statutes of the State of Washington for professional registration and/or other applicable requirements, and WHEREAS, the CONSULTANT represents that it has the background, experience, and ability to perform the required work in accordance with the standards of the profession, and WHEREAS, the CONSULTANT represents that it will provide qualified personnel and appropriate facilities necessary to accomplish the work; NOW, THEREFORE, in consideration of the above representations and the terms, conditions, covenants and agreements set forth below, the parties hereto agree as follows: SCOPE OF WORK The scope of professional services to be performed and the results to be achieved by the CONSULTANT shall be as detailed in the attached Exhibit A and shall include all services and material necessary to accomplish the work. The CITY may review the CONSULTANT'S work product, and if it is not satisfactory, the CONSULTANT shall make such changes as may be required by the CITY. Such changes shall not constitute "Extra Work" as related in Section XII of this Agreement. The CONSULTANT agrees that all services performed under this Agreement shall be in accordance with the standards of the profession and in compliance with applicable federal, state and local laws. The Scope of Work may be amended upon written approval of both parties. II OWNERSHIP OF DOCUMENTS Upon completion of the work, all documents, exhibits, photographic negatives, or other presentations of the work shall become the property of the CITY for use without restriction and PW 410_01 [ReVised 06/01/04] Page 1 of 6 !' without representation as to suitability for reuse by any other party unless specifically verified or adapted by the CONSULTANT. However, any alteration or reuse of the documents, by the City or by others acting through or on behalf of the City, will be at the City's sole risk. III DESIGNATION OF REPRESENTATIVES Each party shall designate its representatives in writing. The CONSULTANT'S representative shall be subject to the approval of the CITY. IV TIME OF PERFORMANCE The CONSULTANT may begin work upon execution of this Agreement by both parties. The work shall be completed in accordance with the schedule set forth in the attached Exhibit D. V PAYMENT The CITY shall pay the CONSULTANT as set forth in this section of the Agreement. Such payment shall be full compensation for work performed, services rendered, and all labor, materials, supplies, equipment and incidentals necessary to complete the work. A. Payment shall be on the basis of the CONSULTANT'S cost for actual labor, overhead and profit plus CONSULTANT'S direct non-salary reimbursable costs as set forth in the attached Exhibits Band C, respectively. 1. Labor costs shall be based on the hourly rates shown in Exhibit B. General clerical time shall be considered an overhead item, except where specific work items are involved that require one hour or more continued effort, in which case time will be charged on the basis of hours worked. 2. The direct non-salary reimbursable costs are those directly incurred in fulfilling the terms of this Agreement, including, but not limited to, travel, subsistence, telephone, CADD computer, reproduction and printing, supplies and fees of outside services and consultants. B. The CONSULTANT shall submit invoices to the CITY on a monthly basis. Invoices shall detail the work, hours, employee name, and hourly rate; shall itemize with receipts and invoices the non-salary direct costs; shall indicate the specific task or activity in the Scope of Work to which the costs are related; and shall indicate the cumulative total for each task. C. The CITY shall review the invoices and make payment for the percentage of the project that has been completed less the amounts previously paid. D. The CONSULTANT invoices are due and payable within 30 days of receipt. In the event of a disputed billing, only the disputed portion will be withheld from payment. E. Final payment for the balance due to the CONSULTANT will be made upon the completion of the work and acceptance by the CITY. F. Payment for "Extra Work" performed under Section XII of this Agreement shall be as agreed to by the parties in writing. PW 410_01 [ReVised 06/01/04] Page 2 of 6 VI MAXIMUM COMPENSATION ., Unless otherwise agreed to in writing by both parties, the CONSULTANT'S total compensation and reimbursement under this Agreement, including labor, direct non-salary reimbursable costs and outside services, shall not exceed the maximum sum of $29,990.00. VII INDEPENDENT CONTRACTOR STATUS The relation created by this Contract is that of employer-independent contractor. The Contractor is not an employee of the City and is not entitled to the benefits provided by the City to its employees. The Contractor, as an independent contractor, has the authority to control and direct the performance of the details of the services to be provided. The Contractor shall assume full responsibility for payment of all Federal, State, and local taxes or contributions imposed or required, including, but not limited to, unemployment insurance, Social Security, and income tax. VIII EMPLOYMENT Employees of the CONSULTANT, while engaged in the performance of any work or services under this Agreement, shall be considered employees of the CONSULTANT only and not of the CITY, and claims that may arise under the Workman's Compensation Act on behalf of said employees while so engaged, and any and all claims made by a third party as a consequence of any negligent act or omission on the part of the CONSULTANT'S employees while so engaged, on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. In performing this Agreement, the CONSULTANT shall not employ or contract with any CITY employee without the City's written consent. IX NONDISCRIMINATION The CONSULTANT shall conduct its business in a manner, which assures fair, equal and non-discriminatory treatment of all persons, without respect to race, creed or national origin, or other legally protected classification and, in particular: A. The CONSULTANT shall maintain open hiring and employment practices and will welcome applications for employment in all positions, from qualified individuals who are members of minorities protected by federal equal opportunity/affirmative action requirements; and, B. The CONSULTANT shall comply with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of non discriminatory requirements in hiring and employment practices and assuring the service of all persons without discrimination as to any person's race, color, religion, sex, Vietnam era veteran status, disabled veteran condition, physical or mental handicap, or national origin. X SUBCONTRACTS A. The CONSULTANT shall not sublet or assign any of the work covered by this Agreement without the written consent of the CITY. PW 410_01 [ReVised 06/01/04] Page 3 of 6 .. B. In all solicitation either by competitive bidding or negotiation made by the CONSULTANT for work to be performed pursuant to a subcontract, including procurement of materials and equipment, each potential subconsultant or supplier shall be notified by the CONSULTANT of Consultant's obligations under this Agreement, including the nondiscrimination requirements. XI CHANGES IN WORK Other than changes directed by the CITY as set forth in Section I above, either party may request changes in the scope of work. Such changes shall not become part of this Agreement unless and until mutually agreed upon and incorporated herein by written amendments to this Agreement executed by both parties. XII EXTRA WORK The CITY may desire to have the CONSULTANT perform work or render services in connection with this project, in addition to the Scope of Work set forth in Exhibit A and minor revisions to satisfactorily completed work. Such work shall be considered as "Extra Work" and shall be addressed in a written supplement to this Agreement. The CITY shall not be responsible for paying for such extra work unless and until the written supplement is executed by both parties. XIII TERMINATION OF AGREEMENT A. The CITY may terminate this Agreement at any time upon not less than ten (10) days written notice to the CONSULTANT. Written notice will be by certified mail sent to the consultant's designated representative at the address provided by the CONSULTANT. B. In the event this Agreement is terminated prior to the completion of the work, a final payment shall be made to the CONSULTANT, which, when added to any payments previously made, shall compensate the CONSULTANT for the percentage of work completed. C. In the event this Agreement is terminated prior to completion of the work, documents that are the property of the CITY pursuant to Section II above, shall be delivered to and received by the CITY prior to transmittal of final payment to the CONSULTANT. XIV INDEMNIFICATION/HOLD HARMLESS The CONSULTANT agrees to indemnify the CITY from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the CONSULTANT, CONSULTANT employees, affiliated corporations, officers, and subcontractors in connection with the work performed under this Agreement. The CITY agrees to indemnify the CONSULTANT from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the CITY, CITY's employees, or agents in connection with the work performed under this Agreement. PW 410_01 [ReVised 06/01/04] Page 4 of 6 -~ If the negligence or willful misconduct of both CONSULTANT and CITY (or a person identified above for whom each is liable) is a cause of such damage or injury, the loss, cost, or expense shall be shared between the CONSULTANT and the CITY in proportion to their relative degrees of negligence or willful misconduct and the right of indemnity shall apply for such proportion. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the CONSULTANT and the CITY, its officers, officials, employees, and volunteers, the CONSULTANT'S liability hereunder shall be only to the extent of the CONSULTANT'S negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the CONSULTANT'S waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. However, the CONSULTANT expressly reserves its rights as a third person set forth in RCW 51.24.035. XV INSURANCE The CONSULTANT shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the CONSULTANT, its agents, representatives, employees or subcontractors. The CONSULTANT shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and, 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations; broad form property damage; eXPlosion, tI 0'> collapse and underground (XCU) if applicable; and employer's liability; and, . <fjj7c. ~ ; CI~\VV\ 3. Professional Liability insurance with limits no less than $1,000,000 limit per o.ccl::JFlvllC'e. Any payment of deductible or self-insured retention shall be the sole responsibility of th~ft\C:::::- CONSULTANT. Ji-.!.a-- ~ The CITY shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of the endorsement naming the CITY as additional insured shall be attached to the Certificate of Insurance. The CITY reserves the right to review a certified copy of all required insurance policies in the CONSULTANT's office. The CONSULTANT'S insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The CONSULTANT'S insurance shall be primary insurance as respects the CITY, and the PW 410_01 [ReVised 06/01/04] Page 5 of 6 ~ CITY shall be given thirty (30) days prior written notice of any cancellation, suspension or material change in coverage. XVI APPLICABLE LAW This Agreement shall be construed and interpreted in accordance with the laws of the State of Washington, and in the event of dispute the venue of any litigation brought hereunder shall be Clallam County. XVII EXHIBITS AND SIGNATURES This Agreement, including its exhibits, constitutes the entire Agreement, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following exhibits are hereby made a part of this Agreement: Exhibit A - Scope of Work Exhibit B - Consultant Labor Costs/Expenses Exhibit C - Schedule for the Work IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first written above. CONSULTANT ATTEST: / ,- PW 410_01 [Revised 06/01/04] Page 6 of 6 February 6, 2005 Mr. Scott McLain Deputy Director of Power Services City of Port Angeles 321 East Fifth Street P.O. Box 1150 Port Angeles, W A 98362-0217 Dear Mr. McLain: HDR Engineering, Inc. (HDR) is pleased to provide a proposal to the City of Port Angeles (City) to conduct a comprehensive electric rate study. This letter proposal provides our understanding of the services being requested by the City along with our estimated fees to conduct the study. Our firm is highly qualified to perform this work for the City based upon our technical skills and experience in this specialized area of expertise. . The project manager assigned to the project successfully completed the last rate study for the City. Our prior experience and familiarity with the City's current cost allocation methodology and rates will be extremely valuable. . The project team members have assisted numerous utilities in determining the impact to rates of the Bonneville Power Administration wholesale power contract and cost recovery adjustment clauses. HDR has developed financial plans to minimize impacts to customers. . The project team members are actively involved in the Northwest Public Power Association (NWPPA) and presented at the last two NWPPA C.R.A.R.T Conferences on the topic of electric utility rates and unbundling. It has been a pleasure assisting the City with its financial planning and rate setting needs. HDR looks forward to discussing the current proposal with you. Should you have any questions about our approach to this project or any information contained herein, please call me directly. Thank you again for the opportunity to provide technical assistance to the City. Sincerely, ~~ Angie Sanchez Vimoche Senior Financial Manager ASV.dlo 10900 NE 4th Street SUite 1110 Bellevue. WA 98004-5876 Phone (425) 452-8100 Fax (425) 454-4189 wwwhdnnc com Contents 1 Project Scope of Services 1.1 Introduction................... ...........................................................................................1 1.2 Overview of a Comprehensive Rate Study..............................................................1 1.3 Detailed Scope of Services ................ .................................................................... ..2 1.4 Summary............................................... ..................................................... ............ ..5 2 Project Staffing 2.1 Introduction.............................................................................................................. 6 2.2 Project Management and Personnel........ ........................... ...... .................. ..............6 2.3 Summary .... ............................................. ............................................... ..................7 3 Billing Rates/Cost Proposal 3.1 Introduction.............................................................................................................. 8 3.2 Hourly Billing Rates ................................................................................................8 3.3 Summary........... .......................................................... .............. ...............................9 @~ City of Port Angeles Comprehensive Electric Rate Study Proposal 1.1 Introduction HDR Engineering, Inc. (HDR) proposes to conduct a comprehensive electric rate study for the City of Port Angeles (City). A comprehensive electric rate study provides the basis for evaluating the City's financial requirements, while establishing electric rates that are equitable and cost-based. HDR has provided a detailed and comprehensive scope of services based upon discussions with City staff regarding the electric utility rate study needs. 1.2 Overview of a Comprehensive Rate Study A comprehensive rate study is generally comprised of three interrelated analyses: (1) the development of revenue requirements to determine adequate funding levels, (2) a cost of service study designed to understand the cost differences associated with serving various types of customers, and (3) a rate design analysis that establishes a cost-basis for setting rates. Provided below in Table 1-1 is a brief overview of the rate study process. , Table 1-1 Overview of the Rate Study Process Revenue Requirement Analysis Compares the revenue of the City to the expenses to determine the overall adjustment to rates + Cost of Service Analysis Allocates the total revenue requirements to the vanous customer classes of service in a ''fair and equitable" manner. ~ Rate Design Analysis Design rates to yield the revenue requirements and meet the goals and objectives of the City. While Table 1-1 provides an overview ofthe typical components of a comprehensive electric rate study, an important aspect of this study is incorporating and "tailoring" those analytical elements into an overall scope of services that will provide the work products being requested by the City. ID~ City of Port Angeles Comprehensive Electric Rate Study Proposal 1 1.3 Detailed Scope of Services The City has requested a scope of services based upon its current perceived needs, along with its goals and objectives for this study. Provided below is a detailed discussion of our approach to successfully completing a comprehensive electric rate study. Task i-Initial Project Meeting An initial project meeting is important to the overall success of this engagement since it will bring the Consultant and the City's management team and staff together. Since the last rate study completed was not a comprehensive study (no cost of service completed), it will be beneficial to schedule an initial project meeting to discuss any specific issues the study should address and the objectives the City would like for the study to accomplish. A half day meeting with key city team members should be sufficient. Task 2-Data Collection An initial data request which details the data and information required to conduct the study will begin the rate study process. This data and information should be for the most part readily available information (e.g. financial, load, plant assets, statistical, customer, etc.). Given our experience from the last study conducted for the City, HDR is aware of the areas of the study where City specific data was either "insufficient" or "unavailable." Therefore, for this study, we believe we can gather the data more efficiently, knowing those areas where data problems may still exist. Task 3-Revenue Requirement Analysis The development of the revenue requirement analysis is the first major analytical portion of the comprehensive rate study process. This portion of the study entails reviewing the revenue of the utility and comparing them to the expenses of the utility. This task considers the prudent and proper funding for O&M and capital expenditures and determines the need for any rate adjustments over the time period selected. A more detailed discussion of the various steps involved in developing the City's revenue requirements is provided below. STEP 1 - SELECTION OF A TEST PERIOD - The first step in the development of the revenue requirements is the selection of a "test period". For this study, a five year projected test period will be reviewed (e.g. 2006 - 2010). STEP 2 - METHOD OF ACCUMULATING COSTS - A cash basis revenue requirement will be utilized to maintain consistency with the past rate setting methodology. A simply summary of the cash basis approach is provided in Table 2-2. @~ City of Port Angeles Comprehensive Electric Rate Study Proposal 2 Table 2-2 Cash Basis Methodology Cash Basis + O&M Expense + Taxes or Transfer Payments + Capital Projects Financed with Rate Revenues (~Deprec. Exp.) + Debt Service (P+I) Revenue Requirement STEP 3 - ACCUMULATION OF REVENUES AND EXPENSES - Revenue requirements are composed of two major types of costs; operational and capital expenses. The operational costs are generally projected from historical or budgeted costs, using assumed escalation factors, and adjusted for any known changes in operations (e.g. additional personnel, growth/expansion, etc.) A major component of the O&M projection is the projection of power supply costs. The City purchases a majority of its power supply from the Bonneville Power Administration (BP A). Similar to the past rate-setting methodology, power supply costs will be projected on a monthly basis for each year of the test period. A new approach added to the rate study process is to further segregate the power costs into demand, energy and transmission related costs. The final power cost calculation will identify the allocated power costs, by customer class, for each power supply component. Projections for the capital costs (expenditures) will use the City's capital plan. The general approach is to list the annual capital projects, and then determine the various outside funding sources for each of the projects. These outside funding sources may be reserve funds, line extension charges, etc. The balance of projects not funded by the available sources of funds must be financed from a combination of long-term debt and rates. Other financial planning criteria such as meeting the required debt service coverage ratio, maintenance of adequate reserves (cash and rate stabilization) and funding the proper level of annual capital projects will be reviewed. The results of the revenue requirement will identify the proper levels of funding for O&M, debt service, capital needs and incorporate applicable financial planning criteria. The revenue requirement will determine the sufficiency of existing rates and highlight any need for a rate adjustment. If necessary, an implementation plan can be developed to "phase-in" rates over time should it appear that large adjustments are required. Task 4-Cost.of Service Analysis The next steps after the revenue requirements is to allocate the City's costs to the various customer classes of service using the "generally accepted" cost of service methodology used in the electric utility industry. A brief discussion of the major steps associated with the cost of service is provided below. @~ City of Port Angeles Comprehensive Electric Rate Study Proposal 3 Step I-Functionalization of Plant in Service and Expenses. The functionalization of costs is the first manipulation of costs within a cost of service study. Functionalization refers to the arrangement of cost data into its basic cost categories. This is a critical step since the costs will need to be functionalized to meet the level of detail required as an end product. This task is simplified through the City's use of a uniform system of accounts. Step 2-Classijication of Plant in Service and Expenses. The next step in the cost of service process is to classifY these items to their various cost components. Traditionally, classification involves determining whether each specific cost or account item was incurred to meet a consumer's demand, energy, or customer related need. HDR will use its expertise and experience conducting electric rate studies as a starting point for the cost of service analysis. These classifications will be reviewed with the City for appropriateness. Step 3-Review of Classes of Service. A determination will need to be made as to the classes of service that will be used for cost allocation purposes. HDR will review the City's current rate schedules and discuss with City management the need for any additional customer classes of service. As a starting point, the study will review the same classes of service as used in the last analysis (e.g. residential, general service, general service demand, municipal water pumping, primary, non-profit tax deductible, industrial transmission - Daishowa, street lighting and yard lighting). The final classes of service to review will be verified with the City. Step 4-Development of Load Data and Allocation Factors. The development of load data and the subsequent allocation factors is a critical step in the cost of service analysis. Within our approach, we will develop load data on a monthly basis for each class of service or rate schedule for a 12-month period. This level of detail allows for the development and review of alternative cost allocation approaches. The load data information is used to develop customer class usage characteristics that will assist in the equitable allocate of energy and demand costs. Therefore, care will be taken in ensuring that the load data is properly developed and fairly reflects the usage characteristics of each class of service. Step 5-Summary Table and Average Unit Cost. An important aspect of any model is having results and output which is in a format which is both easy to read and understand, yet at the same time comprehensive and useful. Care will be taken to ensure that the summary table of the cost of service and the development of average unit costs (cost based rates) is formatted such that the City will be able to easily utilize the output during the rate design process. Task 5- Rate Design Analysis In designing the retail rate options for the City, the cost of service information will be utilized as a starting point. While the City has not detailed any specific rate structures to be reviewed as a part of this process, HDR will discuss with the City the current rate structures and whether alternative rate structures should be reviewed as a part of this process. The industrial transmission rates may be an area of emphasis that had previously not been reviewed in detail. For each rate design developed, a bill comparison will be developed which shows a comparison between the present bill and the proposed bill at various levels of usage. Bill comparisons are useful in assessing the potential impacts to a wide variety of customers. J-i):{ City of Port Angeles Comprehensive Electric Rate Study Proposal 4 Task 6-Computer Model The rate model developed for the electric utility will be provided to the City at the end of the study. The model will be developed using the spreadsheet program of the City's choice (e.g. Excel, Lotus, etc.). Task 7-Project Meetings/Public Presentations The successful completion of a rate study relies on project meetings at key milestones of the project to review the results and assumptions of the deliverables before moving forward. Four (4) project meetings are anticipated between the City project team and the consultant project team. These meetings have been budgeted in the appropriate task of the fee budget. . Meeting 1 - On-site meeting to review the results of the revenue requirement and cost of service results. . Meeting 2 - Conference call to review edits/changes based on meeting 1 technical review. . Meeting 3 - Conference call to review the rate design alternatives . Meeting 4 - Conference call to review edits/changes to the rate design alternatives based on meeting 3. The City has requested the following presentations: . One (1) meeting with the Utility Advisory Committee (UAC) - This meeting will present the results and findings of the rate study. Policy direction from the Committee will be requested. . One (1) meeting with the City Council - One (1) meeting to present the results and findings of the study. Any additional meetings requested beyond those specified above will be billed on time and materials. Task a-Written Report Upon completion of the rate study analysis, the City will receive five (5) draft reports of its findings from the study. City staff will review the draft report and HDR will incorporate any comments or suggestions from the City into the final report. Fifteen (15) copies of the final written report will be provided to the City. The draft and final report will contain technical exhibits of all the analyses undertaken as a part of this study. 1.4 Summary This section of the proposal has provided a detailed discussion of our approach to complete a comprehensive electric utility rate study. We have attempted to provide as much detail to our approach as reasonably possible. The scope of services may be negotiated to meet the specific needs of the City. ill.\ City of Port Angeles Comprehensive Electric Rate Study Proposal 5 2.1 Introduction A key factor to the success of any project is the experience and expertise of the project team. To be successful in a rate study, the project team must successfully combine a number of people with different backgrounds and abilities into a well-rounded, comprehensive team. We believe that is the strength of our proposed project team for the City's study. 2.2 Project Management and Personnel We have created a small, tightly managed work group for this project. This will provide for more efficient communications between project team members. Angie Sanchez Virnoche, Project Manager - Overall project management will be provided by Angie. As project manager she will be responsible for all aspects of the project, including project schedule and coordination as well as the management of the analytical portions of the study. In addition, she will participate in all project meetings and public presentations. Angie was the project manager on the last electric rate analysis completed for the City. She worked successfully with the City's UAC and City Council to adopt the proposed rates outlined in the financial plan. Joe McGrath, Senior Financial Analyst - Joe will provide the maJonty of the analytical work required of this project. Joe has worked in the public utility field for the past 30 years. During that time he has worked for both public and private utilities as both an employee and consultant primarily in the areas of cost analysis and rates. Joe has recently joined the HDR team. He was previously employed as a product manager for Snohomish County PUD. During his employment at the PUD, he was a lead utility representative in settlement negotiations associated with the Bonneville Power Administration's (BPA) FY06-07 Transmission Business Line (TBL) rate case. He was also the group leader responsible for development of cost profiles for all power resources considered for evaluation. The cost profiles were constructed for all major power resource types as well as conceptual long term BP A contract products. During his time at the PUD Joe was also actively involved as a conservation program analyst and chief salmon recovery cost analyst. Shawn Koorn, Financial Analyst - Shawn will assist in the computer modeling and analytical efforts of the study. Shawn specializes in the area of financial planning, cost of service and rates. He has a strong command of spreadsheet and database programs and has successfully used a number of programs for graphics and presentations. Shawn has recently worked on a number of complex rate studies, including electric rate studies for the cities of Clarksville and Hope Arkansas, and the City of Richland, Washington. I-il..\ City of Port Angeles Comprehensive Electric Rate Study Proposal 6 2.3 Summary This section of our proposal has provided an overview of the individuals that will manage and conduct the study for the City. Each individual has also worked extensively with Boards, management, utility staff and the public to ensure that the goals and objectives of the utility are accomplished in a successful manner. @~ City of Port Angeles Comprehensive Electric Rate Study Proposal 7 Section 3 Billing Rates/Cost Proposal 3.1 Introduction This section of the proposal will provide a detailed discussion of our proposed fee estiqIate for completing the comprehensive electric rate study based upon our understanding of the City's needs. 3.2 Hourly Billing Rates The following hourly billing rates will be utilized for the project. These hourly billing rates are used in the development of our project fee estimates. . Angie Sanchez . Joe McGrath . Shawn Koorn . Clerical $ 148.00/hour $ 142.00/hour $96.00/hour $75.00/hour Based upon the above hourly billing rates, the following labor fee estimates are provided to complete the requested services. Table 3-1 Summary of the Electric Rate Study Estimated Fees Total Labor: Task 1: Task 2: Task 3: Task 4: Task 5: Task 6: Task 7: Task 8: Initial Project Meeting Data Collection Revenue Requirement Analysis Cost of Service Analysis Rate Design Analysis Computer Model Public Presentations (1 UAC, 1 CouncIl) Written Report Grand Total Labor $1,300 265 6,000 8,700 3,000 N/A 3,100 5.100 $27,465 Expenses: Plus: Expenses (report/presentation copies, travel expenses, phone, fax) $2,525 GRAND TOTAL (Labor and Expenses) $29.990 The above fee estimate is based upon the scope of services previously presented. HDR is willing to enter into a "fixed fee" contract based upon a final negotiated scope of services. Additional services requested by the City that are not listed in the scope of services will be provided at the hourly billing rates stated above. All portions of this proposal can be expanded or reduced as fi):{ City of Port Angeles Comprehensive Electric Rate Study Proposal 8 mutually agreed upon in writing by the City and HDR. The above quoted fees will remain in effect until December 31, 2005. 3.3 Summary HDR has provided a detailed discussion regarding the proposed fees for the City's project. HDR is willing to negotiate the scope to attempt to work within the City's constraints. @~ City of Port Angeles Comprehensive Electric Rate Study Proposal 9